|
|
CJCSM 3122.02B
25 May 2001
Appendix E--Recommended Supported Command Component/CJTF
Validation Message Format
Appendix F--Recommended Hazardous Material Notification Message
Format
Appendix G--Exercise Planning Guidelines
Appendix H--General/Flag Officer Required Endorsement Format
I--Protection of Movement Information
J--References
GL--Glossary
5
CJCSM 3122.02B
25 May 2001
(INTENTIONALLY BLANK)
6
CJCSM 3122.02B
25 May 2001
DISTRIBUTION
Distribution A, B, C, and J plus the following:
Copies
Secretary of Defense
…………………………
2
Commandant, US Coast Guard .…….……………………
5
Commander, US Element, NORAD
………………
2
Director, Central Intelligence Agency …..………………
2
Director, Federal Emergency Management Agency
…………..
2
Director, Joint Warfighting Center ….………………………..……
2
Commanding General, Marine Corps Combat
Development Center …..……..……………………………………
2
President, National Defense University
………………
5
President, Armed Forces Staff College .………………
5
i
CJCSM 3122.02B
25 May 2001
(INTENTIONALLY BLANK)
ii
CJCSM 3122.02B
25 May 2001
LIST OF EFFECTIVE PAGES
The following is a list of effective pages for this manual. Use this list to verify
the currency and completeness of the document. An "O" indicates a page in
the original document.
PAGE
CHANGE
PAGE
CHANGE
1 thru 6
O
E-1 thru E-10
O
i thru vi
O
E-A-1 thru E-A-2
O
A-1 thru A-4
O
E-B-1 thru E-B-2
O
B-1 thru B-6
O
E-C-1 thru E-C-2
O
B-A-1 thru B-A-2
O
E-D-1 thru E-D-2
O
B-B-1 thru B-B-2
O
E-E-1 thru E-E-2
O
B-C-1 thru B-C-2
O
E-F-1 thru E-F-2
O
B-D-1 thru B-D-2
O
F-1 thru F-4
O
B-E-1 thru B-E-2
O
G-1 thru G-4
O
B-F-1 thru B-F-4
O
G-A-1 thru G-A-6
O
B-G-1 thru B-G-2
O
H-1 thru H-4
O
B-H-1 thru B-H-2
O
H-A-1 thru H-A-14
O
B-I-1 thru B-I-2
O
H-B-1 thru H-B-10
O
C-1 thru C-2
O
H-C-1 thru H-C-4
O
D-1 thru D-8
O
H-D-1 thru H-D-2
O
D-A-1 thru D-A-2
O
H-E-1 thru H-E-2
O
D-B-1 thru D-B-2
O
H-F-1 thru H-F-2
O
D-C-1 thru D-C-2
O
H-G-1 thru H-G-4
O
D-D-1 thru D-D-2
O
H-H-1 thru H-H-2
O
D-E-1 thru D-E-2
O
I-1 thru I-6
O
D-F-1 thru D-F-2
O
J-1 thru J-2
O
GL-1 thru GL-24
O
iii
CJCSM 3122.02B
25 May 2001
(INTENTIONALLY BLANK)
iv
CJCSM 3122.02B
25 May 2001
RECORD OF CHANGES
Name of Person
Change No.
Date of Change
Date Entered
Entering Change
v
CJCSM 3122.02B
25 May 2001
(INTENTIONALLY BLANK)
vi
CJCSM 3122.02B
25 May 2001
ENCLOSURE A
SITUATION DEVELOPMENT AND CRISIS ASSESSMENT
1. General
a. Crisis Action Planning Procedures. This document describes in detail
the activities to be conducted in each CAP phase. However, in a fast-breaking
crisis, CAP procedures can be significantly compressed and steps overlapped.
Further, a crisis can be so time critical, or a single COA so obvious, that the
first written directive might be a deployment or execute order. In these cases,
the supported commander must ensure that all required actions from each
CAP phase are completed whenever possible. To prepare for such eventualities
within their area of responsibility (AOR), supported commanders should
prepare and publish AOR-specific supplemental instructions to the standard
TPFDD LOI (see Enclosure H) before the onset of a crisis to support assigned
military operations. This planning will ensure that a TPFDD can be developed
as rapidly as possible.
b. Deployment and Redeployment Operations. These are operational
imperatives that support the full range of military operations and are a
function of the joint force mission. The joint deployment process begins when
planning is initiated for force projection operations in response to an action or
event that requires protection of US national interests. Deployment operations
involve four phases:
(1) Predeployment activities; (2) Movement to and
activities at the port of embarkation (POE); (3) Movement to port of
debarkation (POD); and (4) Joint reception, staging, onward movement, and
integration (JRSOI) activities. Redeployment activities involve the transfer of
individuals, units/or material, but are not necessarily the reversing of the
deployment process. Redeployment may include movement of forces or
material from one area to another, to another location in the same area, or to
the zone of interior for further employment, or home. Redeployment operations
encompass four phases: (1) Recovery and reconstitution and pre-
redeployment activities, (2) Movement to and from activities at POE, (3)
Movement to POD, and (4) JRSOI. During deployment and redeployment
operations, the supported commander must build and validate requirements,
determine predeployment standards, and balance and regulate the
transportation flow. The supported commander performs these activities with
assistance from assigned supporting combatant commands, Service component
commands, Services, and combat support agencies.
A-1
Enclosure A
CJCSM 3122.02B
25 May 2001
c. The Supported Commander. In accordance with Joint Pub 1-02, the
supported commander is "The commander having primary responsibility for all
aspects of a task assigned by the Joint Strategic Capabilities Plan (JSCP) or
other joint operation planning authority. In the context of joint operation
planning, this term refers to the commander who prepares operation plans or
operation orders in response to requirements of the Chairman of the Joint
Chiefs of Staff." A combatant commander is usually designated as the
supported commander for an operation, but there are exceptions and
alternatives. If an operation is to occur within the area of operations of a
subordinate unified command, its commander is usually the supported
commander. If a joint task force (JTF) is preplanned in an operation plan
(OPLAN) or concept plan (CONPLAN) (with or without TPFDD), the CINC may
designate the commander of the JTF (CJTF) as the supported commander
responsible for all CAP and associated JOPES-required activities. The CJTF
will be provided with a SIPRNET capability and JOPES automated data
processing (ADP)-trained planners so information can be entered and ongoing
JOPES activities monitored. If the JTF is subordinate to a CINC, the CINC will
be the supported commander and be responsible for the required CAP/JOPES
functions. In any case, the CJTF will be provided with a SIPRNET capability,
including JOPES applications; access to additional GCCS databases such as
Common Operational Picture (COP), Global Status of Resources and Training
System (GSORTS), and others; and trained operators so that information can
be input and ongoing execution activities monitored using JOPES applications
and GCCS databases. See reference b for detailed JTF planning guidance and
procedures.
d. Inter- and Intratheater Lift Management. The deployment procedures
described in this manual apply to all modes and sources of transportation,
inter and intratheater, from origin to destination. The scheduling, validation,
and manifesting procedures described in Enclosures D, E, and F are applicable
for supported and supporting command movement control agencies and all lift
providers. Strategic lift assets may be under the control of the supported or
supporting commander and be used for both inter and/or intratheater
deployments. Additionally, even though USTRANSCOM is responsible for
intertheater deployment, the supported commander is responsible for
intratheater transportation to include JRSOI of forces, personnel, and material
from the POD to final destination. To fulfill his transportation responsibilities,
the supported commander has movement control agencies to manage
intratheater movement.
A-2
Enclosure A
CJCSM 3122.02B
25 May 2001
2. Phase I--Situation Development. During CAP Phase I, a combatant
commander may recognize an event or incident of national interest and report
the event or incident to the Chairman of the Joint Chiefs of Staff. The
combatant commander will provide an assessment report to the Chairman of
the Joint Chiefs of Staff detailing the nature of the crisis, the forces readily
available, major constraints to possible force employment, and actions taken, if
any, within existing ROE. The combatant commander’s report will contain a
discussion of various COAs under consideration. The Chairman of the Joint
Chiefs of Staff monitors the situation, evaluates the combatant commander’s
actions being taken under the ROE, orders additional intelligence gathering if
necessary, and advises the NCA as the situation develops. Appropriate
members of the JPEC in accordance with reference a, JOPES Volume I, initiate
procedures. No specific TPFDD procedures are required during this phase.
3. Phase II--Crisis Assessment. Phase II begins with a report from the
combatant commander and ends with a decision by the NCA to return to the
precrisis situation or to have military options developed for possible
consideration and possible use. Phase II is characterized by increased
awareness and reporting and intense information-gathering activity. The
supported commander will continue to evaluate the crisis and begin to review
current applicable OPLANs and CONPLANs.
a. Establish Newsgroup. The following preparatory actions are required to
use JOPES in support of CAP. The supported commander will establish an
operation newsgroup on SIPRNET, in accordance with required joint
procedures and the command’s Information Management Plan, and coordinate
with appropriate members of the JPEC to establish permissions as appropriate.
The supported commander will ensure the newsgroup is announced in the
standard JOPES paragraph to all JOPES orders (warning, planning, deploy,
execute, etc.). When established, the newsgroup is the primary means of
coordinating deployment or redeployment planning and execution. In crisis
situations involving more than one supported command, the Chairman of the
Joint Chiefs of Staff may establish a single newsgroup to coordinate TPFDD
development and deployment execution actions. During Phase II, the JPEC
members will enter the newsgroup(s) and monitor TPFDD development and
deployment execution information.
b. Permissions. JPEC members must obtain required user accounts and
permissions to participate in all phases of CAP and execution. Access
requirements include:
(1) JOPES database and database select (DBSELECT) capability at
primary and backup sites.
A-3
Enclosure A
CJCSM 3122.02B
25 May 2001
(2) Database server sites.
(3) JOPES software applications.
(4) OPLAN plan identification numbers (PIDs) (OPLAN series
permissions). OPLAN series are discussed in Enclosure B.
(5) Restricted-access PIDs (PID permissions) as authorized by supported
command’s functional manager. PID permissions are discussed in Enclosure
B.
(6) Newsgroup access.
(7) GCCS databases such as COP, GSORTS, etc.
During the crisis assessment phase, functional managers should review the
lists of authorized GCCS users (includes JOPES, COP, GSORTS users) at their
database sites, verify that users have permissions necessary to accomplish
their assigned duties, and coordinate with other GCCS functional managers to
ensure site and GCCS (to include JOPES, COP, GSORTS, etc.) permissions are
available for designated users at alternate sites. JOPES functional managers
are to verify and/or obtain required access for crisis action participants at their
backup sites.
A-4
Enclosure A
CJCSM 3122.02B
25 May 2001
ENCLOSURE B
COURSE OF ACTION DEVELOPMENT
1. General. Phase III, Course of Action Development, begins with a decision to
develop possible military COAs, normally transmitted by a CJCS warning order
and ends when the Chairman of the Joint Chiefs of Staff analyzes the COAs
contained in the supported commander’s estimate and the COAs are presented
to the NCA.
2. Supported Commander
a. The Standard TPFDD LOI and AOR-Specific Supplemental Instructions.
During the COA development phase, the supported commander will implement
TPFDD development and execution procedures contained in the TPFDD LOI
contained in this document. The JOPES standard TPFDD LOI provides
procedures and direction to the supported commander and components,
subordinate joint force commanders (including the Theater Special Operations
Command (SOC)), supporting commanders, and other members of the JPEC
pertaining to the identification of force requirements, the sourcing of forces to
fulfill identified requirements, and the deployment and redeployment of those
forces. During the COA development phase, if time permits, the supported
commander publishes the AOR-specific supplemental instructions to the
standard TPFDD LOI. An electronic copy of the standard TPFDD LOI is also
located at <http://nmcc20a.nmcc.smil.mil/~dj9jfdbm.html>. These AOR-
specific instructions describe theater-specific force deployment planning and
execution procedures such as intratheater lift constraints, validation windows
that deviate from the standard TPFDD LOI for reasons such as overflight
clearance, APOE/D/SPOE/D requirements, additional validation procedures,
etc. The supported commander should publish these AOR-specific instructions
on the local JOPES webpage. Appendix E contains sample CINC/AOR-specific
supplemental instructions to the standard TPFDD LOI. Both the standard
TPFDD LOI and Appendix E are made available on the supported commander’s
home page in the area containing information relevant to the crisis. Adherence
to the standard TPFDD LOI and the CINC/AOR-specific supplement is key to
successful conduct of deployment and redeployment operations.
b. COA PID, Access, and Distribution. In JOPES, a PID is assigned to a
specific OPLAN option or COA supporting the OPLAN. Time permitting, the
supported commander will create or modify the JOPES database and assign
PIDs to represent the OPLAN or COA within that OPLAN. The supported
commander will post a newsgroup message to the gccs.jopes.fm newsgroup
B-1
Enclosure B
CJCSM 3122.02B
25 May 2001
requesting distribution of the PID. A sample request is contained in Appendix
A. Access to, and distribution of, a PID can be controlled and restricted in
various ways. When establishing the PID(s), the creator will determine the
extent of plan access (restricted or normal access) and distribution (local or
distributed) at the time of creation. Plan access can be expanded at any time.
Restricted access should be used only for highly sensitive operations when
further access will jeopardize national security and will not be used as a
routine procedure. To access a specific plan, the JOPES functional manager at
the primary JOPES database server site must first grant a user. If the plan is
not loaded at the local JOPES database server site, but a user still requires
access, then the user, in coordination with the JOPES functional manager and
GCCS Site Security Officer (GSSO), must acquire access at a site where the
TPFDD is available. If the TFPDD is restricted access, the user must acquire
permission for the TPFDD from the OPLAN originator as described in the
following paragraphs.
(1) Restricted-Access Distributed Plan. The supported commander
restricts access to a plan to specifically designated userids. GCCS-T will be
used for TOP SECRET planning as required. The plan originator is the only
person who can add or delete userid permissions for the plan. Only personnel
given special permissions by the site functional managers can create restricted-
access plans. A restricted-access distributed plan should be used in COA
development and deployment execution when other JPEC members are
required to participate in the COA development, but security considerations
require controlled access on a strict need-to-know basis. When other JPEC
members are required to participate in COA development, the plan status
should be changed to normal access and distributed to appropriate JOPES
database sites.
(2) Restricted-Access Local Plan. A user requires JOPES "create"
permission to create a restricted-access local plan for which access is restricted
by userid. The restricted-access local plan resides at only one JOPES database
server site but can later be distributed to other sites if required. In both cases,
plan access is restricted by userid. The creator of a restricted-access local plan
must notify the JNOCC Functional Manager to distribute the plan to other
JOPES database sites. Once a restricted-access local plan has been
distributed, the supported commander continues to control access to the
restricted-access PID; but because the JNOCC is sometimes the originator of a
distributed plan, the supported commander may have to direct the JNOCC
Functional Managers to change user access as required.
(3) Normal Access Local Plan. A normal access local plan is available to
all users with appropriate plan series access and host permissions at a single
host where the plan resides.
B-2
Enclosure B
CJCSM 3122.02B
25 May 2001
(4) Normal Access Distributed Plan. A normal access distributed plan is
available to all users with appropriate plan series access and JOPES database
site permissions at one or more JOPES database sites where the plan resides.
c. JOPES Plan Distribution. A plan can reside at any or all GCCS JOPES
database sites. JNOCC Functional Managers accomplish plan distribution in
coordination with the plan originator. The plan owner requests distribution
from the JNOCC via a message posted in the gccs.jopes.fm global newsgroup.
The JNOCC Functional Manager sets up a plan distribution table that results
in initial networking (replication) of plan data to selected GCCS JOPES
database sites. This distribution table allows JOPES to automatically forward
all data transactions for that plan to all other GCCS JOPES database sites on
distribution for the plan. A newly created restricted access or normal PID can
be networked before records are added or loaded. The Normal JOPES OPLAN
Distribution Matrix can be found at http://nmcc20a.nmcc.smil.mil/~dj9jfdbm
/Oplan_dist.html.
d. COA TPFDD Development Options. Supported commander planners
have two basic options, create a COA TPFDD by using or modifying an existing
TPFDD or developing a new TPFDD (no-plan scenario).
(1) Creating COA TPFDD Using Existing TPFDD. A TPFDD already
residing in the JOPES database may be modified, if required, to meet CJCS
warning order and supported commander requirements. The nonunit data
projections created during the deliberate planning process are available only for
COA planning and are not used for execution. Force modules (FMs) from
established OPLANs may also be used as a starting point for a new TPFDD.
(2) Developing a New TPFDD. Where no TPFDD exists, it will be
necessary to build a COA TPFDD from scratch. Planners can develop force
requirements from a variety of sources, including existing TPFDDs, FMs from
existing TPFDDs, on-line input, and Service-unique systems. Planners should
employ, when feasible, the Joint Flow and Analysis for Transportation (JFAST)
and the notional requirements generator in JFAST at this point in the process.
Time permitting, sustainment lift requirements may also be estimated using
the JFAST Sustainment Generator or other JOPES and Service-unique
software capabilities.
e. Creating Flexible Deterrent Options (FDO) as COAs. The supported
commander may wish to request the deployment of FDOs before execution of
the total OPLAN. To do so, the supported commander will identify FDOs
requiring deployment as FMs from a TPFDD. These options should be
constructed so that initiation of deployments is completed within the warning
B-3
Enclosure B
CJCSM 3122.02B
25 May 2001
time specified in the JSCP (or warning/alert order), without mobilization and
with apportioned lift. FDO FMs should also include Air Mobility Command
(AMC), Military Traffic Management Command (MTMC), and Military Sealift
Command (MSC) mission support requirements. Estimates of transportation
feasibility (including numbers and types of aircraft, utilization rates, and
critical assumptions) developed jointly by the supported commander and lift
providers, will be included in the description data of the force module. As part
of a request to deploy FDOs, the supported commander must copy the FDO FM
to the appropriate execution PID. Appropriate dates and routing data must be
changed, if required, to time phase the new PID to ensure requirements are
consolidated at appropriate ports. Any unique requirements not found in the
parent OPLAN should also be added at this time. Force enhancement (FE)
options will also need to be addressed. FEs are described as a subset of a
FDO. FEs are force improvements to military FDOs, designed to provide
increased ability to counter critical enemy capabilities and reduce in-place
vulnerabilities.
f. Entering Plan Information. As COA TPFDDs are developed and loaded
into JOPES, the supported commander must enter specific plan information
into each PID. Appendix B lists data elements that the supported commander
should enter or update.
g. Preparing COAs for Deployment Estimate. After COA TPFDDs are
created, the supported commander will notify the lift providers via the
operation newsgroup that the COA TPFDD is available for a deployment
estimate. Appendix C provides a sample newsgroup message. The supported
commander should make each COA TPFDD available as soon as possible and
not wait until all COA TPFDDs are completed. Appendix D lists COA TPFDD
data elements that may be included.
h. Developing Commander’s Estimates. The supported commander reviews
the deployment estimates, incorporates them as appropriate in the Commander’s
Estimate, and forwards the estimate to the Chairman of the Joint Chiefs of Staff
with recommended COAs in accordance with reference a.
i. TPFDD Time Standard
(1) The time standard shall be 72 hours from notification and receipt by
the supported commander to validation of TPFDD-level 4 detail-for the first 7
days of the mission. (Note: Based on supported commander guidance, assets
deploying from origin to destination on unit organic transportation may not
require level 4 detail.)
B-4
Enclosure B
CJCSM 3122.02B
25 May 2001
(2) The notification from which performance in meeting the time standard
can be tracked will be a duly authorized CJCS order (e.g., alert, deployment) after
the NCA approves a COA. The specific type of order will be situation dependent.
Regardless of the type of order, the coordination instructions within the order
will:
(a) Direct TPFDD development and unit sourcing to meet the approved
COA.
(b) Indicate the start of the 72-hour period to develop a level 4 TPFDD
and validate the first 7 days of the mission. Start time will be provided as a date
time group (DTG, xxxxxxZ MMM YR) to allow transmission and receipt of the
message by the supported commander prior to start of the 72-hour period.
Should a mission change occur requiring development and approval of a new
COA, the 72-hour requirement will be reset pending the supported commander’s
receipt of new COA.
(c) Identify organizations that are involved (supported commander,
supporting commanders, Services, and agencies) and their responsibilities.
Additionally, the message will authorize collaboration and coordination with these
organizations.
(d) Identify mission statement, COA, major force list, location forces will
be deployed to, timing for deployment, and anticipated duration of deployment.
(e) Provide a project code (as appropriate)
(f) Include the following statements:
Supported Commander: In conjunction with supporting
commanders, develop a TPFDD and validate the first 7 days of the
mission to level 4 detail within 72-hours of the following DTG
(xxxxxxZ MMM YR).
Supporting Commanders: Source and verify units and assist the
supported commander in developing a TPFDD with the first 7 days of
the mission to level 4 detail within 72-hours of the following DTG
(xxxxxxZ MMM YR).
C day/L hour will be defined in a CJCS Deployment or Execution Order.
3. Supporting Commanders and Service Components
B-5
Enclosure B
CJCSM 3122.02B
25 May 2001
a. COA TPFDD Development. Supporting commanders and components
will normally be requested to participate in COA TPFDD development. The
level of participation, access to the data, and control over input will be
determined by the supported commander. Close coordination is necessary
among the supported commander, supporting commanders, and their
components during TPFDD development.
b. Reviewing COA TPFDD to Determine Feasibility. When notified by the
supported commander that a COA TPFDD is available for review, the
supporting commanders and components review each COA to determine
supportability (e.g., force shortfalls, preferred POEs, and force availability
dates). The supported commander may request that supporting commanders
and components provide a feasibility assessment of the COA TPFDDs
(Commanders Evaluation Request, reference a, Enclosure Q). The COA PID or
FM is updated by supporting commanders as required in accordance with
supported commander guidance. Upon completion of the review, the
supporting commanders and components forward a supportability message to
the supported commander (See Appendix E).
4. Lift Providers. Lift providers will activate CATs (where appropriate); monitor
the operation newsgroup; evaluate COA TPFDD(s) under development;
consolidate deployment estimates; determine aerial, sea, rail, and inland
waterway POEs and PODs; determine preliminary transportation channels; and
develop deployment estimates and closure profiles for submission to the
supported commander upon request. Lift providers will advise the JPEC of
POEs and PODs to be used and preliminary airlift and sealift channels via the
operation newsgroup. If multiple COAs are to be assessed, the deployment
estimates for one COA will not be delayed pending completion of estimates for
any subsequent COA. Sample deployment messages are provided at
Appendixes G through I. Lift providers will ensure that each COA developed is
assessed for transportation feasibility and that transportation mission support
movement requirements are stated in the TPFDD and considered in the
deployment estimates
5. Services. The Services monitor the COA development process and take the
necessary action to support Service component commander requirements.
B-6
Enclosure B
CJCSM 3122.02B
25 May 2001
APPENDIX A TO ENCLOSURE B
SAMPLE PID(S) DISTRIBUTION REQUEST NEWSGROUP MESSAGE
FROM: (SUPPORTED COMMANDER)
TO: JNOCC
INFO: (THE JPEC)
CLASSIFICATION
SUBJECT: PID(S) DISTRIBUTION REQUEST ( )
REF:
1.
( ) REQUEST IMMEDIATE NETWORKING OF THE FOLLOWING PID(S):
A.
( )
(PID NUMBER), (DATABASE [REAL WORLD OR EXERCISE]),
(REQUESTED DISTRIBUTION PLAN).
B. ( )
(PID NUMBER), (DATABASE [REAL WORLD OR EXERCISE]),
(REQUESTED DISTRIBUTION PLAN).
2.
( ) POC:
(Name, DSN and E-mail address of point of contact).
Appendix A
B-A-1
Enclosure B
CJCSM 3122.02B
25 May 2001
(INTENTIONALLY BLANK)
Appendix A
B-A-2
Enclosure B
CJCSM 3122.02B
25 May 2001
APPENDIX B TO ENCLOSURE B
COA INFORMATION DATA
During COA development, the supported commander provides the following
COA identification data (COA and OPLAN are synonymous below).
DATA
REQUIRED
ELEMENT
INFORMATION
1. Current Status
OPLAN Identification
of OPLAN.
OPLAN Date
OPLAN Security Classification
TPFDD Security Classification
2. Narrative Scope
OPLAN Title (Long Name)
and Concept.
Mission
As Required
OPLAN Objectives
Objective Area
Concept of Operations
Deployment Concept
Conditions for Execution
Assumptions
Critical Resources
Constraints
Unit Shortfalls
Resupply Shortfall
Personnel Shortfalls
Supporting OPLANs
Supporting CINCs
Major Forces in OPLAN
Plan Mobilization Required
Mobilization Lead Time
Appendix B
B-B-1
Enclosure B
CJCSM 3122.02B
25 May 2001
(INTENTIONALLY BLANK)
Appendix B
B-B-2
Enclosure B
CJCSM 3122.02B
25 May 2001
APPENDIX C TO ENCLOSURE B
SAMPLE DEPLOYMENT ESTIMATE REQUEST NEWSGROUP MESSAGE
FROM:
(SUPPORTED COMMANDER)
TO:
LIFT PROVIDER CAT
CLASSIFICATION
OPER/OPERATION NAME//
MSGID/GENADMIN/ORIGINATOR//
SUBJ/SUBJECT: DEPLOYMENT ESTIMATE ( )//
REF/A/TYPE OF REF/ORIGINATOR/DATE OR DTG/SERIAL #/SPECIAL
NOTATION//
AMPN/FREE TEXT TO EXPLAIN PRECEDING REF SET. (JNOCC MESSAGE,
JOPES DATABASE COA INITIALIZATION)//
POC/NAME/RANK-POSITION/LOC:NAME/TEL:NONSEC TEL
#/SECTEL:SECTEL #//
RMKS/MESSAGE TEXT OR COMMENTS.
1.
( ) REQUEST CONSOLIDATED
DEPLOYMENT ESTIMATE NLT (DDHHMMZMMMYY) FOR EACH OF THE
FOLLOWING:
A.
( ) COA 1.
(PID), (SHORT TITLE).
B. ( ) COA 2. (PID), (SHORT TITLE).
2.
( ) COAS ARE AVAILABLE FOR JNOCC DISTRIBUTION TO THE
FOLLOWING COMMANDERS:
A.
( ) COMMANDER A.
B. ( ) COMMANDER B.
NOTE: PARAGRAPH 2 NOT REQUIRED IF COA BUILT AS A NETWORK
PLAN.
Appendix C
B-C-1
Enclosure B
CJCSM 3122.02B
25 May 2001
NOTE: IF COA DATA NOT PROVIDED VIA JOPES, USE THE FOLLOWING
PARAGRAPH.
3.
( ) REF REQUESTED PIDS FOR _____ COAS. THESE PIDS ARE NOT IN
JOPES BECAUSE (DESCRIBE PROBLEM). REQUEST USTRANSCOM
PREPARE A CONSOLIDATED DEPLOYMENT ESTIMATE USING THE
FOLLOWING AGGREGATED DATA:
COMMON-USER *EMBARK *DEBARK
PID
MODE REGION REGION PAX BULK
OVER OUT
TOTAL
COA 1
AIR
CEN-US SWA
#
##
##
##
###
COA 1
SEA
SE-US SWA
#
##
##
##
###
4.
( ) PORT THROUGHPUT DATA:
A.
( ) APOES
(1)
( ) APOE 1
(2)
( ) APOE 2
B. ( ) SPOES
(1)
( ) SPOE 1
(2)
( ) SPOE 2
* EMBARK AND DEBARK REGIONS ARE DESCRIPTIVE OF THE GENERAL
AREA OF OVERALL ONLOAD AND OFFLOAD.//
Appendix C
B-C-2
Enclosure B
CJCSM 3122.02B
25 May 2001
APPENDIX D TO ENCLOSURE B
COA DEVELOPMENT DATA
The supported commander is responsible for entry of the following data
elements during COA development (COA and OPLAN are synonymous) (See
Enclosure D, subparagraph 3b and Appendix C to Enclosure D for guidance on
sourcing):
DATA
REQUIRED
ELEMENT
INFORMATION
1. Required Forces
ULNs in OPLAN
a. Force Description 1/ ULN Description consisting of:
ULN
ULN UTC
ULN Unit Level Code (ULC)
ULN Providing Organization
ULN SERVICE
ULN DESCRIPTION
ULN Parent Indicator Code
ULN Force Indicator Code
FM ID
b. Movement Characteristics 2/-
ULN Authorized Personnel
ULN Personnel Requiring
Transport
ULN BULK CARGO, Short Tons
(STONs)
ULN BULK CARGO,
Measurement Tons (MTONs)
ULN OVERSIZE CARGO (STONs)
ULN OVERSIZE CARGO
(MTONs)
ULN OUTSIZE CARGO (STONs)
ULN OUTSIZE CARGO (MTONs)
Appendix D
B-D-1
Enclosure B
CJCSM 3122.02B
25 May 2001
DATA
REQUIRED
ELEMENT
INFORMATION
c. Routing Data 3/
Routing data consisting of:
ULN, POD, PREFERRED MODE
ULN, POD, PREFERRED SOURCE
ULN POD GEOLOC CODE
ULN DESTINATION GEOLOC
ULN DESTINATION PREFERRED MODE
ULN DESTINATION PREFERRED
SOURCE
ULN POD PRIORITY
ULN POD LOAD CONFIGURATION
ULN POD DISCHARGE CONFIGURATION
ULN DESTINATION LOAD
CONFIGURATION
ULN DEST DISCHARGE CONSTRAINT
d. Time Phasing 4/
Delivery estimates for:
ULN POD EAD
ULN POD LAD
ULN DESTINATION RDD
CINC RDD
1/ The user may select an FM or an OPLAN in JOPES. In this case, ULNs,
cargo increment numbers (CINs), and personnel increment numbers
(PINs), with descriptions, are provided.
2/ During COA development, level 2 data entry is sufficient detail to identify
requirements. Level 4 detail should be provided after the supporting
commander components have identified tasked units.
3/ Routing data are available for OPLAN’s FMs. The user must verify this
data is correct for the crisis. If SVC FMs are used, this data must be
entered. In most cases, adjustments are needed for this data.
4/ This data usually must be changed for a crisis.
Appendix D
B-D-2
Enclosure B
CJCSM 3122.02B
25 May 2001
APPENDIX E TO ENCLOSURE B
SAMPLE COA SUPPORTABILITY NEWSGROUP MESSAGE
FROM: (SUPPORTING COMMANDER OR SERVICE COMPONENT
HEADQUARTERS)
TO:
(SUPPORTED COMMANDER)
INFO: LIFT PROVIDERS CAT
SERVICE HEADQUARTERS
ALCON
CLASSIFICATION
SUBJECT: COA SUPPORTABILITY
REF: ( ) SUPPORTED COMMANDER MESSAGE, DATE-TIME GROUP (DTG),
EVALUATION REQUEST
1.
( ) REF A REQUESTED EVALUATION OF (COAS NAMED BY PID).
2.
( )
(COA #1) CAN BE SUPPORTED WITH AVAILABLE FORCES WITH THE
FOLLOWING CONSTRAINTS:
A.
( ) LIST OF ASSUMPTIONS OR CONSTRAINTS.
B. ( )
(INCLUDE MOBILIZATION REQUIRED, LEAD TIMES).
C. ( ) RECOMMENDED POES, MODE, AND SOURCE TO POES, ETC., AS
REQUIRED.
3.
( )
(COA #2) (SAME AS 2 FOR COA #2).
A.
( ) LIST OF ASSUMPTIONS OR CONSTRAINTS.
B. ( )
(INCLUDE MOBILIZATION REQUIRED, LEAD TIMES).
C. ( ) RECOMMENDED POES, MODE AND SOURCE TO POES, ETC., AS
REQUIRED.
N. ( )
(COA #N).
DRAFTER/RELEASER
Appendix E
B-E-1
Enclosure B
CJCSM 3122.02B
25 May 2001
(INTENTIONALLY BLANK)
Appendix E
B-E-2
Enclosure B
CJCSM 3122.02B
25 May 2001
APPENDIX F TO ENCLOSURE B
SAMPLE DEPLOYMENT ESTIMATE NEWSGROUP MESSAGE
FROM: USTRANSCOM CAT/ OR OTHER LIFT PROVIDER
TO: SUPPORTED COMMANDER
INFO: SUPPORTING COMMANDERS AND SERVICE COMPONENT
HEADQUARTERS
AMC/MTMC/MSC
JOINT STAFF
SERVICE HEADQUARTERS
CLASSIFICATION
SUBJECT: DEPLOYMENT ESTIMATE ( )
REFS: A. WARNING ORDER ( )
B. SUPPORTED COMMANDER DEPLOYMENT ESTIMATE MESSAGE ( )
C. SUPPORTED COMMANDER TPFDD LETTER OF INSTRUCTION ( )
1.
( ) REF A TASKED SUPPORTED COMMANDER TO PREPARE
COMMANDER’S ESTIMATE. REF B DEFINED COA DEPLOYMENT DATA AND
REQUESTED DEPLOYMENT ESTIMATE.
2.
( ) THE DEPLOYMENT ESTIMATE FOR (COA PID) IS (DAY CXXX). AIR
LINES OF COMMUNICATION OPEN ON CXXX AND CONTINUE THROUGH
CLOSURE. SEA LINES OF COMMUNICATION OPEN ON CXXX FOR UNITS.
OCEAN LINER SERVICE FOR MOVEMENT OF SUSTAINMENT IS AVAILABLE,
AND CARGO CAN BE BOOKED IMMEDIATELY UPON RECEIPT OF A
DEPLOYMENT ORDER. BASED ON C-DAY/L-HOUR, FIRST COMMERCIAL
VESSEL CAN ARRIVE IN THE THEATER OF OPERATIONS ON CXXX.
Appendix F
B-F-1
Enclosure B
CJCSM 3122.02B
25 May 2001
3.
( ) AIRLIFT
A.
( ) AIRLIFT ASSETS REQUIRED TO SUPPORT THIS DEPLOYMENT
ESTIMATE FOLLOW. LIFT WILL BE ALLOCATED IN ACCORDANCE WITH
APPENDIX 4 TO REF C. (Lift provider should identify lift assets anticipated to
be available for execution and used in preparing the deployment estimate. This
will assist the supported commander in final prioritization of requirements
against available lift for execution.)
TYPE
TOTAL NUMBER REQUIRED TOTAL NUMBER AVAILABLE
C141
XX
XX
C17
XX
XX
C5
XX
XX
CRAF WB
XX
XX
C130
XX
XX
B. ( ) ASSUMPTIONS
(1)
( ) AVAILABILITY IS BASED ON (PROPOSED OR ASSUMED)
C-DAY, L-HOUR OF (DTG).
(2)
( ) MAXIMUM ON GROUND (MOG) (LIST BY SPECIFIC LIMITING
FACTOR AT SPECIFIC LOCATIONS (GEOLOCS). (MOG OF RESPECTIVE
APODS INCLUDE CONSIDERATIONS OF TACAIR BEDDOWN AND RESOURCE
AVAILABILITY FURNISHED BY THE SUPPORTED CINC.)
(3)
( ) CONSTRAINTS (OVERFLIGHT, LANDING RIGHTS, EN ROUTE
SUPPORT, ETC.).
(4) ( ) SECDEF AUTHORIZATION TO ACTIVATE CRAF STAGE (I, II,
AND III).
(5) ( ) AIRLIFT TO SUPPORT MOVEMENT OF TCC MISSION
SUPPORT PACKAGES IS INCLUDED IN THIS ESTIMATE.
4.
( ) SEALIFT
A.
( ) STRATEGIC SEALIFT ASSETS REQUIRED TO SUPPORT THIS
DEPLOYMENT ESTIMATE FOLLOW. LIFT WILL BE ALLOCATED IN
ACCORDANCE WITH APPENDIX 4 TO REF C.
TYPE
TOTAL NUMBER REQUIRED TOTAL NUMBER AVAILABLE
FSS
XX
XX
Appendix F
B-F-2
Enclosure B
CJCSM 3122.02B
25 May 2001
RO/RO
XX
XX
LMSR (Large Medium Speed Roll-On/Roll-Off)
XX
XX
OTHER*
XX
XX
* INCLUDES BREAKBULK, LASH, SEABEE
B. ( ) ASSUMPTIONS
(1)
( ) AVAILABILITY IS BASED ON (PROPOSED OR ASSUMED)
C-DAY, L-HOUR OF (DTG).
(2)
( ) READY RESERVE FORCE ASSETS WILL ACTIVATE WITHIN
STATED READINESS STATUS.
(3)
( ) ALL CANALS AND CHOKE POINTS REMAIN OPEN.
(4)
( ) CONVOY OPERATIONS ARE NOT REQUIRED.
(5)
( ) UNITS ARRIVE AT SPOES AND ARE AVAILABLE TO LOAD AS
STATED IN (COA PID).
(6)
( ) SUFFICIENT ONLOAD AND OFFLOAD CAPABILITY IS IN
PLACE AT SPOES AND SPODS.
(7)
( ) THERE ARE NO DELAYS BECAUSE OF BUNKERING OR
CREW SHORTAGES.
5.
( ) POC IS (NAME, RANK) AT (DSN, SECURE DSN, FAX, SECURE FAX, AND
E-MAIL).
Appendix F
B-F-3
Enclosure B
CJCSM 3122.02B
25 May 2001
(INTENTIONALLY BLANK)
Appendix F
B-F-4
Enclosure B
CJCSM 3122.02B
25 May 2001
APPENDIX G TO ENCLOSURE B
SAMPLE AMC NEWSGROUP COA DEPLOYMENT ESTIMATE MESSAGE
FROM: COM AMC
TO: USTRANSCOM CAT
CLASSIFICATION
SUBJECT: COA DEPLOYMENT ESTIMATE ( )
REF:
1.
( ) THE DEPLOYMENT ESTIMATE FOR (COA PID) FOR AMC AIRLIFT IS
(DAY CXXX).
2.
( ) ALLOCATION OF AIRLIFT FOR THIS ESTIMATE IS AS FOLLOWS:
TYPE
TOTAL NUMBER
C141
XX
C17
XX
C5
XX
CRAFWB
XX
C130
XX
3.
( ) AIRLIFT AVAILABILITY IS BASED ON (PROPOSED OR ASSUMED)
C-DAY/L-HOUR OF (DTG).
4.
( ) ASSUMPTIONS MADE FOR THIS ESTIMATE ARE:
A.
( ) MOG (BY SPECIFIC LIMITING FACTOR AT SPECIFIC STATION.
B. ( ) CONSTRAINTS (OVERFLIGHT AND LANDING RIGHTS AND
CONSTRAINTS).
C. ( ) AIRCRAFT AVAILABILITY (GIVE REASONS).
D. ( ) OTHERS.
Appendix G
B-G-1
Enclosure B
CJCSM 3122.02B
25 May 2001
5.
( ) AMC MISSION SUPPORT REQUIREMENTS (ARE OR ARE NOT)
CONSIDERED IN THIS ESTIMATE.
DECL/CLBY:
;RES:
;DECLON:
//
OR
DECL/DERFR:
;DECLON:
//
DRAFTER:
RELEASER:
Appendix G
B-G-2
Enclosure B
CJCSM 3122.02B
25 May 2001
APPENDIX H TO ENCLOSURE B
SAMPLE MTMC COA DEPLOYMENT ESTIMATE NEWSGROUP MESSAGE
FROM: COM MTMC
TO: USTRANSCOM CAT
CLASSIFICATION
SUBJECT: COA DEPLOYMENT ESTIMATE ( )
REF:
1.
( ) MTMC (CAN OR CANNOT) SUPPORT (COA PID) ORIGIN TO POE LAND
CONUS MOVEMENTS.
2.
( ) ASSUMPTIONS FOR THIS ESTIMATE ARE:
A.
( )
(LIST OF CONSTRAINTS OR LIMITING FACTIONS.)
B. ( )
C. ( )
D. ( )
3.
( ) THIS ESTIMATE IS BASED ON (PROPOSED OR ASSUMED)
C-DAY/L-HOUR OF (DTG).
DECL/CLBY:
;RES:
;DECLON:
//
OR
DECL/DERFR:
;DECLON:
//
DRAFTER:
RELEASER:
Appendix H
B-H-1
Enclosure B
CJCSM 3122.02B
25 May 2001
(INTENTIONALLY BLANK)
Appendix H
B-H-2
Enclosure B
CJCSM 3122.02B
25 May 2001
APPENDIX I TO ENCLOSURE B
SAMPLE MSC COA DEPLOYMENT ESTIMATE NEWSGROUP MESSAGE
FROM: COM MSC
TO: USTRANSCOM
CLASSIFICATION
SUBJECT: COA DEPLOYMENT ESTIMATE ( )
REF:
1.
( ) THE DEPLOYMENT ESTIMATE FOR (COA PID) FOR MSC STRATEGIC
SEALIFT IS (DAY CXXX).
2.
( ) ALLOCATION OF STRATEGIC SEALIFT FOR THIS ESTIMATE IS AS
FOLLOWS:
TYPE
TOTAL NUMBER
3.
( ) STRATEGIC SEALIFT AVAILABILITY IS BASED ON (PROPOSED OR
ASSUMED) C-DAY/L-HOUR OF (DTG).
4.
( ) ASSUMPTIONS FOR THIS ESTIMATE INCLUDE:
A.
( )
(PORT DOCKING AND DISCHARGE PRIORITY RIGHTS AND
CONSTRAINTS.)
B. ( )
(SAILING TIMES BY TYPE SHIP.)
C. ( ) PORT LOAD AND DISCHARGE RATES (BASED UPON VALUES
PROVIDED BY THE SUPPORTED COMMANDER.)
D. ( )
*
Appendix I
B-I-1
Enclosure B
CJCSM 3122.02B
25 May 2001
E. ( )
F.
( )
DECL/CLBY:
;RES:
;DECLON:
//
OR
DECL/DERFR:
;DECLON:
//
DRAFTER:
RELEASER:
Appendix I
B-I-2
Enclosure B
CJCSM 3122.02B
25 May 2001
ENCLOSURE C
COA SELECTION
General. Phase IV begins when COAs are presented to the NCA and ends when
a COA is selected. The primary activity in Phase IV rests with the Chairman of
the Joint Chiefs of Staff and the NCA following procedures detailed in reference
a. The supported commander continues to monitor the situation and to
prepare in-theater forces for preparatory moves. The supporting commanders
prepare to specify forces to support the COAs under consideration while other
members of the JPEC continue monitoring and coordinating activities of
previous phases.
C-1
Enclosure C
CJCSM 3122.02B
25 May 2001
(INTENTIONALLY BLANK)
C-2
Enclosure C
CJCSM 3122.02B
25 May 2001
ENCLOSURE D
EXECUTION PLANNING
1. General. Phase V, Execution Planning, begins when a planning or an alert
order is received and ends when an executable operation order (OPORD) is
developed and approved for execution on order. JOPES procedures supporting
the JPEC during CAP Phase V are extremely critical to successful execution
and must be accomplished in a timely and accurate fashion.
2. Supported Commander. The supported commander, upon receipt of an
alert order or planning order, converts the approved or selected COA into an
OPORD. This process generally includes the following steps.
a. Reviewing Warning, Alert, or Planning Order. The warning order, alert
order, or planning order normally establishes the proposed C-day and L-hour.
However, the actual C-day/L-hour may not be established until approval of an
execute or deployment order. The alert order may also give authority, if
appropriate, to pre-position strategic lift assets preparatory to deployment
operations for the selected COA. Coordinating instructions establish time
frames for each JPEC member to complete their assigned deployment execution
planning tasks. The supported commander reviews both messages and begins
detailed execution planning for the selected COA. (Note: FMs should be built
during execution planning to allow tracking of the commander’s designated
major force units. General guidelines are provided in the Standard TPFDD LOI.
The supported commander may further refine these guidelines in the AOR-
specific supplemental instructions.)
b. Review or Publish AOR-Specific Supplemental Instructions for the
Standard TPFDD LOI. A message in the crisis newsgroup will be used to
announce the availability of required revisions.
c. Review and Update the AOR-Specific Supplement to the Standard TPFDD
LOI. Changes required to CINC/AOR specific supplement to the standard
TPFDD LOI should be made and published on the supported commander’s
home page. A message in the crisis newsgroup will be used to announce the
availability of required revisions.
d. Adjusting COA/OPORD. The supported commander, in close
coordination with supporting commanders and Service components, reviews
force and sustainment requirements and makes adjustments to the COA as
required to meet alert or planning order guidance. Using the available
automated data processing systems the supporting commander adjusts
D-1
Enclosure D
CJCSM 3122.02B
25 May 2001
priorities and delivery time frames.
(Note: Nonunit requirements in this phase
are notional estimates and are used primarily to ensure available lift is
reserved for movement of actual resupply and/or replacements. The nonunit
portion of the TPFDD is not executable.)
e. Validation. The first deployment increment (usually the first 7 days of
airlift and ground movement and first 30 days of sealift) is validated for
movement scheduling by earliest arrival date (EAD). Validation is the
execution procedure used by supported commander components, supporting
commanders, and providing organizations to confirm to the supported
commander and lift providers that all validated TPFDD records contain no fatal
transportation pre-edit report errors and accurately reflect the current status,
attributes, and availability of unit requirements. Unit readiness, movement
dates, and passenger and cargo details are confirmed with units before
validation occurs. The supported commander’s validation of a requirement
indicates the force and the timing of its arrival/departure support the
operational mission. Any exceptions must be noted in the appropriate
newsgroup with supporting rationale. Failure to validate these details may
result in invalidation of the requirement(s) during the scheduling process. The
validation process, especially during a large multi-Service deployment, involves
close coordination among supported and supporting commanders, Service
components, and lift providers. Direct liaison among components of supported
and supporting commanders, the moving units, and lift providers is essential
for coordinating details of deployment. Supported commander directs
compliance with TPFDD validation process/procedures as outlined in the
Standard TPFDD LOI, including the CINC/AOR-specific supplement to the
standard TPFDD LOI. Validation of the TPFDD begins during the execution-
planning phase and continues into actual execution.
f. Scheduling and Assessing Deployment. Strategic and theater lift
providers notify the JPEC when schedules are loaded into JOPES. Lift
providers must understand the modes and sources of transportation entered in
the TPFDD as "preferred" (as per reference c) and are not final requirements of
the supported commander. Lift providers must coordinate all legs of movement
to provide the supported commander with the most efficient, effective lift
available. The supported commander’s movement control agencies and lift
providers begin to assess the deployment flow in theater, both in light of forces
moving from theater locations to elsewhere in theater and Joint Reception,
Staging, Onward Movement, and Integration of forces from outside the
supported commander’s theater.
D-2
Enclosure D
CJCSM 3122.02B
25 May 2001
3. Supporting Commanders and Service Components of the Supported
Commander. Upon receipt of the alert order or planning order, each
supporting commander, and the Service components of the supported
commander, review force requirements in the appropriate PID and FM for the
COA selected, source force requirements, adjust requirements to reflect actual
unit movement characteristics, and schedule or allocate organic movements for
the first increment of deployment. In addition, supporting commanders and
the Service components of the supported commander establish preparatory
and pre-positioning support and publish OPORDs to support the COA. In an
expanding operation, requirement identification and sourcing are continuous
actions during execution.
a. Review Supported Commander’s LOI. Each supporting commander
receives and reviews the supported commander’s AOR-specific supplemental
instructions to the standard TPFDD LOI. The Service components of the
supported commander source those requirements that can be filled by in-
theater assets (see Appendix C for required information). The supported
commander, generally through his Service components, then adjusts TPFDD
COAs and notifies supporting commanders and lift providers via the operation
newsgroup that the COA TPFDD is ready for sourcing (see Appendix B).
b. Source Force Requirements. Upon notification from the supported
commander that the COA TPFDD is available for sourcing, supporting
commanders begin specifying units to satisfy COA force requirements.
Supporting commanders enter required information (Appendix C) on specified
forces, including origin, unit identification code (UIC), unit name, ready to load
date/available to load date (RLD/ALD), mode and source to preferred POE, and
unit movement characteristics to the fourth level of detail (unless stipulated
otherwise by the supported commander). Level 4 detail enhances strategic lift
allocation and scheduling accuracy and efficiency. Automated interfaces
should be used to the maximum extent possible to provide actual unit
movement characteristics. During this process, the supporting commanders
identify force and sustainment shortfalls and coordinate resolution with the
supported commander. Supporting commanders will continue to coordinate
with the JPEC to update the JOPES database with changing requirements and
sourcing information, including any necessary POE adjustments. This may
require fragmentation (FRAG) and insert coding when large requirements are
split between multiple ports. When small units will be moved via crisis
channel airlift, APOEs and APODs will be changed to reflect channel routing
established by the supported commander and lift provider that establish
channels.
D-3
Enclosure D
CJCSM 3122.02B
25 May 2001
c. Hazardous Cargo. The lift providers require specific information on
hazardous cargo in accordance with reference d as specified by the Code of
Federal Regulations, title 49. The supported commander provides this
information through the use of specific crisis newsgroup. Standard TPFDD LOI
contains a sample message used to declare/coordinate hazardous material
(HAZMAT).
d. Additional Information Required for Lift Requirements. Unit movement
data entered into JOPES at the fourth level of detail and validated by the
supported commander will establish the movement requirement. When
additional information is required, lift providers will so indicate in the
appropriate newsgroup and coordinate with the supported commander for
incorporation into the supplemental instructions.
e. Schedule Organic Moves. Supporting commanders and Service
components of the supported commander will validate to the supported
commander that all sourcing is complete for the first increment of the
deployment flow (first 7 days for air and overland, 30 days for sea), and
schedule lift and allocate requirements for organic movements in JOPES.
4. Lift Providers. Based on the tentative or actual dates of operation contained
in the warning order, alert order, or planning order, lift providers will
coordinate an initial validation with the supported command. Where possible,
this date will be established 72-96 hours before the actual C-day. This lead
time is desired to prepare scheduling information with sufficient time available
to notify deploying units with port departure times.
a. Airlift
(1) Identify Validated Airlift Requirements. A sample validation message
is in Appendix E. Validated requirements are identified by the presence of "V"
in the Schedule Status Flag (SSF) as outlined in Section III of the Standard
TPFDD LOI. USTRANSCOM-validated requirements are identified by the
presence of "T" in the SSF. The supported commander, in coordination with lift
providers, will establish the number of days in advance of the EAD that ULNs
will be validated. Lift providers will advise the supported commander of the
number of days in advance that they can provide mission schedules. The
initial requirements pull will normally cover the first 7 days (LAD C000-C006)
of required moves.
(2) Develop and Enter Air Movement Schedules. Lift providers will enter
initial schedules into the JOPES database as soon as possible, but not later
than 36 hours after the initial validation, or ALD minus 3 days, whichever is
sooner. If the first 7 days or more of requirements are validated, lift providers
D-4
Enclosure D
CJCSM 3122.02B
25 May 2001
will enter the first 4 days of schedules. If fewer than 7 days are validated, lift
providers will schedule 4 days or the number of days validated, whichever is
less. Lift providers will notify the JPEC via the crisis newsgroup when the
initial schedules are entered. When a crisis channel has been established to
aggregate small unit movements, lift providers will provide the schedules in
JOPES.
(3) Adjust Air Movement Schedules. Lift providers are responsible for
maintenance of accurate schedule information in JOPES. Required schedule
data are listed in Appendix E.
(4) Report Preparatory Moves and Lift Pre-positioning. Based on receipt
of a CJCS deployment order or deployment preparation order, lift providers will
determine and position en route infrastructure forces to support air, land, and
sea movements in the COA TPFDD. Lift providers, including AMC/TACC, will
enter those forces in the appropriate PID for supported commander visibility
and validation. Validation of all movement prior to C-Day should follow normal
validation procedures and lead times. Requirements that must move without
normal lead times will be worked on a case-by-case basis.
(5) GO-PAX/Commercial Ticket Program (CTP). Movement under the
CTP is restricted to exercise movement requirements. AMC schedulers will
submit CTP movement recommendations to USTRANSCOM. The supported
commander is the approving authority for CTP movements recommended by
USCINCTRANS. The supported commander identifies ULNs approved for CTP by
recoding mode/source fields from A/K to A/L. Supporting commanders
coordinate with installation transportation offices to move personnel and
equipment between unit installations and commercial ports.
b. Sealift
(1) Identify Validated Sea and Inland Waterway Movement
Requirements. After validation of sea movement requirements by the
supported commander, sealift providers will commence scheduling actions. FM
(Appendix D) will identify validated requirements. Validated requirements are
identified by the presence of "V" in the SSF, as outlined in the standard TPFDD
LOI. USTRANSCOM validated requirements are identified by the presence of
"T" in the SSF. The TPFDD LOI and CINC/AOR specific supplement establish
the number of days in advance of the EAD that ULNs will be validated.
(Initially, the first 30 days of sealift requirements are candidates for validation
if no CINC-specific guidance are provided.) The initial validation increment will
normally cover the first 30 days of movement requirements (EAD of C029 or
less). Lift providers will validate, consolidate, and update seaports for
deploying forces in the JOPES database for the development of initial sea and
D-5
Enclosure D
CJCSM 3122.02B
25 May 2001
inland waterway lift schedules. Lift providers will then notify the JPEC via the
newsgroup of changes to SPOEs and ALDs. Supported and supporting
commanders will in turn notify deploying units.
(2) Allocate Movement Requirements to Sea and Inland Waterway
Carriers. At ports where MTMC operates the port cargo documentation system,
MTMC will allocate movement requirements in JOPES to sealift carriers. The
Navy component of the supported commander is responsible for allocating
requirements to MSC withhold ships. The theater common-user sea or inland
waterway carrier provider is responsible for allocating requirements to
common-user sea or inland waterway carriers. This procedure will begin as
cargo processing and prestow planning commence at the port. In all cases,
movement requirement allocations will be confirmed in the database 48 hours
before sailing.
(3) Schedule Sea and Inland Waterway Movement. Sea and inland
waterway lift providers will provide carrier itineraries and allocations within 36
hours of receipt of validated requirements. If no CINC-specific guidance is
provided in the TPFDD LOI supplement, 4 days of sea and inland waterway
schedules will be maintained in the JOPES database. Initial schedules will be
entered not later than 48 hours before a unit’s port call. Follow-on schedules
for requirements after the first initial increment will be entered 2 weeks before
a vessel’s arrival at the port. For strategic sealift dedicated (withheld) by the
supported commander for specific uses, MSC will identify ships by name, sail
them to SPOEs, and notify users of projected arrivals at SPOEs. Dedicated
sealift schedules will be entered by the supported command, normally through
its Navy component.
(4) Movement Procedures Guidance for Sealift Liner Service. To be
published.
(5) Unit Preparatory Moves. Unit preparatory moves in support of a
crisis will be reflected in the COA TPFDD as pre-C-day or N-day movement or
pre-positioning requirements in accordance with the standard TPFDD LOI and
CINC/AOR-specific supplement. If C-day has been declared and the
preparatory movement requirements are reflected as part of the JOPES
database, lift providers will schedule to meet these requirements as part of the
initial validation process. Procedures addressing how to move forces during
pre-positioning legally and ensuring costs are or will be covered by contingency
funds must be published in advance by the Joint Staff for moving forces
supporting a crisis operation for which no Joint Staff execute order or
deployment order has been issued.
D-6
Enclosure D
CJCSM 3122.02B
25 May 2001
c. Overland (Rail, Truck, Bus) Transportation
(1) Identify Validated Overland Movement Requirements. After
validation of overland movement requirements by the supported commander,
overland lift providers will commence scheduling actions. FM will identify
validated requirements. The initial validation increment will normally cover the
first 7 days of movement requirements. Overland lift providers will validate,
consolidate, and update railheads and marshalling areas for deployment forces
in the JOPES database for the development of initial overland lift schedules.
(2) Allocate Movement Requirements to Overland Carriers. At railheads
where MTMC operates the cargo documentation system, MTMC will allocate
movement requirements in JOPES to rail carriers. The theater common-user
overland transportation provider is responsible for allocating requirements to
common-user overland carriers. In all cases, movement requirement
allocations will be confirmed in the database 48 hours before movement
commences.
(3) Schedule Overland Movement. Overland lift providers will provide
carrier itineraries and allocations within 36 hours of receipt of validated
requirements. Normally, 4 days of overland schedules will be maintained in
the JOPES database. Initial schedules will be entered not later than 48 hours
before a requirement’s departure date (dependent upon movement leg for which
transportation is scheduled). Follow-on schedules for requirements after the
first 7-day increment will be entered 48 hours before a requirement’s departure
date.
5. Services. Upon receipt of the alert order or planning order, the Services
review guidance and coordinate adjustments to sustainment and determine
mobilization requirements accordingly. Additionally, the Services will review
the supported commander’s supplemental instructions to the standard TPFDD
LOI. Services confirm availability of sustainment requirements with the Service
component commander based on the latest CJCS guidance.
D-7
Enclosure D
CJCSM 3122.02B
25 May 2001
(INTENTIONALLY BLANK)
D-8
Enclosure D
CJCSM 3122.02B
25 May 2001
APPENDIX A TO ENCLOSURE D
STRATEGIC ORGANIC SCHEDULES AND MANIFEST DATA
The supporting commander enters the following strategic organic movement
schedule and manifest data in JOPES.
INFORMATION
REQUIRED
REQUIREMENT
INFORMATION
1. TPFDD Identification
PID
2. Carrier Identification
Organic Carrier Name
Carrier Type
Carrier Configuration
Providing Organization
3. Schedule
Schedule Departure Date
Schedule Arrival Date
Schedule Departure Time
Schedule Arrival Time
Intermediate Stop Location
Reason for Stop
4. Routing
On-Load Location
Off-Load Location
5. Manifest
Requirement to be Manifested
OPLAN
Type of Manifest
Bulk STONs for Carrier
Oversize STONs for Carrier
Outsize STONs for Carrier
Total STONs on Carrier
Total MTONs on Carrier
Passenger on Carrier
6. Carrier Capacity
Maximum Passengers
Maximum STONs
Appendix A
D-A-1
Enclosure D
CJCSM 3122.02B
25 May 2001
(INTENTIONALLY BLANK)
Appendix A
D-A-2
Enclosure D
CJCSM 3122.02B
25 May 2001
APPENDIX B TO ENCLOSURE D
SAMPLE REQUEST FOR SOURCING NEWSGROUP MESSAGE
FROM: SUPPORTED COMMANDER
TO: SUPPORTING COMMANDER A
SUPPORTING COMMANDER B
SERVICE HEADQUARTERS (OPTIONAL)
INFO: JOINT STAFF/J-4
CLASSIFICATION
SUBJECT: REQUEST FOR SOURCING ( )
REF: A. ( ) CJCS MESSAGE (MESSAGE DTG), ALERT ORDER FOR
(CRISIS NAME).
B. ( ) STANDARD TPFDD LOI AND SUPPORTED COMMANDER’S
SUPPLEMENTAL INSTRUCTIONS TO SAME.
1.
( ) IN ACCORDANCE WITH REFS A AND B, COA(S) AND (PIDS) ARE
PROVIDED TO SUPPORTING COMMANDERS FOR SOURCING AND
SCHEDULING OF STRATEGIC ORGANIC MOVEMENTS.
2.
( )
(OPTIONAL) REQUEST (SERVICE HEADQUARTERS NAMES)
DETERMINE SUSTAINMENT REQUIREMENTS AND NOTIFY J-4 OF
TRANSPORTATION ALLOCATION REQUIREMENTS.
3.
( ) REQUEST SUPPORTING COMMANDERS IDENTIFY FORCE
SHORTFALLS AS SOON AS POSSIBLE.
DECL/CLBY:
;RES:
;DECLON:
//
OR
DECL/DERFR:
;DECLON:
//
DRAFTER
RELEASER:
Appendix B
D-B-1
Enclosure D
CJCSM 3122.02B
25 May 2001
(INTENTIONALLY BLANK)
Appendix B
D-B-2
Enclosure D
CJCSM 3122.02B
25 May 2001
APPENDIX C TO ENCLOSURE D
SPECIFIED FORCE DATA
The supported and supporting commanders enter specified force data during
execution planning. Force data consists of the following:
INFORMATION
REQUIRED
REQUIREMENT
INFORMATION
1. Specify Forces to
UIC
Support OPORD Execution
Designated Unit Name
2. Unique Air Force, Army, Navy, Marine Corps and Coast Guard data
requirements:
a. Air Force
Air Force Component of Force
Air Force Major Command of Force
Air Force Force Designator
Air Force Designated Arm
b. Army
Initial Army Gaining Command
Army Unit Designated
Army Branch of Service
Combat Unit Designator
Short Name of Army Force
Army Component of Force
Army Standard Requirements Code
Troop Program Sequence Number
c. Navy
Indicator for Type of Navy Ship
Registration Number of Ship
d. Marine Corps
Initial Gaining Command
Specific Force Grouping
Unit Designator
Combat Unit Designator
e. Coast Guard
Indicator for Type of Coast Guard Cutter
Appendix C
D-C-1
Enclosure D
CJCSM 3122.02B
25 May 2001
INFORMATION
REQUIRED
REQUIREMENT
INFORMATION
3. Deployment Flow of
GEOLOC of Intermediate Location
Forces
Country Code of Intermediate Location
Preferred Mode of Transport to Intermediate
Location
Preferred Source of Trans to Intermediate
Location
Days Delay at Intermediate Location
Type of Delay at Intermediate Location
Where Intermediate Location Occurs
Loading for Del to Intermediate Location
Unloading Limits at Intermediate Location
4. Routing Data
GEOLOC of Origin
GEOLOC of Requested POE
Preferred Mode of Transport to POE
Preferred Source of Transport to POE
5. Time Phasing
Day Unit Ready to Load
Available to Load Day at POE
6. Movement
Actual Unit Data
Characteristics
Appendix C
D-C-2
Enclosure D
CJCSM 3122.02B
25 May 2001
APPENDIX D TO ENCLOSURE D
SAMPLE JOPES SCHEDULE REQUIREMENTS PULL NEWSGROUP MESSAGE
FROM: USTRANSCOM CAT
TO: AMC/MTMC/MSC
INFO: SUPPORTED/SUPPORTING COMMANDERS
CJCS
SERVICES
DEFENSE LOGISTICS AGENCY
CLASSIFICATION
SUBJECT: JOPES SCHEDULE (REQUIREMENTS PULL)
REF:
1.
( ) THE JOPES TPFDD MOVEMENT REQUIREMENTS HAVE BEEN
VALIDATED FOR PULL AND SCHEDULING FOR THE PERIOD: (AIR
MOVEMENT: (EAD) THROUGH (LAD)) OR (SEA MOVEMENT: (EAD)
THROUGH (LAD)).
2.
( ) FOR AMC: REQUEST DEPLOYMENT SCHEDULES FOR THE ABOVE
PERIOD BE DEVELOPED AND ENTERED IN JOPES AT THE EARLIEST
POSSIBLE TIME, BUT NOT LATER THAN __________________________.
FURTHER REQUEST YOU NOTIFY USTRANSCOM CAT WHEN SCHEDULES
FOR THE ABOVE PERIOD HAVE BEEN ENTERED IN JOPES.
3.
( ) FOR MTMC: CONUS STRATEGIC MOVEMENT SCHEDULES MAY BE
ENTERED AT THIS TIME. ADDITIONALLY, REQUEST SPOE CONSOLIDATION
BE REFLECTED IN THE JOPES DATABASE NO LATER THAN
_____________________. NOTIFY MSC IMMEDIATELY UPON COMPLETION OF
PORT CONSOLIDATION.
4.
( ) FOR MSC: REQUEST DEPLOYMENT SCHEDULES FOR THE ABOVE
PERIOD BE DEVELOPED AND ENTERED IN JOPES NO LATER THAN 48
HOURS FOLLOWING NOTIFICATION FROM MTMC OF PORT
CONSOLIDATION.
Appendix D
D-D-1
Enclosure D
CJCSM 3122.02B
25 May 2001
DECL/CLBY:
;RES:
;DECLON:
//
OR
DECL/DERFR:
;DECLON:
//
DRAFTER:
RELEASER:
*Note: LADs may be used in lieu of EADs if deemed more advantageous to the
operation and agreeable to the supported commander and USTRANSCOM.
Appendix D
D-D-2
Enclosure D
CJCSM 3122.02B
25 May 2001
APPENDIX E TO ENCLOSURE D
LIFT PROVIDER SCHEDULE DATA
Lift Provider enters the following schedule data in JOPES during deployment
planning and execution.
INFORMATION
REQUIRED
REQUIREMENT
INFORMATION
1. Carrier Identifi-
Carrier Name
cation
Carrier Type
Carrier Configuration
Carrier Source
Carrier OPLAN
2. Carrier Capability
Maximum Passenger Capacity
Maximum STON Capacity
Maximum MTON Capacity
3. Carrier Itinerary
On-Load GEOLOCs
Off-Load GEOLOCs
Intermediate Stop GEOLOCs
Reason for Stop (Stop Code)
Planned Arrival Date at each GEOLOC
Planned Departure Date at each GEOLOC
Planned Arrival Time at each GEOLOC
Planned Departure Time at each GEOLOC
4. ULN Allocation to
ULNs Planned for each Carrier
Carriers
Appendix E
D-E-1
Enclosure D
CJCSM 3122.02B
25 May 2001
(INTENTIONALLY BLANK)
Appendix E
D-E-2
Enclosure D
CJCSM 3122.02B
25 May 2001
APPENDIX F TO ENCLOSURE D
MSC SCHEDULE DATA
MSC provides the following schedule data in JOPES during execution planning
and execution.
INFORMATION
REQUIRED
REQUIREMENT
INFORMATION
1. Carrier
Carrier Name
Identification
Carrier Type
Carrier Configuration
Carrier Source
Carrier OPLAN
2. Carrier Capability
Maximum Passenger Capacity
Maximum STON Capacity
Maximum MTON Capacity
3. Carrier Itinerary
On-Load GEOLOCs
Off-Load GEOLOCs
Intermediate Stop GEOLOCs
Reason for Stop (Stop Code)
Planned Arrival Date at Each GEOLOC
Planned Departure Date at Each GEOLOC
Planned Arrival Time at Each GEOLOC
Planned Departure Time at Each GEOLOC
Appendix F
D-F-1
Enclosure D
CJCSM 3122.02B
25 May 2001
(INTENTIONALLY BLANK)
Appendix F
D-F-2
Enclosure D
CJCSM 3122.02B
25 May 2001
ENCLOSURE E
EXECUTION
1. General. Phase VI, Execution, begins with the decision to execute an
OPORD, normally transmitted by a CJCS execute order, and continues until
the crisis end state is achieved. The execute order establishes a firm C-day
and L-hour for deployment and details any significant changes to warning
order and alert order guidance. Upon receipt of the CJCS execute order, the
supported commander issues an execute order to the subordinate
commanders. The JPEC then makes any required adjustments to its OPORDs
and updates movement requirements in the TPFDD if required by the latest
guidance. Supporting commanders and Service component commanders will
execute the deployment of the first increment of scheduled movement.
Scheduling and movement of subsequent increments of forces will continue for
the duration of the operation. At execution, visibility must be maintained over
the deploying force. Proper allocation of TPFDD requirements to carriers and
adjudication of planned versus actual lift are necessary to ensure a smooth,
controlled deployment in consonance with the supported commander’s
concept. To be successful in this task requires a coordinated effort by the
entire JPEC.
2. Supported Commander, Adjust Requirements and Deployment. The
supported commander monitors the deployment and adjusts force
requirements based on the employment situation. Adjustments to validated
requirements may have a significant impact on deployment flow and should not
be initiated without proper coordination. Such adjustments to the deployment
must be coordinated with supporting commanders and the supported
commander. Additionally, if the supported commander requires a change to
scheduled carriers, the lift provider must be notified via the operation
newsgroup to coordinate the change. In-the-window changes to validated
requirements which effect scheduled lift require GO/FO authority, documented
in the operation newsgroup, per the standard TPFDD LOI.
a. FDO Adjustments. IF FDO forces have deployed or are scheduled to
deploy, the supported commander must establish procedures to prevent
confusion with non-FDO forces in the same PID. This process may be
accomplished by moving FDO forces to a separate PID for execution using FMs
or other procedures coordinated between the supported commander and the lift
provider. If the parent plan is executed before completing the FDO deployment
within the same TPFDD, the following procedures may be used:
E-1
Enclosure E
CJCSM 3122.02B
25 May 2001
(1) The Chairman of the Joint Chiefs of Staff coordinates with lift
providers and the supported commander to establish C-day and L-hour for the
parent plan and issues an execute order.
(2) Lift providers, in coordination with their components, examine the
ongoing FDO deployment to determine which requirements have already been
considered for scheduling. Lift providers will then inform the supported
commander of any FDO deployment requirements that have not yet been
scheduled.
(3) If a separate FDO PID is used, the supported commander deletes
unscheduled requirements from the FDO PID and adjusts the time phasing for
the same requirements in the parent PID to reflect deployment priorities. The
objective is to complete FDO deployment and transition to execution of the
parent plan.
b. Monitor Arrival of Forces. The supported commander monitors arrival of
forces using the Global Transportation Network (GTN), the Scheduling and
Movement (S&M) or Rapid Query Tool (RQT) applications in JOPES. Utilizing
its movement control agencies and intratheater lift providers, the supported
commander receives, stages, onward moves, and integrates arriving forces from
PODs to destinations.
c. Validate Next Increment. Once the first increment of the deployment is
underway, the supported commander will normally validate subsequent
movement requirements in accordance with the schedule established in the
standard TPFDD LOI and CINC/AOR-specific supplement. In addition, the
supported commander will coordinate with lift providers to expand validation
submission days as the situation dictates. It is critical to lift providers that
this validation be as accurate as possible. If strategic lift is apportioned to
support the operation, all requirements eligible for strategic lift will be used to
build schedules within the supported commander’s apportioned lift.
Requirements added, deleted, or changed after validation to reflect changes in
force allocation, sequence, or the supported commander in accordance with the
standard TPFDD LOI must approve priority. When each increment of the
TPFDD has been validated for scheduling, the supported commander sends a
validation message to lift providers, with information copies to the supported
commander’s Service component commands and supporting commands and
agencies (Appendix A). This validation procedure continues every Monday,
Wednesday, and Friday until deployments are completed. When a 24-hour
increment has been validated for scheduling, the supported commander sends
a validation message to USTRANSCOM (Appendix A).
E-2
Enclosure E
CJCSM 3122.02B
25 May 2001
d. Allocation and Manifesting Procedures. Allocation and manifesting
procedures and responsibilities are described later in this enclosure and in
Enclosure F (In-Transit Visibility). Procedures are outlined in the standard
TPFDD LOI.
e. Noncombatant Evacuation Operations (NEO) and Medical Evacuation
(MEDEVAC). Supported commanders will enter or modify actual movement
requirements for NEO and MEDEVAC cargo and passengers returning from the
theater of operation. The supported commander will coordinate changes to
airlift and sealift ULNs with lift providers and allocate requirements to the
appropriate carriers. Lift providers will adjust stop codes in the scheduling
records to provide for new on-load and off-load locations. The supported
commander will not change timing or scheduled stop locations without
coordinating with lift providers.
3. Supporting Commanders. During execution, supporting commanders and
component commanders verify sourcing performed in execution planning,
ensure nonstrategic schedules are correct, and report movements and changes
required during deployments.
a. Request Validation for Sourced Requirements. Using the operation
newsgroup, supporting commander’s Service component commands request
validation of specified forces to the supported commander’s corresponding
Service component commands. Validation by EAD is for the first 7 days of air
movement (APOE to APOD)and the first 30 days of sea or inland waterway
movement (SPOE to seaport of debarkation (SPOD) for strategic sealift;
dependent upon leg of transportation to which lift has been allocated for other
sources of sea and inland waterway lift), and the first 7 days of overland
movement (point of origin (POO) to POE for MTMC provided rail transportation;
dependent upon the leg of transportation to which overland lift has been
allocated for other sources of overland lift). The validation window may be
expanded according to what is specified in the supported commander’s
standard TPFDD LOI, AOR-specific supplemental instructions. During
execution, forces are validated on Monday, Wednesday, and Friday of each
week (unless prescribed otherwise by the supported commander) in
preparation for incremental scheduling by lift providers.
b. Enter Organic Movement Schedules and Manifests. Supporting
commanders (or their Service component commands) enter organic movement
schedules and manifests in S&M and ensure the strategic leg of organic schedules
are in accordance with the execute order.
E-3
Enclosure E
CJCSM 3122.02B
25 May 2001
c. Reporting Actual Movements. Supporting commanders report actual organic
movements using the JOPES S&M application subsystem and the newsgroup or
other agreed upon method. Data to be entered are listed in Appendix B.
d. Continue to Allocate Requirements to Carriers. Lift providers will continue
to notify the supported command via the newsgroup when allocations are entered.
All movement requirements arriving at any route location that are not resident in
JOPES must be entered into the JOPES database by the providing organization.
The activity operating the embarkation facility will identify any such movement
requirements to the supporting commander for resolution via the newsgroup.
e. Reporting Changes to Validated Requirements. After validated
requirements have been scheduled and deployment activities have begun, the
supporting commanders will monitor the flow to ensure unit requirements are
deploying as planned. Request for changes to validated requirements will be
identified to the supported commander by the most expeditious means and
documented in the newsgroup. If approved by the supported commander,
changes will be accomplished by the supporting commander component
commander or supporting commander in accordance with supported
commander direction as indicated in the standard TPFDD LOI. When the
supporting commander or supported commander’s Service component requests
revalidation of requirements to which coordinated changes have been made,
those changes should be noted in the revalidation request message. The
supported commander will include the changes made to revalidated
requirements in the revalidation newsgroup message to the lift provider(s).
f. Reporting Insufficient Lift to Transport a Validated Requirement. If units
are not able to fully deploy on their designated lift, the supporting commander
will identify the lift shortfall and corresponding ULNs to lift providers through
the supported commander for resolution. If the lift is not sufficient because of
unplanned requirements arriving at the POE, the supporting commander must
investigate the reasons for excess requirements. If the excess requirement was
not previously validated, the requirement must be returned to origin. If the
excess requirement was validated, the supporting command will notify the
supported command that insufficient lift was scheduled against validated
requirements. The supported command will resolve the issue with the lift
provider. Supporting commands are responsible for ensuring that TPFDD ULN
data matches load plan data for their units.
g. Adjustments to Schedules. Supporting commands and nonstrategic lift
providers will enter changes to organic and nonstrategic lift schedules and
requirement allocations as they occur. TCCs will enter changes to strategic
schedules and requirement allocations as they occur. JOPES schedules will
reflect the latest itinerary, departure, and arrival times. This information is
E-4
Enclosure E
CJCSM 3122.02B
25 May 2001
required to keep the supported commander apprised of the total deployment
flow for force reception, staging, onward movement, and integration. When the
supporting commander or supported commander’s Service component requests
revalidation of requirements to which coordinated changes have been made,
those changes should be noted in the revalidation request message. The
supported command will include the changes made to revalidated requirements
in the revalidation newsgroup message to the lift provider(s).
h. Sourcing and Validating the Next Increment. Once movement has
begun, supporting commanders, agencies, and the supported commander’s
Service components will source and request validation of specified forces before
incremental scheduling. The sourcing may be completed for the entire
deployment flow, but validation requests will take place as prescribed by the
standard TPFDD LOI. Detailed validation procedures are covered by the
standard TPFDD LOI and expanded in AOR-specific supplemental instructions.
This recurring process continues until all sourced units are deployed.
4. Lift Providers. In conjunction with the supported commander, lift providers
will manage the deployment, direct required adjustments to schedules and
modes and sources of transport, and resolve airlift, sealift, and overland
transportation shortfalls. If required, lift providers will coordinate any
adjustments to deployment or other major changes to deployment parameters
with the supported commander. Lift providers will also provide the impact of
significant changes in the deployment and isolate deployment problems
affecting force closure. Lift providers will maintain accurate carrier schedules
in JOPES. The data to be reported for strategic lift carrier arrivals and
departures is reflected in Appendix E. The carrier itinerary and schedule will
be updated as changes occur to reflect the latest and most accurate mission
status. Carrier remarks will be used to maintain a history of schedule changes
with rationale. For USTRANSCOM-controlled ports, USTRANSCOM’s TCCs are
responsible for reporting actual cargo and passenger manifest information in
JOPES, including crisis channel manifests for unit moves.
a. Report Changes to Planned Deployment. In dynamic situations, changes to
deployment plans will be required regardless of the adverse impact on the overall
deployment flow. Maintenance of an accurate database that reflects actual
movements is essential to the utility of JOPES in deployment execution.
Accuracy of aircraft movement and manifest in JOPES is particularly critical.
Subsequent paragraphs describe procedures for reporting air carrier movements.
(1) Report Arrivals and Departures in JOPES. Airlift providers report
arrivals and departures via S&M. AMC will also report arrivals and departures
via GTN. If for any reason AMC is unable to report via an automated system,
carrier arrivals and departures will be reported by AMC using the on-line entry
E-5
Enclosure E
CJCSM 3122.02B
25 May 2001
functions of the S&M subsystem. If for any reason airlift providers are unable
to report via an automated system, they will request the supported commander
allow exception reporting via the newsgroup and provide an estimated time for
resumption of positive reporting. Changes that affect the scheduled or
previously updated arrival or departure time by greater than 2 hours will be
reported in JOPES as soon as possible. In cases where it is known that the
scheduled or previously updated arrival or departure of a carrier will exceed the
2-hour window, but a new firm arrival or departure cannot be established,
estimated time and remarks will be entered in JOPES to indicate that the time
entered is estimated. This estimate will be changed to actual once a mission
that qualifies for exception reporting departs APOE or arrives APOD or as soon
as firm arrival or departure is established. The manifesting agency, which is
the port operator, will ensure actual manifest information is available in JOPES
no later than 2 hours after aircraft departure from APOE.
(2) Reporting Diversion of Air Carriers and Changes to Schedules. Airlift
providers will notify the supported commander via the operation newsgroup
and enter all diversion or change information in JOPES if a carrier with
allocated requirements is diverted from a scheduled location in JOPES. JOPES
schedules will reflect the latest itinerary departure and arrival times. Carrier
remarks will be used to maintain a history of schedule changes with rationale.
Airlift providers will coordinate diversions or changes with the supported
commander and other appropriate members of the JPEC to determine the
impact to the deployment flow and any additional actions required. Required
data entry is at Appendix F.
(3) Adjusting Deployment Flow and Scheduling the Next Increment.
Adjustments or changes to the deployment flow requested by the supported
commander will be accommodated where possible. However, changes to
movement flow already scheduled may involve extensive manual intervention,
as will changes to requirements that have already been validated for
scheduling. Unless constrained by time-sensitive crisis events, the supported
commander will validate airlift requirements 7 days prior to EAD. Airlift
providers will ensure that 4 days of air schedules are maintained in JOPES.
During execution, airlift providers will monitor the operation newsgroup to
determine when subsequent increments of the TPFDD have been validated and
are ready for scheduling. Within 12 hours of receipt of each validated
increment, airlift providers will enter scheduling data into JOPES for the next
day of requirements to be scheduled. Allocations should consist of the ULN
and the allocated passengers and tonnage. All database changes affecting
validated requirements included in the 7-day window or that have airlift
scheduled against them will be made in accordance with the standard TPFDD
LOI (Enclosure H).
E-6
Enclosure E
CJCSM 3122.02B
25 May 2001
b. Overland Transportation Providers. During execution, overland
transportation providers schedule and allocate lift. MTMC schedules and
allocates CONUS-origin POE transportation to support POE-POD air and sea
flows. MTMC CONUS schedules, if entered in JOPES, will be adjusted by
MTMC as required to maintain visibility of movement requirements when
arriving at PODs. MTMC will notify the JPEC via the designated newsgroup if
delays of major units will preclude meeting carrier schedules. All overland lift
providers will enter schedules and allocations in JOPES.
c. Adjusting CONUS Origin/POE Schedules. CONUS schedules, if entered
in JOPES, will be adjusted by MTMC as required to maintain visibility of
movement requirements when arriving at PODs. MTMC will notify the JPEC
via the newsgroup if delays of major units will preclude meeting carrier
schedules.
d. Sealift and Inland Waterway Lift Providers. A recurring cycle of
incremental sealift scheduling is initiated by the execute order. Sea and inland
waterway lift providers consolidate SPOEs based on validated requirements
and coordinate lift at least 30 days prior to the EAD. For strategic lift, MTMC
consolidates SPOEs and notifies MSC to coordinate strategic sealift. Lift
providers continually update-scheduling information in JOPES, including
carrier arrivals and departures, changes to schedules, and carrier diversions as
they occur. This cycle continues until completion of the operation. For POE-
POD schedules, lift providers will identify to the supported commander specific
exceptions to capability to provide required schedules and manifests.
Additionally, lift providers will allocate requirements to sealift carriers to enable
tracking of the scheduled sealift. For strategic lift, MTMC will allocate
requirements to sealift carriers in JOPES. MSC will enter strategic sealift
schedules during execution planning for subsequent refinement as MTMC
identifies detailed requirements for movement.
(1) Allocating Requirements for Sealift and Inland Waterway Carriers.
Lift providers will allocate sea and inland waterway movement requirements
(mode code "S") for carriers. For strategic lift (M/S codes "S/E" and "S/W,"
MTMC will allocate sealift movement requirements at seaports where MTMC
operates the port cargo documentation system.
(2) Continuing Sealift and Inland Waterway Deployment and Reporting
Significant Discrepancies. Maintenance of an accurate database that reflects
actual sea and inland waterway movements is essential to the utility of JOPES
in deployment execution. Accuracy of carrier movements and requirements
allocation data is particularly critical. Lift providers will reconcile lift
allocations with actual lifted cargo and update JOPES with manifest
information reflecting the actual cargo lifted. Using the newsgroup, they will:
E-7
Enclosure E
CJCSM 3122.02B
25 May 2001
(a) Identify movement requirements received via the Defense
Transportation System and/or processed at the port that are not resident in
JOPES.
(b) Report when validated movement requirements received at the
port exceed the capacity of scheduled carriers.
(c) Identify unlifted validated movement requirements and frustrated
portions of lifted movement requirements for the above scheduled carriers to
the supported commander for resolution (MTMC will report to USTRANSCOM
who will then report to the supported commander with resolution).
(3) Lift providers will coordinate with the supported commander and
resolve any sea or inland waterway lift shortfalls.
(4) Sea and Inland Waterway Lift Manifesting. The port operator is
responsible for manifesting sea and inland waterway lift. Manifest information
will be provided by the lift provider in JOPES no later than 24 hours after ship
departure from port or 48 hours before the ship arrives in port for each leg of
movement, whichever is first.
(5) Reporting Changes to Planned Deployment. In dynamic situations,
changes to deployment plans will be required regardless of technical
requirements and adverse impact. Maintenance of an accurate database that
reflects actual movements is essential to the utility of JOPES in deployment
execution. Accuracy of movement data and allocations to carriers is
particularly critical. Subsequent paragraphs describe procedures for reporting
sealift carrier movements.
(a) Lift providers will report actual departures and arrivals of strategic
common-user sealift carriers in JOPES.
(b) Lift providers will notify the supported command, via the
newsgroup, coordinate with the appropriate supporting command, and enter
information in JOPES when a diversion or change is required to a published
schedule. JOPES schedules will reflect the latest itinerary and departure and
arrival times. Carrier remarks will be used to maintain a history of schedule
changes with rationale.
(6) Adjusting Deployment Flow and Scheduling Next Increment.
Adjustments or changes to the deployment flow requested by the supported
commander will be accommodated where possible. Sea and inland waterway
lift is coordinated during execution planning for requirements during the first
E-8
Enclosure E
CJCSM 3122.02B
25 May 2001
30 days. During execution, lift providers following seaport consolidation will
pull increments of requirements beyond the first 30 days. Lift providers will
enter and maintain all scheduling information in the JOPES database for
carriers scheduled to meet validated requirements throughout the operation.
e. Services. After receiving the CJCS execute order, the Services direct
their major commanders to execute the supporting OPORDs, direct
mobilization activities, and direct their personnel and logistic centers to
support the deployment. Services continue to coordinate with personnel
centers and logistic agencies to identify and confirm sustainment requisitions.
E-9
Enclosure E
CJCSM 3122.02B
25 May 2001
(INTENTIONALLY BLANK)
E-10
Enclosure E
|
||
|
|
|