Takeuchi Mini excavator TB225 (No.122500005~). Operator's Manual (2019) - page 4

 

  Index      Manuals     Takeuchi Mini excavator TB225 (No.122500005~). Operator's Manual (2019)

 

Search            copyright infringement  

 

   

 

   

 

Content      ..     2      3      4      5     ..

 

 

 

Takeuchi Mini excavator TB225 (No.122500005~). Operator's Manual (2019) - page 4

 

 

CONTROLS
ACCESSORIES
OPERATING THE MACHINE WITH AN
ACCUMULATOR (IF EQUIPPED)
Be sure to handle the high-pressure
nitrogen gas enclosed in the accumulator
with care. If handled incorrectly, it could
explode and cause serious injury. Strictly
observe the following precautions:
• Do not disassemble.
• Do not allow flame near or throw it into
6. Move or press the auxiliary hydraulic
a fire.
switches several times to release the
• Do not drill, weld or fuse.
residual pressure in the circuitry.
• Do not subject it to physical shock such
7. Move all the control levers and pedals
as hitting, rolling or dropping.
several times in all directions to release the
• Before disposing of the unit, the sealed
pressure from the working equipment
gas must be drained. Contact a
circuitry.
Takeuchi service agent for help.
8. Raise the safety lock lever to engage the
lock.
For a machine with an accumulator, the
residual pressure in the auxiliary hydraulic
Lowering the boom when the engine has
circuit or the working equipment circuit can
stopped
be released even after the engine is stopped.
Perform this operation within 10 minutes
after the engine stopping.
Releasing residual pressure
1. Sit at the operator’s seat.
Residual pressure refers to the pressure that
2. Turn the starter switch to the ON position.
remains in the hydraulic circuit after the
3. Lower the safety lock lever to the unlock
operation. Release the residual pressure as
position
necessary by using the following steps.
4. Slowly push the operating lever forward to
Perform the residual pressure releasing
lower the boom.
within 10 minutes after the engine stopping.
1. Return the throttle controller to idle the
engine at low speed.
2. Lower the bucket and dozer blade to the
ground.
3. Check that the safety lock lever is in the
released position.
4. Stop the engine.
5. Turn the starter switch to the ON position.
2-72
CONTROLS
ACCESSORIES
LOAD SAFETY DEVICE (IF EQUIPPED)
Arm (option)
The load safety devices include an
emergency shut-off valve and an overload
warning device.
Emergency shut-off valve
• If the boom or arm stops due to the
breakage of hose, immediately move
away from the load being lifted and go
to a safe location.
• Since the emergency shut-off valve (1)
If the hose breaks and the emergency shut-
is a safety device, you must not
off valve (1) is activated to stop the operation
disassemble it and/or replace or adjust
of boom or arm, lower the boom or arm by
its internal part. Takeuchi shall not be
slowly operating the lever while ensuring
held responsible for any injuries,
safety. Ask your sales or service dealer for
accidents or product malfunction
repair.
caused by disassembly.
The emergency shut-off valve (1) prevents
the boom or arm from falling rapidly in case
the hydraulic hose is broken.
Boom
2-73
CONTROLS
ACCESSORIES
Overload warning device
If the overload is not removed after the
overload warning horn is sounded, the
machine may tip over. If the horn starts
sounding, stop operating the machine
and lighten the load.
If a weight greater than the lifting capacity is
applied or lifted, the overload warning device
is activated and the horn sounds. (When the
lift overload warning switch is turned on.)
Lift overload warning switch
OFF
Off
ON
On
2-74
OPERATION
BEFORE STARTING OPERATION
WALK-AROUND INSPECTION
BEFORE STARTING
Perform the walk-around inspections once a
OPERATION
day before starting the engine for the first
GETTING ON OR OFF THE MACHINE
time that day.
Refer to “MAINTENANCE, Walk-around
inspection”, on pages 5-16 and 5-17.
• Do not jump on or down from the
machine. Never attempt to get on or off
DAILY INSPECTION
the moving machine.
• When getting on or off the cab, first fully
Perform the daily inspections once a day
open the door to the locked position
before starting the engine for the first time.
and check that it does not move.
Refer to “MAINTENANCE, Daily inspection”,
on pages 5-18 to 5-22.
• Climb up/down the steps holding the
handrail to support your weight in a
three point secure stance (hand and
feet).
• Never use the safety lock lever or
control levers as hand holds.
3-2
OPERATION
STARTING AND STOPPING THE ENGINE
STARTING AND STOPPING
THE ENGINE
BEFORE STARTING THE ENGINE
1. Adjust the seat for a comfortable operating
position.
2. Fasten the seat belt.
5. Insert the key into the starter switch, turn it
to the ON position, then perform the
following inspections:
3. Check that the safety lock lever is in the
locked position.
· All warning lamps flash and an alarm is
sounded for two seconds. The meters
also start functioning. After two seconds,
the deceleration lamp (3) stops flashing
and remains lit, while the battery charge
warning lamp (1) and engine oil pressure
warning lamp (2) remain flashing. (If the
auxiliary 3rd is selected, it is also
flashing.) The other lamps go out.
4. Check that all levers and pedals are in the
· Turn on the light switch to check that the
neutral position.
boom light, front light and tail lamps turn
on.
· Check the fuel level.
If a lamp does not light or the alarm is not
sounded, the bulb may be burnt out or a
wire may be damaged. Ask a Takeuchi
service agent for repair.
3-3
OPERATION
STARTING AND STOPPING THE ENGINE
STARTING THE ENGINE
4. Warm up the engine.
Refer to “Warming up the engine” on page
3-5.
5. After the completion of the warming up,
• Clear all personnel from the work area.
press the deceleration button to cancel
• Sound the horn to warn people around
the deceleration mode.
the machine.
Starting in cold climates
IMPORTANT: Do not run the starter motor
for more than 15 consecutive seconds. If
the engine fails to start, wait for 30
Never use starting fluid on this engine, as
seconds, and then try again to start the
the starting fluid could cause an explosion.
engine.
IMPORTANT: If the engine stalls due to
fuel shortage, add fuel, turn the key to the
ON position for 60 seconds, and then turn
it to the START position. Running the
starter for a long time before there is
enough fuel is going through can cause
the starter to fail.
Normal starting
1. Turn the throttle controller to the middle
position.
1. Turn the starter key to the START position
and start the engine.
The engine does not start unless the
safety lock lever is in the locked position at
this point.
2. Turn the starter key to the ON position,
Refer to “Safety lock lever” on page 2-46.
and confirm that the glow lamp is on. (The
2. Once the engine starts, release the key.
glow lamp stays lit for a maximum of 15
The key automatically returns to the ON
seconds.)
position.
3. After the glow lamp goes out, press the
3. Check that the warning lamps are off.
deceleration button (to cancel the
For safety reasons, it is designed that the
deceleration mode), and then turn the key
deceleration function is activated to set
to the START position to start the engine.
the engine revolutions to low idling
The engine does not start unless the
whenever the engine is started.
safety lock lever is in the locked position at
Cancel the deceleration mode by pressing
this point.
the deceleration button as necessary.
Refer to “Safety lock lever” on page 2-46.
3-4
OPERATION
STARTING AND STOPPING THE ENGINE
4. Once the engine starts, release the key.
STOPPING THE ENGINE
The key automatically returns to the ON
position.
IMPORTANT: Do not stop the engine
5. Check that the warning lamps are off.
suddenly when operating with heavy
6. Return the throttle controller to the original
loads or at the maximum speed. Doing so
position and warm up the engine.
may cause the engine to overheat or
Refer to “Warming up the engine” on page
seize. Never stop running the engine
3-5.
suddenly except in emergency.
WARMING UP THE ENGINE
IMPORTANT: Avoid racing the engine until
it has warmed up.
Do not warm up the engine for a long time
(20 minutes or more). When idling is
required, occasionally place a load or run
the engine at medium speed.
1. Return the throttle controller.
2. Idle the engine for about 5 minutes to
gradually let it cool.
1. Return the throttle controller, and then run
at a low idle with no load for 5 minutes.
3. Turn the starter key to the OFF position to
stop the engine.
3-5
OPERATION
OPERATING THE MACHINE
OPERATING THE MACHINE
LEVER PATTERN (ISO PATTERN)
• Before starting operation, carefully check which lever pattern you are going to use.
• It is described using the ISO pattern in this manual.
Left crawler forward
Right crawler forward
Left crawler reverse
Right crawler reverse
Arm out
Boom lower
Arm in
Boom raise
Upperstructure slew left
Bucket load
Upperstructure slew right
Bucket dump
Boom swing left
Dozer blade lower
Boom swing right
Dozer blade raise
3-6
OPERATION
OPERATING THE MACHINE
LEVER PATTERN (G PATTERN) (IF EQUIPPED)
• Before starting operation, carefully check which lever pattern you are going to use.
• It is described using the ISO pattern in this manual.
Left crawler forward
Right crawler forward
Left crawler reverse
Right crawler reverse
Boom lower
Arm out
Boom raise
Arm in
Upperstructure slew left
Bucket load
Upperstructure slew right
Bucket dump
Boom swing left
Dozer blade lower
Boom swing right
Dozer blade raise
Refer to “Selecting a lever pattern” on page 8-5.
3-7
OPERATION
OPERATING THE MACHINE
WARMING UP THE MACHINE
(HYDRAULIC OIL)
Operating the working equipment without
warming up the machine (hydraulic oil) is
dangerous, as the working equipment
cannot response to controls quickly or
may move in unexpected ways, and the
safety devices may not operate properly.
Be sure to sufficiently warm up the
2. Fully lower the safety lock lever to
machine.
disengage the lock and lift the bucket from
the ground.
IMPORTANT: Do not operate the levers
too quickly when the hydraulic oil
temperature is below 20°C (68°F). The
proper hydraulic oil temperature during
operation is 50 to 80°C (122 to 176°F). If
operations must be performed at lower
temperatures, heat up the hydraulic oil to
at least 20°C (68°F).
Normal warm-up
3. Extend and retract each of the cylinders
slowly several times with no load.
1. Turn the throttle controller to the middle
position, and then run the engine at
medium speed for about five minutes with
no load.
4. Slew slowly to the left and the right several
times.
3-8
OPERATION
OPERATING THE MACHINE
INSPECTION AFTER WARM-UP
After warming up the engine and machine
(hydraulic oil), perform the checks and
inspections described below, and repair if
necessary.
5. Travel slowly forward and in reverse
several times.
Warm-up in cold climates
1. Perform the normal warm-up procedure.
1. Check that the warning lamps and meters
are as follows:
· Are all warning lamps off?
· Is the LED on water temperature gauge
seen within the green range?
2. Check that there are no irregularities in the
exhaust color, sound and vibrations.
2. Set the bucket cylinder at the stroke end
and keep it there.
Do not keep this condition for more than
30 seconds.
3. Repeat Step 2 until the bucket operating
speed becomes normal.
3. Raise the safety lock lever to the locked
position, and then check that the
operating and travel levers are locked.
3-9
OPERATION
OPERATING THE MACHINE
CRAWLER WIDTH SWITCHING
Switching the crawler width
Perform the operation on a flat and rigid
ground where no obstacles around.
Operate the machine with the maximum
crawler width
• Always operate the machine with the
crawler width extended to 1500 mm
(59.1 in.) to maximize the machine
stability. If the machine is operated with
the crawler width narrowed (1100 mm,
43.3 in.), the machine may tip over due
to its poor stability.
• If the machine must be operated with
the narrowed crawler width (1100 mm,
AD6D012
43.3 in.), traveling should be done after
1. Raise the machine body by using the hoe
folding the hoe attachment, lowering the
attachment and the dozer blade.
boom to lower the center of gravity and
keeping the machine facing forward.
IMPORTANT: Be sure to raise the machine
body before switching the crawler width.
IMPORTANT: All debris, mud, soil, stones,
If the operation is attempted when the
etc. must be removed from the track
crawler is rested on the ground, the travel
frame before switching the crawler width.
frame or span cylinder may be damaged.
Do it in a safe manner and do not work
under the machine.
This machine is able to change the crawler
width. Normally, it is best to operate with the
crawler width extended for machine’s
stability.
2. Turn the crawler width switch lever in the
direction of “A” to increase the crawler
width (1500 mm or 59.1 in.).
If necessary, extend the blade width by
changing the plate (2).
Refer to “Switching the blade width” on
page 3-11.
3-10
OPERATION
OPERATING THE MACHINE
SWITCHING THE BLADE WIDTH
3. Turn the crawler width switch lever in the
direction of “B” to decrease the crawler
width (1100 mm or 43.3 in.).
1. Pull out the lock pin (1).
2. Rotate the plate (2).
3. Insert the lock pin (1) to secure the plate
(2).
3-11
OPERATION
OPERATING THE MACHINE
OPERATING THE TRAVEL LEVERS/
Moving the machine forward and
PEDALS
backward
• Never allow anyone to enter the
machine’s slewing radius and path.
• Signal your intention to move by
sounding the horn.
• There is a blind spot in the rear of the
machine. Before traveling in reverse, as
necessary, swing the cab around in
reverse to check that the area is safe
and clear.
1. Turn the throttle controller and increase
the engine speed.
• Before operating the travel levers/
pedals, make sure that the dozer blade
is to the front of the operator’s seat.
2. Fully lower the safety lock lever to
Remember that when the dozer blade is
disengage the lock.
to the rear of the operator’s seat, the
travel levers/pedals must be operated in
the reverse direction from when it is to
the front.
• Clear all obstacles from the path of the
machine.
3. Fold the hoe attachment and lower it 30 to
40 cm (12 to 16 in.) above the ground.
4. Lift the dozer blade.
5. Operate the left and right travel levers as
below.
3-12
OPERATION
OPERATING THE MACHINE
Traveling in 2nd (High) speed
When a load greater than a set value is
applied during traveling in 2nd (high)
speed, the speed will automatically slow
down to 1st (low) speed. When the load
becomes lighter, the speed will increase
and return to 2nd (high) speed. It should
be noted that the travel speed changes
depending on the load condition (for
When the dozer blade is in front of the
machines with the automatic travel shift-
operator’s seat:
down system).
To move forward:
Tilt the levers forward.
To move backward:
Tilt the levers backward.
Press the travel speed switch on the right
travel lever to switch to 2nd (high) speed,
and press it again to return to 1st (low)
speed.
When the dozer blade is behind the
operator’s seat:
To move forward:
Tilt the levers backward.
To move backward:
Tilt the levers forward.
3-13
OPERATION
OPERATING THE MACHINE
Pivot turn
Spin turn
Turning to the left when stopped:
To spin left:
To turn forward to the left:
Tilt the left lever backward and the right
Tilt the right lever forward.
lever forward.
To turn backward to the left:
To spin right:
Tilt the right lever backward.
Tilt the right lever backward and the left
To turn to the right, operate the left lever in
lever forward.
the same way as for the right lever.
Turning to the left while traveling:
To turn left while traveling forward:
Set the left lever to neutral.
To turn left while traveling backward:
Set the left lever to neutral.
To turn to the right while traveling, operate
the right lever in the same way as for the left
lever.
3-14
OPERATION
OPERATING THE MACHINE
STOPPING TRAVEL
• Park the machine on a flat, rigid and
safe ground. Set the parking brake. If
you must park on a slope, chock the
tracks to block the machine.
• If any control is accidentally touched
when the safety lock lever is not locked,
the machine may suddenly move and
cause serious injury or death.
• Note that the dozer blade and crawler
width switch controls cannot be locked,
even when the safety lock lever is set to
the locked position.
Do not carelessly touch these controls.
Never stop running the machine suddenly
except in emergency. Stop in good time,
if possible.
1. Set the left and right travel levers slowly to
the neutral position. The machine stops.
3-15
OPERATION
OPERATING THE MACHINE
OPERATING THE WORKING EQUIPMENT
Slewing
Check the surrounding area for safety
• Before starting operation, carefully
before slewing.
check which lever pattern you are going
to use.
• It is described using the ISO pattern in
this manual.
Upperstructure slew left:
Tilt the left operating lever to the left.
Upperstructure slew right:
Tilt the left operating lever to the right.
Use the right operating lever to operate the
boom and bucket.
Operating the boom
Use the left operating lever to operate the
arm and slewing.
Return the operating levers to the neutral
position to stop the hoe attachments.
1. Lower the safety lock lever to the
unlocked position.
2. Set the pedal cover to the unlocked
position.
Boom lower:
Tilt the right operating lever forward.
Boom raise:
Tilt the right operating lever backward.
3-16
OPERATION
OPERATING THE MACHINE
Operating the arm
Operating the boom swing
Arm in:
Boom swing left:
Tilt the left operating lever backward.
Step on the left side of the pedal.
Arm out:
Boom swing right:
Tilt the left operating lever forward.
Step on the right side of the pedal.
Operating the bucket
Operating the dozer blade
Bucket load:
Dozer blade lower:
Tilt the right operating lever to the left.
Tilt the lever forward.
Bucket dump:
Dozer blade raise:
Tilt the right operating lever to the right.
Tilt the lever backward.
3-17
OPERATION
OPERATING PROCEDURES
Be gentle when using the hydraulic
OPERATING PROCEDURES
cylinder
PROHIBITED OPERATIONS
• Do not operate on bedrock (hard or
soft).
• Do not slew while traveling. If you must
operate the hoe attachment while
traveling, operate at speeds slow
enough so you have complete control at
all times.
Do not perform demolition or leveling
Do not extend the hydraulic cylinders to the
using slew force
stroke ends. Operate them with leeway.
Do not demolish walls or level ground using
Do not support the machine body with the
slew force. Also, do not dig the bucket teeth
hoe attachment when the body is lowering
into the ground during slewing. Doing so will
with the arm cylinder fully extended. Doing
damage the hoe attachment.
so concentrates the load on the arm cylinder
and could damage the arm cylinder.
Do not dig while traveling
Do not dig the bucket into the ground and
use the traveling force to dig.
3-18
OPERATION
OPERATING PROCEDURES
Do not drive piles with the bucket or dig
Digging bedrock
by banging the bucket
For hard base rock, break the rock up into
Doing so will shorten the service life of the
small pieces with a breaker, etc., before
hoe attachment. Use the hydraulic force to
digging. This prevents damage to the
dig.
machine and is thus more economical in the
end.
Do not perform operations using the
machine’s dropping force
Caution on exposing the dozer blade to
shocks
Hitting the dozer blade against rocks, etc.,
could damage the dozer blade or the blade
cylinder.
Putting excessive strain on the machine will
shorten its service life. When digging, use the
hydraulic force of the cylinders and the
shallow and long strokes.
3-19
OPERATION
OPERATING PROCEDURES
Caution on folding the hoe attachment
Pay attention to the dozer blade when
digging
Be careful not to let the bucket to hit the
dozer blade when the hoe attachment is
When digging deeply with the dozer blade
being folded.
positioned at the front, be careful that the
boom and bucket do not hit the dozer blade.
Do not use the dozer blade as an
Operate with the dozer blade at the rear
outrigger
whenever possible.
Caution on digging down with the dozer
blade
This dozer blade is designed for simple earth
pushing. Do not dig down deeply with the
dozer blade. Doing so could damage the
dozer blade and undercarriage.
3-20
OPERATION
OPERATING PROCEDURES
CAUTIONS ON OPERATING
• When traveling in 2nd speed, do so with
the dozer blade at the front.
Cautions on traveling
Cautions on using machine in water
Traveling over obstacles (rocks, stumps, etc.)
may put a great load on the machine body
If the rear of the machine is submerged in
and may cause damage to it. Avoid crossing
water as shown in the figure above, it causes
over obstacles whenever possible. If you
the radiator fan to turn in water, resulting in
must do so, keep the hoe attachment near
damage to the fan. The rear of the machine
the ground, travel at a low speed, and go
must not be submerged.
over the obstacle at the center of the crawler.
Cautions on traveling in 2nd (High) speed
1
AD6D019
• Allowable water depth
Use the machine in water only when the
water is up to the middle of the shoe slide
• On uneven ground, maintain the low speed
(1).
and avoid starting, stopping or changing
• For those parts used in water for a long
directions abruptly.
time, apply enough grease until the old
• When a load greater than a set value is
grease is expelled.
applied during traveling in 2nd (high)
• Never submerge the slew bearing or main
speed, the speed will automatically slow
body in water or sand. If submerged,
down to 1st (low) speed. When the load
contact a Takeuchi service agent for
becomes lighter, the speed will increase
inspection.
and return to 2nd (high) speed. It should be
noted that the travel speed changes
depending on the load condition (for
machines with the automatic travel shift-
down system).
3-21
OPERATION
OPERATING PROCEDURES
CAUTIONS ON TRAVELING ON SLOPES
• The machine may slip sideways even on
a slight slope if they are covered with
grass or dead leaves, or when traveling
on a wet metal plate or frozen surfaces.
• Never travel on slopes that are too
Do not allow the machine to position
steep for the machine to maintain its
sideways to slopes.
stability. Note that in reality, the
machine’s performance decreases on
slopes due to its poor working
Traveling posture on slopes
condition.
Climbing slopes
• When traveling on slopes, lower the
bucket to a height of 20 to 30 cm (8 to
12 in.) above the ground. When climbing
a steep slope, extend the hoe
attachment to the front. In emergencies,
lower the bucket to the ground and stop
the machine.
• When traveling on slopes or grades,
drive slowly in 1st (low) speed.
• When climbing a hill, keep the
operator’s seat facing the hillside. When
descending a hill, keep the operator’s
seat facing the downhill direction. In
When climbing slopes of 15° or more,
either case, travel must be done while
maintain the machine posture as shown in
paying attention to the ground in front
the figure above.
of the machine.
• Do not descend slopes in reverse.
Descending slopes
• Do not change directions on slopes or
When descending slopes of 15° or more,
traverse slopes. First return to a flat
slow down the engine speed and maintain
surface, and then take an alternative
the machine posture as shown in the figure
path.
above.
3-22
OPERATION
OPERATING PROCEDURES
Braking when descending slopes
If the engine stops
When descending slopes, the brakes are
If the engine stops when descending a
applied automatically once the travel levers
slope, set the travel levers to the neutral
are returned to the neutral position.
position, stop the machine, then start the
engine.
If the crawler slips
Do not open the door while traveling on
slopes
If the crawler slips while climbing a slope and
impossible to travel, use the pulling force of
the arm to climb the slope.
Opening the door while traveling on slopes is
dangerous, as the force required to open
and close the door changes abruptly. Always
keep the door closed when traveling on
slopes.
3-23
OPERATION
OPERATING PROCEDURES
GETTING OUT OF MUD
OPERATIONS POSSIBLE WITH THIS
MACHINE
If the machine gets stuck in mud, use the
procedure below to get it out.
Excavating
If one crawler is stuck
1. Set the dozer blade on the side opposite
to the side you want to dig on.
1. Swing the bucket to the side of the
2. Use the arm and bucket and dig with
crawler being stuck.
shallow, long strokes. The maximum
2. Set the arm and boom to an angle of 90
digging force can be obtained when the
to 110°.
boom and arm angle is 80 to 120°. Use
3. Press the bottom of the bucket (not the
this angle for effective digging.
teeth) against the ground.
4. Place a plank or the like under the lifted
Digging ditches
crawler.
5. Lift the bucket and slowly move the
machine out of the mud.
If both crawlers are stuck
Install a bucket suited for digging ditches
and set the crawlers parallel to the ditch to
be dug for greater efficiency.
When digging wide ditches, dig the sides
first, and then dig the center.
1. Perform the steps 1 to 4 above for both
crawlers.
2. Dig the bucket into the ground in front of
the machine.
3. Pull with the arm while traveling forward to
slowly move the machine out.
3-24
OPERATION
OPERATING PROCEDURES
Digging side drains
Leveling
Use the boom swing function to dig side
1. Bring the hoe attachment close to the
ditches as shown in the figure.
body.
2. Gradually remove the dirt from the side of
Loading
the mound.
3. Once the mound is low, remove the dirt
from the top. If the load becomes too
heavy for the machine body, adjust by
raising or lowering the dozer blade.
When loading dirt onto a truck bed, load
from the back of the truck, as it is easier and
able to load more load than doing it from the
front.
Also, use a small slewing angle for greater
efficiency.
3-25
OPERATION
PARKING THE MACHINE
3. Lower the bucket and the dozer blade to
PARKING THE MACHINE
the ground.
PARKING
4. Raise the safety lock lever to the locked
position.
5. Stop the engine and remove the key.
Refer to “Stopping the engine” on page
3-5.
INSPECTION AND CHECKS AFTER
STOPPING THE ENGINE
1. Check for oil or water leak and inspect the
working equipment, covers and
undercarriage. If any irregularities are
found, repair.
2. Fill up the fuel tank.
• Park the machine on a flat, rigid and
Refer to “Inspecting the fuel level” on page
safe ground. Set the parking brake.
5-20.
3. Remove any paper scraps or dirt from the
engine room.
4. Remove any mud from the undercarriage.
Locking
Be sure to lock the following places:
If you must park on a slope or incline,
park the machine securely and block
the movement of the machine.
• When parking on a street, use barriers,
caution signs, lights, etc., so that the
machine can easily be seen even at
night to avoid collision with other
• Fuel lid
vehicles.
• Cab door
• Before leaving the operator’s seat, raise
• Manual storage compartment
the safety lock lever to engage the lock
• Engine hood
and stop the engine. Also, be sure to
• Covers
remove the key, lock the door and
covers, take it with you and store it in a
specified place.
1. Set the left and right travel levers to the
neutral position.
2. Return the throttle lever to idle the engine
at low speed.
3-26
OPERATION
HANDLING IN COLD CLIMATES
CAUTIONS AFTER OPERATIONS
HANDLING IN COLD
Observe the following cautions to prevent
CLIMATES
mud, water, or the undercarriage from
PREPARING FOR COLD CLIMATES
freezing and making it impossible for the
machine to move.
Starting engine in cold climates is not easy,
• Remove all mud and water from the
and it becomes more difficult if the coolant
machine body. In particular, wipe the
freezes. Prepare for cold-climate problems
hydraulic cylinder rod clean to prevent
as follows.
damage to the seal caused by mud or dirt
on the rod surface getting inside the seal
Replacing the fuel and lubricant
together with drops of water.
Replace the hydraulic oil, engine oil and fuel
• Park the machine on hard and dry ground.
with those intended for cold climates.
If this is impossible, park the machine on a
Refer to “Fuel and lubricant table” on page
wooden board placed on ground.
5-4.
• Drain any water in the fuel tank to prevent it
from freezing.
Engine coolant
Refer to “Draining the water from the fuel
tank” on page 5-29.
• As the battery capacity drops markedly in
The engine coolant is combustible. Keep
low temperatures, cover the battery or
away from flame.
remove it from the machine and keep it in a
Use long-life coolant (antifreeze) and tap
warm place.
water for the engine coolant.
If the electrolyte level is low, add distilled
water in the morning before beginning
Note: New machines are delivered with JIS
work. To prevent the battery electrolyte
Type 2 long-life coolant (antifreeze) at a
from freezing in the night, do not add water
concentration of 50%.
after the day’s work.
Refer to “Fuel and lubricant table” on page
5-4.
AFTER THE COLD CLIMATE
Battery
As the temperature drops, the battery
When the climate becomes warmer, do as
performance decreases.
follows:
Inspect the battery. If it is discharging,
• Replace the fuel and oil for all parts with
contact a Takeuchi service agent to have the
those specified in the “Fuel and lubricant
battery recharged.
table”.
Refer to “Inspecting the battery fluid level
Refer to “Fuel and lubricant table” on page
and replenishing” on page 5-30.
5-4.
• If a coolant of “one season type” is used,
drain the cooling system completely, clean
out the inside of the cooling system
thoroughly, and fill with tap water.
Refer to “Cleaning the engine cooling
system” on page 5-48.
3-27
OPERATION
HANDLING RUBBER CRAWLERS
HANDLING RUBBER
CRAWLERS
Rubber crawlers have an inherent weakness,
lack of strength, due to their use of rubber.
Be sure to observe the prohibitions and
cautions below to prevent the crawlers from
being damaged or coming off.
PROHIBITIONS
• Do not let fuel, oil, salt or chemical solvents
Do not travel or operate the machine in the
get on the crawlers. These substances
following places:
may corrode the bonding of the steel cores
on the crawlers, resulting in rust or peeling.
If any of these substances gets on the
crawler, immediately clean it off with water.
• Traveling and slewing on crushed rock,
extremely rough hard rock, steel beams,
scrap iron, or near the edges of steel plates
will cause damage to the rubber crawlers.
• It will cause an irregular wear or damage to
the lugs, if the machine travels on irregular
surfaces such as recently paved with
asphalt, exposed to a bonfire or of hot iron
sheets under the blazing sun.
• Do not move earth in places where the
rubber crawlers may slip. Doing so may
speed up lug wear.
• Traveling on riverbeds or places where
there are large numbers of boulders may
cause the stones to get caught and
damage the crawler or make the crawler
come off.
• Do not use the machine on the seashore.
The salt may corrode the steel core.
3-28
OPERATION
HANDLING RUBBER CRAWLERS
CAUTIONS
Observe the following cautions when
operating the machine:
• Rubber crawler belts are not as stable as
steel crawler belts since the entire lugs are
made of rubber. Be very careful when
slewing and swinging sideways.
• Do not turn the undercarriage with the front
of the machine body lifted using the hoe
PREVENTING THE RUBBER CRAWLERS
attachment (the upperstructure is not
FROM COMING OFF
turned). Doing so will twist the crawlers
with the load concentrated on a single
Observe the following cautions to prevent
point on the crawler belt, causing rapid
the crawler from coming off:
damage to the crawlers.
• Always keep the crawlers at the proper
• Avoid changing course abruptly or spin-
tension.
turning on concrete surfaces whenever
possible. Doing so may wear or damage
the rubber crawlers.
• Avoid drops that may expose the rubber
crawlers to strong shocks.
• Salt, potassium chloride, ammonium
sulfate, potassium sulfate, and triple
superphosphate of lime can damage the
crawler belts. If any of these substances
gets on the crawler belts, wash if off
thoroughly with water.
• Do not let the sides of the rubber crawlers
rub against concrete or walls.
• When traveling over a large step such as a
• Do not damage the rubber crawlers by
cobblestone or rock (20 cm (8 in.) or
hitting the bucket against them.
deeper), climb up the step at the right
• Be especially careful on snowy or frozen
angle and do not change courses on top of
surfaces in winter, as the crawler belts tend
the step.
to slip in such conditions.
• Use rubber crawler belts at temperatures
between -25°C to +55°C (-14°F to 131°F).
• When storing the rubber crawlers for long
periods of time (three months or more), do
so indoors in a place not exposed to direct
sunlight or rain.
3-29
OPERATION
HANDLING RUBBER CRAWLERS
• When climbing in reverse, do not change
• Do not change directions when the crawler
directions at the point where the slope
belts are slack as shown in the figure.
starts.
• The rubber crawler belts will come off if the
• Avoid traveling by setting one crawler on a
machine travels backward in this condition.
slope or projecting portion and the other
crawler on a flat surface (with the machine
at a tilt of 10° or more). Travel with both
crawlers set on flat surfaces.
• The rubber crawler belts will come off if the
machine turns in this condition.
3-30
TRANSPORT
LOADING AND UNLOADING
When loading or unloading the machine, be
LOADING AND UNLOADING
sure to use ramps or a platform and follow
the procedure below.
The machine may roll or tip over or fall
while being loaded or unloaded. Take the
following precautions:
• Select a firm, level surface and keep
sufficient distance from road shoulders.
• Secure the ramps of adequate strength
and size to the truck bed. The slope of
the ramps must not exceed 15°. If the
rumps are bowed down too low,
support them with poles or blocks.
• Never use the working equipment to
load or unload the machine. Doing so
1. Set the parking brake on the transporter
may result in tipping over or falling
and chock the wheels.
down of the machine.
2. Fix the ramps securely to the truck bed.
• Keep the truck bed and loading ramps
The slope of the ramps must not exceed
clean of oil, soil, ice, snow, and other
15°.
materials to prevent the machine from
3. Align the center of the truck bed with the
sliding sideways. Clean the crawlers.
center of the machine, and of the ramp
• Chock the transporter wheels to prevent
with the center of the crawler.
movement.
4. Make sure the dozer blade does not hit
• When being loaded or unloaded, travel
the ramps.
slowly in 1st (low) gear by following the
5. Lower the hoe attachment as far as
signal from the signal person.
possible without letting it touch the
• Never change courses on the ramp.
transporter.
• Do not slew/swing on the ramp. The
6. Decrease the engine speed.
machine may tip over.
• When slewing/swinging on the truck
bed, do it slowly as the footing should
be unstable.
• Lock the cab door after being loaded, if
applicable. Otherwise, the door may
open during transport.
• Chock the tracks and secure the
machine to the truck bed with wire rope
or chain.
4-2
TRANSPORT
LOADING AND UNLOADING
7. Drive the machine straight toward the
ramps and travel up or down the ramps at
1st (low) speed, by following the signal
from the signal person.
8. Load the machine at the specified position
on the transporter.
Refer to “Transporting posture” on page
4-6.
4-3
TRANSPORT
HOISTING THE MACHINE
Hoisting
HOISTING THE MACHINE
1. Slew the upperstructure so that the dozer
blade is at the rear of the machine (set the
upperstructure parallel to the track frame).
• Know and use the correct crane signals.
2. Raise the dozer blade fully.
• Check the hoisting equipment for
3. Extend the bucket cylinder and arm
damaged or missing parts on a daily
cylinder fully to raise the boom to its
basis and replace as necessary.
uppermost position.
• When hoisting, use a wire rope capable
4. If the boom is swung to either the left or
of lifting the machine mass.
right side, set it in the neutral position.
• Hoist the machine in only as manner
5. Raise the safety lock lever to the locked
described in the procedure below. Do
position.
not do it in any other manner. Doing so
6. Stop the engine, remove the starter key
is dangerous as it may result in the
and get off the machine.
machine losing its balance.
7. Install the wire ropes as shown on the
• Do not hoist the machine with an
figure below. Install the wire ropes and
operator on it.
hoisting attachment without letting them
• When hoisting, hoist slowly so that the
touch the machine body.
machine does not tip.
8. Hoist the machine slowly until it leaves the
• Keep everyone out of the area when
ground.
hoisting. Do not move the machine over
9. Stop hoisting until the machine becomes
the heads of the persons.
stable, and then start hoisting the machine
slowly again.
IMPORTANT: This hoisting method
applies to machines with standard
specifications. The center of gravity
differs according to the attachments and
optional equipment installed.
Contact your Takeuchi service agent for
details.
4-4
TRANSPORT
HOISTING THE MACHINE
<Two-point suspension>
<Three-point suspension>
4-5
TRANSPORT
SECURING THE MACHINE
SECURING THE MACHINE
After loading the machine at the specified position, secure it as described below.
Transporting posture
1. Lower the dozer blade.
Precautions to be taken during
2. Extend the bucket cylinder and arm
transportation
cylinder fully, and then lower the boom.
3. Raise the safety lock lever to the locked
position.
• Know and follow the applicable safety
4. Stop the engine, remove the starter key
rules, vehicle code and traffic laws
and lock all locks.
when transporting the machine.
5. Place the stoppers (chocks) in front and
• Select the best transport route by
behind the crawlers.
considering the length, width, height
6. Install a chain or wire rope over the lower
and weight of the truck with the
frame of the machine and fasten it
machine loaded on it.
securely to prevent the machine from
• Never abruptly start or stop or run at a
slipping sideways.
high speed at the sharp curves during
7. Secure the bucket with a chain or wire
transport. Doing so will move or lose the
rope.
balance of the loaded machine.
IMPORTANT: Place a wooden block under
the bucket to protect the floor from
damage caused by the bucket.
4-6
MAINTENANCE
5-1
MAINTENANCE
GENERAL
CAUTIONS ON MAINTENANCE
GENERAL
MAINTENANCE OVERVIEW
Do not perform any other inspection and
maintenance works than those listed in this
To keep the machine in good condition and
manual.
use if for a long period, perform the
For works not listed in this manual, ask your
inspection and maintenance properly and
sales or a service dealer for help.
safely following the procedures
recommended by this manual.
Keep the machine clean
• Clean the machine before performing
The inspection and maintenance items are
inspection and maintenance and try to
divided into groups according to the
keep it clean.
machine’s total operating time: every 10
• Stop the engine before washing the
hours (walk-around and daily inspection),
machine. Cover the electrical parts so that
every 50 hours, every 250 hours, etc. Refer
water cannot enter. Water on electrical
to the hour meter readings to determine
parts could cause short-circuits or
when to schedule an inspection and
malfunctions. Do not use water or steam to
maintenance. Items for which it is not
wash the battery, electronic control
possible to determine the inspection and
components, sensors, connectors or the
maintenance interval are included under
operator’s compartment.
“When Required”.
Fuel, lubricant and grease
When operating the machine in extremely
• Choose fuel, lubricant and grease by
harsh environments (with high dust levels or
following to the “Fuel and lubricant table”.
high temperatures), inspection and
• Use fuels, lubricants and greases which do
maintenance should be performed earlier
not contain water, and be careful to keep
than the times specified on the Maintenance
dirt out when changing or replenishing fuel,
List.
lubricant or grease.
• Store fuels, lubricants and greases in the
prescribed places and in such a way that
no water or dirt can get in them.
Cautions on refueling
• If the port includes a strainer, do not
remove the strainer when fueling.
• After fueling, be sure to securely tighten the
fuel filler cap.
• Do not add more than the specified
amount of fuel.
Do not use fuel to clean parts
Do not use fuel to clean parts. Use a non-
combustible cleaning agent.
Keep dirt out
When mounting and removing parts, do so in
a place where there is no dust, clean the
working area and the part, and keep dirt out.
5-2
MAINTENANCE
GENERAL
Clean the installation surfaces
Cautions on handling of battery wiring
When installing and removing parts, be sure
• Disconnect the wiring from the both
that the surfaces of contact of the parts are
terminals (+ and -) on the battery before
clean. If the sealing grooves of the surface of
working on the electrical system or doing
contact are damaged, consult your sales or
electric welding.
service dealer for repair or release.
Always disconnect it from the earth side
(-). When connecting, connect the earth
Seals and split pins
side last.
• Be sure to replace all seals and cotter pins
• Do not disconnect the battery wiring while
with new ones.
the engine is moving. Otherwise, the
• When installing, be careful not to damage
electric circuits of the rotary converter or
or twist the seal.
others may be damaged.
Sealing tape
• When wrapping the plug with sealing tape,
remove any old sealing tape from the
threads and clean the threads.
• Wrap the thread tight with seal tape
starting 1 or 2 threads away from the
thread end.
Disposing of wastes
• Always collect oil that is drained from the
machine in containers. Improperly
disposed waste oil can cause
environmental harm.
• Follow appropriate laws and regulations
when disposing of harmful objects such as
oil, fuel, cooling water, coolant, filters and
batteries.
Check after maintenance
• Gradually increase the engine speed from a
low idle to maximum speed and check that
there is no oil or water leaking from
serviced parts.
• Operate each control lever and check that
the machine is operating properly.
5-3

 

 

 

 

 

 

 

Content      ..     2      3      4      5     ..