10.3.1.8 

Scrap and Waste Disposal (including hazardous waste) 

10.3.1.9 

Operation and Maintenance of ETP  

10.3.1.10  Operation and Maintenance of Incinerator 
10.3.1.11  Transportation of Material by Road Trucks 
10.3.1.12  Maintenance of M&P  
10.3.1.13  Maintenance of Engineering Infrastructure (including buildings and track) 
10.3.1.14  Maintenance of electrical fittings, switches, wiring/cable, etc. 
10.3.1.15  Security of Shed Premises 

 

10.3.2 

Specific Activities for Alco Loco Shed 

 

10.3.2.1  Maintenance and Overhauling of Compressors through OEM 
10.3.2.2  Maintenance and Overhauling of  MEPs through OEM 
10.3.2.3  Maintenance and Overhauling of MCBGs/WW Governors through OEM 
10.3.2.4  Overhauling of PTLOCs through OEM 
10.3.2.5  Reclamation and Overhauling of Bogies  
10.3.2.6  Overhauling of Moatti Filters through OEM 
10.3.2.7  Reclamation and Overhauling of High Efficiency Turbo Super Chargers through 

OEM 

10.3.2.8  Overhauling of Air Brake Valves through OEM 
10.3.2.9  Maintenance and Overhauling of Air Dryers through OEM 

10.3.2.10  Maintenance and Overhauling of CCB through OEM 
10.3.2.11  Maintenance and Overhauling of Traction Alternators through OEM 
10.3.2.12  Maintenance and Overhauling of Traction Motors through OEM 
10.3.2.13  Maintenance and Overhauling of Auxiliary Rotating Machines/Motors through 

OEM 

10.3.2.14  Overhauling of Power Pack of locos 
10.3.2.15  Overhauling of Engine Assemblies (cylinder heads, FIPs, Injectors, Water Pump, 

Lub Oil Pump, etc.) 

10.3.2.16  Overhauling of RTTM blowers through OEM 
10.3.2.17  Overhauling of loco accessories (FTTM blowers, ECC, Right Angle Gear Box, 

Radiator Fan, Radiators, etc.) 

 

10.3.3 

Specific Activities for EMD Loco Shed 

 

10.3.3.1  Maintenance and Overhauling of Compressors through OEM 
10.3.3.2  Maintenance and Overhauling of TCCs through OEM 
10.3.3.3  Maintenance and Overhauling of MCBGs/WW Governors through OEM 
10.3.3.4  Overhauling of Lube Oil Coolers through OEM 
10.3.3.5  Reclamation and Overhauling of Bogies  
10.3.3.6  Reclamation and Overhauling of Turbo super chargers through OEM 
10.3.3.7  Maintenance and Overhauling of Air Dryers through OEM 
10.3.3.8  Maintenance and Overhauling of CCB through OEM 
10.3.3.9  Maintenance and Overhauling of Traction Alternators through OEM 

10.3.3.10  Maintenance and Overhauling of Traction Motors through OEM 
10.3.3.11  Maintenance and Overhauling of Auxiliary Rotating Machines/Motors through 

OEM 

10.3.3.12  Overhauling of Power Pack of locos  
10.3.3.13  Overhauling of Engine Assemblies (Power Assembly, Unit Injectors, Water 

Pump, Lube Oil Pump, etc.) 

10.3.3.14  Overhauling of RTTM blowers through OEM 

Home 

Ch-10 

Draft

Document No: 

Chapter –10   Outsourcing & Contract Management

 

Version No: 1.0-d0 

Date Issued: dd/mm/yyyy 

Document Title: MANUAL MAINTENANCE FOR  DIESEL LOCOMOTIVES 
 

Revised 2013 

Printed: 2015/03/08 

Page 237 of 303

 

 

10.3.3.15  Overhauling of loco accessories (Radiator Fan, Radiators, etc.) 

 

10.4  Contract Management 

 

10.4.1 

Normal contracting is a lengthy and complex process as lot of variables are 
involved in this. Shed officials do not have much expertise in dealing with tenders. 
But, as mentioned above, with proliferation of outsourcing the contracting is bound 
to increase manifold. Hence, it is important that shed officials remain aware of the 
nitty-grities of tendering and contract management. In this regard reference to 
Chapter on “Tenders and Contract Management” of New Mechanical Code, under 
issue, may be made to get more details on this subject. 

 

10.4.2 

At the same time, it is a fact that most of the specific activities of 
maintenance/overhauling of loco assemblies/system through OEM are of Pan- India 
nature. Hence, Rate contract for such maintenance/overhauling shall be finalized by 
Centralized  Agencies like DLW/DLMW/ICF, or other agencies as nominated by 
Board. This will greatly help in ensuring uniformity of rates and other terms and 
conditions. Also, since volume will be higher, better price and terms & conditions 
can be negotiated with the OEM, who will find it easier to deal with one agency for 
contract finalization. 

 

10.4.3 

Such Rate Contracts for AMCs/Overhauling Contract should be for a period of at 
least 2-3 years. 

 

10.4.4 

Such Rate Contracts should be operated by Shed in-charges after getting 
administrative approval and sanction from CME/CMPE (for proposals of total value 
prescribed in the SOP) with  their  associate finance concurrence. Administrative 
approval/sanction by CME/CMPE shall be given duly considering the need for 
operation of rate contract, keeping in view the local conditions. 

 

10.4.5 

Each shed shall have a dedicated “Contract Management Cell” for processing and 
managing the contracts. 

 

10.4.6 

Contracts shall be based on the concept of minimum acceptable performance level 
of availability / reliability.  Suitable penalty clauses shall be built into the contract 
in case of violation / non-achievement of the specified performance level.  

 

10.4.7 

In  the  system  of  service  contract,  the  user  (PU,  a  workshop  or  a  diesel  shed,  for 
example)  enters  into  a  running  contract  with  a  service  provider  who  refurbishes 
sub-assemblies  or  major  parts  for  the  Railways. The  system  is  based  on  statistical 
average  for  refurbishment  rather  than  on  measurements  of  the  work  content  in 
individual  pieces. The  contractor  is  expected  to  carry  out  refurbishment  of 
assemblies  given  to  him  at  fixed  contract  prices  regardless  of  the  actual  work 
content in each piece. A model on these lines exists in DMW which awards works 
contracts for rehabilitation / refurbishing of ABB turbochargers.  
 

10.4.7.1  In such contracts the benefit to the Railways is that it gets sub-assemblies repaired 

at  fixed  prices. It  is  noteworthy  that  the  refurbished  sub-assemblies  come  with 
warranty  as  new. It  is  upto  the  contractor  to  either  refurbish  the  sub-assembly 
thoroughly or in some cases  replace  it with  a  new  one. As far  as Railways  are 
concerned, the quality and reliability is identical in both cases.  

Home 

Ch-10 

Draft

Document No: 

Chapter –10   Outsourcing & Contract Management

 

Version No: 1.0-d0 

Date Issued: dd/mm/yyyy 

Document Title: MANUAL MAINTENANCE FOR  DIESEL LOCOMOTIVES 
 

Revised 2013 

Printed: 2015/03/08 

Page 238 of 303

 

 

 

10.4.7.2  The benefit to the contractor would be that he gets order for an assured quantity 

and often for a period of 2-3 years. He would, therefore, be motivated to invest 
in  equipment  and  systems  in  his  plant. The  OEM  of  the  sub-assembly  is  a 
natural candidate for such contracts though it may not be necessary in all cases. 

 

10.4.8 

Sufficient  unit  exchange  spares  must  be  maintained  by  sheds  so  that  sufficient 
quantities can be offered for overhauling and repair through outsourcing. 

 

10.4.9 

A unified computerized contract management system should be developed for close 
monitoring  and  accounting  of  outsourcing  activity.  There  should  be  online  bill 
submission  and  clearance  for  transparency.  Also  the  performance  and  penalties  of 
the  contractors  can  be  displayed  online  on  diesel  portal  –  so  that  effective 
monitoring can take place. 

 

10.4.10 

All  outsourcing  contracts  should  preferably  be  comprehensive,  including  cost  of 
parts to be changed, both must and condition basis, so that benefit by  reduction in 
inventory and procurement cost of material can be realized. 

 

10.4.11 

The  activities  outsourced  by  various  sheds,  other  than  those  being  operated  on 
Centralized Rate Contracts, should be hosted on a common diesel portal. This will 
help  in  dissemination  of  information  and  comparison  of  prices  for 
maintenance/overhauling of various activities and as well help in quick adoption of 
same by other sheds. This will help in achieving synergy amongst sheds, saving of 
time and efforts of others. 

 

10.4.12 

Outsourcing  activity  is  meant  for  value  addition  and  cost  cutting  in  maintenance. 
Therefore,  the  advantages  accrued  by  such  outsourcing  should  be  documented  for 
monitoring the efficacy of the activity. 

 

10.5  Important Points to be considered in Contract Management 

 

10.5.1 

Proposal Stage: 

 

10.5.1.1  Justification should contain the requirement to outsource and savings to Railways 

by Outsourcing. 

 

10.5.1.2  Proposal should be very clear in scope of work which needs to be outsourced. 

 

10.5.1.3  The cost analysis should be done on the basis of open market rates, minimum 

wages to labour, and previous rates for similar or same contracts. 

 

10.5.1.4  Detailed estimate should contain the costing of each individual item.  

 

10.5.1.5  Sanction of competent authority as per SOP to the detailed estimate. 

 

10.5.1.6  Adding of items not in the estimate at the proposal stage is very difficult once the 

concurrence from Finance and sanction of Executive Officer has been obtained. 

 
 
 

Home 

Ch-10 

Home 

Ch-10 

Draft

Document No: 

Chapter –10   Outsourcing & Contract Management

 

Version No: 1.0-d0 

Date Issued: dd/mm/yyyy 

Document Title: MANUAL MAINTENANCE FOR  DIESEL LOCOMOTIVES 
 

Revised 2013 

Printed: 2015/03/08 

Page 239 of 303

 

 

10.5.2 

Tendering Stage: 

 

10.5.2.1 

Prepare Tender schedule carefully 

 

a)  Think how would you carry out the work if the contract was given to you as a 

private person. The exact step by step procedure for carrying out any activity in 
the contract should be clearly understood and preferably written down in 
background papers. The scope of work for contractor should then be clearly 
defined in the tender document. 
 

b)  Think what is the expectation of Railways from the contract and what assistance 

will be given by Railways and what items, manpower, etc., will be under the 
scope of contractor. It should be clearly specified whether the supporting 
infrastructure required, supply of consumables, any other facility/material 
required will fall in scope of contractor or Railways? If the onus is on Railways 
to supply/provide; cost (if any) and method of cost recovery should be clearly 
mentioned. 
 

c)  Ideally, General Conditions of Contract should be left unchanged/untampered.  

 

10.5.2.2  Specific requirements for a particular contract such as what work exactly is to be 

done, how it should be done, how the resources will be arranged, how the 
measurement of work will be done, what action can be taken by Railways in 
case of default, etc., should be listed out in detail under Special Conditions of 
Contract and added to the GCC separately. 

 

10.5.2.3  The final result expected should  be clearly mentioned. It should also be clearly 

mentioned: 

a)  Who will measure the result? (i.e. nominate with clear designation at suitable 

level- SSE, SE, JE etc)  
 

b)  Where and when will the results be measured? (i.e. location and at what stage of 

work completion) 
 

c)   How will the results be measured? (i.e. what are the tools/equipments required 

for testing the quality as well as quantity of the work done and what procedure 
will be followed?) 
 

d)  What shall be acceptable limit in terms of quality? (Once method of measuring 

quality is defined, the limits for accepting/rejecting the work should also be 
mentioned to avoid any ambiguity) 

 

10.5.2.4  In most cases, a certain methodology/procedure for carrying out an activity is 

desired. In such cases, the methodology/procedure to be followed by the 
contractor for the particular activity should be clearly spelt out in the tender 
schedule. 

 

10.5.2.5  Once procedure to be followed by contractor is laid down, verification is required 

to ensure that no shortcuts are being adopted by the contractor. To verify this, 
the following aspects should be clearly spelt out in tender schedule: 

 