INDIAN RAILWAYS MAINTENANCE MANUAL FOR DIESEL LOCOMOTIVES - PART 18

 

  Index      Engines     INDIAN RAILWAYS MAINTENANCE MANUAL FOR DIESEL LOCOMOTIVES 2013 year

 

Search            

 

 

 

 

 

 

 

 

 

Content   ..  16  17  18  19   ..

 

 

INDIAN RAILWAYS MAINTENANCE MANUAL FOR DIESEL LOCOMOTIVES - PART 18

 

 

Document No: 

Chapter –3 Infra. Facilities of Diesel Loco Shed

 

Version No: 1.0-d0 

Date Issued: dd/mm/yyyy 

Document Title: MANUAL MAINTENANCE FOR  DIESEL LOCOMOTIVES 
 

Revised 2013 

Printed: 2015/03/08 

Page 64 of 303

 

 

Pre Engineered Buildings 

Conventional Structural Steel 

 
Overall Price 
Price per square meter may be as much as 
40% lower than conventional steel. 

Overall Price 
High price per square meter. 

Sourcing & Co-ordination 
Building is supplied complete with cladding and 
all accessories, including erection if required, all 
from one source of supply. 

Sourcing & Co-ordination 
Sourcing of different material has to be done 
from different sources. 

Changes 
Very flexible, tailor made, accepts changes and 
revisions easily. One supplier to coordinate 
changes. Easily accommodated at any stage 
since this is made up of standard raw materials. 

Changes 
Changes, revisions & additions can be difficult 
due to extensive re-design and co-ordination 
among suppliers and sub-contractors. 
Substitutions of hot rolled sections are 
infrequently rolled, time consuming and also 
very expensive if it is already shipped for 
fabrication. 

Performance 
All components have been specified and 
designed specifically to act together as a system 
for maximum efficiency, precise fit up, and 
performance in the field. The experience with 
similar buildings, in actual field conditions 
worldwide has resulted in design improvements 
over time, which allow dependable prediction of 
performance. 

Performance 
Components are designed in general for 
possible use in many alternative 
configurations. Design and detailing errors are 
possible in assembling diverse components 
into unique buildings. Each building design is 
unique, so prediction of how components will 
perform together is uncertain. Materials, which 
have performed well in some climates, may not 
in other environments. 

Seismic 
Low-weight flexible frames offer high seismic 
resistance 

Seismic 
Rigid heavy structures do not perform well in 
seismic zones. 

Functional Versatility 
Larger spans & longer bay spacing. Easily re-
locatable & reusable as joints can be 
dismantled. 

Functional Versatility 
Restriction on larger spans & longer bay 
spacing. Can’t be relocated as all joints are 
rigid. 

 

Home 

Ch-3 

Draft

Document No: 

Chapter –3 Infra. Facilities of Diesel Loco Shed

 

Version No: 1.0-d0 

Date Issued: dd/mm/yyyy 

Document Title: MANUAL MAINTENANCE FOR  DIESEL LOCOMOTIVES 
 

Revised 2013 

Printed: 2015/03/08 

Page 65 of 303

 

 

Annexure 3.2

 

 

 
 

Home 

Ch-3 

Draft

Document No: 

Chapter –3 Infra. Facilities of Diesel Loco Shed

 

Version No: 1.0-d0 

Date Issued: dd/mm/yyyy 

Document Title: MANUAL MAINTENANCE FOR  DIESEL LOCOMOTIVES 
 

Revised 2013 

Printed: 2015/03/08 

Page 66 of 303

 

 

 

Annexure 3.3 

4

50

m

m

X7

50

m

m

(D

EE

P)

 E

LE

C

T

R

IC

AL

 

C

A

B

LE

 T

RE

NC

IN

 T

W

O

 T

IE

T

O

 B

E

 CO

V

E

RE

W

IT

H

 M

.S

. CHE

CK

E

RE

D

PL

AT

ES

 O

F

 SU

IT

AB

L

E

 S

IZ

E

S

E

CT

IO

N B

 -

 B

13500

10000

2900

5

 T

O

N

N

E  C

AP

AC

IT

Y 2

 N

os.

  E

.O

.T

 C

R

A

N

E

T

U

R

BO

 V

EN

T

IL

A

T

O

R

M

A

IN

T

E

N

A

NCE

 RO

O

M

350

6000

350

2900

900

4200

M

A

IN

T

E

N

A

NCE

 RO

O

M

O

N

 FI

R

S

T FL

O

O

R

900

900

1500

350

350

350

3200

3400

500

600

790

1200

ST

EE

L

 CO

LU

M

N

ST

EE

L

 CO

LU

M

N

3200

3400

500

600

790

400

DRA

INA

G

E

 /

W

AT

ER

 PI

P

E

LI

N

E

W

IT

 T

A

P

P

ING

S

1700

400

400

C

A

W

AL

K -

3

400

DRA

INA

G

E

 /

W

AT

ER

 PI

P

E

LI

N

E

W

IT

 T

A

P

P

ING

S

1700

400

400

C

A

W

AL

K -

3

C

.L

. OF

 T

R

A

C

K

C

.L

. OF

 T

R

A

C

K

2

7000

3950

3350

5150

3350

5100

3350

3950

2

50

0

(MI

N

.)

2

50

0

(MI

N

.)

1200

R

A

IL

 L

EVEL

F

L

O

O

R

 L

EVEL

1200

C

.L

. OF

 T

R

A

C

K

1200

ST

EE

L

 CO

LU

M

N

ST

EE

L

 CO

LU

M

N

3200

3400

500

600

790

1200

ST

EE

L

 CO

LU

M

N

ST

EE

L

 CO

LU

M

N

Sample Drawing of a Three Tier Typical Shed 

 

Draft

Document No: 

Chapter –3 Infra. Facilities of Diesel Loco Shed

 

Version No: 1.0-d0 

Date Issued: dd/mm/yyyy 

Document Title: MANUAL MAINTENANCE FOR  DIESEL LOCOMOTIVES 
 

Revised 2013 

Printed: 2015/03/08 

Page 67 of 303

 

 

 

Annexure 3.4 

 

 

 
 

 

 

PHOTOGRAPH OF EPOXY FLOORING 

Home 

Ch-3 

Home 

Ch-3 

Draft

 

 

 

 

 

 

 

Content   ..  16  17  18  19   ..