Abu Dhabi, United Arab Emirates. STANDARD CONSTRUCTION SPECIFICATIONS (PART 2 - ROAD STRUCTURES, 2020) - page 17

 

  Index      Manuals     Abu Dhabi, United Arab Emirates. STANDARD CONSTRUCTION SPECIFICATIONS (PART 2 - ROAD STRUCTURES, 2020)

 

Search            copyright infringement  

 

   

 

   

 

Content      ..     15      16      17      18     ..

 

 

 

Abu Dhabi, United Arab Emirates. STANDARD CONSTRUCTION SPECIFICATIONS (PART 2 - ROAD STRUCTURES, 2020) - page 17

 

 

S

TANDARD 

C

ONSTRUCTION 

S

PECIFICATIONS

 

 

P

ART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 28-15 

C

HAPTER 

28:

 

W

ATERPROOFING

 

 

First Edition -January 2018 

 

Properties shall not degrade by more than 10% after exposure according to ASTM B117-11 (salt 
spray) and ASTM G154 - 12a (UV resistance). 

The proposed system shall have a  valid  British Board of Agreement (BBA) Certificate (or equally 
recognized certification). 

The waterproofing material shall not be sensitive to and/or affected by atmospheric moisture during 
application.  Over  coating  and  lapping  at  joints  shall  not  be  dependent  on  critical  over  coating 
windows. Over coating shall be possible without needing any special surface preparation. 

Penetration  of  the  waterproofing  membrane  for  dewatering,  temporary  construction  or  any 
permanent construction (unless specifically indicated on the Contract plans, i.e., pipes at manholes) 
shall not be permitted by the Engineer. 

a.  Thickness Application 

1.  For horizontal surfaces: total thickness of 

≥ 3.0 mm (DFT) shall be applied in two or more 

coats as approved by the Engineer. 

2.  For vertical surfaces: total thickness of 

≥ 2.0 mm (DFT) shall be applied in two or more 

coats as approved by the Engineer 

Multiple coats shall be colour-coded to ensure proper coverage. First coat should be checked and 
repaired before application of subsequent coat(s). 

b.  Expansion, Construction and Contraction Joints 

At  expansion,  construction,  and  contraction  joints,  a  minimum  of  175  mm  wide  polyester 
reinforcement  scrim  shall  be  provided  directly  over  the  joint  and  embedded  into  first  coat  of 
waterproofing membrane. 

c.  Protection Boards 

Protection for the waterproofing membrane shall be 4 mm thick non-absorbent board in compliance 
with performance properties stipulated by AASHTO M 33-99 (2012). The board shall be used at all 
locations, and as directed by the Engineer and as recommended and endorsed by the waterproofing 
material  supplier  and  applicator.  For  horizontal  application,  one  layer  of  4mm  protection  shall  be 
used. For vertical application, two (2) layers of 4mm protection board shall be used. 

d.  Screed Protection 

The  Contractor  shall  furnish  and  install  75  mm  thick  screed  concrete  in  accordance  with  Section 
21.7.8 of Chapter 21, Concrete Structures, for additional protection of waterproofing  on all buried 
roof concrete slabs and other horizontal surfaces as specified in the Contract plans and as directed 
by the Engineer. 

28.3.4.1 

Submittals for Type B Liquid Sprayed Applied Membranes 

In addition to the requirements of Section 28.3.1, the Contractor shall submit a material submittal as 
per  Section  1.15,  Submittal  Procedures,  outlined  in  Chapter  1,  General  Requirements,  of  these 
standard specifications including the following for all materials for the Engineer

’s approval: 

1.  Material samples and technical brochures. 

2.  Recent test data of physical and mechanical properties from certified laboratories. 

3.  Qualifications of proposed sub-contractors, for application of materials. The subcontractor 

should be endorsed by the waterproofing manufacturer. 

4.  Method statement for application of materials which shall be endorsed by the applicator and 

supplier and include the following as a minimum. 

a)  QC testing of thickness, adhesion and holidays during application. 

b)  Details of sequencing and temporary and permanent protection. 

S

TANDARD 

C

ONSTRUCTION 

S

PECIFICATIONS

 

 

P

ART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 28-16 

C

HAPTER 

28:

 

W

ATERPROOFING

 

 

First Edition -January 2018 

 

c)  Provisions for repair of any incidental damage. 

d)  Provisions  for substrate preparation  and sealing of  any  pre-existing  cracks.  Primer 

should be as recommended by the waterproofing manufacturer. 

5.  A mock-up sample of size 2 m x 2 m to the specified and approved details. 

6.  Shop drawings with detailing at joints, corners, edges, etc. 

The Engineer may perform in-house testing of the materials to determine suitability. Final approval 
of materials will be given after analysis of such test results. The decision of the Engineer shall be 
final. Provisions for in-house and/or independent testing of the materials prior and during application 
shall be included by the Contractor/manufacturer/supplier. 

28.3.4.2 

Application of Type B Liquid Sprayed Applied Membranes 

1.  Surface  preparation,  including  use  of  primers,  mixing,  application  and  protection  of  all 

materials shall strictly conform to manufacturer’s printed instructions, as specified in these 
specifications and as instructed by the Engineer.  

2.  Protection board shall be installed using adhesives or similar methods so as not to damage 

the waterproofing membrane.  

3.  The  material  shall  be  applied  by  a  licensed  subcontractor  specialized  in  waterproofing 

material application. 

28.3.4.3 

Field Quality Control for Type B Liquid Sprayed Applied 
Membranes 

a.  Inspection 

Prior  to  priming  of  the  surface,  the  Engineer,  Applicator  and  Manufacturer

’s  representative  shall 

inspect and approve the prepared substrate. 

Random  tests  for  adequate  tensile  bond  strength  shall  be  conducted  on  the  substrate  by  the 
Applicator at the job site using an Elcometer Adhesion Tester in accordance with the requirements 
of ASTM D4541 - 09e1. The minimum test frequency shall be three per 500 m

2

.  

Adequate surface preparation shall be indicated by tensile bond strengths of primer to the substrate 
greater than or equal to 2.0 MPa  or 90% failure in the concrete. 

If the tensile bond strength is lower than the minimum specified, the Engineer shall request additional 
substrate preparation. Any primer not adequately applied shall be removed and a new application 
effected at the Contractor’s expense as directed by Engineer. 

Cracks  and  joints  shall  be  treated  in  accordance  with  the  Manufacturer

’s  recommendations  as 

approved or directed by the Engineer. 

b.  Field Quality Control 

The  following  tests  shall  be  conducted  by  the  Applicator  or  Manufacturer

’s  representative  and 

recorded on a form to be submitted to the Engineer. The testing equipment shall be furnished by the 
Contractor. 

  Temperature:  Air, substrate temperatures and dew point. 

  Adhesion Tests:  Adhesion tests of the cured membrane to the substrate shall be checked 

as per Item 1 above. 

  Membrane Thickness:  Wet film thickness shall be checked every 9 m

2

 using a gauge pin or 

standard comb type thickness gauge during application where membrane gel time permits. 
Ultrasonic  testing,  calibrated  point-penetrating  (destructive)  testing,  or  other  methods 
approved by the Engineer, shall be employed for determination of dry film thickness in the 
event that rapid set time of the membrane does not allow for the use of wet film thickness 

S

TANDARD 

C

ONSTRUCTION 

S

PECIFICATIONS

 

 

P

ART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 28-17 

C

HAPTER 

28:

 

W

ATERPROOFING

 

 

First Edition -January 2018 

 

testing  methods.  Repair  of  the  membrane  system  following  destructive  testing  shall  be  in 
accordance with the manufacturer’s recommendations.        

  Coverage  Rates:    Rates  for  all  layers  shall  be  monitored  by  checking  quantity  of  material 

used against the area covered. 

  Holidays (pinholes): All horizontal and vertical surfaces shall be scanned by the applicator for 

holidays  (pinholes)  by  using  the  proper  equipment  followed  by  local  touch  up  spraying  at 
these pinhole locations. No pinholes will be accepted in the completed waterproofing system. 
Detailed 

shop drawings shall be submitted for the Engineer’s approval. 

28.4 

Type C Waterproofing Membranes 

Type C waterproofing membranes shall be furnished and supplied  by the Contractor as specified 
herein  to  all  concrete  and  block masonry  surfaces  where Type  A  waterproofing  is  impractical,  as 
indicated in the Contract plans, the particular specifications, or directed by the Engineer.   

28.4.1 

Type C Waterproofing Materials  

Type  C  waterproofing  shall  be  cold  applied,  single  component,  water  based,  emulsified  rubber 
modified bitumen coating that can be applied on damp substrates of closed or confined areas. The 
membrane shall have a minimum overall thickness of 2.0 mm. 

The properties of the waterproofing membrane shall not significantly diminish with age. The provision 
of test data and/or evidence of successful performance of the membrane in climatic conditions similar 
to the UAE shall be a condition of acceptance. Type C membranes shall meet the following physical 
properties as shown in Table 28-7.  

Table 28-7: Physical properties of Type C membranes 

Property

 

Test Method

 

Requirement

 

Rubber Content 

> 10 % 

Tensile Strength 

ASTM D638-10 

5 N/mm

2

 minimum 

Elongation 

ASTM D412 - 06a(2013)  

30% minimum 

Adhesion Strength 

ASTM D4541 - 09e1, and 
BS 1881-207:1992 

> 0.75 MPa 

Flammability 

Non flammable 

Drying Time  

< 90  minutes 

Curing Efficiency (water loss) 

ASTM C309 - 11 

< 0.50 kg/m

28.4.2 

Application of Type C Waterproofing 

a.  The application temperature shall be between 4

o

 C to 45

o

 C.  

b.  Surfaces  shall  be  cleaned  thoroughly  of  all  contaminants  like  dust,  traces  of  curing 

compound, oil and grease by light mechanical grinding, grit blasting, or high pressure water 
jet as needed and as directed by the Engineer. All surface imperfections or protrusions shall 
be  removed  and  repaired.  Structurally  unsound  concrete  and  friable  concrete  shall  be 
removed and repaired with a suitable concrete repair mortar as approved by the Engineer. 

c.  Priming coating shall be applied  in two coats  on the surface prior to the application of the 

bitumen coating. The second coat shall be applied only after the first coat dries of completely. 
In case  of  delay  in  application  of the  second  coat  for more than  24  hours,  a fresh  coat  of 
primer shall be reapplied. 

S

TANDARD 

C

ONSTRUCTION 

S

PECIFICATIONS

 

 

P

ART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 28-18 

C

HAPTER 

28:

 

W

ATERPROOFING

 

 

First Edition -January 2018 

 

d.  Depending on the dry film thickness required, the rubberized bitumen coating shall be applied 

at a rate recommended by the manufacturer and approved by the Engineer. 

e.  On vertical surfaces, the coating shall be applied in multiple layers. Subsequent coats shall 

be applied only after the previous coat dries off completely and shall be applied at right angles 
for the previous coat. Clean dry sand shall be broadcasted onto the wet coating. 

f.  The coating shall be cured for a minimum period of 48 hours before applying any protection 

board or backfilling. 

g.  The Contractor shall ensure that the first coat is not punctured during the application of the 

second coat. If the coating is damaged, the damaged area shall be over coated provided the 
surface preparation is done properly. 

h.  Type C membrane shall be protected by protection boards as per Section 28.2.3. On vertical 

surfaces,  protection  boards  shall  be  fixed  on  the  membrane  by  a  double  sided  bitumen 
adhesive tape as per the manufacturer recommendations. 

28.4.3 

Storage of Type C Membranes 

Products shall be stored in a covered area, away from direct sunlight, UV and other source of heat. 
The Contractor shall demonstrate to the Engineer that the shelf life of the stored products has not 
exceeded the manufacturer recommended shelf life. 

28.5 

Type D Waterproofing Membranes 

When  required  by  the  Contract  plans  or  particular  specifications,  the  waterproofing  of  roadway 
surfaces of concrete bridge decks, tunnels, approach slabs and other areas shall be as described 
below. This section applies to proprietary liquid spray applied waterproofing systems. 

28.5.1 

Type D Liquid Spray Applied Waterproofing Systems 

28.5.1.1 

Materials and Submittals for Liquid Spray Applied Systems 

All materials shall comply with the requirements of 

Waterproofing and Surfacing of Concrete Bridge 

Decks 

(BD 47/99), and its Appendix B, 

Certification Test Requirements for Waterproofing Systems 

on Concrete Bridge Decks, 

and the requirements of this section. 

The  waterproofing  system  shall  provide  long  term  protection  to  the  concrete  from  the  ingress  of 
water-borne chlorides or other deleterious substances.  

Waterproofing  for  bridge  decks  shall  be  rapid  curing  and  liquid  spray  applied  conforming  to  the 
requirements of Section 28.3.4 and this section. A total 

thickness of ≥ 4.0 mm (DFT) including peaks 

and arises shall be applied in two coats in accordance with the manufacturer’s recommendations 
and as approved by the Engineer.  Sufficient time shall be allowed for the first  coat to adequately 
cure  prior  to  the  application  of  the  second  coat.  The  waterproofing  shall  incorporate  an  anti-slip 
aggregate  under  traffic areas

, as per the manufacturer’s recommendations, in the final coat. The 

finished membrane shall be free of pinholes.  

Good  adhesion  shall  be  provided  between  the  membrane  and  the  concrete  and  between  the 
membrane and the asphalt by the use of compatible, purpose made primer and tack coats. Adhesion 
between the membrane and the concrete shall be at least 2.0 MPa average. The membrane shall 
have good flexibility and be able to bridge live cracks of up to 3mm.  

The waterproofing membrane, primer and bonding agents including tack coat shall be compatible 
with each other.  

The use of ventilating layers, partial bonding or bond breakers with the waterproofing system shall 
not be permitted.  

The membrane shall be resistant to water and chloride ion penetration, embrittlement, abrasion, UV 
degradations,  pedestrian  traffic,  indentation  by  hot  or  cold  aggregates  and  the  effect  of  placing 
asphalt.  

S

TANDARD 

C

ONSTRUCTION 

S

PECIFICATIONS

 

 

P

ART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 28-19 

C

HAPTER 

28:

 

W

ATERPROOFING

 

 

First Edition -January 2018 

 

The membrane shall easily accommodate the need for day joints and patch repairs as a result of 
testing for adhesion or coating thickness, if required by the Engineer.  

In addition to the requirements of Article 28.3.4.1, the following information shall be submitted for the 
Engineer's approval:   

1.  Full details of previous bridge deck waterproofing contracts performed in climatic conditions 

similar  to  the  UAE  including  details  of  contract,  contractor,  Consultant/  Engineer, 
Client/Employer, location, size (m²), temperature and brief description.  

2.  Curricula Vitae of technical representatives and skilled operatives.  

3.  Full technical literature with test results etc. relevant to UAE climatic conditions and proof 

of compliance with this specification including the requirements of Table 28-6 and additional 
physical property requirements shown in Table 28-8. 

Table 28-8: Physical properties of bridge Deck liquid spray applied system 

Property

 

Test Method

 

Requirement

 

Minimum Thickness (for each layer)  

As approved by the 
Engineer  

2 mm 

Shear adhesion to sand asphalt 
and hot rolled asphalt   

BD 47/99   

0.15 Mpa minimum (at 40°C)   

Tensile adhesion to sand asphalt 
and hot rolled asphalt   

BD 47/99  

0.15 Mpa minimum   

Indentation by hot or cold 
aggregate during asphalt placing or 
pedestrian traffic prior to any 
protection   

BD 47/99 

Negligible   

Resistance to high temperature 
from concrete surface (80°C) or due 
to asphalt placing (150°C)   

BD 47/99 

Yes   

Holidays (pinholes)   

Electronic detection   

None   

Blisters   

    

None   

Resistance to embrittlement   

UK Department Transport 
Tech. Memo BE27 90°C 
Mandrel Test at 0°C   

No cracking   

Resistance to hot asphalt   

BAM ZTV BEL-B @ 160° 
or more   

No change   

Resistance to chisel impact   

BD 47/99 

No indentation   

The above properties shall also apply for the small areas of patch repair that may be required. The 
above properties shall not significantly diminish with age. 

An additional protective layer shall be applied immediately above bridge deck waterproofing to those 
areas shown on the Contract plans and shall comply with this section. 

28.5.1.2 

Materials for Additional Bituminous Protection 

Bituminous protection, where shown on the Contract plans as an additional protective layer, shall be 
15mm sand asphalt having a Marshall Stability of 5.5 kN ± 2 kN when tested in accordance with BS 
598-107:2004 and comply with BS EN 12591:2009, BS EN 13924:2006, and BS EN 13108-4:2006 
recipe Type F wearing course mixture Designation 0/3 except that 5% ± 0.5% of the total mix shall 
be inorganic red oxide and regarded as part of the filler content. 

S

TANDARD 

C

ONSTRUCTION 

S

PECIFICATIONS

 

 

P

ART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 28-20 

C

HAPTER 

28:

 

W

ATERPROOFING

 

 

First Edition -January 2018 

 

28.5.1.3 

Surface Preparation for Liquid Spray Applied Systems 

The Contractor shall prepare all concrete surfaces prior to the application of waterproofing system, 
and ensure they are free of cracks, voids, and blowholes. 

Immediately before the application of the primer or laying of the waterproofing system or protective 
layer, the concrete surface or primed surface shall be clean, dry and free from moisture, laitance, 
loose  aggregate,  sand,  dust  and  other  debris.  The  Contractor  shall  use  mechanical  surface 
preparation such as vacuum blasting as directed by the Engineer to provide lattice free substrate. 
Where the adhesion to the concrete would be impaired, the surface shall be free from curing liquids, 
compounds and membranes.  

28.5.1.4 

Installation of Liquid Spray Applied Systems 

Proprietary  waterproofing  systems  shall  be  installed  only  by  applicators  approved  by  the 
manufacturers and the Engineer and in accordance with the approved installation procedures. 

The formation of defects affecting the integrity of the membrane including pin/blow holes and blisters 
in the waterproofing shall:  

1.  be  made  good  by  repair  in  accordance  with  the  manufacturer's  procedure  before  any 

subsequent layers are applied; or  

2.  require the system to be replaced where directed by the Engineer.  

Proprietary waterproofing systems shall be laid to follow the contours of the concrete surface and 
shall be incapable of flow and slump. 

28.5.1.5 

Installation of Additional Bituminous Protection 

Additional bituminous protection complying with Article 28.5.1.2 shall be laid on the clean and dry 
substrate and compacted to the areas and thickness shown on the Contract plans.  

The additional protective layer or surfacing laid on the waterproofing system shall be firmly bonded 
to the waterproofing system. Where a tack coat for the additional protective layer or surfacing is not 
provided as part of the waterproofing system a satisfactory bond to the membrane shall be obtained 
from:  

1.  A separate compatible tack coat or  

2.  The binder within the directly applied additional protective layer or surfacing.  

Where  the  tack  coat  is  of  the  type  activated  by  the  heat  of  the  succeeding  bituminous  layer,  the 
rolling temperature of this layer shall be sufficient to ensure adhesion.  

Tack  coats  between  the  waterproofing  membrane  and  overlying  asphalt  shall  have  a  minimum 
softening point of 80

o

 C.  

28.5.2 

Water Seepage Relief Channels  

Water seepage relieve channels shall be provided where specified on the Contract plans. In general 
the  seepage  relief  channels  shall  be  located  adjacent  to  the  lower  kerb  line  and  at  bridge  deck 
expansion joints or as directed by the Engineer. The waterproofing membrane shall be lapped onto 
the interior of any seepage relief wells or drainage fittings to form a lap of 100mm. Outlets shall be 
spaced in accordance with the manufacturer’s requirements.  

28.5.3 

Protection of Bridge Deck Waterproofing System during 
Construction  

On any structure, providing no damage results, only plant and equipment fitted with rubber tyres may 
stand or travel on proprietary waterproofing systems with the prior approval of the Engineer solely 
for the purposes of laying an additional protective layer or surfacing course on that structure.  

Rollers shall not be permitted to stand or travel directly on the waterproofing system.  

S

TANDARD 

C

ONSTRUCTION 

S

PECIFICATIONS

 

 

P

ART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 28-21 

C

HAPTER 

28:

 

W

ATERPROOFING

 

 

First Edition -January 2018 

 

Where it is necessary for plant, equipment or traffic to stand or travel on a bridge deck that has been 
waterproofed with a proprietary system before the laying of an additional protective  layer, suitable 
temporary  protection  shall  be  provided  to  the  satisfaction  of  the  Engineer.  All  such  plant  and 
equipment shall have its tyre treads regularly inspected and any embedded stones removed.  

Temporary  protection  shall  be  provided  where  damage  to  the  waterproofing,  protective  layer  or 
additional protective layer could result from particular site traffic.  

The protective layer of a two layer waterproofing system, or any protective layer additional to that 
included as part of a waterproofing system, shall be laid immediately after the waterproofing layer's 
bonding agent has set or cured.  

Where a waterproofing membrane also serves as an adhesive for the protective layer, any additional 
protective layer shall not be laid until the liquid waterproofing membrane/adhesive has set or cured. 

28.5.4 

Integrity Testing of Type D Waterproofing  

The Contractor shall submit for the approval of the Engineer a regime of compatible tests to check 
the integrity of the waterproofing system that he proposes to use in order to substantiate fitness of 
purpose.  The  test  methods  shall  be  those  which  have  been  assessed  by  the  British  Board  of 
Agreement (BBA) for use with waterproofing system. 

28.6 

Integral Waterproofing 

This section Includes furnishing of all labor, materials, services, and equipment necessary for the 
supply and installation of integral waterproofing admixture to concrete structures as indicated on the 
Contract  plans  and  as  specified  herein.  The  integral  waterproofing  material  shall  be  added  to 
concrete during the mixing cycle.   

Integral waterproofing admixture shall be a specially formulated product, usually in the form of a dry 
powder, liquid or other suitable form which can be added to the concrete mix at the batch plant or 
the jobsite in order to make the hardened concrete practically impervious to moisture penetration. 
Such admixtures may be water repellent, hydrophobic/hydrophilic, concrete densifiers, pore blockers 
or crystalline types.  

The  integral  waterproofing  admixture  must  meet  the  classification  of  a  Permeability  Reducing 
Admixture for Hydrostatic Conditions (PRAH) as indicated by ACI 212.3R-10, Report on Chemical 
Admixtures  for  Concrete  and  meet  the  requirements  of  ASTM  C494,  Type  S  admixtures,  as 
applicable. The effect of the admixture must remain available within the hardened concrete and must 
be able to pore blocking or self-sealing of minor cracking that may occur in the future. It shall protect 
the concrete from deterioration due to harsh environmental conditions. 

Dosage  of  the  integral  waterproofing  admixture  shall  be  as  recommended  by  the  manufacturer 
technical literature. System Requirements for Integral Waterproofing 

a. 

Testing Requirements:

 Integral waterproofing system shall be tested in accordance with the 

following  standards  and  conditions,  and  the  testing  results  shall  meet  or  exceed  the 
requirements as specified herein.  

b. 

Independent Laboratory:

 Testing shall be performed by an independent laboratory meeting 

the requirements of ASTM E329 - 13a and approved by the Owner. The testing laboratory 
shall obtain all concrete samples and waterproofing product samples. 

c. 

Crystalline  or  Pore  blocking  Formation:

  Crystallizing  or  pore  blocking  capability  of 

waterproofing  system  shall  be  evidenced  by  independent  SEM  (Scanning  Electron 
Microscope) photographs showing crystalline or pore blocking formations within the concrete 
matrix.  

d. 

Permeability:

  Independent  testing  shall  be  performed  according  to  U.S.  Army  Corps  of 

Engineers  CRD-C48-92 

Standard  Test  Method  for  Water 

Permeability  of  Concrete”. 

No 

passage  of  water  shall  be  exhibited  through  treated  samples  when  exposed  to  a  vertical 
water head equal to minimum 140 meters (1.38 MPa).  

S

TANDARD 

C

ONSTRUCTION 

S

PECIFICATIONS

 

 

P

ART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 28-22 

C

HAPTER 

28:

 

W

ATERPROOFING

 

 

First Edition -January 2018 

 

e. 

Permeability:

 The coefficient of permeability for admixture treated concrete shall be reduced 

by a minimum of  90% compared to untreated concrete when tested using  BS EN 12390-
8:2009 at 1.035 MPa of pressure for 96 hours (Taywood- Valenta Method, ACI 212.3R-10, 

Report on Chemical Admixtures for Concrete

). 

f. 

Chemical  Resistance:

 

Independent  testing  shall  be  performed  to  determine  “Sulfuric  Acid 

Resistance of Concrete Specimens”. Treated concrete samples (at the full range of dosage 
rates required for the concrete mix design) shall be tested against untreated control samples. 
All  samples  shall  be  immersed  in  sulfuric  acid  and  weighed  daily  until  a  control  sample 
reaches a weight loss of 50% or over. On final weighing the percentage weight loss of the 
treated samples shall test significantly lower than the control samples.  

g. 

Compressive  Strength:

  Independent  testing  shall  be  performed  according  to  applicable 

ASTM or BS standards. Concrete samples containing the integral waterproofing admixture 
shall  be  tested  against untreated  control sample.  At  28  days  and  at  one  year, the treated 
samples shall exhibit the same or better compressive strength over the control.   

h. 

Drying Shrinkage: 

Minimum 20% reduced drying shrinkage for treated concrete compared to 

untreated concrete when tested according to ASTM C157 / C157M 

– 08 or equivalent. 

i. 

Admixtures with  Self-Sealing  Properties: 

Autogenous  crack  sealing  of treated  concrete for 

cracks with width of up to 0.5mm or greater; verified by independent testing. 

j. 

Carbonation Resistance: 

No increase in rate of carbonation compared to untreated concrete 

when exposed to a 4% carbon dioxide atmosphere for 28 days. Test method according to 
BS 1881-210:2013 or ISO 1920-12:2015 or other similar international standards.  

k. 

Sulfate  Resistance: 

Improved  resistance to  sulfate  attack  compared  to  untreated  concrete 

when  tested  to  the  US  Bureau  of  Reclamation  Accelerated  Method  or  other  similar 
international standards. 

l. 

History: 

The  waterproofing  admixture  must  have  demonstrated  success  in  similar 

applications that are no less than 15 years old. 

28.6.1 

Submittals for Integral Waterproofing 

a.  General: The Contractor shall submit listed submittals in accordance with conditions of the 

Contract. 

b.  Product  Data:  The  Contractor  shall  s

ubmit  product  data,  including  manufacturer’s 

specifications,  installation  instructions,  and  general  recommendations  for  waterproofing 
applications.  The  Contractor  shall  als

o  include  manufacturer’s  certification  or  other  data 

substantiating that products comply with the requirements of the Contract documents.  

c.  Test Reports: The Contractor shall submit, for 

the Engineer’s approval, complete test reports 

from  approved  independent  testing  laboratories  certifying  that  waterproofing  system 
conforms to the characteristics and testing requirements specified herein.  

d.  Manufacturer

’s  Certification:  The  Contractor  shall  provide  certificate  signed  by  the 

manufacturer  certifying  that  the  materials  to  be  installed  comply  in  all  respects  with  the 
requirements of this specification. 

e.  Project  References:

 

The  Contractor  shall  provide  case  study  documents  demonstrating 

successful applications of the waterproofing admixture in similar projects over a period of no 
less than 15 years. 

28.6.2 

Quality Assurance for Integral Waterproofing 

a.  Manufacturer Qualifications:  Manufacturer  to  be  BS  EN  ISO  9001:2015  registered,  and to 

have no less than 15 years

’ experience in manufacturing the integral waterproofing admixture 

for the required work. Manufacturer shall be capable of providing field service representation 
during  construction  phase.  Manufacturers  that  cannot  provide  the  performance  test  data 
specified herein shall not be considered for the Project.  

S

TANDARD 

C

ONSTRUCTION 

S

PECIFICATIONS

 

 

P

ART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 28-23 

C

HAPTER 

28:

 

W

ATERPROOFING

 

 

First Edition -January 2018 

 

b.  Waterproofing admixture: It shall  

  Comply with ASTM C494 / C494M 

– 13 Type S, admixture. 

  Be  certified  by  the  International  Code  Council  (ICC),  or  equivalent,  as  a  Chemical 

Admixture used in Concrete (AC198). 

  Bear  a  CE  mark  or  equivalent  and  conform  to  the  performance  and  quality 

requirements of BS EN 934-2:2009+A1:2012. 

  Hold  a  valid  Agreement  Certificate  from  the  British  Board  of  Agreement  (BBA)  or 

equally recognized certification. 

  Hold  a  valid  Appraisal  certificate  from  BRANZ  Limited  or  equally  recognized 

certification. 

  Be certified to NSF/ANSI Standard 61 

– Drinking Water System Components – Health 

Effects or equally recognized certification. 

c.  Applicator (concrete supplier): Installer of integral waterproofing admixture shall be approved 

by  the  manufacturer  in  writing.  Applicator  shall  conduct  laboratory  and  field  trials  as 
necessary  to  successfully  incorporate  the  waterproofing  admixture  into  their  concrete 
mixture, and shall follow the manufacturer’s testing guidelines.  

d.  Pre-Installation  Conference:  Prior  to  installation  of  waterproofing,  the  Contractor  shall 

conduct  meeting  with  the  Engineer, the  Owner,  the  Applicator,  concrete  placer,  and 
waterproofing manufacture to verify and review the following:  

  Project requirements for waterproofing as set out in the Contract documents.  

  Manufacturer

’s product data including application instructions.  

  Procedures, roles and responsibilities among the parties. 

e.  Technical  Consultation: 

The  waterproofing  manufacturer’s  representative  shall  provide 

technical consultation on waterproofing application. 

f. 

All parties shall follow the manufacturer’s written instructions as contained in the Application 
Instructions, published by the manufacturer. 

g. 

All waterproofing system components shall bear a traceable manufacturer’s lot number. 

28.6.3 

Delivery, Storage and Handling of Integral Waterproofing 

a.  Ordering:  The  Contractor  shall  comply  wit

h  manufacturer’s  ordering  instructions  and  lead 

time requirements to avoid construction delays.  

b.  Delivery: The contractor shall deliver packaged waterproofing materials to project site in 

original undamaged containers, with manufacturer’s labels, lot number, and seals intact. 

c.  Storage:  The  Contractor  shall  store  waterproofing  materials  in  dry,  enclosed  location,  at 

temperature and humidity conditions recommended by the manufacturer. 

d.  Handling:

 The Contractor shall o

bserve all occupational health and safety requirements, read 

and  follow  the  Material  Safety  Data  Sheet  for  each  product,  and  conform  to  all  local 
regulations. 

28.6.4 

Warranty 

The manufacturer shall provide the following executed by authorized company official: 

  25 years 

manufacturer’s limited standard material warranty for the waterproofing admixture. 

  10  years 

manufacturer’s  limited  labor  and  material  performance  warranty  for  the 

waterproofing admixture system from Date of Substantial Completion. 

S

TANDARD 

C

ONSTRUCTION 

S

PECIFICATIONS

 

 

P

ART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 28-24 

C

HAPTER 

28:

 

W

ATERPROOFING

 

 

First Edition -January 2018 

 

28.6.5 

Concrete Batching, Mixing, Placing & Curing 

Concrete  batching,  mixing,  placing,  and  curing  shall  comply  with  the  applicable  requirements  of 
Chapter 4, Concrete Works, and Chapter 21, Concrete Structures, of these standard specifications. 

Waterproofing admixture shall be added to the concrete mix during batching operations as per the 
recommendations  of  the  manufacturer.  Waterproofing  admixture  shall  not  be  mixed  with  other 
admixtures prior to addition. It shall be added separately from other admixtures. 

28.6.6 

Field Quality Control 

The  Contractor  shall  not  conceal  concrete  before  it  has  been  observed  by  the 

manufacturer’s 

representative and the Engineer. Concrete shall be examined for structural defects such as faulty 
construction  joints,  cold  joints  and  cracks.  Such  defects  to  be  repaired  in  accordance  with  the 
manufacturer’s repair procedures 

S

TANDARD 

C

ONSTRUCTION 

S

PECIFICATIONS

 

 

P

ART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 28-25 

C

HAPTER 

28:

 

W

ATERPROOFING

 

 

First Edition -January 2018 

 

I

NDEX

 

abutments, 28-1 
Additional bituminous protection, 28-20 
adhesion, 28-4, 28-15, 28-18, 28-19, 28-20 
affidavits, 28-5, 28-8 
Air pressure tests, 28-13 
applicator, 28-5, 28-8, 28-9, 28-11, 28-15, 28-

17 

approach slabs, 28-18 
base slab, 28-1 
Blinding, 28-13 
block masonry surfaces, 28-1, 28-17 
box girder, 28-1 
bridge decks, 28-1, 28-18 
bridge substructure, 28-1 
channels, 28-20 
compartmented, 28-10, 28-12 
concrete protection, 28-1 
contact with soil, 28-1, 28-5 
contingency utility ducts, 28-1 
corner treatment, 28-8 
corners, 28-8, 28-9, 28-12, 28-16 
crystalline waterproofing, 28-21, 28-22, 

28-23

 

damp substrates, 28-17 
end walls, 28-1 
European Union of Agreement, 28-5 
execution quality, 28-8 
exposed concrete surfaces, 28-1 
exterior surfaces, 28-1 
fabric reinforcement, 28-6 
Gulf Region, 28-5, 28-6, 28-8 
horizontal slabs, 28-8 
impractical, 28-1, 28-17 
ingress, 28-18 
integral waterproofing, 28-1 
integrity, 28-13, 28-20, 28-21 
joint treatment, 28-8 
laid sheet, 28-12 
Liquid materials, 28-10 
liquid spray-applied, 28-14 
Manufacturer,  28-5,  28-7,  28-8,  28-9,  28-10, 

28-11,  28-12,  28-13,  28-14,  28-16, 

28-22

28-23

 

mastic, 28-5, 28-7, 28-8 
mechanical bonded, 28-10, 28-12 
Membrane Thickness, 28-16 
mock-up, 28-8, 28-16 
Over coating, 28-15 
performance properties, 28-9, 28-15 

Permeability

28-21

, 28-22 

piers, 28-1 
Primer, 28-2, 28-5, 28-7, 28-16 
protection board, 28-5, 28-7, 28-8, 28-15, 28-

18 

protective membrane, 28-5 
pullboxes, 28-1 
Random tests, 28-16 
retaining walls, 28-1 
roadway surfaces, 28-1, 28-18 
self-adhering, 28-5, 28-6, 28-7, 28-8 
self-seal, 28-21 
sheet applied, 28-8, 28-10, 28-11, 28-14 
Spark test, 28-13 
special warranty, 28-9 
storm water drainage structures, 28-1 
substrate, 28-9, 28-11, 28-16, 28-20 

Sulfate Resistance

28-22

 

sunlight, 28-10, 28-18 
technical data, 28-9 
Temperature, 28-2, 28-16 
Temporary protection, 28-21 
tensile bond strength, 28-16 
traffic control system, 28-1 
tunnels, 28-1, 28-18 
unopened containers, 28-5, 28-9 
visual inspection, 28-13 
warranty, 28-9 
Water seepage, 28-20 
water-borne chlorides, 28-18 
water-tightness, 28-1, 28-8 
wearing course, 28-19 
weld seams, 28-13 
welding, 28-12, 28-13 
wing walls, 28-1 
written instructions, 28-9, 28-10, 

28-23

 

 

 

 

 

 

 

 

 

STANDARD CONSTRUCTION SPECIFICATIONS 

PART 2 

ROAD STRUCTURES 

 

CHAPTER 29 - MISCELLANEOUS ITEMS FOR 

STRUCTURES

 

 

 

 

 

 

 

 

DOCUMENT

 

NO:

 

TR- 

FIRST

 

EDITION 

JANUARY

 

2018

 

S

TANDARD 

C

ONSTRUCTION 

S

PECIFICATIONS

 

 

P

ART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page i 

C

HAPTER 

29:

 

M

ISCELLANEOUS 

I

TEMS FOR 

S

TRUCTURES

 

First Edition -January 2018 

 

 

Chapter 29: Miscellaneous Items for Structures

 

T

ABLE OF 

C

ONTENTS

 

Table of Contents............................................................................................................................. i

 

List of Tables .................................................................................................................................. iv

 

29

 

Miscellaneous Items for Structures .................................................................................. 29-1

 

29.1

 

Reference Standards and Codes ................................................................................. 29-1

 

29.2

 

Removing Existing Bridge Structures ........................................................................... 29-5

 

29.2.1

 

Submissions for the Removal of Structures .......................................................... 29-5

 

29.2.2

 

Removal Construction........................................................................................... 29-6

 

29.2.3

 

Partial Removal of Structures ............................................................................... 29-6

 

29.2.4

 

Removal of Structures for Demolition .................................................................... 29-6

 

29.2.5

 

Removal of Bridges, Culverts, and Other Existing Structures ................................ 29-6

 

29.2.6

 

Salvaging Materials after Removal........................................................................ 29-7

 

29.2.7

 

Removing Abandoned Structures ......................................................................... 29-7

 

29.2.8

 

Disposal of Materials after Removal ...................................................................... 29-8

 

29.3

 

General Requirements for Structures Foundations ...................................................... 29-8

 

29.3.1

 

Protection of Existing Structures ........................................................................... 29-8

 

29.3.2

 

Excavation ............................................................................................................ 29-9

 

29.3.2.1

 

Abutment (End Bent) Fill .............................................................................. 29-10

 

29.3.3

 

Cofferdams ......................................................................................................... 29-10

 

29.3.4

 

Vibrations on Freshly Placed Concrete (Drilled Piles and Piers) ......................... 29-11

 

29.4

 

Bridge Drainage Systems .......................................................................................... 29-11

 

29.4.1

 

Bridge Drainage Terminology ............................................................................. 29-11

 

29.4.2

 

Materials for Bridge Drainage Systems ............................................................... 29-11

 

29.4.2.1

 

Materials Related to Superstructure ............................................................. 29-11

 

29.4.2.2

 

Materials Related to Retaining Systems ...................................................... 29-13

 

29.4.3

 

Construction Requirements for Bridge Drainage Systems .................................. 29-13

 

29.4.3.1

 

Inlet Frames, Grates, and Scuppers for Bridge Drainage Systems .............. 29-13

 

29.4.3.2

 

Steel Alloy Pipe for Bridge Drainage Systems ............................................. 29-13

 

29.4.3.3

 

Fibreglass Pipe and Fittings for Bridge Drainage Systems ........................... 29-13

 

29.4.3.4

 

Concrete Gutters for Bridge Drainage Systems ........................................... 29-14

 

29.4.3.5

 

Weep Holes for Bridge Drainage Systems ................................................... 29-14

 

29.4.3.6

 

Drainage Blankets for Bridge Drainage Systems ......................................... 29-14

 

29.4.3.7

 

Geocomposite Drainage Systems ................................................................ 29-15

 

29.5

 

Resin Injection of Cracks in Concrete Structures ....................................................... 29-15

 

29.5.1

 

Materials for Resin Injections .............................................................................. 29-15

 

29.5.2

 

Equipment for Resin Injections ........................................................................... 29-15

 

29.5.3

 

Qualifications for  Resin Injection Personnel ....................................................... 29-15

 

29.5.4

 

Cracked Surface Preparation and Cleaning ........................................................ 29-16

 

29.5.5

 

Sealing Cracks for Resin Injection ...................................................................... 29-16

 

29.5.6

 

Resin Injection .................................................................................................... 29-16

 

29.5.7

 

Cleaning after Resin Injection ............................................................................. 29-16

 

29.5.8

 

Acceptance of Resin Injection ............................................................................. 29-16

 

29.6

 

Sealing Concrete Surfaces and Cracks ..................................................................... 29-17

 

29.6.1

 

Penetrant Sealers ............................................................................................... 29-17

 

29.6.1.1

 

Materials for Penetrant Sealers .................................................................... 29-17

 

29.6.1.2

 

Surface Preparation for Penetrant Sealers................................................... 29-18

 

29.6.1.3

 

Application of Penetrant Sealers .................................................................. 29-18

 

29.6.1.4

 

Control of Concrete Sealing Materials .......................................................... 29-19

 

29.6.2

 

High Molecular Weight Methacrylate Sealers ...................................................... 29-20

 

29.6.2.1

 

Materials for a Methacrylate System ............................................................ 29-20

 

29.6.2.2

 

Surface Preparation for a Methacrylate System ........................................... 29-22

 

S

TANDARD 

C

ONSTRUCTION 

S

PECIFICATIONS

 

 

P

ART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page ii 

C

HAPTER 

29:

 

M

ISCELLANEOUS 

I

TEMS FOR 

S

TRUCTURES

 

First Edition -January 2018 

 

29.6.2.3

 

Method for Applying Methacrylate ................................................................ 29-22

 

29.6.2.4

 

Opening Roadway Surfaces to Traffic .......................................................... 29-24

 

29.6.2.5

 

Cure Test ..................................................................................................... 29-24

 

29.7

 

Epoxy Compounds .................................................................................................... 29-24

 

29.7.1

 

Types of Epoxy Compounds ............................................................................... 29-24

 

29.7.2

 

Epoxy Design Requirements ............................................................................... 29-25

 

29.7.2.1

 

Certifications for Epoxy Products ................................................................. 29-25

 

29.7.3

 

Specific Requirements for Type A and Type B Epoxy Compounds ..................... 29-25

 

29.7.3.1

 

Mixing and Applying Type A and Type B Epoxy Compounds ....................... 29-25

 

29.7.3.2

 

Performance Tests for type A and type B Epoxy Compounds ...................... 29-26

 

29.7.4

 

Specific Requirements for Type E Epoxy Compounds ........................................ 29-26

 

29.7.5

 

Specific Requirements for Type F Epoxy Compounds ........................................ 29-26

 

29.7.6

 

Specific Requirements for Type G Epoxy Compounds........................................ 29-27

 

29.7.7

 

Specific Requirements for Type H Epoxy Compounds ........................................ 29-27

 

29.7.8

 

Specific Requirements for Type I Epoxy Compounds ......................................... 29-27

 

29.7.9

 

Specific Requirements for Type J Epoxy Compounds......................................... 29-27

 

29.7.10

 

Specific Requirements for Type K Epoxy Compounds ........................................ 29-28

 

29.7.11

 

Specific Requirements for Type L Epoxy Compounds ........................................ 29-28

 

29.7.12

 

Specific Requirements for Type M Epoxy Compounds ....................................... 29-28

 

29.7.13

 

Specific Requirements for Type N Epoxy Compounds ........................................ 29-28

 

29.7.14

 

Specific Requirements for Type Q Epoxy Compounds........................................ 29-28

 

29.7.15

 

Specific Requirements for Type T Tape Compounds .......................................... 29-29

 

29.7.16

 

Packaging, Labelling, and Safety for Epoxy ........................................................ 29-29

 

29.7.17

 

Storage of Epoxy ................................................................................................ 29-30

 

29.7.18

 

Fillers for Mixing Mortars and Grouts .................................................................. 29-30

 

29.8

 

Adhesive Bonding Material Systems .......................................................................... 29-30

 

29.8.1

 

Certification of Adhesive Bonding Products ........................................................ 29-31

 

29.8.2

 

Minimum Performance Requirements for Adhesive Bonding Materials ............... 29-31

 

29.8.3

 

Product Identification (Fingerprint) Properties for Adhesive Bonding Materials ... 29-31

 

29.8.4

 

Packaging and Marking Adhesive Bonding Materials .......................................... 29-32

 

29.9

 

Adhesive-bonded Anchors and Dowels ..................................................................... 29-32

 

29.9.1

 

Adhesive-bonded Anchors and Dowels .............................................................. 29-32

 

29.9.2

 

Storage of Adhesive-bonded Anchors and Dowels ............................................. 29-32

 

29.9.3

 

Equipment for installing Adhesive-bonded Anchors and Dowels ......................... 29-33

 

29.9.4

 

Preparing Concrete Members for Adhesive-bonded Anchors and Dowels .......... 29-33

 

29.9.5

 

Method of Installing Adhesive-bonded Anchors and Dowels ............................... 29-33

 

29.9.6

 

Testing Adhesive-bonded Anchors and Dowels .................................................. 29-33

 

29.9.6.1

 

Field Tests for Adhesive-bonded Anchors and Dowels ................................ 29-33

 

29.9.6.2

 

Removal and Replacement of Adhesive-bonded Anchors and Dowels that Have 

Failed Testing ................................................................................................................ 29-34

 

29.9.7

 

Acceptance of Installed Adhesive-bonded Anchors and Dowels ......................... 29-34

 

29.10

 

Embedment Anchors ................................................................................................. 29-34

 

29.10.1

 

Prequalification for Embedment Anchors ............................................................ 29-34

 

29.10.2

 

Materials for Embedment Anchors ...................................................................... 29-35

 

29.10.3

 

Construction Methods for Embedment Anchors .................................................. 29-35

 

29.10.4

 

Inspection and Testing for Embedment Anchors ................................................. 29-35

 

29.11

 

Bridge Deck Wearing Surfaces .................................................................................. 29-36

 

29.11.1

 

General Requirements for  the Installation of Latex-modified Concrete Type Wearing 

Surfaces 29-36

 

29.11.2

 

Materials for the Installation of Latex-modified Concrete Wearing Surfaces ........ 29-37

 

29.11.2.1

 

Portland Cement .......................................................................................... 29-37

 

29.11.2.2

 

Aggregates .................................................................................................. 29-37

 

29.11.2.3

 

Water ........................................................................................................... 29-37

 

29.11.2.4

 

Latex Emulsion for the Wearing Surfaces .................................................... 29-37

 

29.11.3

 

Mix Design of Latex-modified Concrete for Wearing Surfaces ............................ 29-37

 

29.11.4

 

Applying Latex-modified Concrete for Wearing Surfaces .................................... 29-38

 

29.11.4.1

 

Preparing the Surface .................................................................................. 29-38

 

S

TANDARD 

C

ONSTRUCTION 

S

PECIFICATIONS

 

 

P

ART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page iii 

C

HAPTER 

29:

 

M

ISCELLANEOUS 

I

TEMS FOR 

S

TRUCTURES

 

First Edition -January 2018 

 

29.11.4.2

 

Proportioning and Mixing to Apply the Wearing Surfaces ............................. 29-39

 

29.11.4.3

 

Installation Procedures for the Wearing Surfaces ........................................ 29-40

 

29.11.5

 

Curing Latex-modified Concrete Wearing Surfaces ............................................ 29-41

 

29.11.6

 

Testing and Acceptance of Latex-modified Concrete Wearing Surfaces ............. 29-42

 

29.11.6.1

 

Compression Strength Test for the Wearing Surfaces ................................. 29-42

 

29.12

 

Drip Check Angle ....................................................................................................... 29-42

 

29.13

 

Lockable Doors, Access Covers, and Internal Access Walkways .............................. 29-42

 

29.14

 

End walls for ducts ..................................................................................................... 29-42

 

29.14.1

 

Materials for the Construction of End Walls for Ducts ......................................... 29-43

 

29.14.2

 

Construction Methods for End Walls for Ducts .................................................... 29-43

 

29.15

 

Scour Protection ........................................................................................................ 29-44

 

29.15.1

 

Method Statement .............................................................................................. 29-44

 

29.15.2

 

Rock Materials .................................................................................................... 29-45

 

29.15.2.1

 

Physical Properties ...................................................................................... 29-45

 

29.15.2.2

 

Cracks, Laminations and Other Deficiencies ................................................ 29-45

 

29.15.2.3

 

Length to Thickness Ratio ........................................................................... 29-45

 

29.15.2.4

 

Grading of Rock ........................................................................................... 29-45

 

29.15.2.5

 

Quality Control ............................................................................................. 29-46

 

29.15.3

 

Placing of Rock Materials ................................................................................... 29-46

 

29.15.3.1

 

Transporting and Depositing Rock Materials ................................................ 29-46

 

29.15.3.2

 

Grading of Armouring to be Maintained ....................................................... 29-46

 

29.15.3.3

 

Survey Equipment ....................................................................................... 29-47

 

29.15.3.4

 

Construction Survey .................................................................................... 29-47

 

29.15.3.5

 

Above Water Survey Technique for Rock Armour ........................................ 29-47

 

29.15.3.6

 

Below Water Survey Techniques for Rock Structures .................................. 29-47

 

29.15.3.7

 

Presentation of Results ................................................................................ 29-47

 

29.15.3.8

 

Tolerances ................................................................................................... 29-47

 

29.16

 

Sea Port Authority Works ........................................................................................... 29-48

 

29.16.1

 

Navigation beacons ............................................................................................ 29-48

 

29.16.2

 

Navigation direction signs ................................................................................... 29-48

 

Index   ...................................................................................................................................... 29-49

 

 

 

 

S

TANDARD 

C

ONSTRUCTION 

S

PECIFICATIONS

 

 

P

ART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page iv 

C

HAPTER 

29:

 

M

ISCELLANEOUS 

I

TEMS FOR 

S

TRUCTURES

 

First Edition -January 2018 

 

L

IST OF 

T

ABLES

 

Table 29-1: Designations and titles for AASHTO and ASTM standards that apply to miscellaneous 
items for structures .................................................................................................................... 29-2

 

Table 29-2: Designations and titles for BS and BS EN standards that apply to miscellaneous items 
for structures .............................................................................................................................. 29-5

 

Table 29-3: Physical properties of penetrant sealers ................................................................ 29-17

 

Table 29-4: Physical properties of methacrylate resin .............................................................. 29-21

 

Table 29-5: Types of epoxy compounds .................................................................................. 29-24

 

Table 29-6: Additional requirements for type E epoxy compounds ........................................... 29-26

 

Table 29-7: Properties for subtype F-1 compounds .................................................................. 29-26

 

Table 29-8: Properties for subtype F-2 compounds .................................................................. 29-26

 

Table 29-9: Requirements for the mix of type G epoxy compounds ......................................... 29-27

 

Table 29-10: Requirements for the sand epoxy mix of type K compounds ............................... 29-28

 

Table 29-11: Standard ASTM test methods for epoxy grout plus aggregate mix for type Q epoxy 29-
29

 

Table 29-12: Gradation requirements for fillers for use with epoxy compounds ........................ 29-30

 

Table 29-13: Uniform bond stress for adhesive bonding material ............................................. 29-31

 

Table 29-14: Polymer type stabilizers styrene butadiene ......................................................... 29-37

 

Table 29-15: Approximate latex-modified concrete mixture proportions ................................... 29-38

 

Table 29-16: Rock physical properties for scour protection ...................................................... 29-45

 

Table 29-17: Rock grading(s) ................................................................................................... 29-46

 

Table 29-18: Rock test requirements for scour protection ........................................................ 29-46

 

Table 29-19: Rock material tolerances ..................................................................................... 29-47

 

 

 

 

S

TANDARD 

C

ONSTRUCTION 

S

PECIFICATIONS

 

 

P

ART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 29-1 

C

HAPTER 

29:

 

M

ISCELLANEOUS 

I

TEMS FOR 

S

TRUCTURES

 

First Edition -January 2018 

 

29 

MISCELLANEOUS ITEMS FOR STRUCTURES 

This  chapter  outlines  standards  and  requirements  that  apply  to  the  following  work  activities  and 
related miscellaneous structures that are not otherwise covered in these specifications. 

1.  Removing Existing Bridge Structures 

2.  General Requirements For Structures Foundations 

3.  Bridge Drainage Systems 

4.  Epoxy Injection of Cracks in Concrete Structures 

5.  Sealing Concrete Surfaces and Cracks 

6.  Epoxy Compounds 

7.  Adhesive Bonding Material Systems 

8.  Adhesive-Bonded Anchors and Dowels 

9.  Embedment Anchors 

10. Bridge Deck Wearing Surfaces 

11. Drip Check Angles 

12. Lockable Doors, Access Covers, and Internal Access Walkways 

13. End Walls for Ducts 

14. Scour Protection 

15. Sea Port Authority Works 

The Contractor shall comply with the specifications in this chapter whenever performing such work 
and using such materials for the Project. 

29.1 

Reference Standards and Codes 

Standards and codes for miscellaneous items for structures and related construction works shall be 
as specified in this section, in the Contract documents, if any, and the following, in their latest edition: 

AASHTO LRFD  American Association of State Highway and Transportation Officials - Load and 

Resistance Factor Design, Bridge Construction Specifications; 

AASHTO LRFD  American Association of State Highway and Transportation Officials - Load and 

Resistance Factor Design, Bridge Design Specifications; 

AASHTO 

Standard Specifications for Transportation Materials and Methods of Sampling 
and Testing; 

AASHTO GSH-9  Guide Specifications for Highway Construction, 9th Edition; 

ACI 

American Concrete Institute; 

ACI 349-06 

Code Requirements for Nuclear Safety-Related Concrete Structures and 
Commentary; 

ADQCC (TR-516) Road Structures Design Manual 

ANSI 

American National Standards Institute; 

ANSI/AWWA 

AWWA Standard for Ductile-Iron Pipe, Centrifugally Cast; 

C151/A21.51-09 

ANSI/AWWA 

AWWA Standard for Coal-Tar Protective Coatings and Linings for Steel 

S

TANDARD 

C

ONSTRUCTION 

S

PECIFICATIONS

 

 

P

ART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 29-2 

C

HAPTER 

29:

 

M

ISCELLANEOUS 

I

TEMS FOR 

S

TRUCTURES

 

First Edition -January 2018 

 

C203-08 

Water Pipelines

—Enamel and Tape—Hot Applied; 

ANSI/AWS 

Structural Welding Code 

– Steel; 

D1.1/D1.1M:2010  

ASTM 

American Society for Testing and Materials; 

AWS 

American Welding Society; 

AWWA 

American Water Works Association; 

BS 

British Standards; 

BS EN

 

European Standards; 

DIN 

German Institute for Standardization; 

DIN 8061-8062 

Sizes and Description - PVC Pressure Pipes & Fittings 

FM 3-C882 

Florida Test Method for Performance of Epoxy-Resin Systems with Concrete by 
Slant Shear and Compressive Strength; 

FM 5-518 

Florida Test Method for Wet Bond Strength of Epoxy Mortars to Concrete and 
Fiberglass Jacket Surfaces; 

FM 5-568 

Florida Method of Test for Anchor System Tests for Adhesive-Bonded Anchors 
and Dowels; 

FM 5-569 

Florida Method of Test for Material Properties Identification of Adhesive-bonded 
Anchors and Dowels; 

FS MMM-A-121  Federal  Specification  Adhesive,  Bonding  Vulcanized  Synthetic  Rubber  to  Steel 

HAP-Free Replacement; 

IALA 

International Association of Marine Aids to Navigation and Lighthouse 
Authorities; 

NCHRP 244 

Condition Evaluation of Concrete Bridges Relative to Reinforcement Corrosion, 
Volume 5: Methods of Evaluating the Effectiveness of Penetrating Sealers; 

Rock Manual 

Manual on the Use of Rock in Coastal and Shoreline Engineering, 

CIRIA 

Construction Industry Research and Information Association; 

CIRIA-C683 

The Rock Manual 2007: The Use of Rock in Hydraulic Engineering; 

USACE 

United States Army Corps of Engineers; 

USACE C-200 

US Army Corps of Engineers - Guide Specification, Coal Tar Epoxy. 

Table  29-1  and  Table  29-2  presents  American  Association  of  State  Highway  and  Transportation 
Officials (AASHTO), American Society for Testing and Materials (ASTM), British (BS), and European 
(BS  EN)  Standards  that  are  related  to  materials  for  miscellaneous  items  for  structures.  It  also 
includes designations and titles. 

Table 29-1: Designations and titles for AASHTO and ASTM standards that apply to 

miscellaneous items for structures 

AASHTO 

Designation 

ASTM 

Designation 

TITLE 

AASHTO M 105-

09 

 

Standard Specification for Gray Iron Castings 

 

ASTM D3333 - 

07(2012) 

Standard Practice for Sampling Manufactured Staple 
Fibers, Sliver, or Tow for Testing 

S

TANDARD 

C

ONSTRUCTION 

S

PECIFICATIONS

 

 

P

ART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 29-3 

C

HAPTER 

29:

 

M

ISCELLANEOUS 

I

TEMS FOR 

S

TRUCTURES

 

First Edition -January 2018 

 

AASHTO 

Designation 

ASTM 

Designation 

TITLE 

 

ASTM D2996 - 

01(2007)e1 

Standard Specification for Filament-Wound "Fiberglass" 
(Glass-Fiber-Reinforced Thermosetting-Resin) Pipe 

 

ASTM B211 - 

12e1 

Standard Specification for Aluminum and Aluminum-
Alloy Rolled or Cold Finished Bar, Rod, and Wire  

 

ASTM A53 / 

A53M - 12 

Standard Specification for Pipe, Steel, Black and Hot-
Dipped, Zinc-Coated, Welded and Seamless 

 

ASTM A377 - 

03(2008)e1 

Standard Index of Specifications for Ductile-Iron 
Pressure Pipe 

 

ASTM A123 / 

A123M - 12 

Standard Specification for Zinc (Hot-Dip Galvanized) 
Coatings on Iron and Steel Products 

 

ASTM A48 / 

A48M - 03(2008) 

Standard Specification for Gray Iron Castings 

 

ASTM A183 - 

03(2009) 

Standard Specification for Carbon Steel Track Bolts and 
Nuts 

AASHTO M 306-

10 

 

Standard Specification for Drainage, Sewer, Utility, and 
Related Castings 

AASHTO M 

111M/M 111-11 

ASTM A123 / 

A123M - 12 

Standard Specification for Zinc (Hot-Dip Galvanized) 
Coatings on Iron and Steel Products 

 

ASTM A500 / 

A500M - 10a 

Standard Specification for Cold-Formed Welded and 
Seamless Carbon Steel Structural Tubing in Rounds 
and Shapes 

 

ASTM A536 - 

84(2009) 

Standard Specification for Ductile Iron Castings 

 

ASTM A780 / 

A780M - 09 

Standard Practice for Repair of Damaged and Uncoated 
Areas of Hot-Dip Galvanized Coatings 

 

ASTM D3278 - 

96(2011) 

Standard Test Methods for Flash Point of Liquids by 
Small Scale Closed-Cup Apparatus 

 

ASTM C642 - 06 

Standard Test Method for Density, Absorption, and 
Voids in Hardened Concrete 

 

ASTM C672 / 

C672M - 12 

Standard Test Method for Scaling Resistance of 
Concrete Surfaces Exposed to Deicing Chemicals 

 

ASTM E274 / 

E274M - 11 

Standard Test Method for Skid Resistance of Paved 
Surfaces Using a Full-Scale Tire 

 

ASTM D1481 - 

02(2007) 

Standard Test Method for Density and Relative Density 
(Specific Gravity) of Viscous Materials by Lipkin 
Bicapillary Pycnometer 

 

ASTM D2471-99 

Standard Test Method for Gel Time and Peak 
Exothermic Temperature of Reacting Thermosetting 
Resins (Withdrawn 2008) 

S

TANDARD 

C

ONSTRUCTION 

S

PECIFICATIONS

 

 

P

ART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 29-4 

C

HAPTER 

29:

 

M

ISCELLANEOUS 

I

TEMS FOR 

S

TRUCTURES

 

First Edition -January 2018 

 

AASHTO 

Designation 

ASTM 

Designation 

TITLE 

 

ASTM C307 - 

03(2012) 

Standard Test Method for Tensile Strength of Chemical-
Resistant Mortar, Grouts, and Monolithic Surfacings 

 

ASTM C882 / 

C882M - 12 

Standard Test Method for Bond Strength of Epoxy-
Resin Systems Used With Concrete By Slant Shear 

 

ASTM D2393-86 

Test Method for Viscosity of Epoxy Resins and Related 
Components 

 

ASTM D638 - 10 

Standard Test Method for Tensile Properties of Plastics 

 

ASTM C579 - 

01(2012) 

Standard Test Methods for Compressive Strength of 
Chemical-Resistant Mortars, Grouts, Monolithic 
Surfacings, and Polymer Concretes 

 

ASTM C580 - 

02(2012) 

Standard Test Method for Flexural Strength and 
Modulus of Elasticity of Chemical-Resistant Mortars, 
Grouts, Monolithic Surfacings, and Polymer Concretes 

 

ASTM C531 - 

00(2012) 

Standard Test Method for Linear Shrinkage and 
Coefficient of Thermal Expansion of Chemical-Resistant 
Mortars, Grouts, Monolithic Surfacings, and Polymer 
Concretes 

 

ASTM C884 / 

C884M - 

98(2010) 

Standard Test Method for Thermal Compatibility 
Between Concrete and an Epoxy-Resin Overlay 

 

ASTM C1339 - 

02(2012) 

Standard Test Method for Flowability and Bearing Area 
of Chemical-Resistant Polymer Machinery Grouts 

 

ASTM E488 / 

E488M - 10 

Standard Test Methods for Strength of Anchors in 
Concrete Elements 

 

ASTM E1512 - 

01(2007) 

Standard Test Methods for Testing Bond Performance 
of Bonded Anchors 

AASHTO M 6-08 

 

Standard Specification for Fine Aggregate for Hydraulic 
Cement Concrete  

AASHTO M 80-

08 

 

Standard Specification for Coarse Aggregate for 
Hydraulic Cement Concrete  

AASHTO M 43-

05 (2009) 

ASTM D448 - 08 

Standard Classification for Sizes of Aggregate for Road 
and Bridge Construction 

 

ASTM C31 / 

C31M - 12 

Standard Practice for Making and Curing Concrete Test 
Specimens in the Field 

 

ASTM C131 - 06 

Standard Test Method for Resistance to Degradation of 
Small-Size Coarse Aggregate by Abrasion and Impact in 
the Los Angeles Machine 

AASHTO T 259-

2002(R 2006) 

 

Standard Method of Test for Resistance of Concrete to 
Chloride Ion Penetration 

S

TANDARD 

C

ONSTRUCTION 

S

PECIFICATIONS

 

 

P

ART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 29-5 

C

HAPTER 

29:

 

M

ISCELLANEOUS 

I

TEMS FOR 

S

TRUCTURES

 

First Edition -January 2018 

 

AASHTO 

Designation 

ASTM 

Designation 

TITLE 

AASHTO T 260-

97 (2011) 

 

Standard Method of Test for Sampling and Testing for 
Chloride Ion in Concrete and Concrete Raw Materials  

AASHTO T 

106M/T 106-12 

ASTM C 109/C 

109M-11b)

 

 

Standard Method of Test for Compressive Strength of 
Hydraulic Cement Mortar (Using 50-mm or 2-in. Cube 
Specimens) 

 

ASTM C403 / 

C403M - 08 

Standard Test Method for Time of Setting of Concrete 
Mixtures by Penetration Resistance 

Table 29-2: Designations and titles for BS and BS EN standards that apply to miscellaneous 

items for structures 

BS Designation 

BS EN 

Designation 

Title 

 

BS EN ISO 

1452-1:2009 

Plastics piping systems for water supply and for buried 
and above-ground drainage and sewerage under 
pressure. Unplasticized poly(vinyl chloride) (PVC U). 
General 

BS 812-

103.1:1985 

 

Testing aggregates. Method for determination of particle 
size distribution. Sieve tests  

BS 6349-1:2000 

 

Maritime structures. Code of practice for general criteria  

29.2 

Removing Existing Bridge Structures 

The Contractor shall remove, wholly or in part, all bridges, retaining walls, and other major structures 
that  are  designated  to  be  removed  in  the  Contract  documents.  Unless  the  Contract  documents 
specify otherwise, the Contractor shall also complete any necessary excavation and backfilling of 
trenches, holes, or pits that result from such removal. To the satisfaction of the Engineer and Owner, 
the Contractor shall also salvage or dispose of materials from such work. The Contractor shall also 
bear responsibility for all costs for environmental and health monitoring systems or programs that 
the Project requires. 

29.2.1 

Submissions for the Removal of Structures 

The Contractor shall prepare method statement with supporting calculations and working drawings 
showing methods and a sequence of removal under the following conditions: 

a.  When  the  Contract  documents  specify  that  structures  or  portions  of  structure  are  to  be 

removed and salvaged 

b.  When  removal  operations  will  be  performed  over  or  adjacent  to  public  traffic  or  railroad 

property 

c.  When specified in the Contract documents.  

The Contractor shall submit method statement, calculations, and working drawings to the Engineer 
for approval at least ten days before the proposed start of removal operations. Removal work shall 
not begin until the drawings have been approved. Such approval shall not relieve the Contractor of 
any responsibility under the Contract documents for the successful completion of the work. 

When salvage is required, drawings shall clearly indicate how individual segments of the structure 
will be marked to designate them for removal. 

S

TANDARD 

C

ONSTRUCTION 

S

PECIFICATIONS

 

 

P

ART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 29-6 

C

HAPTER 

29:

 

M

ISCELLANEOUS 

I

TEMS FOR 

S

TRUCTURES

 

First Edition -January 2018 

 

29.2.2 

Removal Construction 

Except for utilities and other items that the Engineer may direct the Contractor to leave intact, the 
Contractor shall raze, remove, and dispose of each structure or portion of structure designated to be 
removed. All concrete and other foundations shall be removed to a depth of at least 600 mm below 
ground elevation or  900 mm below  the subgrade elevation, whichever  is  lower. Unless otherwise 
specified in the Contract documents, the Contractor has the option to either pull piles or cut them off 
at a point not less than 600 mm below ground line. Cavities left after structures are removed shall 
be  backfilled  to  the  level  of  the  surrounding  ground  and,  if  they  are  within  the  area  of  roadway 
construction,  shall  be  compacted  to  meet  the  requirements  of  the  Contract  documents  for 
embankment. 

Explosives  shall  not  be  used  except  at  locations  and  under  conditions  specified  in  the  Contract 
documents. All blasting shall be completed before the placement of new work. 

29.2.3 

Partial Removal of Structures 

When structures are to be widened or modified and only portions of the existing structures are to be 
removed,  these  portions  shall  be  removed  in  such  a  manner  as  to  leave  the  remaining  structure 
undamaged and in proper condition to fulfil their required purposes. Methods that involve the use of 
blasting or wrecking balls shall not be used within any span or pier unless the entire span or pier is 
to be removed. Any damage to the portions that remain in service shall be repaired by the Contractor 
at the Contractor's expense. 

Before beginning concrete removal operations that involve the removal of a portion of a monolithic 
concrete  element,  the  Contractor  shall  make  a  saw  cut  approximately  25  mm  deep  to  a  true  line 
along the limits of removal on all faces of the element that will be visible in the completed work. 

Old concrete shall be carefully removed to the lines designated by drilling, chipping, or other methods 
approved by the Engineer. Surfaces that are visible as a result of this removal shall be reasonably 
true and even, with sharp, straight corners that permit a neat joint with the new construction or be 
satisfactory 

to fulfil the surfaces’ required purposes. Where existing reinforcing bars will extend from 

the existing structure into new construction, the Contractor shall remove the concrete, leaving the 
projecting  bars  clean  and  undamaged.  Where  projecting  bars  will  not  extend  into  the  new 
construction, the Contractor shall cut them off flush with the surface of the old concrete. 

During full-depth removal of deck concrete over steel beams or girders that will remain in place, the 
Contractor shall be careful not to notch, gouge, or distort the top flanges. The Contractor shall repair 
any damage at the direction of the Engineer and at his own expense. Repairs may include grinding, 
welding, heat straightening, or member replacement, depending on the location and severity of the 
damage. 

29.2.4 

Removal of Structures for Demolition 

If the Contract requires demolition, the Contractor shall remove existing structures and restore the 
existing surface in accordance with the Contract documents or as directed by the Engineer. 

Before beginning demolition, the Contractor shall coordinate disconnection of utility services with the 
appropriate utility owner. 

The  Contractor  shall  immediately  repair  broken  or  damaged  utilities.  The  Owner  shall  make  no 
additional payment to the Contractor for such repair.  

29.2.5 

Removal of Bridges, Culverts, and Other Existing Structures 

Bridges and culverts in use by traffic shall not be removed until alternative arrangements have been 
made to accommodate traffic. 

When  structures  are  to  remain  the  property  of  the  Owner,  the  method  of  dismantling  steel 
superstructure shall avoid inflecting any damage to the materials. Before dismantling steel members, 
the Contractor shall match-marked them in paint and stencils, in accordance with directions from the 

S

TANDARD 

C

ONSTRUCTION 

S

PECIFICATIONS

 

 

P

ART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 29-7 

C

HAPTER 

29:

 

M

ISCELLANEOUS 

I

TEMS FOR 

S

TRUCTURES

 

First Edition -January 2018 

 

Engineer, to be erected again. Steel members at the original field splices shall be dismantled and 
supported  on falsework during  the  operation  of dismantling,  or  in  a  manner  and  method  that  has 
been approved by the Engineer. 

Without compensation, the Contractor shall replace or satisfactorily repair any damaged steel. 

Piers,  abutments,  and  piling  shall  be  cut  at  the ground  line,  or  in case  of  channel  change,  at the 
elevation of the channel excavation as shown on the Contract plans.  

Salvaged structural steel and other materials shall be stacked on the right-of-way outside of the ditch 
line in a neat and workmanlike manner. 

Old concrete and other similar  materials shall be broken up and placed in the fill as specified for 
placing solid rock in fills, or otherwise disposed off as directed by the Engineer. 

Where such portions of existing structures lie wholly or in part within the limits  of a new structure, 
the  Contractor  shall  remove  such  portions  as  necessary  to  accommodate  the  construction  of  the 
proposed structure. 

In no case shall material be left in the channel. 

When blasting or other operations that may damage new construction are necessary for the removal 
of an existing structure or obstruction, the Contractor shall complete these operations before placing 
the new work. 

Structures such as piers, abutments, piling, substructures or material in structures shall be removed 
and disposed by the Contractor in accordance with the specifications in this chapter. 

29.2.6 

Salvaging Materials after Removal 

Materials that the Contract documents designate for salvage, either for reuse in the Project or for 
future  use  by  the  Owner,  shall  remain  the  property  of  the  Owner.  The  Contractor  shall  carefully 
remove  such  materials  in  transportable  sections  and  stockpile  them  near  the  site  at  a  location 
designated by the Engineer or deliver them to the place indicated by the Owner. The Contractor shall 
restore or replace damaged or destroyed material without additional compensation. 

To remove rivets and bolts from steel structures to be salvaged, the Contractor shall cut the heads 
with a chisel. Then, the Contractor shall punch or drill the rivets and bolts from the hole, or use any 
other  method  that  will  not  damage  the  members  for  reuse  and  that  has  the  Engineer

’s  approval. 

Before dismantling members or sections of steel structures, the Contractor shall match-marked them 
with paint in accordance with the appropriate engineering diagram or a plan that has the Engineer

’s 

approval.  

29.2.7 

Removing Abandoned Structures 

All abandoned existing structures shall be broken off and removed to a depth of not less than 150 
mm  below  the  foundation  grade  of  new  structure.  When  sewer  lines,  water  lines,  and  similar 
structures are to be abandoned, they must be tightly plugged at each end with concrete in the manner 
that has been approved by the Engineer. 

Manholes and similar structures to be abandoned shall be removed to the depth specified, and shall 
be filled and compacted with suitable material. If an abandoned structure to be backfilled will reside 
under  paving  or  another  structure,  the  Contractor  shall  tamp  and  compact  the  backfill material  in 
uniform layers not more than 150 mm thick. 

If  an  abandoned  structure  is  not  under  paving  or  other  structures,  the  Contractor  may  obtain 
settlements by thoroughly flushing with water during backfill operations. 

S

TANDARD 

C

ONSTRUCTION 

S

PECIFICATIONS

 

 

P

ART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 29-8 

C

HAPTER 

29:

 

M

ISCELLANEOUS 

I

TEMS FOR 

S

TRUCTURES

 

First Edition -January 2018 

 

29.2.8 

Disposal of Materials after Removal 

All  material  removed  and  all  debris,  rubbish  or  other  unsuitable  material  produced  as  a  result  of 
demolition  shall  be  disposed  of  by  the  Contractor  in  a  dumping  area  previously  approved  by  the 
Competent Authority. 

The  Contractor  shall  identify  all  hazardous  materials,  properly  dispose  them,  and  maintain  the 
appropriate records. 

The Contractor shall conduct his operations in such a manner as to avoid hazards to persons and 
vehicles. After work is started on any existing structure, the work on that structure shall be continued 
to completion, promptly and expeditiously. 

29.3 

General Requirements for Structures Foundations 

Available soil samples or rock cores obtained during the soil boring operations shall be examined by 
the Contractor at the Owner

’s approved laboratory. 

29.3.1 

Protection of Existing Structures 

When the  Contract  plans require foundation construction  operations  in  close  proximity  to  existing 
structures,  the  Contractor  shall  take  all  precautions  to  prevent  damage  to  such  structures. 
Requirements described herein apply to all types of roadway structures on or off the Right of Ways 
(ROW)  that  may  be  adversely  affected  by  foundation  construction  operations,  including  phase 
construction, vibrations, ground loss, ground heave,  or dewatering. Utilities shall be protected, as 
described  in  the  applicable  provisions  and  sections  of  Chapter  11,  Utilities,  of  these  Standard 
Specifications. 

Existing  structures  shall  be  monitored  for  settlement  in  a  manner  approved  by  the  Engineer, 
recording elevations to an accuracy of 0.3 mm. The Contractor shall monitor the following structures: 

a.  Structures shown in the Contract plans. 

b.  Structures  within  a  distance,  in metres,  of  pile-driving  operations  equal to  0.131 times  the 

square root of the impact hammer energy, in meter-Newton. Required measurements shall 
be taken before the initiation of driving and then daily on days  when driving occurs, or  as 
indicated in the Contract plans, and weekly for two weeks after driving has stopped. 

c.  Structures  within  a  distance  of  10  pile  diameters  or  the  estimated  depth  of  excavation, 

whichever is greater. 

d.  Structures within a distance of three times the depth of excavation for the footing. 

The Cont

ractor shall obtain the Engineer’s approval of the number and location of monitoring points. 

Elevation shall be taken for the following: 

1.  Before beginning construction;  

2.  Daily during the driving of any casings, piling, or sheeting;  

3.  Weekly for two weeks after stopping driving;  

4.  During excavation;  

5.  During blasting (if approved); or, 

6.  As directed by the Engineer. 

Any movements detected shall be reported by the Contractor to the Engineer and the Contractor 
shall take any remedial measures required to prevent damage to the existing structures. 

A  qualified  specialty  engineer  shall  be  employed  by  the  Contractor  to  survey  all  structures,  or 
portions thereof, within the following: 

S

TANDARD 

C

ONSTRUCTION 

S

PECIFICATIONS

 

 

P

ART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 29-9 

C

HAPTER 

29:

 

M

ISCELLANEOUS 

I

TEMS FOR 

S

TRUCTURES

 

First Edition -January 2018 

 

  A distance, in metres, of pile-driving operations equal to 0.0655 times the square root of the 

impact hammer energy, in meter-Newton;  

  A distance of 10 pile diameters or the estimated depth of excavation, whichever is greater;  

  Three times the excavation depth for footings and caps; or,  

  As shown in the Contract plans. 

The Owner will assist the Contractor to make the necessary arrangements to provide right-of-way 
entry for the Contractor to survey. Structure conditions and all existing cracks shall be adequately 
documented  with  descriptions  and  pictures  by  the  Contractor,  which  shall  prepare  two  reports 
documenting  the  condition  of  the  structures:  one  report  before  beginning  foundation  construction 
operations and a second report after completing foundation construction operations. The Owner will 
take ownership of both reports. Pre- and post-driving surveys of the condition of bridges shall not be 
performed by the Contractor, except when shown in the Contract documents or requested by the 
Engineer. 

When shown in the Contract documents, the Contractor shall employ a qualified specialty engineer 
to  monitor  and  record  vibration  levels  during  the  driving  of  casings,  piling,  sheeting,  or  blasting 
operations. Vibration monitoring equipment capable of detecting velocities of 2.5mm/s or less shall 
be provided by the Contractor. 

Upon detecting settlement or heave of 1.5 mm, vibration levels reaching 12.5 mm/s, levels otherwise 
shown in the Contract documents, or damage to the structure, the Contractor shall immediately stop 
the source of vibrations, backfill any open pile excavations, and contact the Engineer for instructions. 

When  the  Contract  plans  require  excavations  for  construction  of  footings  or  caps,  the  Contractor 
shall evaluate the need for, design of, and provide for any necessary features to protect adjacent 
structures. When sheeting and shoring are not detailed in the Contract plans, the Contractor shall 
employ a specialty engineer to design the sheeting and shoring, and to sign and seal the plans and 
specification requirements. These designs shall be sent to the Engineer for his approval and record 
before beginning construction. 

When shown in the Contract documents, or when authorized by the Engineer, the Contractor shall 
install  the  piling  to  the  depth  required  to  minimize  the  effects  of  vibrations  or  ground  heave  on 
adjacent structures by approved methods other than driving, including preformed holes, predrilling, 
and jetting. If the Owner authorizes the use of preformed pile holes to meet this requirement, the 
Contractor shall carry out the work without extra charge to the Owner. 

If not otherwise provided in the Contract plans, the Contractor shall evaluate the need for, design of, 
and provide for all reasonable precautionary features to prevent damage, including, but not limited 
to,  selecting  construction  methods  and  procedures  that  will  prevent  damaging  caving  of  the  pile 
excavation and monitoring and controlling the vibrations from construction activities, including driving 
of casings, driving of sheeting, and blasting. 

When  shown  in  the  Contract  plans,  or  directed  by  the  Engineer,  the  Contractor  shall  install  a 
Piezometers  near  the  ROW  line  and  near  any  structure  that  may  be  affected  by  lowering  the 
groundwater when dewatering is required. The Contractor shall monitor the Piezometers and record 
the groundwater elevation level daily and the Contractor shall notify the Engineer of any groundwater 
lowering near the structure of 0.3 m or more. 

29.3.2 

Excavation 

All excavation of the foundations shall be completed by the Contractor prior to installing piles, unless 
otherwise authorized by the Engineer. After completing pile installation, the Contractor shall remove 
all loose and displaced materials from around the piles, leaving a clean, solid surface. Soil surfaces 
on which concrete is to be placed, or which will support the forming system for the concrete to support 
the load of the plastic concrete, shall be compacted by the Contractor to avoid settling or causing 
the concrete to crack, as shown in the Contract documents. Compaction for excavations made below 

S

TANDARD 

C

ONSTRUCTION 

S

PECIFICATIONS

 

 

P

ART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 29-10 

C

HAPTER 

29:

 

M

ISCELLANEOUS 

I

TEMS FOR 

S

TRUCTURES

 

First Edition -January 2018 

 

water for seals 

— or when the footing, cap, or forming systems, including supports — does not rest 

on the ground surface shall not be required by the Engineer. 

29.3.2.1 

Abutment (End Bent) Fill 

Fill shall be placed and compacted by the Contractor before installing end-bent piling, except when 
the following occurs: 

a.  Driving specified test piling in end bents; or, 

b.  When the Contract plans show uncased piles through proprietary retaining wall fills. 

When installing piles or casing prior to placing fill, the Contractor shall take necessary precautions 
to prevent displacement of piles during placing and compacting fill materials within 4.5 m of the piles 
and casing. Positions of the piles and casing shall be referenced and checked by the Contractor at 
three approximately equal intervals during construction of the embankment. 

Embankment  material  shall  be  placed  by  the  Contractor  in  150-mm  loose  lifts  in  the  4.5-m  area 
around the piles and casing. The Contractor shall compact embankment material within the 4.5-m 
area adjacent to the piles and casing to the required density with compaction equipment weighing 
less  than  4.448  KN.  When  installing  piles  prior  to  the  completion  of  the  surrounding  fills,  the 
Contractor shall not cap them until placing the fills as near to final grade as possible, leaving only 
the necessary working room for construction of the caps. 

Permanent casings shall be installed by the Contractor prior to placement of the fill, for all drilled 
piles through mechanically stabilized fills; for example, behind proprietary retaining walls, for piles 
installed  after  fill  placement.  Temporary  casings  shall  be  installed  by  the  Contractor  through  the 
completed conventional fill when permanent casings are not required. 

Permanent casings shall be provided by the Contractor, if required, before the fill is placed extending 
a sufficient distance into the existing ground to provide stability to the casings during construction of 
the abutment fill. 

29.3.3 

Cofferdams 

Cofferdams  shall  be  constructed  by  the  Contractor  as  detailed  in  the  Contract  plans.  When 
cofferdams are not detailed in the Contract plans, the Contractor shall employ a specialty engineer 
to design cofferdams, and to sign and seal the plans and specification requirements. Designs shall 
be sent to the Engineer for its records before beginning construction. 

A qualified diver and a safety diver shall be provided by the Contractor to inspect the conditions of 
the foundation enclosure or cofferdam when the Contract documents require a seal for construction. 
These  divers  shall  be  equipped  by  the  Contractor  with  suitable  voice  communications,  and  have 
them  inspect  the  foundation  enclosure  and  cofferdam  periphery 

—  including  each  sheeting 

indentation and around each piling to ensure that no layers of mud or other undesirable materials 
were left above the bottom of seal elevation during the excavation process. The Contractor shall also 
have the divers check to make sure the surfaces of the piles are sufficiently clean to allow bond of 
the  concrete  down  to the  minimum  bottom  of  seal  elevation. When  required,  the  Contractor  shall 
ensure  that  there  are  no  mounds  of  stone,  shell,  or  other  authorized  backfill  material  left  after 
placement and grading. To ensure that the seal is placed as specified and evaluate the adequacy of 
the foundation soils or rock, the Contractor shall assist the Engineer, as required. Deficiencies found 
by the divers shall be corrected by the Contractor. Upon completion of inspection by the divers, the 
Owner  may  also  elect  to  inspect  the  work  before  authorizing  the  Contractor  to  proceed  with 
subsequent construction operations. A written report by the divers that indicates the results of their 
underwater  inspection  shall  be  furnished  by  the  Contractor  to  the  Engineer  before  requesting 
authorization to place the seal concrete. 

S

TANDARD 

C

ONSTRUCTION 

S

PECIFICATIONS

 

 

P

ART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 29-11 

C

HAPTER 

29:

 

M

ISCELLANEOUS 

I

TEMS FOR 

S

TRUCTURES

 

First Edition -January 2018 

 

29.3.4 

Vibrations on Freshly Placed Concrete (Drilled Piles and 
Piers) 

Until the concrete has attained its final set, as defined by ASTM C403 / C403M - 08, freshly placed 
concrete shall not be subjected to vibrations greater  than 38 mm/s from pile-driving or drilled-pile 
casing installation sources located within the greater dimension of three pile diameters, as measured 
from the perimeter of the pile closest to the vibration source; or 9 m from the nearest outside edge 
of freshly placed concrete to the vibration source 

— except as required to remove temporary casings 

before the drilled pile elapsed time has expired. 

29.4 

Bridge Drainage Systems 

The  Contractor  shall  construct  drainage facilities  and  accessories  to  collect  and  dispose  of  water 
from drains on the bridge structures, in accordance with the details shown in the Contract plans and 
the specifications in this section. 

Construction of bridge drainage systems shall consist of furnishing and installing drainage facilities, 
including drainage inlets and channel grates and frames on bridge deck, subways, and underpasses, 
to collect surface water from structures, draining pipes, and down-pipes that are connected to the 
drainage inlets and channel grates by hoppers. Such inlets and channel grates and frames may be 
of cast iron or cast steel with or without integral cast hoppers. When not using integral cast hoppers, 
a  bridge  drainage  system  shall  have  fabricated  U-PVC  or  GRP  hoppers  as  approved  by  the 
Engineer. 

This  work  shall  also  consist  of  furnishing  and  installing  concrete  gutters,  weep  holes,  drainage 
blankets, and geocomposite drainage systems for all earth retaining systems. 

The Contractor shall submit, as early as possible, a proposal with details of all drainage material and 
components  to  the  Engineer  for  approval.  The  Contractor  shall  not  incorporate  any  material  or 
component into a bridge drainage system without written approval from the Engineer. 

29.4.1 

Bridge Drainage Terminology  

This section defines core terminology for constructing bridge drainage systems. 

Gutter:

 

A channel along the eaves or on the roof that collects and carries away rainwater. 

Hopper:

  

Funnel-shaped receptacle through which contents pass, by gravity, into a receptacle 
below. 

Scupper: 

An opening for draining water from the bridge deck.  

Weep Hole:

  A small opening that enables water that accumulates behind a retaining wall to drain 

away. 

29.4.2 

Materials for Bridge Drainage Systems 

29.4.2.1 

Materials Related to Superstructure 

This article outlines specifications for materials related to superstructures. 

a.  Drainage Inlets and Channel Grates and Frames for Superstructures 

Drainage inlets and channel grates and frames shall be heavy duty and of the types indicated on the 
Contract  plans.  They  shall  be  class  No  25  S  or  equivalent  structural  steel  or  gray  cast  iron  that 
conforms to the specifications in AASHTO M 105-09.  

Integral cast hoppers shall be of the same grade and quality as the drainage inlet or channel grate 
and frame. Fabricated U-PVC or GRP shall conform to the requirements of the Engineer, who may 
require material and load testing for such approval. 

S

TANDARD 

C

ONSTRUCTION 

S

PECIFICATIONS

 

 

P

ART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 29-12 

C

HAPTER 

29:

 

M

ISCELLANEOUS 

I

TEMS FOR 

S

TRUCTURES

 

First Edition -January 2018 

 

b.  Fibreglass Pipe for Superstructures 

Fibreglass pipe and fittings shall conform to ASTM D2996 - 01(2007)e1 Designation Code RTRP- 
11AE-5112. Pipe and fittings with Class C or Class F liners are acceptable. Finish colour for such 
pipes shall be concrete gray. 

c.  PVC and U-PVC Pipes for Superstructures 

Pipes  of  synthetic  material  for  general  drainage  use  shall  be  polythene,  polypropylene,  or 
polyvinylchloride and shall have the approval of the Engineer. Unplasticized polyvinylchloride pipes 
shall be class 2 or 3 pipes that conform to the specifications of ASTM D3333 

– 07 (2012). PVC pipes 

and sleeves shall comply with DIN 8061-8062. Fittings shall be 10 bars class that comply with BS 
EN ISO 1452-1:2009. 

d.  Aluminium Pipes for Superstructures 

Aluminium pipes, sleeves, and fittings shall be alloy 6061-T6 that conforms to ASTM B211 - 12e1. 

e.  Steel Alloy Pipe for Bridge Storm Drains for Superstructures 

Steel alloy pipe and fittings shall be grade B alloy steel that conforms to the chemical analysis of 
ASTM A53 / A53M - 12 or ASTM A500 / A500M - 10a. As an alternative, the Contractor may provide 
pipes of ductile iron that conforms to ASTM A377 - 03(2008)e1 (ANSI/AWWA C151/A21.51-09), and 
as approved by the Engineer. Steel alloy pipe, alternative ductile iron pipe, and fittings shall be zinc-
coated (galvanized) according to ASTM A123 / A123M - 12. The Contractor shall weld steel pipes 
and fittings to connect them before galvanizing. 

Ductile iron pipe fittings shall be class 30 iron that conforms to ASTM A48 / A48M 

– 03 (2008). Pipe 

bends shall have long radii. Pipe joints shall be formed using groove-type couplings that consist of 
a housing clamp keyed into a groove cut around the 

pipe’s full circumference. A gasket of moulded 

or extruded butyl or EPDM (ethylene propylene diene M-class rubber) shall provide a sealed joint. 
The Contractor shall use track bolts that conform to ASTM A183 - 03(2009), with oval necks and 
heavy  hexagon  standard  nuts.  The  Contractor  shall  galvanize  such  assemblies  as  described  in 
Section 23.4.10 of Chapter 23, Steel Structures. 

f.  Zinc Coating on Steel for Superstructures 

Zinc  coating  (hot-dip  galvanizing)  applied  on  iron  and  steel  products  shall  conform  to  the 
specifications outlined in Section 23.4.10 of Chapter 23, Steel Structures. 

g.  Castings, Materials, and Components for Drainage Structures 

Upon  completion,  all  inlet  and  manhole  castings,  grates,  extension  rings,  extension  frames,  and 
covers shall be able to withstand the Abu Dhabi Vehicular Load (ADVL) in accordance to Abu Dhabi 
Road Structures Design Manual (AD-D-06). All inlet and manhole castings, grates, extension rings, 
extension frames, and covers shall conform to the following requirements: 

1.  Gray iron castings shall conform to  AASHTO M 105-09 and AASHTO M 306-10 for Class 

30B and Class 35B and shall be true to pattern in form and dimensions. They shall also be 
free from pouring faults, sponginess, cracks, blowholes, and other defects that could diminish 
their strength and value for their intended service. 

2.  Castings shall be sandblasted or otherwise effectively cleaned of scale and sand to present 

smooth, clean, and uniform surfaces. 

3.  Carbon  steel  extension  frames  and  rings  for  inlets  and  manholes  shall  be  galvanized 

according to AASHTO M 111M/M 111-11, when specified. Welding of fabricated steel shapes 
and structures shall conform to ANSI/AWS D1.1/D1.1M:2010. No punching, drilling, reaming, 
welding,  or  cutting  shall  be  allowed  in  the  field.  Without  additional  compensation,  the 
Contractor shall repair any damage to the galvanized coatings that occurs during or before 
installation. 

S

TANDARD 

C

ONSTRUCTION 

S

PECIFICATIONS

 

 

P

ART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 29-13 

C

HAPTER 

29:

 

M

ISCELLANEOUS 

I

TEMS FOR 

S

TRUCTURES

 

First Edition -January 2018 

 

4.  Structural steel shapes used in the fabrication of drainage structures and components shall 

conform to the applicable requirements of Chapter 12, Strom Water Drainage, Chapter 23, 
Steel Structures, and Chapter 30, Miscellaneous Metals, of these standard specifications. 

5.  Ductile iron castings shall be grade 65-45-12 iron or grade 80-55-06 iron that conforms to the 

requirements outlined in ASTM A536 - 84(2009). 

29.4.2.2 

Materials Related to Retaining Systems 

This article outlines specifications for materials related to retaining systems. 

a.  Pipe and Perforated Pipe for Retaining Systems 

Pipes,  including  perforated  pipes,  shall  conform  to  AASHTO  GSH-9,  Guide  Specifications  for 
Highway Construction, 9th Edition. Subsections 708, "Concrete, and Plastic Pipe" and 709 "Metal 
Pipe" of that guide apply. 

b.  Filter Fabric for Retaining Systems 

Filter fabric shall conform to AASHTO GSH-9, Guide Specifications for Highway Construction, 9th 
Edition. Subsection 620, "Filter fabric" applies. Filter fabric shall prevent clogging of the drain and 
transmission of fines from the backfill. 

c.  Permeable Material for Retaining Systems 

Permeable material shall meet the specifications outlined in AASHTO GSH-9, Guide Specifications 
for Highway Construction, 9th Edition. Subsection 704 (Aggregate for Drainage) applies, unless the 
Contract documents or approved working drawings specify otherwise. 

d.  Geocomposite Drainage Systems 

Geocomposite  drainage  systems  shall  conform  to  the  requirements  specified  in  the  Contract 
documents or approved working drawings. 

29.4.3 

Construction Requirements for Bridge Drainage Systems 

Drainage  facilities  shall  be  constructed  in  accordance  with  the  details  shown  on  the  Contract 
documents, approved working drawings, and the specifications in this chapter.  

29.4.3.1 

Inlet Frames, Grates, and Scuppers for Bridge Drainage 
Systems 

Bearing surfaces of frames and grates shall be machined so that the grates have uniform bearing 
on frames. They shall be match-marked before being delivered. Inlet frames, grates, and scuppers, 
if fabricated from steel, shall be zinc-coated. 

29.4.3.2 

Steel Alloy Pipe for Bridge Drainage Systems 

Areas where galvanizing has been damaged shall be repaired by any of the three methods specified 
in ASTM A780 / A780M - 09. In all cases, such repair shall achieve the minimum coating thickness 
specified for the item. The Contractor shall obtain approval for the type of threaded concrete inserts 
for support brackets and clamps. 

29.4.3.3 

Fibreglass Pipe and Fittings for Bridge Drainage Systems 

The  Contractor  may  use  fibreglass  pipes  and  fittings  wherever  a  bridge  drainage  system  design 
specifies steel alloy pipes. 

Runs  of  pipe  shall  be  supported  at  intervals  not  greater  than  those  recommended  by  the 
manufacturer of the pipe. The Contractor shall avoid installing supports that have point contact or 
narrow supporting areas.  The Contractor may use standard sling, clamp, and clevis hangers  and 

S

TANDARD 

C

ONSTRUCTION 

S

PECIFICATIONS

 

 

P

ART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 29-14 

C

HAPTER 

29:

 

M

ISCELLANEOUS 

I

TEMS FOR 

S

TRUCTURES

 

First Edition -January 2018 

 

shoe supports that are designed for use with steel pipe. Strap widths for hangers shall be at least 37 
mm for  pipe with a diameter of  150 mm and  at least  50 mm for  pipe with a diameter of 300 mm. 
Straps shall contact at least 120 degrees of a pipe’s surface. Pipe supported on surfaces with less 
than 120 degrees contact shall have a split fibreglass pipe protective sleeve bonded in place with 
adhesive. 

All fibreglass pipe and fittings shall be pigmented resin throughout the wall. Colour shall be standard 
concrete gray or another colour designated in the Contract documents. The Owner shall not accept 
painted  gel-coat  or  exterior  coating.  Fibreglass  pipe  and  fittings  shall  be  handled  and  installed 
according to the manufacturer‘s recommendations. 

29.4.3.4 

Concrete Gutters for Bridge Drainage Systems 

Concrete gutters shall be constructed to the profile indicated in the  Contract documents or on the 
approved  working  drawings.  Pneumatically-applied  mortar  shall  conform  to  the  requirements 
outlined  in  Article  4.3.10.5  of  Chapter  4,  Concrete  Works,  of  these  standard  specifications.  The 
Contractor shall provide outlet working at sags in the profile at the low ends of the gutter and at other 
locations indicated in working drawings. 

29.4.3.5 

Weep Holes for Bridge Drainage Systems 

Weep holes, if specified, shall be constructed at the locations shown in the Contract documents or 
on  the  approved  working  drawings.  A  minimum  of  0.06  cubic  metres  of  permeable  material 
encapsulated with filter fabric shall be placed at each weep hole. 

Joints  between  precast  concrete  retaining  wall  face  panels  that  function  as  weep  holes  shall  be 
covered  with  filter  fabric.  Such  filter  fabric  shall  be  bonded  to  the  face  panels  with  adhesive  that 
conforms to Federal Specification MMM-A-121. Face panels that are to receive filter fabric shall be 
dry and thoroughly cleaned of dust and loose material. 

29.4.3.6 

Drainage Blankets for Bridge Drainage Systems 

Drainage blankets that consist of permeable material encapsulated in filter fabric, collector pipes, 
outlet pipes, and clean-out pipes shall be constructed as specified in the Contract documents or on 
the approved working drawings. 

Subgrade to receive filter fabric shall conform to the specified compaction and elevation tolerance 
and shall be free of loose or extraneous material and sharp objects that may damage the filter fabric 
during  installation.  Filter  fabric  shall  be  stretched,  aligned,  and  placed  without  wrinkles.  Adjacent 
borders of the filter fabric shall overlap from 300 mm to 450 mm. Should filter fabric be damaged, 
the Contractor shall repair any torn or punctured section by placing a piece of filter fabric that is large 
enough to cover the damaged area and to meet the overlap requirement. 

Permeable material shall be placed in horizontal layers and thoroughly consolidated along with and 
by the same methods specified for structure backfill. Ponding and jetting of permeable material or 
structure  backfill  material  that  is  adjacent  to  permeable  material  shall  not  be  permitted.  When 
spreading and compacting permeable material and structural backfill or embankment material, the 
Contractor  shall  maintain  at  least  150  mm  of  such  material  between  the  filter  fabric  and  the 
Contractor's equipment. 

A perforated collector pipe shall be placed within the permeable material at the designated flow line 
elevations. 

The Contractor shall place outlet pipes at sags in the flow line, at the low end of the collector pipe, 
and at other locations shown or specified in the Contract documents. Rock slope protection, when 
required at the end of outlet pipes, shall conform to the details in the Contract documents or approved 
working drawings and the applicable requirements outlined in Section 7.4 of Chapter 7, Incidental 
construction, and Chapter 12, Storm Water Drainage, of these standard specifications. 

S

TANDARD 

C

ONSTRUCTION 

S

PECIFICATIONS

 

 

P

ART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 29-15 

C

HAPTER 

29:

 

M

ISCELLANEOUS 

I

TEMS FOR 

S

TRUCTURES

 

First Edition -January 2018 

 

Clean-out pipes shall be placed at the high ends of collector pipes and at other locations as specified 
in the Contract documents. 

29.4.3.7 

Geocomposite Drainage Systems 

The Contractor shall install geocomposite drainage systems at the locations shown in the Contract 
documents or on approved working drawings. Geocomposite drainage material shall be placed and 
secured  tightly  against  the  excavated  face,  lagging,  or  back  of  wall  as  specified  in  the  Contract 
documents. When placing concrete against geocomposite drainage materials, the Contractor shall 
protect such drainage material against physical damage and grout leakage. 

29.5 

Resin Injection of Cracks in Concrete Structures 

Resin types such as epoxy, polyurethane, acrylic, etc., as appropriate, shall be used when injecting 
cracks  in  concrete  structures.  When  injecting  resins  into  cracks  in  Portland  cement  concrete  or 
pozzolanic concrete, the Contractor shall comply with the specifications outlined in this section. The 
epoxy resin injection system shall be used for dry, wet and damp cracks. In general epoxy resins 
shall  be  used  only  for  dry  cracks  whereas  polyurethane  and  acrylic  resins  shall  be  used  for  wet 
(producing flowing water) and damp cracks. The Contractor shall procure the services of a qualified 
and specialized company to carry out  resin injection works.  

29.5.1 

Materials for Resin Injections 

In addition to complying with the requirements outlined in Section 29.7, the Contractor

’s specialized 

applicator shall adhere to the following directions when using epoxy injection for dry cracks: 

  Use Type E compound epoxy for injection. 

  Use Type F-1 compound epoxy for sealing crack surfaces in preparation for injection. 

  Use epoxy materials as approved by the Engineer. 

When using polyurethane and/or acrylic resin injection for wet and/or damp cracks, the Contractor

’s 

specialized  applicator  shall  strictly  adhere  to  the  guidelines  and  recommendations  of  the  resin 
manufacturer. 

29.5.2 

Equipment for Resin Injections 

For the equipment used to inject the resins, the Contractor shall comply with the recommendations 
of the resin injection material

’s manufacturer and shall adhere to the following directions: 

a.  Use  equipment that  has  the  capacity  to  automatically  proportion  the material  components 

within the mix ratio tolerances set by the resin materials

’ manufacturer. 

b.  Use  equipment  that  has  the  capacity  to  automatically  mix 

a  resin’s  component  materials 

within the pump and injection apparatus. No batch mixing shall be allowed unless approved 
by the Engineer in writing. 

c.  Use equipment that has the capacity to inject resin under controlled variable pressures up to 

1.4 MPa,  with a pressure gauge mounted at or near  the nozzle to indicate actual working 
pressure. 

29.5.3 

Qualifications for  Resin Injection Personnel   

The Contractor shall employ personnel with training and experience in injecting resins into cracks in 
concrete in ways that are similar to that required for the Project. The Contractor shall provide an on-
site  supervisor  for  the  resin  injection  work.  This  supervisor  shall  have  one  of  the  following 
qualifications methods: 

S

TANDARD 

C

ONSTRUCTION 

S

PECIFICATIONS

 

 

P

ART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 29-16 

C

HAPTER 

29:

 

M

ISCELLANEOUS 

I

TEMS FOR 

S

TRUCTURES

 

First Edition -January 2018 

 

a.  Supervisor shall have been certified by the manufacturer  of the  resin  injection material as 

having the necessary competence to satisfactorily and safely accomplish the resin injection 
work in compliance with the specifications in this chapter. 

b.  Supervisor  can  furnish  documented  evidence  that  he  has  a  minimum  of  three  years  of 

experience performing on-site supervision of resin injection work similar to that required for 
the  Project  and  a  list  of  five  contracts 

who  can  attest  to  the  supervisor’s  acceptable 

completion  of  relevant  resin  injection  work.  The  Contractor  shall  ensure  that  the  listed 
experience  in  on-site  supervision  and  completed  contracts  contains the project  name  and 
location, names of contracting parties, the O

wner’s name, brief description of the work, and 

dates on which resin injection work was completed. 

The  Contractor  shall  furnish  written  evidence  that  verifies  personnel  training  and  the  on-site 
supervisor’s qualifications to the Owner before beginning any resin injection work. 

29.5.4 

Cracked Surface Preparation and Cleaning  

The Contractor shall clean areas surrounding cracks of all deteriorated concrete, efflorescence, and 
other contaminants that are detrimental to the adhesion of the surface sealing epoxy compound. The 
Contractor shall clean the interiors of the cracks with air under sufficient pressure to remove loose 
materials, including efflorescence, that are entrapped in cracks. 

29.5.5 

Sealing Cracks for Resin Injection 

After cleaning, the Contractor shall drill injection port holes using a swivel drill chuck and hollow drill 
bits. They shall also use a vacuum attachment to remove dust and debris that were generated during 
drilling. The Contractor shall determine the spacing of the injection port holes by the size of the crack 
and the depth of the crack in the concrete substrate. Generally, injection ports shall be spaced from 
100 mm to 200 mm apart. The Contractor shall conduct field trials to determine the actual spacing 
of injection ports. For dry cracks, the Contractor shall drill the holes to a minimum depth of 16 mm, 
being careful to align the hole along the plane of the crack so that the hole follows the crack for the 
full 16 mm depth. For wet/damp cracks, the Contractor shall drill the holes to a minimum depth equal 
to one-half the thickness of the concrete element into which resin injection will be applied to ensure 
that the entire crack is filled with resin. 

The Contractor shall insert injection ports in the drilled holes to an appropriate depth, allowing for a 
small reservoir below the injection port. 

After cleaning cracks and drilling injection port holes, the Contractor shall seal the crack surface and 
the injection ports with suitable epoxy mortar. 

29.5.6 

Resin Injection 

The  Contractor  shall  inject  resin  in  accordance  with  the  resin 

manufacturer’s  instructions.  The 

Contractor  shall  conduct  field  trials  to  determine  the  actual  injection  procedures  and  pressures, 
based on crack widths, crack depths into the substrate and the sufficiency of the results. 

29.5.7 

Cleaning after Resin Injection 

After completing resin injection work, the Contractor shall clean concrete surface areas of excess 
resin  materials  and  injection  ports.  When  cleaning  after  injecting  resin,  the  Contractor  shall  not 
damage the concrete by scraping, light sand blasting, grinding, using solvents, or applying any other 
cleaning method. The Contractor shall apply only cleaning methods that have been approved by the 
Engineer.  Excess  materials  shall  be  cleaned  so  that  no  resin  material  or  injection  ports  extend 
beyond the plane surface of the concrete. 

29.5.8 

Acceptance of Resin Injection 

The Contractor 

shall drill three cores located in each day’s work as directed by the Engineer. The 

Contractor shall take drilled core samples that contain representative crack sizes. The Engineer will 

 

 

 

 

 

 

 