short-term increase in maintenance costs .The increase is relatively short-lived. The 
cost of reactive maintenance decreases as failures are prevented and preventive 
maintenance tasks are replaced by condition monitoring. The net effect is reduction 
of reactive maintenance and a reduction in total maintenance costs.  

 

12.10.3 

Scheduling

 

-  The ability of a condition monitoring program to forecast certain 

maintenance activities provides time for planning, obtaining replacement parts, 
making the necessary logistical arrangements  (i.e., notifying occupants of 
equipment downtime) before the maintenance is executed. RCM reduces the 
unnecessary maintenance performed by a calendar-based preventive maintenance 
program, which tends to err consistently on the "safe" side in determining time 
intervals between maintenance tasks. 

12.10.4 

Equipment/Parts Replacement

  

- It obtains the maximum use from the equipment. 

With RCM, equipment replacement is based on equipment condition, not on 
calendar. This condition based approach to maintenance extends the  life of the 
facility and its equipment. 

12.10.5 

Efficiency/Productivity

In summary,  the multi-faceted RCM approach promotes the most efficient use of 
resources. Equipment is maintained as required by its characteristics and the 
consequences of its failures. 

- Safety is the primary concern of RCM. The second most 

important concern is cost-effectiveness. Cost-effectiveness takes into consideration 
priority or mission criticality and then matches a level of cost appropriate to that 
priority. The flexibility of the RCM approach to maintenance ensures that the 
proper type of maintenance is performed when it is needed. Maintenance that is not 
cost-effective is identified and not performed. 

12.11  RCM on a Life Cycle 

RCM must be  considered throughout the life cycle of a component if it is to achieve 
maximum effectiveness. The four recognized major phases of an equipment’s life cycle 
are: 

 

•  Planning 

 

•  Design 

 

•  Manufacture 

 

•  Operations and Maintenance. 

 

Planning and Design stages contribute to the maximum costs in a components life cycle 
cost.  

 
12.12  Use of Reliability Centered Maintenance by RDSO: 

 

12.12.1 

 As stated earlier, data collection of failures of the components with reasons thereof, 
is the core activity of the Reliability Centered Maintenance. For this purpose, 
RDSO has made a four digit codification of component failures as per which users 
(Zonal Railways) have to submit information of components failures regularly to 

Home 

Ch-12 

Draft

Document No: 

Chapter –12   Reliablity Centered Maintenance

 

Version No: 1.0-d0 

Date Issued: dd/mm/yyyy 

Document Title: MANUAL MAINTENANCE FOR  DIESEL LOCOMOTIVES 
 

Revised 2013 

Printed: 2015/03/08 

Page 261 of 303

 

 

RDSO. On the basis of this information received, analysis is done and RDSO 
publishes a Quarterly Report in which action to be taken for improving reliability is 
defined. This four digit codification is explained in brief for both, Alco and HHP 
locos below:- 

 

12.12.2 

Diesel Loco Defect Codification for Management Information System for ALCO 
locos issued vide Report No.MP-1406/87 (Revision-02) of October-2010

 

-This 

codification system has been developed to facilitate collection of information from 
Railways about defects in Alco Diesel Locos. The data as received from zonal 
railways is analyzed to identify deficiencies in design stage, manufacturing and 
maintenance system of loco and to strategize the proposed areas for improvement. 
A complete cycle of feedback helps to improve reliability in the loco with 
appropriate inputs planned at various stages of the life cycle. The system calls for 
reporting on the following parameters- 

S.No  Parameter 

Number 

Description 

Zonal Railway details have to be filled in 

Diesel Shed details have to be filled in 

Type of Loco viz.WDM2,WDM3D etc. has to be filled in 

Loco number has to be filled in 

Date of occurrence of defect has to be advised 

Whether design change is required or not, has to be indicated.  
Say ‘Yes’, ‘No’ or ‘-’ indicating that Railway has no comment to 
offer 

Whether Manufacturing method needs improvement, has to be 
indicated 
Say ‘Yes’, ‘No’ or ‘-’ indicating that Railway has no comment to 
offer 

Whether Maintenance system needs improvement, has to be 
indicated 
Say ‘Yes’, ‘No’ or ‘-’ indicating that Railway has no comment to 
offer 

This defect codification is to be used to identify the four Digit 
code for the defects’ location and its nature  
1

st

 digit indicates the main assembly involved. 

2

nd

 digit indicates the sub assembly involved 

3

rd

  digit indicates the sub assembly/component specified by first 

two digits. 
4

th

  digit indicates the nature of defect on the sub 

assembly/component specified by first three digits. 
 

10 

10 

Remarks, if any, to be given 

 

12.12.3 

Diesel Loco Defect Codification for Management Information System for HHP 
locos issued vide Report No.MP.MISC.270 (Revision-00) of March-2011
-This 
codification system has been developed to facilitate collection of information from 
Railways about defects in HHP Diesel Locos. The data as received from zonal 
railways is analyzed to identify deficiencies in design stage, manufacturing and 
maintenance system of loco and to strategize the proposed areas for improvement. 

Home 

Ch-12 

Draft

Document No: 

Chapter –12   Reliablity Centered Maintenance

 

Version No: 1.0-d0 

Date Issued: dd/mm/yyyy 

Document Title: MANUAL MAINTENANCE FOR  DIESEL LOCOMOTIVES 
 

Revised 2013 

Printed: 2015/03/08 

Page 262 of 303

 

 

Complete cycle of feedback helps to improve reliability in the loco with appropriate 
inputs planned at various stages of the life cycle. The system calls for reporting on 
the following parameters- 

 

S.No  Parameter 

Number 

Description 

Zonal Railway details have to be filled in 

Diesel Shed details have to be filled in 

Type of Loco viz. WDG4, WDP4, WDP4B, WDP4D, etc., has to be 
filled in 

Loco number has to be filled in 

Date of occurrence of defect has to be advised 

Whether design change is required or not, has to be indicated.  
Say ‘Yes’, ‘No’ or ‘-’ indicating that Railway has no comment to 
offer 

Whether Manufacturing method needs improvement, has to be 
indicated 
Say ‘Yes’, ‘No’ or ‘-’ indicating that Railway has no comment to 
offer 

Whether Maintenance system needs improvement, has to be indicated 
Say ‘Yes’, ‘No’ or ‘-’ indicating that Railway has no comment to 
offer 

This defect codification is used to identify the four Alphabet code for 
the defects’ location and its nature 
1

st

 Alphabet indicates the main assembly involved. 

2

nd

 Alphabet indicates the sub assembly involved 

3

rd

 Alphabet indicates the sub assembly/component specified by first 

two alphabets. 
4

th

  Alphabet indicates the nature of defect on the sub 

assembly/component specified by first three alphabets. 

10 

10 

Remarks, if any, to be given 

 

Home 

Ch-12 

Draft

Document No: 

Chapter –13  Technological Advancements 

Version No: 1.0-d0 

Date Issued: dd/mm/yyyy 

Document Title: MANUAL MAINTENANCE FOR  DIESEL LOCOMOTIVES 
 

Revised 2013 

Printed: 2015/03/08 

Page 263 of 303

 

 

 
 

INDEX 

 
 

Chapter 13

  

 
 

Technological Advancements 

 

 

Para No. 

Description 

Page No. 

13.1 

Induction of Diesel Locos on Indian Railways after 

Independence- Chronology 

265  

13.2 

Technological Advancements 

273  

 

Draft

 

 

 

 

 

 

 

Content   ..  65  66  67  68   ..