2.6.6  Forecast of locos to be turned out from shed. 

 

2.6.7  Keeping a watch on the movement of disabled, overdue schedule, new and locos 

from/to POH/Rebuilding shops.  
 

2.6.8   Daily utilization of diesel locos on each division. 

 

2.6.9  Monitoring of VVIP / VIP specials like MR, MOSR, GM, etc. from point of view of 

arrangement of diesel loco and running staff requirement. 
 

2.6.10  Close monitoring of ART /SPART, ARMV/SPMRT & BD Cranes during accidents. 

 

2.6.11  Monitoring of diverted trains in coordination with Zones & Divisions. 

 

2.7  Facilities: The Central Power Control Organization should be well equipped, to enable it to 

discharge its function efficiently. It should have suitable and well-furnished 
accommodation which is free from other disturbances. The key to proper functioning of 
centralized power control organization is prompt and efficient communication facilities. 
Central Power Control Organization should be able to contact all diesel sheds, Divisional 
Control Organization and all the major yards directly, and if possible, simultaneously, so 
that  instructions to all concerned can be conveyed without delay. One P&T Line, three 
Railway phones with STD, two CUG phones, two computers with FOIS connectivity, two 
printers and one photocopier should be available to enable Central Power Control to get in 
touch with Central Control on other Railways, other diesel sheds and individual Officers, 
LIs/LPs/ALPs, Supervisors, etc., to effectively monitor the loco performance and prepare 
various types of information required. 
 

2.8   Maintenance Schedules: 

 

2.8.1  Strict enforcement of maintenance schedule is one of the important responsibility of 

the Central Power Control Organization. If the locos are not attended for schedule 
maintenance in time, it would not only affect its reliability but would also cause 
serious setback to the maintenance as well as availability of diesel locos. The uneven 
flow of locos will result in shed capacity going underutilized during lean period and 
locos waiting for repairs when there is bunching of locos. 
 

2.8.2  As a rule, the loco should not be booked to work trains after the due date except with 

the specific permission of the Dy. CME (Diesel) or the Engineer-in-charge of the 
shed. 
   

2.8.3  The Central Power Control should therefore prepare a list of diesel locos which are 

due  for  schedule attention four days in advance and relay these numbers to the 
divisions on which the locos are working on that day so that they can be booked on 
trains working towards the home shed and reach in time for undergoing schedule 
attention. 

 

2.9  Operations  

2.9.1  Passenger services:  

2.9.1.1 Allotment of diesel locos for passenger services is made on the basis of loco links. 

Loco links for working passenger services should be so framed as to get the 

Home 

Ch-2 

Draft

Document No: 

Chapter –3 Infra. Facilities of Diesel Loco Shed

 

Version No: 1.0-d0 

Date Issued: dd/mm/yyyy 

Document Title: MANUAL MAINTENANCE FOR  DIESEL LOCOMOTIVES 
 

Revised 2013 

Printed: 2015/03/08 

Page 25 of 303

 

 

maximum advantage of extended runs by providing fuelling facilities and change 
of crews en-route. 
 

2.9.1.2 Loco Link: Loco link is an arrangement of loco for working a set of trains from 

one station to another for Mail/Express/Passenger trains. Loco link gives the 
requirement of locos required to run the given number of trains. Loco link is 
prepared by HQ office in consultation with COM. Factors to be considered while 
preparing a loco link: 1) Availability of the Locos 2) Trip Inspection 
(Mail/Express /Passenger locos are required to be given trip inspection within the 
link) 3) Lie over period at destination station: When a loco completes its journey 
after working a train, this loco is sent to yard, trip shed etc. This loco is again 
attached to the train as per the link. The period for which it remains idle at 
destination station (i.e. the time period when loco is detached and again attached 
to train) is known as lie over period of the loco. This time should be adequate to 
take care of the types of attention required to be given to loco 4) Total Kms 
earned during trip should normally not exceed 5000 Kms. 5) Fueling locations. 
 

2.9.1.3 For every 30 locos in link, an additional overlapping loco shall be provided to 

cater for higher schedules (as per Railway Board’s letter no. 2006/TT-IV/9/3 
dated 2

nd

 Nov’06). 

 

2.9.2   Goods operation: 

 

2.9.2.1 The allotment of diesel loco for each division is worked out on the basis of 

number of through goods trains to be run daily on different sections. The number 
of diesel locos required for working the planned number of trains is arrived at on 
the basis of target of loco Kms per day per loco in use. Normally, utilization of 
500 Km on BG double-line and 400 km on BG single – line per day per loco can 
be adopted. The actual targets should be fixed by each Railway taking into 
consideration the operating conditions prevailing on that Railway. 
 

2.9.2.2 To get the best results, all diesel loco operating  goods trains should be run on 

fixed paths. This system is also helpful in forecasting the number of locos which 
are likely to be available at terminals or the interchange points 
 

2.9.2.3 The movement of each diesel loco in 24 hours should be monitored and plotted on 

a chart having hourly divisions. Locos working passenger and goods services 
should be plotted in different colors. The detention to locos in yards can also be 
shown in a distinct manner for clearly bringing out the utilization of the locos. 
Similarly, the idle time when a loco is waiting in the yard for load can be shown 
in a different manner 

 

2.10  Crew Management  

 

2.10.1  Training of Crew: 

 

2.10.1.1 Induction/Promotional training of crews for diesel operation and conducting 

refresher courses for the running staff should be organized by the Headquarters 
Office at the various Diesel Technical Training Centers on the Railway. A 
competency certificate must be issued to the running staff after they have been 
trained and qualified for operating each type of diesel loco.  

Home 

Ch-2 

Draft

Document No: 

Chapter –3 Infra. Facilities of Diesel Loco Shed

 

Version No: 1.0-d0 

Date Issued: dd/mm/yyyy 

Document Title: MANUAL MAINTENANCE FOR  DIESEL LOCOMOTIVES 
 

Revised 2013 

Printed: 2015/03/08 

Page 26 of 303

 

 

2.10.1.2  In addition, special courses for diesel operation shall also be organized for the 

Trainers and Loco Inspectors. 
 

2.10.1.3  Details of training content and periodicity for promotional and refresher courses 

for LIs, LPs, Shunters and ALPs prescribed by Railway Board are given at 
Annexure-2.1
 

2.10.1.4  After completion of training of particular(s) types of diesel unit(s) by running 

staff, endorsement of that diesel unit(s) should be made in their competency 
certificate.  
 

2.10.1.5  After a Loco Pilot/ Shunter/ Assistant Loco Pilot has done the basic course of a 

diesel electric unit, he can be retrained for Diesel Electric Multiple Unit/ Diesel 
Hydraulic Multiple Unit with a short 3 week familiarization course. Such courses 
should include 1 week of handling/on line training with Loco Inspector. 
 

2.10.1.6  In the event of a Loco Pilot / Shunter not having handled a particular type of unit 

for which he had been trained for a period of more than 6 months, he should be 
given 3 trips of handling with Loco Inspector. In the event of the period 
exceeding 18 months, the 3 week familiarization course as mentioned in para 
2.10.1.5
 

 should be repeated. 

2.10.1.7  Road Learning Training:  

 

(i)  Road Learning training is given to running staff to make themselves conversant 

with signal locations  and other operating conditions. This training is essential 
before a LP or ALP is booked to work the train independently in section. During 
the Road Learning period, LP/ALPs travel in the section on loco and make 
themselves aware with the following aspects of train working: 

 
a)  Locations of signal at each station of the section. 
b)  Idea of visibility of signals of each station. 
c)  Intermediate block signaling in section. 
d)  Automatic and semi-automatic signals. 
e)  Location of spring points in section. 
f)  Approximate idea of gradient of the section and ruling gradient. 
g)  Siding at various places in section where goods train are placed or removed. 
h)  Locations of Permanent speed restriction in section. 
i)  Maximum load allowed in section with single and multiple locos. 
j)  Banking section where banker is provided to avoid stalling of the train. 
k)  Maximum permissible and booked speed of the train in section. 
l)  Idea of capacity of loop lines at various stations. 
m)  Idea of running time in section. 
n)  Restriction of not stopping the good trains at certain stations or signals 
o)  Knowledge of WTT 
p)  Knowledge of approximate trip rations for different locos and loads. 

 

Home 

Ch-2 

Draft

Document No: 

Chapter –3 Infra. Facilities of Diesel Loco Shed

 

Version No: 1.0-d0 

Date Issued: dd/mm/yyyy 

Document Title: MANUAL MAINTENANCE FOR  DIESEL LOCOMOTIVES 
 

Revised 2013 

Printed: 2015/03/08 

Page 27 of 303

 

 

(ii)  Every new LP should be given three trips, including one night trip between 20:00 

hrs. to 06:00 hrs. This scale of trips would apply to all systems  of working, 
including sections having one train only system of working. During road learning 
crew should sign ON & OFF, like working crew. 

 

(iii)  After completion of Road Learning, LP/ALP should submit the diary indicating 

the Road Learning taken by them. During the Road Learning training, they should 
obtain the signature of the LP of the train by which they traveled during their 
Road Learning training. In addition to above, the depot in-charge should also 
interview the crew of his depot, to judge the knowledge gained during Road 
Learning. If the performance is unsatisfactory, the Road Learning period can be 
extended suitably with knowledge of branch officer. 

 

(iv)  After the road learning training, the candidate should give a declaration as per the 

format given as under:-   

 

 

FORMAT 

“I hereby declare that I have taken Road Learning in following section. 
______________________________________________________________ 
S.No.      Section      Date of learning       No. of trips        From           To 
 
1. 
2. 
3. 
4. 
Now, I am fully familiar with the requirements for safe and efficient  diesel 
operations in the aforesaid  sections. 
Signature:_______________________ 
Name:__________________________ 
Design:__________________________ 
Date:____________________________ 
 

(v)  If the candidate is not confident of Road Learning, in the prescribed period, he 

may ask for an extension of road learning period to his depot in-charge. On 
getting such request, Road Learning period shall be suitably extended. 

 

(vi)  A register should be maintained at crew booking point indicating the Road 

Learning validity of LP/ALPs. Before a LP/ ALP is allowed to work the train, a 
declaration should be obtained that he has taken the Road Learning of the section 
and he is fully familiar to work the train in the section. 

 

(vii)  If a LP/ALP has not operated on a section for over three months, he should be 

given Road Learning trips as per schedule given below:- 

 

Absence of 

Number of Trips 

3 to 6 months 

One trip 

6 months to two years 

Two trips 

Absence of over 2 years.   

Three trips (as given to new 
entrants) 

 