INDIAN RAILWAYS MAINTENANCE MANUAL FOR DIESEL LOCOMOTIVES - PART 43

 

  Index      Engines     INDIAN RAILWAYS MAINTENANCE MANUAL FOR DIESEL LOCOMOTIVES 2013 year

 

Search            

 

 

 

 

 

 

 

 

 

Content   ..  41  42  43  44   ..

 

 

INDIAN RAILWAYS MAINTENANCE MANUAL FOR DIESEL LOCOMOTIVES - PART 43

 

 

Document No: 

Chapter –8  Fuel & Lubricants 

 

Version No: 1.0-d0 

Date Issued: dd/mm/yyyy 

Document Title: MANUAL MAINTENANCE FOR  DIESEL LOCOMOTIVES 
 

Revised 2013 

Printed: 2015/03/08 

Page 164 of 303

 

 

 

8.7.8.2  Automatic sensing of the fuel level in the loco tank should be done through the 

ultrasonic fuel level sensor fitted in the loco.  

 

8.7.8.3  Depending on the fuel level in the loco tank and level required to be maintained, 

calculation should be done by the console and accordingly fuelling pump started 
and cut off, after completion of the filling of the required amount of fuel.  

 

8.7.8.4  The fuelling pumps should have facility of remote on an off for facilitating 

automatic fuelling in the locos.  

 

8.7.8.5  Storage tanks should have the facility of automatic measurement of fuel level, 

accordingly it can be decided as to from which storage tank how much fuelling 
can be done. The level so recorded should also be periodically relayed to a 
central server for record and viewing by the division and HQ officials. 

 

8.7.8.6  Fuel meters should also have the facility of automatic relaying of the amount of 

fuel filled up in the locos. 

 

8.7.8.7  The amount of fuel filled in the loco and other details should be automatically 

relayed to the  central server for record and viewing by various divisional and 
HQ officials.  

 

8.8 

Periodicity of Maintenance of RCD installation: Summary of periodicity of 
maintenance of various parts of RCD is as under:- 
 

SN 

Activity 

Frequency 

Cleaning of Storage 
Tanks 

Every 5 years (4 
years, if need be) 

Para 3.4 of Rly. Board’s JPO of 
Feb’10 

Painting of Storage tanks  Every 5 years (4 

years, if need be) 

Para 3.4 of Rly. Board’s JPO of 
Feb’10 

Changing of Flowmeters 

15 years after 
installation 

or                    

dispensing of 4 
lakh kl, whichever 
is earlier. 

Para 5.3 of Rly. Board’s JPO of 
Feb’10 

Calibration of 
flowmeters 

Once in a year by  
Oil company 

Para 5.3 of Rly. Board’s JPO of 
Feb’10 

Joint Inspection with Oil 
Firms’s representative 

Once  in a Quarter 

As per agreement between the 
Railways and Oil Firms 

 

8.9 

Security and Safety of RCDs: 
   

8.9.1 

RCD holds precious and inflammable commodity. Hence, it is very important that 
proper security at each RCD is provided. As per Standing Order No. 88 of Rly. 
Board, communicated vide letter no.2003/Sec/(E)/PO-2/5 dt 13th May 2009, RPF  
should provide security at RCDs, as it falls under core activity (it does specifically 
state so but since it has not been mentioned as one of the non-core areas, it is 
inferred that it is core activity). But, later on  this Standing order has been held in 
abeyance by Board. Nonetheless, Railways to ensure that security at RCDs is 
provided at the earliest. 

Home 

Ch-8 

Draft

Document No: 

Chapter –8  Fuel & Lubricants 

 

Version No: 1.0-d0 

Date Issued: dd/mm/yyyy 

Document Title: MANUAL MAINTENANCE FOR  DIESEL LOCOMOTIVES 
 

Revised 2013 

Printed: 2015/03/08 

Page 165 of 303

 

 

 

8.9.2 

In terms of Railway Board’s letter No. 2009/Fuel/282/19 dt. 30/11/2009 all 
Railways should ensure that a current valid clearance of the Chief Controller of 
Explosives, Nagpur is obtained for every RCD duly meeting all conditions and a 
copy is kept in the RCDs, without fail.  

 

8.9.3 

The inherent danger of fire around a diesel fuelling installation is due to the 
formation of inflammable vapours resulting from the leakage or spillage of oil. Fire 
prevention measures must, therefore, curtail oil leakage and avoid practices which 
may allow vapours to form or collect. The possibilities of ignition can be minimized 
by ensuring that  the equipment is in good condition and that the operating 
instructions are worked to properly. Proper fire fighting facilities should be 
available so that in case of a fire breaking out, it is possible to combat it. 

 

8.9.4 

The following will help to minimize oil leakage and spillage and, thus, safeguard 
against fire hazards: 

 

a.   Welded pipe joints in fuel lines reduce oil leakage. 

 

b.  Air vents should terminate in open atmosphere outside the pump house. 

 

c.   Pressure relief valves should be piped back into the storage  system and not 

discharged to atmosphere.  
 

d.  Fuel pumps should be equipped with proper seals to safeguard against fuel oil 

leakages. 
 

e.   Areas around fuel installations should be paved so that if any oil is spilled, it is 

possible to clean it easily. Concrete paved platform with proper slope to provide 
quick drainage into sumps or drains is recommended. 
 

f.   Naked lights should never be brought near the tanks even when they are empty. 

Oil rags and waste easily catch fire and therefore should not be allowed to 
accumulate near the fuel installation area.  

 

8.9.5 

Exposure to extremes of temperatures would result in evaporation and loss of fuel, 
besides involving risk of fire. Leakage also has the same harmful effects. Tanks 
containing fuels should, wherever possible, be shaded from direct sun light 
otherwise wide temperature variations will increase the chances of water 
condensation within the tanks. When fuel becomes hot, it expands and forces some 
of the air above it to go out of the tank. On cooling, the air and water vapour are 
drawn into the tank resulting in water contamination of fuel. 

 

8.9.6 

In terms of Railway Board’s Lr.No.2009/Fuel/282/19  Dt. 09-11-2009 Railways 
should ensure following fire fighting facilities at fuelling installations : 

 

Items 

Major installation 

Medium 

Installation 

Minor 

Installation 

DCP fire 
extinguishers- 70 Kg 

4 nos. around 
storage tank 

4 nos. around 
storage tank 

4 nos. around 
pump room 
Generator Room 

Home 

Ch-8 

Draft

Document No: 

Chapter –8  Fuel & Lubricants 

 

Version No: 1.0-d0 

Date Issued: dd/mm/yyyy 

Document Title: MANUAL MAINTENANCE FOR  DIESEL LOCOMOTIVES 
 

Revised 2013 

Printed: 2015/03/08 

Page 166 of 303

 

 

Items 

Major installation 

Medium 

Installation 

Minor 

Installation 

DCP fire 
extinguishers- 10 Kg 

8 nos. around 
pump room 
Generator Room 

8 nos. around 
pump room 
Generator Room 

-- 

DCP fire 
extinguishers- 5 Kg 

1 No. at each 
fuelling point 

1 No. at each 
fuelling point  

1 No. at each 
fuelling point  

CO2 fire 
extinguishers- 5 Kg 

3 Nos. for tackling 
computer and 
electrical fires 

2 Nos. for tackling 
computer and 
electrical fires 

1 No. for tackling 
computer and 
electrical fires 

Sand Buckets 

8 Nos. 

8 Nos. 

4 Nos. 

Hand Operated Siren 
(dynamically 
balanced) with range 
of 1.5 Kms 

01  

01 

01 

 

8.9.7 

Proper mechanism of maintenance of the above-mentioned fire fighting facilities 
should be in place in each RCD. 

 
B. 

 

Procedure for Accountal of Diesel Fuel  

8.10  Indenting  

 

8.10.1 

Each Railway will work out a time table so that the indent is prepared and 
submitted in time.  

 

8.10.2 

Division/Diesel Shed should work out the requirements of HSD oil for the RCDs in 
their jurisdiction. These should take into account anticipated variation in the train 
operation during the next financial year. Arrangement for new/additional storage 
capacity (normally being 15 days consumption plus lead time) / pumping should be 
reviewed and specific proposals along with the requirements of next financial year 
sent to fuel branch. Fuel branch will forward the requirement of HSD oil and 
new/additional storage capacity along with details of direct demanding officers to 
Controller of Stores for procurement. In case of placement of rate/running 
contracts, COS will advise fuel branch of the Railway and all Divisions/Diesel 
Sheds and RCDs in-charges.  

 
 

For rate contracts, supply orders shall be placed by COS. For running contracts 
direct demanding officers will place orders on suppliers. A fresh order should be 
placed when balance quantity due on a supply order is reduced to two months 
consumption.  

 
 

Fuel branch should control and regulate day to day supply of HSD oil by tank 
wagons or by RTTs. A close watch on the trend of consumption vis-à-vis 
rate/running contract should be kept and amendments called for through COS, as 
and when necessary. 

Home 

Ch-8 

Draft

Document No: 

Chapter –8  Fuel & Lubricants 

 

Version No: 1.0-d0 

Date Issued: dd/mm/yyyy 

Document Title: MANUAL MAINTENANCE FOR  DIESEL LOCOMOTIVES 
 

Revised 2013 

Printed: 2015/03/08 

Page 167 of 303

 

 

 

8.11  Loading advice and Railway receipt: 

 

8.11.1 

Loading advices should be sent by suppliers by postal dak within 24 hours of 
loading  to the consignee. These should be serially numbered for each consignee 
separately and should contain the following particulars for each loading day : 

a.  Tank wagon number/lorry number 
b.  Carrying capacity 
c.  Net quantity loaded in liters 
d.  Date of loading 
e.  Loading station code 

Copies of the loading advice will be simultaneously dispatched by postal dak to the 
FA&CAO and fuel branch 

 

8.11.2 

The RR should be sent to consignee immediately by the supplier to enable the 
former to take delivery.  

 

8.11.3 

The supplier will prepare a statement in Form No.1 in respect of each bill and send 
two copies to consignee and one copy to FA&CAO. The form should be serially 
numbered for each consignee and this serial number should be indicated in the bills 
sent for payment.  

 

8.12  Pocket Card Labels and Tie-on-labels: 

 

8.12.1 

It shall be the responsibility of the base stations to provide pocket card-labels and 
tie-on-labels on both sides of tank wagons showing: 

a.  Tank wagon No. 
b.  Full booking particulars. 
c.  Supplier’s name 
d.  Consignee’s name and station booked to  
e.  Quantity loaded in litres as per RR at temperature ------ 

0

C and dip 

measurement in cm. 

In a case of short receipt, these should be preserved until the cases have been resolved. 

 

8.13  Receipt  and Accountal in the RCDs: 

 

8.13.1 

On arrival of HSD Tank wagon(s) at the destination, the same will be received by 
the official-in-charge of the RCD and in case there is any evidence of the seals 
having been disturbed/ tampered with, the delivery should be effected in the 
presence of the traffic and RPF representative (if posted), Dip measurements taken 
and damage deficiencies message, if found,  issued in accordance with the IRCA 
rules in vogue. Whenever shortages are found, these will be recorded in Form No.2 
and should be pursued with the Commercial Branch through FA&CAO (Stores). 
The provision of section 76C of Indian Railways Act for delivery of goods at 
sidings will also be applicable.  

 

8.13.2 

For short receipts detected in seals intact tank wagons booked under “Said to 
Contain” RRs covered by modified transit risk clause, claims for the cost of HSD 
oil received short with proportionate freight charges should invariably be advised to 
the Company within 30 days of the receipt of the tank wagons. A copy of this claim 
should be endorsed to the CCM (Claims) with the request that if supplying oil 
Company does not issue credit notes for the claims preferred within 15 days of 
preferring the claims, the same should be recovered from supplying oil Company’s 
subsequent bills by FA&CAO (Stores). 

 

Home 

Ch-8 

Draft

 

 

 

 

 

 

 

Content   ..  41  42  43  44   ..