Index Manuals Abu Dhabi, United Arab Emirates. STANDARD CONSTRUCTION SPECIFICATIONS (PART 2 - ROAD STRUCTURES, 2020)
|
|
S TANDARD C ONSTRUCTION SPECIFICATIONS
PART 2
–
R OAD S TRUCTURES
Page 26-7 C HAPTER 26:
B RIDGE D ECK J OINT S YSTEMS
First Edition -January 2018
Bridge and Highway Metal Component Manufacturers, or equivalent. The Contractor shall supply 26.3.2 Submittals for Joint Sealing Systems This article shall apply to following joint sealing systems: 1. Compression seal expansion joints 2. Preformed elastomeric neoprene profile seal expansion joints 3. Low-density, closed cell, cross-linked, nitrogen-blown seal expansion joints As with all bridge deck joint designs, a critical factor is accurately predicting the anticipated a deck’s surface and become exposed to traffic, which can cause premature wear. If a compression seal is too small for The Contractor shall provide the Manufacturer of the joint sealing system with a working drawing for a. Identification and orientation of each joint b. Length of each joint, including a turn up of at least 150 mm at both barrier faces c. Total projected movement range of each joint If the Project involves the installation of bridge deck joints acros s the bridge’s full width, working drawings shall indicate the use of a full-length seal. If traffic conditions require joint seal installation If existing edge beams are to remain as joint headers, the Contractor shall also give the Manufacturer • Joint width measurements taken at 600 mm intervals along the full length of the joint, plus a measurement of the joint width of each barrier in the area of the turn ups • Ambient temperature, taken at the same times as the width measurements The Manufacturer of the joint sealing system shall use this information to determine required ngineer’s approval is required before the Contractor installs a joint seal. Such approval shall not relieve the Contractor of any responsibility 26.3.3 Submittals for Strip Seal Type Expansion Joints The strip seal joint Manufacturer shall be prequalified with a five year proven history of successful Before fabricating any joints, the Contractor shall submit shop drawings and expansion joint details The Contractor shall provide shop drawings for any proposed joint installation. The Engineer must ontractor’s drawings shall not relieve the Contractor of any responsibility for conformity to specifications and Contract plans. |