Document No: Chapter –3 Infra. Facilities of Diesel Loco Shed
Version No: 1.0-d0 Date Issued: dd/mm/yyyy Document Title: MANUAL MAINTENANCE FOR DIESEL LOCOMOTIVES Revised 2013 Printed: 2015/03/08 Page 36 of 303
2.12.3 The Divisional Power Control Organization should be well equipped and provided with suitable accommodation to ensure un-disturbed working. There should be 2.12.4 It is necessary to provide adequate strength of Loco Inspectors on divisions to monitor the working of crews on line. The strength should be related to the number
2.12.4.1 Effectively monitor performance of the crew.
2.12.4.2 Investigate avoidable diesel loco failure due to mismanagement of crews.
2.12.4.3 Educate diesel crews in trouble shooting and fuel economy.
2.12.5 Supervisor (Running) in Diesel Sheds: SSE/SE (running) working under Sr.DME (Diesel) in operating division will look after operational aspect of diesel locos in
2.12.5.1 Maintaining close liaison with the Central and Divisional Power Control Organizations. 2.12.5.2 Maintain 4 hourly position of diesel outage.
2.12.5.3 Maintain minor schedule forecast register: trip, monthly, other higher schedules.
2.12.5.4 Keep record of important features like diesel loco failures, detentions, etc.
2.12.5.5 Check speedometer & VCD records.
2.12.5.6 Monitor issue of Technical Instructions to crew lobbies (called by different names: Shed Notice Book, Shed Order Book, etc.) 2.12.5.7 Trial Loco Register.
2.12.5.8 Supervisor (Running)’s relief Dairy containing important instructions to be followed by the SE/JE (Running) in shift duties
2.13 Power Plan: Power plan provides the information for planning the goods train on a division for each section.
2.13.1 Procedure for issue of a power plan: Every six months, the running of goods traffic on a Railway is reviewed for each division. Data of actual number of goods Home Ch-2 Draft |