Westfalia. Testing repair electrical manual - part 70

 

  Index      Westfalia     Westfalia (903.662) testing repair electrical manual in english

 

Search            copyright infringement  

 

 

 

 

 

 

 

 

 

Content   ..  68  69  70  71   ..

 

 

Westfalia. Testing repair electrical manual - part 70

 

 

AS86.00-Z-0004-
01A

Risk of explosion caused by
ignition of gas exiting the lines of
the vehicle's gas system. Risk of
injury
 caused by burns to skin
and eyes.

Before commencing any
work, ensure that all sources
of ignition have been
removed and that the gas
system is completely emptied
if necessary. Wear protective
clothing.

 Danger!

Potential risks 

Risk of explosion 
If the vehicle's gas system leaks, there is the chance that the gas may
accidentally ignite in the vehicle or in closed rooms, causing an
explosion. 

Risk of injury 
Accidental ignition of the exiting gas can cause burns to skin and eyes.

 

 

 

D00.00-1132-01

Safety precautions/instructions 
It must be ensured that all sources of ignition are
removed from the area before commencing work. 

- Before commencing with any repair work on the
gas tank, it must be completely emptied as per the
legal requirements. 
- Before commencing any work on the lines of the
gas system, all shutoff valves must be closed as
per the legal requirements. 
- No open flames or smoking in the work area. 
- Avoid the formation of sparks (use spark-
inhibiting tools). 
- Keep all combustible materials and objects away
from equipment 
- Do not use any flammable substances to lubricate
threads and valves (oils, grease, etc.). 
- Wear protective clothing, safety gloves and safety
glasses 

 

- Keep fire extinguishing devices at hand. 
- Perform a fire check of the surroundings after
work has carried out. 
- Never perform work in closed rooms. 
- All work involving assembly and disassembly and
all leak tests may only be performed by authorized
personnel. 
- Workshop personnel must demonstrate their
knowledge in accordance with the OSHA
requirements (Occupational Safety and Health
Administration) and be able to act accordingly. 
- All work involving assembly and disassembly and
all leak tests must be performed as per the relevant
regulations and requirements of the ANSI, NFPA
and UL standards (e.g. UL No. 1075 and NFPA No.
58) 

Due to the fact that explosions can occur when the
gas system leaks, a leak test must be performed
before restarting the system after repairs have
been done in which the pipes and lines of the gas
system have been opened. 

First aid measures: 
Move the victim out of the risk area. 
If eyes are affected immediately and thoroughly
wash out eyes (making sure that eye lids are open)
with plenty of clean water. 
If skin is affected drench with water. The victim
should remain calm and be kept warm.

 

If inhaled, and if drowsiness, headaches, visual
problems or irritation of the eyes, nose and throat
occur, remove victim to fresh air. Place
unconscious victims in the recovery position and
check for breathing and pulse. If there is no
breathing or insufficient breathing, the preferable
action is to perform mouth-to-mouth resuscitation.
If necessary, carry out CPR. 

 If any of these symptoms occur, consult a

physician immediately.

AR86.30-D-0065-
01A

Check fresh water system for
leakage in area of boiler/sink
combination

 

 

1 Check water tap of boiler/sink
combination (1) for leakage 

2 Check hose connection on
water tap of boiler/sink
combination (1) for leakage 

3 Check hose connections on rear
distributor element of boiler/sink
combination (1) for leakage.

 

 

 

D86.30-0108-06

AR86.30-D-0065-
02A

Check fresh water system for
leakage in area of fresh water
tank

 

 

1 Check hose connection on fresh
water tank (2) for leakage.

 

 

 

D86.30-0113-06

AR86.30-D-0065-
03A

Check fresh water system for
leakage in area of wash room

 

 

1 Check hose connections on
water tap (3) in wash room for
leakage. 

2 Check water tap (3) in wash
room for leakage. 

3 Check hose connection on toilet
(4) for leakage.

 

 

 

D86.30-0105-06

AR86.30-D-0065-
04A

Check fresh water system for
leakage in rear area of vehicle

 

 

D86.30-0117-09

1 Check hose connections on hot water boiler (5)
for leakage. 

2 Check hose connections on system drain valve
(6) for leakage. 

3 Check hose connections on distributor element in
wardrobe (7) for leakage.

 

4 Check pressure reducing valve (8) on city water
connecting pipes for leakage. 

5 Check hose connection on pressure reducing
valve (8) for leakage. 

6 Check hose connections on distributor element
behind pressure reducing valve (8) for leakage.

AR86.60-D-0009-
01A

Prepare wash basin and shower
tray for installation

 

 

D86.60-0067-08

1 Area

 

2 Area

1 Remove sealant from wash basin in marked area
(1) 

2 Degrease marked area (1) with suitable cleaner 

3.1 Remove glue from shower tray in marked area
(2)

 

 Perform work only when shower tray is installed 

4.1 Degrease marked area (2) with suitable cleaner

 Perform work only when shower tray is installed

D86.60-0070-08

Shown on wash basin

 

3 Adhesive tape

 

4 Area

5 Mask area (4) on top of wash basin with masking  

tape (3) 

6 Slightly roughen gluing surface in area (4) with
sand paper 

7 Degrease gluing surface in area (4) with suitable
cleaner. 

 Allow cleaner to air-dry cleaner according to

manufacturer's specifications, to prevent poor
adhesion 

8 Apply suitable primer to gluing surface in area (4)

 Allow cleaner to air-dry cleaner according to

manufacturer's specifications, to prevent poor
adhesion 

Shown on shower tray 

5 Adhesive tape 
6 Area

 

 

 

D86.60-0071-11

9.1 Mask area (6) on top with adhesive tape (5) 

 Perform work only when shower tray is installed 

10.1 Roughen gluing surface in area (6) with
suitable sand paper 

 Perform work only when shower tray is installed 

11.1 Degrease gluing surface in area (6) with
suitable cleaner

 

 Allow cleaner to air-dry cleaner according to

manufacturer's specifications, to prevent poor
adhesion 

 Perform work only when shower tray is installed 

12.1 Apply suitable primer to gluing surface in area
(6) 

 Allow cleaner to air-dry cleaner according to

manufacturer's specifications, to prevent poor
adhesion 

 Perform work only when shower tray is installed

 

 

 

 

 

 

 

Content   ..  68  69  70  71   ..