|
|
|
Document No: Chapter –3 Infra. Facilities of Diesel Loco Shed
Version No: 1.0-d0 Date Issued: dd/mm/yyyy Document Title: MANUAL MAINTENANCE FOR DIESEL LOCOMOTIVES Revised 2013 Printed: 2015/03/08 Page 60 of 303
3.15 Governor, Instruments and Brake Valve Repair Rooms:
3.15.1 Separate rooms should be provided for repair and testing of engine governor, instruments and gauges and brake valves. purpose, these rooms should be made Air-conditioned. Laboratories:
3.16.1 In every diesel locos maintenance shed, it is essential to have a well equipped laboratory to exercise control on lubricating oil, fuel oil and cooling water. The described in chapters 8(a) and 8(b), respectively. Some of these tests, including Cleaning and Washing:
3.17.1 Keeping the equipment clean goes a long way in ensuring trouble free operation and long equipment life. Suitable cleaning and washing facilities are, therefore, any inspection or repair can be undertaken. Degreasing and cleaning facilities turbocharger after coolers, oil heat exchangers, etc.
3.18 Shed offices:
3.18.1 The offices for Supervisors should be located near their place of work. This ensures effective and constant supervision of the repair work. locos are inspected and prepared for dispatch. room. sized and architecturally designed.
Home Ch-3 Draft |