Abu Dhabi, United Arab Emirates. STANDARD CONSTRUCTION SPECIFICATIONS (PART 2 - ROAD STRUCTURES, 2020) - page 14

 

  Index      Manuals     Abu Dhabi, United Arab Emirates. STANDARD CONSTRUCTION SPECIFICATIONS (PART 2 - ROAD STRUCTURES, 2020)

 

Search            copyright infringement  

 

   

 

   

 

Content      ..     12      13      14      15     ..

 

 

 

Abu Dhabi, United Arab Emirates. STANDARD CONSTRUCTION SPECIFICATIONS (PART 2 - ROAD STRUCTURES, 2020) - page 14

 

 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 25-22 

C

HAPTER 

25:

 

B

EARING 

D

EVICES

 

 

 

 

 

First Edition -January 2018 

 

±10% or ±2 seconds whichever is the greater, of the values obtained in the approval tests at 
20

o

 C.  

2.  Each load of mortar mixed for placing in the Works shall be tested at ambient temperature 

by the flow cone test method as described in Article 25.4.13.3. The results shall agree within 
±10% or ±2 seconds whichever is the greater, of the values obtained in the approval tests at 
5

o

 C.  

b.  Compressive Strength 

Three cubes from each load of mortar mixed for placing in the Works shall be tested for compressive 
strength as described in the relevant article of this section as appropriate. 

25.4.13.5  Tolerances  

The following tolerances shall apply to all temperatures referred to in this section:  

Table 25-7: Temperature tolerances 

Temperature 

Tolerance 

5

o

 C 

(-0

o

 C + 2

o

 C) 

10

o

 C 

(-0

o

 C + 2

o

 C) 

20

o

 C 

(-0

o

 C + 2

o

 C) 

45

o

 C 

(-2

o

 C + 2

o

 C) 

110

o

 C 

(-5

o

 C + 5

o

 C) 

The  tolerances  applying  to  all  linear  dimensions  shall  be  ±1%  unless  otherwise  shown  on  the 
Contract plans  

25.5 

Fabrication of Bearing Devices 

The Contractor shall provide the Engineer with written notification 30 days before the Manufacturer 
starts  to  fabricate  bearings.    Each  b

earing’s  Manufacturer  shall  certify  that  it  satisfies  the 

requirements  of  the  Contract  documents  and  the  specifications  in  this  chapter,  and  shall  give  a 
certified copy of material test results to the Engineer. 

Bearing  assemblies  shall  be  preassembled  in  the  shop  by  the  supplier  and  checked  for  proper 
completeness and geometry, and shall be certified by a competent third party independent testing 
agency before they are shipped to the site. Unless otherwise specified in the Contract documents, 
steel bearing components, other than stainless steel, including anchor bolts, shall be galvanized in 
accordance with the requirements outlined in Section 23.4.10 of Chapter 23, Steel Structures. The 
following Bearing surfaces shall not be galvanised or painted: 

1.  The surface of the piston and the internal surfaces of the pot in pot bearings.  

2.    All  areas  where  welding  is  required,  such  as  where  the  stainless  steel  plate  is  welded  to  the 
underside of the bearing top plate. 

3.  Machined female end of bolts in anchor studs. 

4.  The surface to come in contact with the PTFE at the top of the piston in pot bearings. 

The finish of the moulds used to produce the elastomeric rotational element for pot bearings or the 
polyether  urethane  structural  element  for  disc  bearings  shall  conform  to  good  machine  shop 
practices. 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 25-23 

C

HAPTER 

25:

 

B

EARING 

D

EVICES

 

 

 

 

 

First Edition -January 2018 

 

Polytetrafluorethylene (PTFE) sheets shall be bonded to a grit-blasted steel substrate using an epoxy 
resin adhesive under controlled factory conditions in accordance with the instructions of the adhesive 
Manufacturer. Such PTFE sheets shall be recessed into its steel substrate for at least one-half of its 
thickness. If  on  a  vertical  surface,  a  PTFE  sheet  may  be  mechanically  fastened to  the  substrate. 
Attachment  of  a  PTFE sheet  to  its substrate  shall  be  done  in  accordance  with  the manufacturing 
requirements and Section 25.4.11. 

After fabrication, steel surfaces that are exposed to the atmosphere, except stainless steel surfaces, 
shall be shop painted or coated to protect against corrosion as specified in the Contract documents. 
Before  coating  exposed  steel  surfaces,  the  Contractor  shall  clean  them  in  accordance  with  the 
recommendations of the coating Manufacturer. For metal surfaces that are to be field-welded more 
than  three  months  after  fabrication,  the  Contractor  shall  provide  a  coat  of  clear  polish  or  other 
protective  coating  that  has  been  approved  by  the  Engineer.  The  Contractor  shall  remove  such 
lacquer coating at the time of welding. Final painting or coating for these surfaces shall occur after 
welding is complete. 

Using an approved epoxy, the Contractor shall attach each stainless steel sheet to a steel substrate 
to ensure complete contact. The Contractor shall then seal each sheet with a continuous weld. 

All welding shall comply with the requirements outlined in the current version of the AASHTO/AWS 
D1.5M/D1.5:2010 Bridge Welding Code. All welders shall be qualified to meet the requirements of 
this same standard. 

Except as noted, all bearing surfaces of steel plates shall be  flat to  within 0.0008 mm/mm, either 
through machining or finishing. The Owner may reject any plate that does not meet this minimum 
standard for flatness. A lower bearing plates (masonry plates) that rests on bearing pads shall have 
a bottom surface that is flat to within 0.005 mm/mm. Oxygen-cut surfaces shall not exceed a surface 
roughness value of 25 μm, as defined by the American Society of Mechanical Engineers (ASME) in 
their Surface Texture (Surface Roughness, Waviness, and Lay) (ASME B46.1-2009). 

Tolerances for gross bearing dimensions shall match the Manufacturers

’ specifications. 

Every bearing shall have its Project identification number, lot number, and individual bearing number 
in indelible ink on a side that will be visible after erection. 

25.5.1 

Elastomeric Bearings Tolerance 

Plain elastomeric pads and laminated bearings shall be built as specified in the Contract documents 
within the tolerances of AASHTO M 251-06 (R2011) and as specified in this chapter. 

An individual elastomer lamination

’s thickness shall not vary by more than 3 mm within the width or 

length of a bearing pad.  Thicknesses for all elastomer laminations within a bearing pad shall ensure 
that each metal or fabric lamination does not vary by more than 3 mm from a plane parallel to either 
the top or bottom surface of the bearing pad. 

A bearing pad’s total out-to-out thickness shall be at least as thick as indicated on the Contract plans 
and not more than 6 mm greater than that thickness. 

An individual bearing pad’s total thickness shall 

not vary by more than 3 mm. 

A bearing pad’s length and width shall not vary more than 3 mm from the dimensions indicated on 
the Contract plans. 

Bonds  between  an  elastomer  and  steel  laminate  shall  be  such  that,  when  a  sample  is  tested  for 
separation, failure  shall occur  within  the  elastomer  and  not  between  the elastomer  and the  steel. 
Laminated elastomeric bearings shall be factory bonded. 

25.5.2 

Other Fabrication Tolerances 

Other fabrication tolerances shall comply with the tolerances given in Table 25-8. 

 

 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 25-24 

C

HAPTER 

25:

 

B

EARING 

D

EVICES

 

 

 

 

 

First Edition -January 2018 

 

Table 25-8: Fabrication tolerances 

Item 

Thickness 

Tolerance, 

mm. 

Dimension 

Tolerance, 

mm. 

Flatness or Out-of-
Round Tolerance, 
mm. 

Surface 
Finish, 

μm. (rms) 

Metal Rocker & Roller Bearings   

 Single Roller 

 Diameter   

— 

–1.6, +1.6 

-0.02, +0.02 

1.6 

  Nested Roller 

 Diameter   

— 

–0.05, 

+0.05 

–0.02, +0.02 

1.6 

 Rockers 

 Diameter   

— 

–3.17, 

+3.17 

–0.02, +0.02 

3.1 

 Pins 

 Diameter   

— 

–0.13, 

+0.00 

–0.05, +0.05 

0.8 

 Bushings 

 Diameter   

— 

–0.00, 

+0.13 

–0.05, +0.05 

0.8 

Pot Bearings 

  Overall Dimensions   

–0.00, 

+6.35 

–0. 00, 

+3.17 

— 

— 

 Pot Depth (Inside)   

— 

–0.00, 

+0.64 

— 

— 

 Pot 

Wall: 

Thickness 

and 

Average Inside Diameter   

–0.00, 

+3.17 

–0.08, 

+0.08 

–0.02, +0.02 

0.8 

 Pot  Base:  Top  and  Bottom 
Surfaces   

–0.00, 

+0.64 

— 

Class C 

1.6 

 Piston: Rim   

–0.00, 

+1.60 

–0.08, 

+0.08 

–0.02, +0.02 

0.8 

 Piston: 

Top 

and 

Bottom 

Surfaces   

–0.00, 

+0.64 

— 

Class C 

1.6 

 Elastomeric Disc (Unstressed)   

–0.00, 

+3.17 

–0.00, 

+1.60 

— 

— 

Disc Bearings 

  Overall Dimensions   

–0.00, 

+6.35 

–0.00, 

+3.17 

— 

— 

 Shear-Restricting Element   

— 

–0.00, 

+0.13 

Class A 

0.8 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 25-25 

C

HAPTER 

25:

 

B

EARING 

D

EVICES

 

 

 

 

 

First Edition -January 2018 

 

Item 

Thickness 

Tolerance, 

mm. 

Dimension 

Tolerance, 

mm. 

Flatness or Out-of-
Round Tolerance, 
mm. 

Surface 
Finish, 

μm. (rms) 

 Other Machined Parts   

–0.00, 

+1.60 

–0.00, 

+1.60 

Class B 

1.6 

 Urethane Disc   

–0.00, 

+1.60 

–0.00, 

+3.17 

Class B 

1.6 

Flat PTFE Sliding Bearings 

  PTFE   

–0.00, 

+1.60 

–0.00, 

+0.76 

Class A 

— 

 Stainless Steel   

–0.00, 

+1.60 

–0.00, 

+3.17 

Class A 

#8 Mirror 

Flat Bronze and Copper Alloy Sliding Bearings 

 Sliding Surfaces   

–0.00, 

+3.17 

–0.00, 

+3.17 

Class A 

0.8 

Curved PTFE Sliding Bearings 

 Convex Radius   

— 

–0.25, 

+0.00 

–0.05, +0.05 

#8 Mirror 

 Concave Radius   

— 

–0.00, 

+0.25 

–0.05, +0.05 

3.1 

Curved Bronze and Copper Alloy Sliding Bearings 

 Convex Radius   

— 

–0.25, 

+0.00 

–0.05, +0.05 

0.8 

 Concave Radius   

— 

–0.00, 

+0.25 

–0.05, +0.05 

0.8 

Guides 

 Contact Surface   

— 

–0.00, 

+3.17 

Class A 

0.8 

 Distance between Guides   

— 

–0.00, 

+0.76 

— 

— 

 Parallelism of Guides   

— 

±0.005 rad 

— 

— 

Load Plates 

 Overall Dimensions   

–1.60, 

+1.60 

–6.35, 

+6.35 

Class A 

3.1 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 25-26 

C

HAPTER 

25:

 

B

EARING 

D

EVICES

 

 

 

 

 

First Edition -January 2018 

 

Item 

Thickness 

Tolerance, 

mm. 

Dimension 

Tolerance, 

mm. 

Flatness or Out-of-
Round Tolerance, 
mm. 

Surface 
Finish, 

μm. (rms) 

 Bevel Slope   

±0.002 rad 

— 

— 

— 

25.6 

Testing and Acceptance of Bearing Devices 

Testing and acceptance criteria for bearings shall conform to the minimum requirements specified 
in Section 25.6.2. The Engineer may impose more stringent standards. 

Section 25.6.4 outlines minimum frequencies for testing for different bearing types. 

When bearings are manufactured from a number of components, each component shall satisfy the 
testing requirements from the applicable section. 

The Manufacturer shall give the Engineer free access to inspect bearing manufacturing at any time 
throughout  the  Project.  The  Contractor  shall  pay  required  expenses  for  a  visit  to  the  bearing 
manufacturer plant for two persons representing the Owner before bearings  are approved for the 
Project. 

25.6.1 

Bearing Device Testing Terminology 

Load Range: 

A range of load capacities in which the highest capacity is no more than 2.0 times as 

large as the lowest. 

Lot:

 A group of no more than 25 bearings of the same type (for example, a group of elastomeric and 

pot bearings or a group of fixed, guided, and floating bearings) and the same load range. 

Batch:

 A body of material in which the ingredients are uniformly blended together at one time. 

Sample: 

A piece of material or a complete bearing that is tested to infer the properties of the batch 

of material or group of bearing elements from which it is taken. A sample shall consist of at least one 
bearing chosen randomly from each lot and material batch and shall comprise at least 10% of a lot.  

25.6.1.1 

Adapter Plates and Attachments 

Each bearing that is sampled for testing with a tapered sole plate or other attachment that impedes 
the application of a perpendicular  loading to the bearing device shall be delivered to the test site 
accompanied by an unattached adapter plate or attachment. For bearings with a tapered sole plate, 
the adapter plate shall have a single bevel and be so constructed that, when placed in contact with 
the  tapered  sole  plate,  the  two  shall  form  a  single  body,  rectangular  in  shape  and  uniform  in 
thickness.  For  bearings  with  other  attachments,  the  adapter  plate  or  attachment  shall  be  so 
constructed as to permit the accurate application of perpendicular loading to the bearing device. 

25.6.2 

Bearing Device Tests 

At their own expense, bearing device Manufacturers shall conduct all tests specified in this chapter. 
The Engineer shall authorize an approved independent and disinterested testing agency to observe 
all bearing device tests 

at the Contractor’s expense.  

The  Contractor  shall  prepare  inspection  and  testing  plans  for  all  items  and  submit  them  to  the 
Engineer for approval. Such plans shall show materials, manufacturing, and proving inspections, as 
well as tests and hold points for approvals. 

The manufacturer shall also conduct any additional tests for specific types of bearings, as specified 
in other sections and chapters of these specifications. 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 25-27 

C

HAPTER 

25:

 

B

EARING 

D

EVICES

 

 

 

 

 

First Edition -January 2018 

 

25.6.2.1 

Material Certification Tests 

In accordance with appropriate specifications for each type of material, the Contractor shall conduct 
material  certification  tests  to  determine the  physical  and chemical  properties  of  all  materials.  The 
Contractor shall provide all relevant test certificates to the Engineer.  

25.6.2.2 

Material Friction Test (Sliding Surfaces Only) 

The manufacturer shall measure the coefficient of friction between the two mating surfaces. Such 
tests shall be conducted either on samples taken from the same batch of materials as those used in 
the prototype bearings or, at the Manufacturer's option, on finished bearings. The manufacturer shall 
only test new materials; they shall not test any material that has been tested previously. 

The manufacturer shall thoroughly clean all surfaces with a degreasing solvent. They shall not use 
any lubrication other than that specified for the prototype bearings. Mating surfaces for test pieces 
shall have a common area no smaller than the either the bearing area or 4500 mm2, whichever is 
smaller.  

The  manufacturer  shall  load  test  pieces  in  compression  to  a  stress  that  corresponds  to  their 
maximum service dead load plus their live load, which shall be held constant for  one hour before 
and  throughout  a  sliding  test.  The  manufacturer  shall  apply  at  least  100  cycles  of  sliding,  each 
involving movement of at least ±25 mm, at a temperature of 50° C ± 1° C or the design temperature, 
whichever is higher. Sliding speed shall be a uniform 65 mm per minute. 

The manufacturer shall compute a  breakaway friction coefficient for each direction of each cycle. 
They shall compute a mean and standard deviation for the sixth through twelfth cycles. For the first 
cycle, an initial static breakaway coefficient of friction shall not exceed twice the design coefficient of 
friction.  Coefficient  of  friction  for  all  subsequent  cycles  shall  not  exceed  the  design  coefficient  of 
friction. If a single sample fails such testing, the Engineer shall reject the entire lot. 

Following  the  100  cycles  of  testing,  the  manufacturer  shall  determine  a  breakaway  coefficient  of 
friction  again;  it  shall  not  exceed  the  initial  value.  No  tested  bearing  or  specimen  shall  show  any 
appreciable sign of wear, bond failure, or other defects. In addition, the bearing manufacturer shall 
provide experimental evidence of the performance of proposed sliding materials for temperatures in 
the range of 30° C to 70° C. 

25.6.2.3 

Dimension Check for Bearing Devices 

Tests  shall  check  each  tested 

bearing’s  standard  and  critical  dimensions.  The  tested  bearing’s 

Manufacturer shall record its critical dimensions and provide these recorded values to the Engineer. 
If any critical dimension of a tested bearing falls outside  any dimensional tolerance, the Engineer 
shall reject it. If any standard measurement for a tested bearing exceeds its allowable tolerance, the 
Engineer may, at his own discretion, reject it.   

To check flatness, the manufacturer shall place a precise straightedge on 

a tested bearing’s surface 

while  inserting  feeler  gauges  between  the  two  layers.  Placing  the  straightedge  at  different 
orientations, shall establish the worst condition. No more than three feeler gauges shall be stacked 
on top of one another. Any straightedge used in such testing shall be as long as the largest dimension 
of the flat surface.  

All dimension checks shall satisfy the tolerances of Section 25.5.2. 

25.6.2.4 

Clearance Test for Bearing Devices 

Components of each tested bearing shall be moved through their design displacements or rotations 
to  verify  the  required  clearances.  When  testing  a  rotational  component  that  is  not  under  a 
simultaneous full vertical load, the manufacturer shall make allowances for the displacements that 
would be caused by such a load. 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 25-28 

C

HAPTER 

25:

 

B

EARING 

D

EVICES

 

 

 

 

 

First Edition -January 2018 

 

1.   When  at  150%  of maximum  design rotation,  the  dimensions  of  the  bearing  elements  shall  be 
sufficient to provide at least 5mm vertical clearance between rotating and non-rotating components 
of the bearing assembly. 

2.  The sliding surface shall have an additional 50mm of spare displacement capacity after the bridge 
reaches  its  maximum  movement  range  taking  into  consideration  all  factors,  such  as  creep, 
shrinkage, elastic deformation, temperature, etc. 

25.6.2.5 

Short-term Compression Proof Load Test for Bearing Devices 

The manufacturer shall load each tested bearing in compression to 150% of its rated service load. If 
a bearing has a rotational element, the manufacturer shall introduce a tapered plate in the load train 
to  ensure  that  the  bearing  sustains  the  load  at  the  maximum  simultaneous  design  rotation.  The 
manufacturer shall maintain load for five minutes, remove it, then reapply it for another five minutes. 
The  manufacturer  shall  examine  each  bearing  visually  while  it  is  under  the  second  loading.  Any 
defects shall constitute cause for rejection. If the load drops below the required value during either 
application, the manufacturer shall restart the test from the beginning. 

25.6.2.6 

Long-term Compression Proof Load Test for Bearing Devices 

The manufacturer shall conduct long-term compression proof load testing in the same manner as 
the short-term compression proof load testing, except that the second load shall be maintained for 
15 hours. If the load drops below 90% of its target value during this 15-hour period, the manufacturer 
shall increase the load to the target value and increase the test duration for a length of time equal to 
the time during which the load was below the required value. 

25.6.2.7 

Bearing Friction Test (Sliding Surfaces Only) 

Bearing  friction  tests  verify  that  the  friction  generated  during  material  friction  tests  are  adequate 
predictors of friction in finished bearings. 

No  lubrication  shall  be  applied  on  the  tested  sliding  surfaces.  The  bearing  shall  be  loaded  in 
compression with 100% of the full service dead plus live load, which shall remain constant for one 
hour before and throughout a sliding test. The manufacturer shall apply at least 12 cycles of sliding, 
each consisting of either the design displacement or ± 26 mm of movement, whichever is smaller. 
Average sliding speed shall be 65 mm/minute. When applying this test to curved sliding bearings, 
the manufacturer shall use the design rotation in place of the displacement. 

For flat sliding bearings, the manufacturer shall compute the breakaway friction coefficient for each 
direction of each cycle. They shall also compute its mean and standard deviation for the sixth through 
twelfth cycles. Neither the friction coefficient for the first movement nor the mean plus two standard 
deviations for the sixth through twelfth cycles shall exceed the value used in design. For the sixth 
through the twelfth cycles, the mean shall not exceed two thirds of the value used in design. 

For curved sliding surfaces, the manufacturer shall determine the moment that corresponds to the 
design rotation at each peak movement (positive and negative) during the first and last six cycles of 
testing. To calculate a corresponding load eccentricity, the manufacturer shall divide the moment by 
the  total  active  compressive  load.  Eccentricity  shall  be  small  enough  not  to  violate  the  allowable 
design stresses on PTFE. 

25.6.2.8 

Long-term Deterioration Test for Bearing Devices 

The manufacturer shall conduct long-term deterioration tests either on samples of the materials used 
in the bearings or, at the M

anufacturer’s option, on a pair of bearings, placed back-to-back. Tested 

samples shall have an area of at least 4500 mm2. The manufacturer shall first load a test piece in 
compression  to  a stress  equal  to  100%  of the 

bearing’s maximum dead load plus its live service 

load. Flat sliding systems shall then be displaced through at least 1000 cycles with amplitude of at 
least ±25 mm (50 mm peak to peak.) Curved sliding systems and rotational systems that depend on 
deformation  of  an  elastomeric  element  shall  be  subjected  to  5000  cycles  or  displacements 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 25-29 

C

HAPTER 

25:

 

B

EARING 

D

EVICES

 

 

 

 

 

First Edition -January 2018 

 

corresponding to a rotation of plus or minus the design amplitude. Sliding may take place at up to 
250 mm per minute, except when the manufacturer take readings of the coefficient of friction, when 
sliding speed shall be 65 mm per minute. 

The Engineer may reject a test bearing for either of the following reasons: 

  Upon disassembly, a bearing has damage, such as excessive wear, cracks, or splits in the 

material, that is visible to the naked eye. 

  A coefficient of friction exceeds two-thirds the value used in design. 

25.6.2.9 

Bearing Horizontal Force Capacity (Fixed or Guided Bearings 
Only) 

To test fixed or guided bearings for horizontal force capacity, the manufacturer shall select one or 
more loading combinations that consist of a horizontal and vertical service loading that could exist 
simultaneously  in  the  structure.  The  manufacturer  shall  apply  vertical  load  first,  at  1.0  times  its 
nominal  value.  The  manufacturer  shall  then  apply  horizontal  load,  in  stages,  up  to  1.5  times  its 
nominal  value.  The  Engineer  shall  reject  any  bearing  that  fails  this  test  or  for  which  even  one 
component shows excessive deflection. 

25.6.3 

Performance Criteria for Bearing Devices 

If  one  bearing  of  a  sample  fails,  the  Owner  shall  reject  all  the  bearings  of  that  lot,  unless  the 
Manufacturer of that lot elects to test each bearing of the lot at his expense. Should one bearing fail, 
the Engineer may require the Manufacturer to test all the bearings in that lot. 

25.6.4 

Special Testing Requirements for Bearing Devices 

This section describes special testing requirements for bearing devices. 

25.6.4.1 

Testing Elastomeric Bearings 

Materials for elastomeric bearings and finished bearings shall be subjected to the tests described in 
this section. Material tests shall be within the parameters outlined in either Table 25-3 or Table 25-4, 
as appropriate. 

a.  Frequency of Testing 

The manufacturer shall conduct the ambient-temperature tests for an elastomer that are specified in 
this section for the materials used in each lot of bearings. In lieu of performing a shear modulus test 
for each batch of material, the Manufacturer may elect to provide certificates from tests performed 
on  identical  formulations  within  the  preceding  year,  unless  the  Engineer  declines  to  accept  such 
certificates. A supplier shall provide test certificates for each lot of reinforcement. 

The manufacturer shall conduct the three low-temperature tests for an elastomer that are specified 
in this section on the material used in each lot of bearings for grades 3, 4 and 5 material. They shall 
conduct an instantaneous thermal stiffening test on material of grades 0 and 2. For Grade 3 material, 
in lieu of the low temperature crystallization test, the Manufacturer may choose to provide certificates 
from low-temperature crystallization tests performed on identical material within the last year, unless 
the  Engineer  declines  to  accept  such  certificates.  Low  temperature  brittleness  and  crystallization 
tests shall not be required for materials of grades 0 and 2, unless the Engineer specifically requests 
such tests. 

The manufacturer shall visually inspect each finished bearing as specified in this section. 

The manufacturer shall subject every steel reinforced bearing to the short-duration compression test 
outlined in this section. 

From  each  lot  of  bearings  designed  in  accordance  with  the  AASHTO  LRFD  Bridge  Design 
Specifications  and  Road  Structures  Design  Manual  (ADQCC  TR-516),  the  manufacturer  shall 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 25-30 

C

HAPTER 

25:

 

B

EARING 

D

EVICES

 

 

 

 

 

First Edition -January 2018 

 

subject  a  random  sample  to  the  long-duration  compression  tests  outlined  in  this  section.  Such  a 
sample shall consist of at least one bearing  that is chosen randomly from each size and material 
batch and shall comprise at least 10% of the lot. If one bearing in this sample fails, the Owner shall 
reject all the bearings of that lot, unless the Manufacturer elects to test each bearing of the lot at their 
own expense. The Engineer may require such testing for every bearing of a lot. 

The Engineer may require shear modulus tests on material from a random sample of the finished 
bearings in accordance with the requirements outlined in this section. 

b.  Ambient-temperature Tests on an Elastomer 

Each elastomer used shall satisfy or exceed the criteria specified in either Table 25-3 or Table 25-4, 
as  appropriate.  Any  bond  to  the  reinforcement  shall  also  satisfy  the  provisions  outlined  in  Article 
25.4.6.3. Using the apparatus and procedure described in Annex A of ASTM D4014 - 03(2007), the 
manufacturer shall record the shear modulus for material at 23° C. It shall fall within 15% of the value 
specified in the Contract documents. If the Contract documents do not specify shear modulus, the 
range  of  hardness  shall  conform  to  the  AASHTO  LRFD  Bridge  Design  Specifications  and    Road 
Structures Design Manual (ADQCC TR-516). 

c.  Low-temperature Tests on an Elastomer 

The manufacturer shall perform low-temperature tests in accordance with the requirements outlined 
in Table 25-3 and Table 25-4. Each compound shall satisfy all criteria for its grade. 

d.  Visual Inspection of Finished Bearings 

The manufacturer  shall inspect  each finished bearing for compliance with dimensional tolerances 
and for overall quality of manufacture. In steel reinforced bearings,  steel edges shall be protected 
everywhere from corrosion. 

e.  Short-duration Compression Test on Bearings 

For  short-duration  compression  testing,  the  manufacturer  shall  load  a  bearing  in  compression  to 
150% of its rated service load. If a bearing has a rotational element, the manufacturer shall introduce 
a tapered plate in the load train so that the bearing sustains the load at the maximum simultaneous 
design rotation. The manufacturer shall sustain this load for five minutes, remove it, then reapply it 
for another five minutes. While a bearing is under this second load, the manufacturer shall visually 
examine it. If load drops below the required value during either application, the manufacturer shall 
restart the test from the beginning. 

The Engineer shall reject any tested bearing with any of the following characteristics: 

  A bulging pattern that suggests laminate parallelism 

  A layer thickness that is outside the specified tolerances 

  A laminate is poorly bonded  

  Any visible cracks on the surface. 

f.  Long-duration Compression Tests on Bearings 

For  long-term  compression  testing,  the  manufacturer  shall  follow  the  ambient-temperature  test 
procedure outlined in this section, but will maintain the second load for 15 hours. At the end of this 
15 hours, while a bearing is still under load, the manufacturer shall visually examine it. If the bearing 
indicates any visual patterns or cracks, it fails this test. The Engineer shall reject any bearing that 
fails this test.  

g.  Shear Modulus Tests on Material from Bearings 

The manufacturer shall determine the shear modulus of a material in the finished bearing by cutting 
a  specimen  from  this  materials  and  using  the  apparatus  and  procedure  described  in  Annex  A  of 
ASTM  D4014  -  03(2007),  amended  where  necessary  in  either  Table  25-3  or  Table  25-4,  as 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 25-31 

C

HAPTER 

25:

 

B

EARING 

D

EVICES

 

 

 

 

 

First Edition -January 2018 

 

appropriate.  The  Engineer  has  discretion  to  ask  the  manufacturer  to  conduct  a  comparable 
nondestructive stiffness test on a pair of finished bearings. 

A material’s shear modulus shall fall within 

±15% of the value specified for it in the Contract documents. If the Contract documents do not specify 
a shear modulus for a material, its range for hardness shall conform to the details outlined for such 
materials  in  the  AASHTO  LRFD  Bridge  Design  Specifications  and  Abu  Dhabi  Road  Structures 
Design  Manual  (AD-D-06).  When  applying  this  test  on  material  from  finished  bearings,  the 
manufacturer shall compute shear modulus from the measured shear stiffness of the bearings, taking 
into account the influence of bearing geometry and compressive loading. 

25.6.4.2 

Testing Pot and Disc Bearings 

Tests for pot and disc bearings shall comply with the requirements outlined in this section. 

a.  Lot Sizes for Pot and Disc Bearing Tests 

The Contractor shall conduct sampling and testing for each lot, and shall apply acceptance criteria 
for each lot as a whole. To determine the quantity of bearings in a lot, the Contractor shall apply the 
following criteria: 

  A lot shall not exceed a single Contract document or Project quantity. 

  A lot shall not exceed 25 bearings. 

  A lot shall consist of bearings of the same type, regardless of load capacity. A lot may contain 

fixed or expansion bearings. The Contractor shall consider guided and non-guided expansion 
bearings to be a single type. 

b.  Sampling and Acceptance 

The  Manufacturer  shall  sample,  at  random,  a  minimum  of  two  (2)  bearings  and,  as  permitted  or 
required, a minimum of two (2) individual bearing components from each completed lot of bearings 
for  material  certification  and  performance  testing  by  the  Manufacturer.  Individual  bearing 
components  sampled  for  material  certification  or  performance  testing  shall  be  sampled  from  the 
materials used to fabricate a lot of bearings, and not from completed bearings. The Manufacturer 
shall  complete  the  required  testing  and  determine  compliance  with  this  specification  before 
submitting  the  lot(s)  for  quality-assurance  inspection,  testing,  and  acceptance  consideration.  The 
results of the Manufacturer's tests shall be furnished to the Engineer. 

c.  Material Certification Tests for Pot and Disc Bearings 

Material certification tests shall be conducted in accordance with Article 25.6.2.1.  

The Manufacturer shall also provide certification for all elastomeric and polyether urethane elements. 
These  material

’s  properties  shall  satisfy  the  requirements  specified  in  the  Contract  documents. 

These material’s properties shall also pass the tests for pot bearings described in Article 25.4.7.3 
and the tests for disc bearings described in Article 25.4.7.7. The Engineer may also require additional 
tests. 

d.  Dimension Check and Clearance Test for Pot and Disc Bearings 

Dimensions  and  clearances  shall  be  checked  for  all  bearings  according  to  Articles  25.6.2.3  and 
25.6.2.4.  

The clearance test between the piston and the pot on a pot bearing and the clearance between the 
shear-restricting  element  and  disc  on  a  disc  bearing  are  critical  clearances  that  shall  be  verified 
through the clearance test, described in Article 25.6.2.4, to ensure proper functioning of the bearing 
through its entire design displacement and rotation.  

e.  Long-Term Deterioration Test 

The long-term deterioration test shall satisfy the requirements of Article  25.6.2.8. When testing is 
specified by the Owner to be on a per lot basis, the long-term deterioration test shall be performed 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 25-32 

C

HAPTER 

25:

 

B

EARING 

D

EVICES

 

 

 

 

 

First Edition -January 2018 

 

on one (1) sampled disc bearing of each lot and one (1) sampled pot bearing of each lot. For such 
testing, sealing rings with rectangular cross-sections and sealing rings with circular cross sections 
shall meet the specifications outlined in the AASHTO LRFD Bridge Design Specifications and  Road 
Structures Design Manual (ADDQC TR-516). 

f.  Quality Assurance Testing for Pot and Disc Bearings 

When  the  Contract  documents  specify  quality  assurance  testing,  the  Manufacturer  shall  give  the 
required  number  of  complete  bearings  and  component  samples  to  the  Engineer  for  quality-
assurance testing in accordance with Table 25-9. 

The Engineer shall test at least one elastomeric element per lot of bearings for pot bearings. For pot 
bearings, the Engineer shall conduct at least one set of material property tests per lot. All exterior 
surfaces of sampled production bearings shall be smooth and free from irregularities or protrusions 
that might interfere with testing procedures. 

The Project schedules shall allocate at least 30 days for inspection, sampling, and quality assurance 
testing of production bearings and component materials. 

Bearings with tapered sole plates shall conform to the provisions outlined in Article 25.6.1.1. 

The Engineer may select, at random, required sample bearings from completed lots and samples of 
elastomeric and PTFE materials for quality assurance testing. 

The Contractor shall assume the cost of transporting all samples from the place of manufacture to 
the test site and then either back to the place of manufacture or, if applicable, to the Project site. 

Table 25-9 shows the sample required for different quality assurance testing. 

Table 25-9: Samples required for quality assurance testing

 

Test 

Samples required 

Proof load 

One production bearing per lot 

Coefficient of Friction 

One production bearing per lot 

Physical  Properties  of  Elastomeric 
Rotational Element 

One elastomeric element per lot 

Physical Properties of PTFE Sheet 

One 0.25 m×0.38 m sheet of PTFE material per project 

Physical 

Properties 

of 

Polyether 

Urethane  Structural  Element  (except 
compression set) 

One 0.25 m×0.38 m sheet of polyether urethane material 
(thickness of 1.6 mm to 3.1 mm per lot) 

Compression 

Set 

of 

Polyether 

Urethane Structural Element 

One 0.10 m×0.10 m sheet of polyether urethane per lot, 
moulded or cut to the thickness requirements of ASTM 
D395 - 03(2008), Method B 

g.  Proof Load Test for Pot and Disc Bearings 

Sampled bearings shall be short-term load-tested to 150% of its specified rated capacity at an angle 
of 1.14 degrees. If 

a bearing’s size prohibits adequate testing with available equipment, the Owner 

and Manufacturer may agree to test a prototype bearing that has characteristics that are comparable 
with those required for the Project. The load shall be held for 5 minutes, removed, then reapplied for 
5  minutes.  If  the  load  drops  below  the  required  value  during  either  application,  the  test  shall  be 
restarted from the beginning. 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 25-33 

C

HAPTER 

25:

 

B

EARING 

D

EVICES

 

 

 

 

 

First Edition -January 2018 

 

At the discretion of the Owner, a long-term proof load test may also be specified or substituted for 
the  short-term  proof  load  test.  Except  as  specified  below,  the  magnitude  of  the  loading,  test 
procedures, and failure criteria for the long-term test shall be identical to that of the short-term test. 
The first loading shall be held for 5 minutes and the second loading shall be held for 15 hours. If the 
load drops below 90 percent of its target value during this time, the load shall be increased to the 
target value and the test duration shall be increased by the period of time for which the load was 
below the required value. 

Throughout this test, the 

bearing’s steel bearing plate and steel piston shall maintain continuous and 

uniform contact. 

The manufacturer shall visually examine each bearing both during the test and upon disassembly 
after the test. The Owner shall reject an entire lot for which such testing has caused visual defects 
to even a single bearing. Causes for rejection include any of the following resultant visual defects: 

  Extruded or deformed elastomer, polyether urethane, or PTFE 

  Damaged seals or limiting rings 

  Evidence of metal-to-metal contact between the pot wall and the top plate 

  Cracked steel  

Throughout tests for disc bearings, continuous and uniform contact shall be maintained between the 
polyether urethane element and the bearing plates and between the sliding steel top plate and the 
upper bearing plate. The Owner may reject an entire lot for which any lift-off has been observed for 
even a single bearing during such testing. 

h.  Sliding Coefficient of Friction Test for Pot and Disc Bearings 

For all guided and non-guided expansion-type bearings, the manufacturer shall measure the sliding 
coefficient of friction at the bearing's design capacity in accordance with the specifications outlined 
in Article 25.6.2.2 and Article 25.6.2.7. The manufacturer shall also take addition measurements on 
the fifth and fiftieth cycles at a sliding speed of 25 mm per minute. 

To  calculate a bearing’s  sliding coefficient  of friction, the  manufacturer  shall  divide  the  horizontal 
load required to keep the bearing sliding continuously by the bearing's vertical design capacity. 

A bearing’s measured sliding coefficients of friction shall not exceed 3%.  

The  manufacturer  shall  visually  examine  each  tested  bearing  both  during  and  after  testing.  The 
Owner  shall reject an entire lot for which such testing has caused visual defects to even a single 
bearing. Causes for rejection include any of the following resultant visual defects: 

  Bond failure 

  Physical destruction 

  Cold flow of PTFE to the point of de-bonding 

  Damaged components 

The Contractor may use bearings that are not damaged during testing in the Project work. 

25.6.4.3 

Testing Rocker and Roller Bearing 

The manufacturer shall conduct material certification tests for rocker and roller bearings to verify that 
their material properties meet the P

roject’s requirements. 

25.6.4.4 

Testing Polytetrafluorethylene Surfaces for Bearings 

The Engineer may require inspection of completed bearings or representative samples of bearings 
with PTFE surfaces. Inspectors, if appointed, shall be allowed free access to the necessary part of 
the  Manufacturer's  plant  and  test  facility.  If  the  Manufacturer  performs  testing,  they  shall  submit 
copies of the test results to the Engineer. 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 25-34 

C

HAPTER 

25:

 

B

EARING 

D

EVICES

 

 

 

 

 

First Edition -January 2018 

 

The Manufacturer is required to perform material tests, as defined in Article 25.6.2.2, on the materials 
used in the sliding surface. The manufacturer shall perform at least one test for each lot of bearings. 

If the Engineer requests such testing and test facilities permit such testing, the manufacturer shall 
conduct complete bearing friction tests as defined in Article 25.6.2.9. If a test facility does not permit 
testing  complete  bearings,  the  Engineer may  direct  the  Contractor to  manufacture  extra  bearings 
and to prepare samples of at least 450 KN Capacity at normal working stresses by sectioning the 
bearings. As soon as all bearings have been manufactured for the Project, the Contractor shall notify 
the Engineer, who shall randomly select prescribed test bearings from the lot. The Contractor shall 
also provide the Manufacturer's certification of the steel, elastomeric pads, preformed fabric pads, 
PTFE, and other materials used in the construction of the bearings. 

After such testing, the Engineer may inspect tested bearings on site for visible defects. After such 
inspection, the Engineer may approve the use of bearings that passed such testing for use in the 
structure under construction. 

25.6.4.5 

Testing Bronze or Copper-alloyed Plates for Bearings 

The  manufacturer  shall  conduct  material  certification  tests  for  bronze  or  copper-alloy  bearings  to 
verify that their material properties meet the P

roject’s requirements. 

25.6.4.6 

Testing for Curved Sliding Bearing 

Curved  PTFE  sliding  surfaces  shall  satisfy  all  of  the  test  requirements  specified  for  PTFE  sliding 
surfaces in Article 25.6.4.4. If, however, a prototype bearing is too large to test, the Contractor may 
manufacture a test bearing using materials and fabrication methods that are identical to those used 
for the prototype, rather than  sectioning the bearing. When bearings are too large for testing,  the 
Engineer shall determine the size of any test bearings to be specially manufactured. 

Critical dimensions shall include the difference between the average radii of the two elements and 
the  variation  of  the  actual  curved  surface  from  the  average  one.  The  Engineer  may  require  the 
Contractor to verify these critical dimensions by following the procedure described in Article 25.6.2.3. 

25.6.5 

Use of Tested Bearings in a Structure 

The  Contractor  may  use  bearings  that  have  been  satisfactorily  tested  in  accordance  with  the 
requirements of this  chapter in the structure under  construction. As the Engineer so requires,  the 
Contractor shall equip such tested bearings with new deformable elements, sliding elements, and 
seals. 

25.7 

Packaging, Handling, and Storing Bearing Devices 

Each  bearing  shall  be  assembled  at  the  plant,  shall  be  marked  for  identification,  and  shall  be 
delivered to the construction site as a complete unit. 

Before shipment from the point of manufacture, bearings shall be packaged to protect them against 
damage  from  handling,  weather,  or  other  normal  hazard  during  shipment  and  storage.  The 
Contractor shall clearly mark the components of each completed bearing. They shall also securely 
bolt, strap, or otherwise fasten completed bearings to prevent any relative movement. In compliance 
with the Contract documents, the Contractor shall mark the top of each bearing to clearly indicate its 
location, orientation, and preset in each structure in the Project. 

All  bearing  devices  and  components  shall  be  stored  at  the  work  site  in  an  area  that  provides 
protection from environmental and physical damage. When installed, bearings shall be clean and 
free of all foreign substances. 

The  Contractor  shall  not  open  or  dismantle  bearings  at  the  site  unless  doing  so  is  absolutely 
necessary for inspection or installation.  

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 25-35 

C

HAPTER 

25:

 

B

EARING 

D

EVICES

 

 

 

 

 

First Edition -January 2018 

 

25.8 

Installing Bearing Devices 

Qualified personnel shall install bearings in the positions shown in the Contract documents. When 
installing bearings, the Contractor shall set them to the dimensions and offsets prescribed by the 
Manufacturer,  the  Engineer,  and  the  Contract  documents,  making  any  necessary  adjustments  to 
account  for  anticipated  temperatures,  future  movements  of  the  bridge  caused  by  temperature 
changes, release of falsework, and shortening  caused by pre-stressing. The Contractor shall use 
the  approved  working  drawings  which  locate  the  bearings  taking  into  account  the  size  of  the  top 
plate,  preset,  etc  that  ensures  that  the  bearing  does  not  encroach  to  close  to  the  deck  concrete 
edges.  The centre line of the bottom part of the bearings shall be in line at any one support. 

Each bridge bearing shall be located within ±3 mm of its correct position in the horizontal plane and 
oriented to within an angular tolerance of 1.14 degrees. Guided bearings and bearings  that rotate 
about only one axis shall be oriented in the direction specified in the Contract documents to within 
an angel tolerance of 0.28 degrees. All bearings except those that are placed in opposing pairs shall 
be set horizontal to within an angular tolerance of 0.28 degrees, and must have full and even contact 
with load plates, where these exist.  A superstructure supported by a bearing shall be set so that, 
under full dead load, its slope lies within an angular tolerance of 0.28 degrees of the design value. 
Any departure from this tolerance shall be corrected by means of a tapered plate or by other means 
approved by the Engineer. If the Contractor uses shim stacks to level a bearing, they shall remove 
the shim stacks after grouting and before the weight of the superstructure acts on the bearing. 

Metallic bearing assemblies that are not embedded in concrete shall be bedded on the concrete with 
a filler or fabric material that conforms to the specifications outlined in Section 25.4.13. 

Where  bearings  are  seated  directly  on  steel  work,  the  Contractor  shall  machine  the  supporting 
surface to provide a level surface upon which a bearing is placed. 

Bearings  or masonry  plates that  rest  on steel supports  may  be  directly  installed  on the supports, 
given that the support is flat within a tolerance of 0.002 times its nominal dimension and is sufficiently 
rigid to resist deformation under specified loads. 

25.8.1 

Installing Elastomeric Bearings 

Elastomeric bearings without external load plates may reside directly on a concrete or steel surface 
if such surface is flat to within a tolerance of 0.005 mm of the nominal dimension for steel reinforced 
bearings and within 0.01 mm of the nominal dimension for other bearings. Bearings shall reside on 
surfaces that are horizontal to within 0.6 degrees. The Contractor shall correct any lack of parallelism 
between the top of the bearing and the underside of the girder that exceeds 0.6 degrees by grouting 
or by applying another method as directed by the Engineer. 

All  concrete  bearing  surfaces  on  which  elastomeric  bearing  pads  are to be  placed  shall  be  wood 
float finished to a level plane that shall not vary more than 3 mm from a straightedge placed in any 
direction across the area. A finished bearing seat shall not vary more than 3 mm from the elevation 
shown on the Contract plans. 

Concrete or metal surfaces on which the bearing pads are to be set shall be dry, clean, and free 
from dirt, grease, laitance, and contaminants. The Contractor shall not place any bearing pad until 
the Engineer has inspected and approved the seat conditions. 

Using an approved epoxy mortar pad, with surface roughness no smoother than gr.40 sand-particles, 
in  accordance  with  the  recommendations  of  each  elastomeric  be

aring  pad’s  Manufacturer,  the 

Contractor shall fix all elastomeric bearing pads in position on the bearing seat. 

For expansion bearings only, the Contractor shall use polyethylene sheeting or another removable 
bond-breaking material that has been approved by the Engineer to prevent concrete from bonding 
to the top surface of each bearing pad. 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 25-36 

C

HAPTER 

25:

 

B

EARING 

D

EVICES

 

 

 

 

 

First Edition -January 2018 

 

The Contractor shall not weld exterior plates of the bearing unless at least 40 mm of steel resides 
between  the  weld  and  the  elastomer.  In  no  case  shall  an  elastomer  or  bond  be  subjected  to 
temperature higher than 200° C. 

25.8.1.1 

Stress Relieving of Elastomeric Expansion Bearings 

No sooner than 30 days after the final stressing and grouting of the pre-stressing steel, the Contractor 
shall use jacks to raise the concrete superstructure at expansion bearings to relieve the shear strain 
in the elastomeric bearing pads that results from elastic shortening and shrinkage of the concrete. 
The Contractor shall provide steel flat jacks with steel shims for jacking between the superstructure 
end diaphragm and the abutment seat. Flat jacks shall have a maximum outside diameter of 600 
mm, a minimum capacity of 350 metric tons, and minimum travel of 25 mm. The Contractor shall 
obtain written approval from the Engineer for the specifications of such flat jacks. 

The Contractor shall place jacks at the locations shown on the Contract plans and shall operate them 
simultaneously  through a  manifold to  equalize  pressure. To  relieve  the  load  and  shear  deflection 
from the bearing pads and to allow removal of the bond breaking material, the Contractor shall extend 
jacks  no  more  than  the  minimum.  Stress  relief  for  bearing  pads  shall  occur  only  at  expansion 
bearings. For the two span continuous structures, the Contractor shall only jack one abutment at a 
time. 

To avoid compounding stresses in bearing pads with stresses caused by temperature changes, the 
Contractor shall only perform a jacking operation when the abutment air temperature is between 20° 
C  and  32°  C.  After  completing  a  jacking  operation,  the  Contractor  shall  immediately  release  the 
pressure  in  the  jacks  and  remove  them  to  avoid  complications  that  can  result  when  temperature 
changes cause the superstructure to expand or contract. 

To  ensure  reliability,  the  Contractor  shall  use  only  new  jacks.  Before  reusing  any  jacks,  the 
Contractor shall get approval from the Engineer. The Contractor shall operate jacks only under the 
Engineer’s direct supervision. 

25.8.2 

Installing Pot and Disc Bearings 

The Contractor shall certify to the Engineer that a skilled representative of the bearing Manufacturer 
will be available to the Contractor to give aid and instruction in the installation of bearings to ensure 
satisfactory results. 

This  skilled  representative  shall  be  present  during  the  initial  installation  of  the  bearings  and  shall 
remain on the job until the Engineer declares that the bearing installation is proceeding smoothly 
and that workers involved are familiar with the work required for each installation. The Engineer may 
also require the Contractor to arrange to have this representative present at any other times. 

The Contractor shall install pot and disc bearings in accordance with the Contract documents and 
approved working drawings. After final installation of bearings, the Engineer, in the presence of the 
Manufacturer's representative, shall inspect all bearing components to ensure that they are level and 
parallel  to  within  2.6  mm/m. The  Contractor  shall  correct  any  deviations  in  excess  of the  allowed 
tolerances. 

Using templates, the Contractor shall monolithically cast anchor bolts with the substructure concrete 
to  the  exact  locations  and  with  precise  bolt  projections  above  a  bearing  seat,  as  shown  on  the 
Contract plans and approved working drawings. 

Using an epoxy and quartz sand grout, the Contractor shall place bearing grout pads in accordance 
with the Contract plans, these specifications, and the bearing Manufacturer

’s recommendations. Top 

surfaces of epoxy grout pads shall be perfectly level; the Contractor shall correct any perceptible 
deviations  from  a  straightedge  by  filling  them  as  necessary  with  epoxy  mortar  and  grinding  such 
deviations until they are level. Alternatively, a high strength self levelling grout below bearings may 
be used in accordance with the bearing Manufacturer’s recommendations. 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 25-37 

C

HAPTER 

25:

 

B

EARING 

D

EVICES

 

 

 

 

 

First Edition -January 2018 

 

The  Contractor  shall  place  bearings  when  erecting  the  superstructure  form,  and  shall  remove  all 
temporary restraints as directed by the bearing Manufacturer. 

Bearings shall reside in the exact alignment shown on the Contract plans for each location and shall 
have proper  directional orientation. To prevent wedging actions in a bearing that may result from 
movements of a superstructure, the Contractor shall carefully align both the base and upper part of 
a guided expansion bearing to be parallel to the expansion axis of the structure. The Contractor shall 
adjust the location of the upper part of a bearing relative to the base to accommodate for temperature 
at the time of erection. 

If bearings are disassembled for any reason, the Contractor shall be extremely careful to ensure that 
the rubber pads and piston rings are properly seated in the recess with piston ring gaps 180° apart. 

25.8.3 

Installing Rocker and Roller Bearings 

When setting rocker and roller bearings, the installer shall take into account how the support span 
may by impacted by variations from mean temperature and otherwise change in length. The installer 
shall ensure that  at mean temperature, after release of falsework and any shortening due to pre-
stressing force and shrinkage, 

the supported span’s rockers and rollers will be vertical. The installer 

shall be careful to properly set and adjust bearings to avoid restricting the full and free movement of 
the superstructure at movable bearings. 

The Contractor shall coat all contact surfaces thoroughly with oil and graphite before placing roller 
bearings. 

Positions of cylindrical bearings shall ensure that their axes of rotation are in alignment and coincide 
with the 

superstructure’s axis of rotation. 

25.8.4 

Installing Spherical Bearings 

Spherical bearings shall be installed as specified in the Contract documents.  

25.8.5 

Installing Bronze or Copper-alloyed Plates for Bearings 

Installation  of  bronze  or  copper-alloyed  plates  for  bearings  shall  comply  with  the  requirements 
outlined in this section. 

25.8.5.1 

Bronze Bearing and Expansion Plates 

Bronze  bearing  and  expansion  plates  shall  conform  to  the  requirements  for  C91100,  C86300,  or 
C90500  alloys  as  outlined  in  the  Specification  for  Bronze  Castings  for  Bridges  and  Turntables 
(AASHTO  M  107-09)  or  (ASTM  B22  -  09e2).  Unless  the  Contract  documents  specify  otherwise, 
bronze bearing and expansion plates shall be alloy C91100.  Components may be cast, rolled, or 
forged. Castings shall be free of blow-holes that are larger than 3 mm. Contact surfaces shall be free 
of blow-holes of any size. 

Casting for  bronze plates shall  comply  with details shown in the  Contract documents.  Unless the 
Contract documents indicate otherwise, sliding surfaces shall be polished and shall reside in a plane 
that parallels the movement of the spans. 

25.8.5.2 

Rolled Copper-alloy Bearings and Expansion Plates 

Rolled  copper-alloy  bearing  and  expansion  plates  shall  conform  to  the  Specification  for  Rolled 
Copper-Alloy  Bearing  and  Expansion  Plates  and  Sheets  for  Bridge  and  Other  Structural  Uses 
(AASHTO M 108-09) or (ASTM B100 - 08). Unless the Contract documents specify otherwise, rolled 
copper bearings and expansion plates shall be C51000 alloy or C51100 alloy. 

The Contractor shall provide copper-alloy plates in accordance with the Contract documents. Rolled 
plates with plane, true, and smooth surfaces shall not require finishing. 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 25-38 

C

HAPTER 

25:

 

B

EARING 

D

EVICES

 

 

 

 

 

First Edition -January 2018 

 

25.8.6 

Installing Masonry, Sole, and Shim Plates for Bearings 

To form holes in bearing plates, the Contractor may apply drilling, punching, or accurately controlled 
oxygen-cutting. The Contractor shall remove all burrs by grinding. 

Bearing plates shall be level, as shown in the Contract documents and shall have a uniform bearing 
over an entire area. When plates are embedded in concrete, installers shall ensure that the plates 
remain in their correct positions while concrete is placed. 

25.8.7 

Installing Polytetrafluorethylene Surfaces for Bearings 

25.8.7.1 

Attachment of Polytetrafluorethylene Material 

Mechanically  fastening  for  PTFE  sheets,  when  applied,  shall  be  as  shown  in  the  Contract 
documents; sizes, types, and numbers of fasteners shall be as required. The installer shall ensure 
that any fastener used for a PTFE sheet and its back-up material provide full bearing. 

a.  Flat Sheet Polytetrafluorethylene 

All flat PTFE sheets that are attached to a metal backing plate shall be attached by recessing into 
the backing of the plate for one-half of the PTFE thickness and bonding. PTFE attached to other 
materials, such as elastomers, shall be attached by a method specified in the Contract documents 
or as directed by the Engineer. 

All PTFE shall be factory-bonded, using an adhesive that is approved by the Engineer, in accordance 
with  the  instructions  of  the  adhesive's  Manufacturer.  Before  bonding,  the  approved  Manufacturer 
shall use a sodium naphthalene or sodium ammonia process 

to etch a PTFE sheet’s surface. When 

a backing plate is metal, bonding shall be conducted under a uniform pressure greater than 0.7 MPa.  

A bond’s peel strength shall not be less than 3.5 N/mm, tested in accordance with method B from 
ASTM D429 - 08. 

A PTFE sheet’s finished surface shall be smooth and free from bubbles. It shall 

also  conform  to  the  tolerances  shown  in  Table  25-6.  Filled  PTFE  sheets  shall  be  polished  after 
bonding. 

b.  Curved Sheet Polytetrafluorethylene 

Curved PTFE sheets, such as those used in spherical bearings, shall be attached by recessing for 
one-half the PTFE thickness. 

A PTFE element’s dimensions shall enable it to fit tightly in its recess 

even when a bearing is subjected to its lowest design temperature. 

c.  Fabric Containing Polytetrafluorethylene Fibres 

Fabric made from woven PTFE fibres shall be bonded or mechanically attached to a rigid substrate. 
A fabric shall be capable of carrying unit stress of 70 MPa without cold flow. A fabric-substrate bond 
shall be capable of withstanding, without delamination, a shear force equal or greater than (0.1+μ) 
P at the same time as the normal load, where μ is the design coefficient of friction between a PTFE 
sheet and its mating surface and P is the design load acting perpendicularly to the interface. 

25.8.7.2 

Stainless Steel Mating Surface 

When the Contract documents specify that a stainless steel element specified is a single piece, the 
Contractor shall comply. Each sheet shall be attached to its backing material by seal welding around 
the entire perimeter, preventing moisture from entering between the stainless steel and the backing 
material. Welds shall conform to the current AASHTO/AWS D1.5M/D1.5:2010 Bridge Welding Code. 
After welding, a stainless steel sheet shall be flat, free from wrinkles, and in continuous contact with 
its backing plate. 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 25-39 

C

HAPTER 

25:

 

B

EARING 

D

EVICES

 

 

 

 

 

First Edition -January 2018 

 

25.8.7.3 

Lubrication for Polytetrafluorethylene Surfaces 

If the Contract documents so specify or the Engineer so directs, installers shall apply lubrication to 
an  entire  PTFE  surface.  If  PTFE  is  dimpled,  installers  shall  apply  enough  lubricant  to  fill  all  the 
dimples. 

25.8.7.4 

Installation of Polytetrafluorethylene Surfaces 

Installation of PTFE surfaces shall comply with the specifications outlined in Section 25.8.3. 

25.8.8 

Installing Anchor Bolts for Bearing Devices 

The  Contractor  shall  drill  holes  for  anchor  bolts  and  set  them  in  Portland  cement  grout.  As  an 
alternative, installers may preset anchor bolts as shown in the Contract documents or as directed by 
the Engineer. 

To locate anchor bolts, installers shall take into account any mean temperature variations that could 
impact the superstructure at time of setting, as well as any anticipated lengthening of a bottom chord 
or bottom flange causes by the dead load after setting. As much as practicable, at mean temperature 
and under dead loads, anchor bolts at expansion bearings shall be centred in their slots. Installers 
shall be careful to ensure that anchor bolts and nuts do not restrict the superstructures full and free 
movement at movable bearings. 

25.8.9 

Installing Load Plates for Bearing Devices 

The Contractor may make load plates from either a single plate or from several steel laminates that 
are  each  oriented  in  a  plane  perpendicular  to  the  direction  of  the  load.  Installers  shall  use  seal 
welding to join such built-up load plates  and to prevent the  ingress of moisture. Such welds shall 
also provide sufficient shear strength to resist applied loads. A load plate shall have no sharp corners 
or edges. To form holes, the installer may apply drilling, punching, or accurately controlled oxygen 
cutting. Installers shall remove all burrs by grinding. 

25.8.10 

Installing Guides for Bearing Devices 

When  attaching guide  bars  to the  body  of  a  bearing,  installers  shall  minimize  distortion  and shall 
ensure that all parts of a bearing remain within the tolerance for flatness. 

A guide system’s sliding 

surfaces shall be flat and parallel. 

Bolts or threaded fasteners that attach guide bars to their supporting plates shall have a sufficient 
embedded thread length to develop their strength. 

To  attach  low-friction material  at  a  contact  interface,  the  installer  shall  simultaneously  use  two  or 
more of the following methods to attach it to its backing piece: 

a.  Bonding 
b.  Recessing 
c.  Mechanical attachment with countersunk fasteners 

If  material  is  bonded,  the  installer  shall  affix  it  using  a  method  recommended  by  either  the 
Manufacturer  of  the  material  or  the  bonding  agent.  Recessing  shall  be  one-half  of  the  material 
thickness. Fasteners shall be countersunk to a depth that ensures that they will not touch the mating 
material after allowing for wear. 

25.8.11 

Installing Guide-ways and Restraints for Bearing Devices 

Guided  bearings  and  bearings  that  rotate  about  only  one  axes  shall  be  oriented  in  the  direction 
specified on the Contract plans to within an angular tolerance of 0.3 degrees. 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 25-40 

C

HAPTER 

25:

 

B

EARING 

D

EVICES

 

 

 

 

 

First Edition -January 2018 

 

25.8.12 

Installing Seismic Buffer Blocks  

Installation of seismic buffer blocks, if used, shall comply with the Contract plans. Buffer blocks shall 
be elastomeric blocks that are vulcanised to steel plates that, in turn, are anchored into concrete.  

Elastomeric blocks shall comply with the stiffness requirements given on the Contract plans. 

25.8.13 

Installing Seismic Restraint Cables  

The  Contractor  shall  provide  and  install  seismic  restraint  cables  in  accordance  with  the  Contract 
plans. The Contractor may propose alternative proprietary systems for approval from the Engineer.  

Restraint  cables  shall  be  unstressed  and  positioned  with  no  more  than  10  mm  slack  between 
anchorages. The Contractor shall prepare detailed method statements that describe the installation 
methods that will achieve this requirement and submit these statements to the Engineer for approval. 
Retaining plates shall prevent slippage of the wedges. 

25.8.14 

Installing Shear Transfer Units at Abutments 

The Contractor shall furnish and install shear transfer units between the superstructure abutment 
shear  blocks  and  where  indicated  on  the  Contract  plans,  as  specified  herein,  as  detailed  on  the 
Contract plans and as directed by the Engineer. 

  Shear  transfer  units  shall  be  elastomeric  materials  complying  with  the  requirements  as 

specified in Section 25.4.6. 

  All steel components shall comply with the requirements of all applicable clauses in Section 

25.4 and Section 30.5 of Chapter 30, Miscellaneous Metals, of these Standard Specifications. 

  The PTFE layers shall comply with the requirements as specified in Section 25.4.11. 

  Installation of shear transfer units shall comply with the details as indicated on the Contract 

plans 

and the manufacturer’s printed directions. 

25.8.15 

Load Cells  

Load cells for measuring applied vertical load, shall be provided for the bearings indicated on the 
Contract  plans  and  others  as  proposed  by  the  Contractor  and  approved  by  the  Engineer  for 
monitoring of load transfer during construction. The loads cells shall comprise a pressure transducer 
connected for instance to the elastomer in the pot bearing (or by other suitable method approved by 
the  Engineer for  disc  or spherical  bearings) giving  an  instantaneous reading to  a  local Windows-
based  personal  computer  (PC)  for  display.  The  computer  shall  be  provided  with  a  suitable  Data 
Acquisition  System  (DAS)  for  storing,  analysing  and  displaying  the  data  in  graphical  format. 
Graphical output shall be given in terms of the variation of vertical load over time. The DAS shall be 
capable of recording and displaying results at a minimum rate of 1Hz. 

All load cells shall be operational during construction to enable monitoring of loads throughout that 
phase. Load cells, by design, shall enable replacement of damaged units during construction or at 
any time thereafter.  

The Contractor shall design, supply, maintain, and operate the system during construction, recording 
loads to an accuracy of +/-5%. 

25.9 

Bearing Replacement  

The Contractor shall provide fully detailed proposals for bearing replacement, including all related 
components at all bearing positions. These proposals shall include sizes and positions of jacking 
equipment,  a methodology for removing  existing  bearings,  details for  installing the  new  bearings, 
and descriptions of all temporary works that are necessary to enable replacement of bearings. The 
Contractor shall describe any modifications to the outlines of permanent works and any additional 
local reinforcement in permanent works at jacking locations. Bearing replacement proposals shall 
provide all necessary information and facilities to enable subsequent bearing replacement without 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 25-41 

C

HAPTER 

25:

 

B

EARING 

D

EVICES

 

 

 

 

 

First Edition -January 2018 

 

adding attachments or fixings to the permanent works. The Contractor shall ensure that permanent 
works provide all necessary additional reinforcement and cast-in sockets; the Contractor shall also 
supply any additional materials, as necessary to support the bearing replacement proposal.  

The Contractor shall make necessary provisions to reinstate fuse links after an earthquake occurs 
that exceeds the capacity of fuse links, but that is less than the extreme event. Fuse link devices and 
seismic devices shall be designed for ease of reinstatement and to support any jacking that would 
be necessary to adjust a deck back to its original horizontal alignment with minimal temporary works. 

25.10 

Warranty and Maintenance for Bearing Devices  

The  Contractor  shall  obtain  the  specified  warranty  period  from  the  Manufacturer  for  all  bearing 
devices that are installed for the Project.  Such warranties shall extend to all elements of covered 
bearings. The Manufacturer warranties shall cover any defective workmanship and product failure.  

The required warranty periods for each category of bearings shall be as follows: 

-

  25 years for spherical type 

-

  20 years for pot, disc, rocker and roller type 

-

  15 years for laminated elastomeric type 

-

  10 years for plain elastomeric type 

The Contractor shall provide certification from the Manufacturer of the bearing devices that shows 
that all materials in the bearings conform to the requirements stated in Section 25.4 of this chapter. 
The Contractor shall transfer to the Owner the M

anufacturer’s  warranty on each installation.  

The Contractor shall inspect the bearing devices that are installed on the Project within one year of 
its opening to traffic. The Contractor shall be responsible for required maintenance to ensure such 
bearings

’ functionality and durability. 

For the rest of the warranty period, if deficiencies are found, the Owner may inform the Manufacturer 
through the Contractor in writing of any defects and specify a required completion date for repairs. 

The bearing Manufacturer shall provide guidelines and manuals to support routine maintenance and 
replacement of the bearing devices and to support resolution of any concerns during the warranty 
period.  

25.11 

Documentation for Bearing Devices  

The Contractor shall provide all necessary documentation for approval of the design, manufacture, 
and  installation  of  bearing  devices  and  for  the  long  term  inspection,  maintenance,  and  potential 
replacement of such bearings. Such documentation shall include the following: 

  Design 

  Working drawings 

  Inspection and test plans 

  A certificate of compliance from the Manufacturer 

  Certified documentation of the structure

’s loading criteria and load tests 

  Quality records 

  As  installed  details,  including  tabulated  benchmark  measurements  that  will  allow  the 

movement of the structure to be monitored during operation 

  procedures for the inspection of bearings 

  Procedures for maintenance 

  A fully detailed method statement for the replacement of bearings 

  Risk assessments and appropriate safety information. 

 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 25-42 

C

HAPTER 

25:

 

B

EARING 

D

EVICES

 

 

 

 

 

First Edition -January 2018 

 

I

NDEX

 

Absorption of water, 25-22 
acid-soluble sulfate content, 25-20 
actual design capacity, 25-5 
Adhesive material, 25-17 
aggregate size, 25-19 
ambient-temperature tests, 25-30 
Anchor bolts, 25-1, 

25-18

 

axes, 25-38, 25-40 
Bearing assemblies, 25-10, 25-23 
bearing elements, 25-5, 25-27 
bearing schedule, 25-6 
bedding, 25-1, 

25-18

25-19

, 25-20, 25-21, 25-

22 

blow-holes, 25-9, 25-38 
Bonds, 25-24 
bridge bearings, 25-1, 25-5 
cementitious, 25-20, 25-21, 25-22 
chemical properties, 25-19, 25-27 
chloride ion content, 25-19, 25-20 
chloride salts, 25-20 
coefficient  of  friction,  25-5,  25-28,  25-29,  25-

30, 25-34, 25-39 

compression,  25-6,  25-14, 

25-18

,  25-28,  25-

29, 25-30, 25-31, 25-33 

compressive strength, 25-5, 

25-19

, 25-21, 25-

22, 25-23 

countersunk fasteners, 25-40 
critical dimensions, 25-28, 25-35 
cubes, 25-19, 25-21, 25-22, 25-23 
damping coefficient, 25-8 
design calculations, 25-5 
deterioration tests, 25-29 
disassembly, 25-30, 25-34 
Disc bearings, 25-1 
Durometer hardness, 25-14 
elastic stability tests, 25-22 
Elastomeric pad bearings, 25-1 
environmental conditions, 25-14, 

25-18

 

expansion  bearings,  25-8,  25-16,  25-32,  25-

36, 25-37, 25-40 

expansion plates, 25-1, 25-15, 25-38 
Fabric reinforcement, 25-13 
Filler material, 25-16 
flatness, 25-24, 25-28, 25-40 
Forged steel, 25-9 
fuse links, 25-6, 25-41 
Guide devices, 25-1 
guided expansion, 25-5, 25-32, 25-34, 25-38 
horizontal load, 25-5, 25-6, 25-30, 25-34 
inspections, 25-27 
Installation scheme, 25-5 
load capacities, 25-27 

load cells, 25-41 
load combination, 25-6 
load range, 25-5, 25-27 
long-term, 25-29, 25-31 
low-temperature tests, 25-30, 25-31 
Lubricants, 25-1, 

25-18

 

Masonry, 25-1, 25-15, 

25-18

, 25-38 

masonry plates, 25-1, 

25-18

25-19

, 25-24, 25-

36 

mating surface, 25-8, 

25-18

, 25-39 

Mechanical attachment, 25-40 
Metal plates, 25-15 
minimum peel strength, 25-14 
movement capacity, 25-5 
necessary documentation, 25-42 
non-guided expansion, 25-5 
Portland cement, 25-20, 25-40 
Pot bearings, 25-1 
Qualified personnel, 25-36 
random, 25-30, 25-31, 25-33 
Recessing, 25-40 
relative displacement, 25-8 
relative velocity, 25-8 
representative samples, 25-34 
Risk assessments, 25-42 
Rocker bearings, 25-1 
Roller bearings, 25-1 
rotation, 25-5, 25-8, 25-15, 25-29, 25-31, 25-

38 

seal weld, 25-8 
Sealing rings, 25-14 
seismic buffer blocks, 25-40 
seismic loads, 25-6 
seismic restraint cables, 25-41 
Seismic restraint devices, 25-6 
shear modulus, 25-10, 25-30, 25-31 
shimming, 25-16 
Shims, 25-16 
shipment, 25-35 
Short term expansion, 25-22 
Sliding plate bearings, 25-1 
sliding  surfaces,  25-8,  25-29,  25-35,  25-38, 

25-40 

Sole and shim plates, 25-1 
Spherical bearings, 25-1, 25-38 
stainless steel, 25-8, 25-14, 25-23, 25-24, 25-

39 

steel laminates, 25-9, 25-40 
steel piston, 25-14, 25-34 
stiffness, 25-8, 25-11, 25-13, 25-31, 25-40 
tapered sole plates, 25-33 
temporary lift-off, 25-6 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 43 

C

HAPTER 

25:

 

B

EARING 

D

EVICES

 

 

 

 

 

First Edition -January 2018 

 

testing requirements,  25-9, 25-10, 25-27, 25-

30 

thickness,  25-9, 

25-18

,  25-24,  25-31,  25-33, 

25-39, 25-40 

tolerances, 25-8, 25-23, 25-31, 25-37, 25-39 
vertical load, 25-28, 25-30 
Visual Inspection, 25-31 
Vulcanized bonds, 25-14 

vulcanizing process, 25-10 
warranty, 25-42 
Water, 25-20, 25-22 
welding, 25-5, 25-14, 25-24, 25-39, 25-40 
welding process, 25-5 

Woven fabric

25-17

 

written notification, 25-23 

 

 

 

 

 

 

 

 

STANDARD CONSTRUCTION SPECIFICATIONS 

PART 2 

ROAD STRUCTURES 

 

CHAPTER 26 - BRIDGE DECK JOINT SYSTEMS 

 

 

 

 

 

 

 

DOCUMENT

 

NO:

 

TR- 

FIRST

 

EDITION 

JANUARY

 

2018

 

 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page i 

C

HAPTER 

26:

 

B

RIDGE 

D

ECK 

J

OINT 

S

YSTEMS

 

 

First Edition -January 2018 

 

 

Chapter 26: Bridge Deck Joint Systems 

T

ABLE OF 

C

ONTENTS

 

Table of Contents............................................................................................................................. i

 

List of Tables .................................................................................................................................. iii

 

26

 

Bridge Deck Joint Systems .............................................................................................. 26-1

 

26.1

 

General Description ..................................................................................................... 26-1

 

26.1.1

 

Compression Seal Expansion Joints ..................................................................... 26-1

 

26.1.2

 

Other Type of Expansion and Fixed Joints ............................................................ 26-1

 

26.1.3

 

Asphaltic Plug Joint (APJ) ..................................................................................... 26-2

 

26.1.4

 

Poured Joint Seals ................................................................................................ 26-2

 

26.1.5

 

Dimensions and Movement Ratings ...................................................................... 26-2

 

26.1.6

 

Water-tightness..................................................................................................... 26-2

 

26.1.7

 

Strength ................................................................................................................ 26-3

 

26.1.8

 

Proposed Subcontractor ....................................................................................... 26-3

 

26.1.9

 

Materials Compliance ........................................................................................... 26-3

 

26.2

 

Reference Standards and Codes ................................................................................. 26-3

 

26.3

 

Submittals for Bridge Deck Joint Systems .................................................................... 26-6

 

26.3.1

 

Working Drawing Submissions ............................................................................. 26-6

 

26.3.2

 

Submittals for Joint Sealing Systems .................................................................... 26-7

 

26.3.3

 

Submittals for Strip Seal Type Expansion Joints ................................................... 26-7

 

26.3.4

 

Submittals for Finger Type Expansion Joints ........................................................ 26-8

 

26.3.5

 

Submittals for Elastomeric Expansion Joints ......................................................... 26-8

 

26.3.6

 

Submittals for Modular Bridge Joint System .......................................................... 26-8

 

26.3.7

 

Submittals for Fixed Joint Seals ............................................................................ 26-9

 

26.3.8

 

Submittals for Asphaltic Plug Type Joint ............................................................... 26-9

 

26.4

 

Materials for Bridge Deck Joint Systems .................................................................... 26-10

 

26.4.1

 

Compression Seal Expansion Joints ................................................................... 26-10

 

26.4.2

 

Preformed Elastomeric Neoprene Profile Seal Expansion Joints ........................ 26-10

 

26.4.3

 

Low-density, Closed Cell, Cross-Linked, Nitrogen-blown Seal Expansion Joints  26-10

 

26.4.4

 

Strip Seal Type Expansion Joints ....................................................................... 26-12

 

26.4.5

 

Finger Type Expansion Joints ............................................................................. 26-12

 

26.4.6

 

Elastomeric Expansion Joints ............................................................................. 26-13

 

26.4.7

 

Modular Bridge Joint Systems ............................................................................ 26-15

 

26.4.8

 

Fixed Joint Seal .................................................................................................. 26-16

 

26.4.9

 

Asphaltic Plug Joint (APJ) ................................................................................... 26-16

 

26.4.10

 

Header Materials ................................................................................................ 26-16

 

26.5

 

Manufacturing and Fabrication of Bridge Deck Joint Systems .................................... 26-21

 

26.5.1

 

Manufacturing Joint Sealing Systems ................................................................. 26-21

 

26.5.2

 

Manufacturing Strip Seal Type Expansion Joints ................................................ 26-22

 

26.5.3

 

Manufacturing Finger Type Expansion Joints ..................................................... 26-22

 

26.5.4

 

Manufacturing Elastomeric Expansion Joints ...................................................... 26-22

 

26.5.5

 

Manufacturing Modular Bridge Joint Systems ..................................................... 26-22

 

26.5.6

 

Manufacturing Fixed Joint Seal ........................................................................... 26-24

 

26.5.7

 

Manufacturing Asphaltic Plug Type Joint ............................................................ 26-24

 

26.6

 

Construction of Bridge Deck Joint Systems ............................................................... 26-24

 

26.6.1

 

Construction of Compression Seal Expansion Joints .......................................... 26-24

 

26.6.2

 

Construction of Preformed Elastomeric Neoprene Profile Seal Expansion Joints 26-25

 

26.6.3

 

Construction  of  Low-density,  Closed  Cell,  Cross-linked,  Nitrogen-blown  Seal 

Expansion Joints ............................................................................................................... 26-27

 

26.6.4

 

Construction of Strip Seal Expansion Joints ........................................................ 26-27

 

26.6.5

 

Construction of Finger Type Expansion Joint ...................................................... 26-28

 

26.6.6

 

Construction of Elastomeric Expansion Joints .................................................... 26-28

 

26.6.7

 

Construction of Modular Bridge Joint Systems .................................................... 26-29

 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page iii 

C

HAPTER 

26:

 

B

RIDGE 

D

ECK 

J

OINT 

S

YSTEMS

 

 

First Edition -January 2018 

 

L

IST OF 

T

ABLES

 

Table 26-1: Designations and titles for AASHTO and ASTM standards that apply to bridge deck joint 
systems ..................................................................................................................................... 26-4 
Table  26-2:  Physical  properties  for  low-density,  closed  cell,  cross-linked,  ethylene  vinyl  acetate, 

polyethylene copolymer, nitrogen-blown seal ......................................................... 26-11 

Table 26-3: Physical properties for the adhesive used with the low-density, closed cell, cross-linked, 

ethylene vinyl acetate, polyethylene copolymer, nitrogen-blown seals ..................... 26-11 

Table 26-4: Physical properties of the strip seal gland ............................................................. 26-12 
Table 26-5: Physical properties of the neoprene for elastomeric expansion joints .................... 26-13 
Table 26-6: Physical properties of black two component flexible epoxy sealant ....................... 26-14 
Table 26-7: Physical properties of grey two component flexible epoxy ..................................... 26-14 
Table 26-8: Physical properties for elastomeric concrete cured binder material (without filler) . 26-17 
Table 26-9: Physical requirements for elastomeric concrete binder material (with filler) ........... 26-18 
Table 26-10: Physical properties of epoxy concrete material ................................................... 26-21 
Table 26-11: Gradation requirement for aggregate used in epoxy concrete ............................. 26-21 
Table 26-12: Cure time for epoxy mortar .................................................................................. 26-26 

 

 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 26-1 

C

HAPTER 

26:

 

B

RIDGE 

D

ECK 

J

OINT 

S

YSTEMS

 

 

First Edition -January 2018 

 

26 

BRIDGE DECK JOINT SYSTEMS 

This  chapter  outlines  standards  and  requirements  for  furnishing  and  installing  bridge  deck  joint 
systems for the Project. Such systems shall be furnished as specified in the Contract documents at 
the locations shown on the Contract  plans where significant movements are expected across the 
joint or at fixed joints.  The furnishing and installing or application of all necessary hardware including 
structural steel angles, anchor bolts and studs, sealants, adhesives, epoxies, and other accessories 
are included in this work. 

26.1 

General Description

 

26.1.1 

Compression Seal Expansion Joints 

This  chapter  applies  to  compression  seal  expansion  joints  consisting  of  preformed  elastomeric 
material  that  is  compressed  and  installed  in  specially  prepared  joints  and  joint  seal  assemblies 
consisting of assemblies of metal and elastomeric materials that are installed in recesses in deck 
surfaces. Compression seals shall be compression stressed during all movement phases for a joint. 
They  maintain  water  tightness  and  seal  the  joint  by  maintaining  sidewall  pressure  on  the  joint 
interface (joint  armouring). Other type of  bridge deck joint sealing systems  include the  preformed 
elastomeric  neoprene  profile  seal,  and  the  low-density,  closed  cell,  cross-linked,  ethylene  vinyl 
acetate, polyethylene copolymer, nitrogen-blown seal.  

26.1.2 

Other Type of Expansion and Fixed Joints 

This chapter also applies to furnishing and constructing other type of expansion and fixed joints for 
concrete  bridge  decks  consisting  of  strip  seal  type  expansion  joints, finger  type  expansion  joints, 
elastomeric expansion joints, modular bridge joint systems, and fixed joint seals of the quality, types, 
and  sizes  designated  in the  Contract  plans  or  as  directed  by  the  Engineer  and  shall  comply  with 
these specifications. 

26.1.2.1 Strip Seal Type Expansion Joints 

Strip seal type expansion joints shall consist of two extruded steel channels that extend across the 
full width of the bridge roadway and support neoprene seal inserts. The gland that folds below the 
deck’s surface shall enable strip seals to move. 

26.1.2.2 Finger Type Expansion Joints 

The finger type expansion joints shall consist of steel finger plates which cantilever between the ends 
of the expansion opening to provide for the expansion and contraction of the superstructure due to 
temperature  variations  and  subsequent  shrinkage  and  creep movements  after  the joint  has  been 
installed. The steel finger plates cantilevering between the joint gap shall be of sufficient capacity to 
carry the wheel loads as indicated on the Contract plans across the joint. 

26.1.2.3 Elastomeric Expansion Joints 

The elastomeric expansion joints shall be integrally molded units of neoprene and bonded steel. The 
elastomeric joint shall comply with the details indicated on the Contract plans shall meet the material 
requirements as specified herein. 

26.1.2.4 Modular Bridge Joint Systems (MBJS) 

Modular bridge joint systems (MBJS) are sealed joints with two or more elastomeric seals held in 
place by edgebeams that are anchored to the structural elements (deck, abutment, etc.) and one or 
more transverse centerbeams that are parallel to the edgebeams. The MBJS shall accommodate 
large movement ranges, and shall use one or more transverse centerbeams to separate two or more 
seals. The MBJS must structurally support the wheel-loads across the gap between bridge elements, 
and shall continue into the traffic barriers with an upturn angle as shown on the Contract plans. 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 26-2 

C

HAPTER 

26:

 

B

RIDGE 

D

ECK 

J

OINT 

S

YSTEMS

 

 

First Edition -January 2018 

 

The Multiple-support-bar (MSB) MBJS shall have the centerbeams rigidly connected to the support 
bars, and each support bar shall support only one centerbeam. The MSB system shall have a support 
box to hold as many support bars as there are centerbeams. 

The single-support-bar (SSB) MBJS  shall have transverse centerbeams that are attached to only 
one  support  bar  at  each  support  box  location  using  steel  yokes  and  elastomeric  springs  and 
bearings. 

In the special type “swivel-joist system”, the support bar swivels as well as slides in the 

support boxes. 

In MBJS that use a support bar that slides on bearings, the support bar shall have a thin stainless 
steel cover plates joined to the top and bottom of the support bar to provide smooth sliding surfaces. 
The support bars shall slide between elastomeric bearings and springs that are fixed in the support 
boxes by a round boss or protrusion that fits into a hole in the steel plate of the support box. The 
bearings and springs shall have low-friction polytetrafluorethylene (PTFE) pads bonded to the sliding 
surface of the spring or bearing. 

The elastomeric bearings and springs shall be both precompressed and located atop and below the 
support  bar,  with  the  bearing  on  the  bottom  and  the  spring  on  top.  The  springs  shall  exert 
compression to keep the bearing in place. The vertical component of each wheel-load applied to the 
centerbeam and transmitted through the support bar compresses the bearings and reacts against 
the support box and the deck. There is a significant upward rebound of each wheel-load cycle that 
compresses the springs and reacts on the top plate of the support box, imposing an upward load on 
the deck. 

The wheel-load may also impart a horizontal force to the centerbeam and an associated rebound. 
The horizontal load is transmitted through the centerbeam, into the support bar, and into the springs 
and bearings through friction. Ultimately, the horizontal force is resisted by the small bosses in the 
springs and bearings into the support box and deck. These small bosses are subjected to millions of 
cycles of this reversible shearing action. Shear failure of the bosses leads to systemic failure of the 
MBJS.  The  movements  of  bridge  elements  provide  the  necessary  forces  to  open  and  close  the 
MBJS. The MBJS shall be provided by an equidistant device to maintain an approximately equal gap 
between  centerbeams  and  between  centerbeam  and  edgebeam.  The  equidistant  device  shall  be 
comprised of a series of horizontal elastomeric springs (control springs).  

26.1.2.5 Fixed Joint Seal 

The joint sealer shall be of a neoprene, preformed or extruded type, of essentially the size and shape 
indicated on the Contract plans. 

26.1.3 

Asphaltic Plug Joint (APJ) 

Field molded asphaltic plug joints (APJs) used in expansion joint sealing on asphalt concrete overlay 
and portland cement concrete decks shall consist of multilayer, or single layer, or both, application 
systems depending upon individual manufacturing requirements. The  asphaltic binder  to be used 
shall be thermoplastic polymeric-modified asphalt. APJs shall not be used for movement applications 
exceeding ± 25 mm from the installation width. 

26.1.4 

Poured Joint Seals 

Joint  seals  that  the  Contract  documents  specify  to  be  poured  joint  seals  shall  conform  to  the 
specifications  for  expansion  and  contraction  joints  outlined  in  Article  21.9.1.4  of  Chapter  21, 
Concrete Structures.  

26.1.5 

Dimensions and Movement Ratings 

At each designated location, types, dimensions, and movement ratings for bridge deck joint systems 
shall comply with the Contract documents or directions from the Engineer. 

26.1.6 

Water-tightness 

All  bridge  deck  joint  systems  shall  prevent  the  intrusion  of  material  and  water  through  the  joint 
system. Water-tightness shall be ensured across the full width of the bridge deck, from  barrier to 
barrier and across raised walkways and medians if exist. 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 26-3 

C

HAPTER 

26:

 

B

RIDGE 

D

ECK 

J

OINT 

S

YSTEMS

 

 

First Edition -January 2018 

 

26.1.7 

Strength 

The bridge deck joint system shall have sufficient strength in all positions to support the Abu Dhabi 
Vehicular Load (ADVL) and corresponding impact in accordance to Road Structures Design Manual 
(ADQCC  TR-516).  The  Contractor  shall  also  ensure  that  the  system  can  accommodate  all 
movements indicated in the Contract plans. 

26.1.8 

Proposed Subcontractor 

Before a subcontract is awarded for the expansion joints, the Contractor shall submit to the Engineer 
for approval the prequalification documents of the organization proposed for the installation of the 
expansion joints in accordance with these standard specifications. The proposed subcontractor shall 
submit  evidence  that  he  has  at  least  five  years  of  experience  in  the  Gulf  Region  of  successful 
installation  and  operation  of  bridge  deck joints  comparable  to the  propriety  expansion  joints  work 
specified in these standard specifications. The subcontractor shall verify his experience by citing at 
least five projects, comparable to the Project, which have been successfully accomplished. The joint 
manufacturer shall be ISO 9001:2000 certified with at least 30 years of experience in designing and 
fabricating expansion joint systems.  

26.1.9 

Materials Compliance 

No shipment of materials will be accepted by the Engineer for use in the Project unless the materials 
comply with the requirements of these standard specifications. The materials shall not be used or 
installed until the Contractor has been notified by the Engineer that they meet the requirements of 
these standard specifications. 

26.2 

Reference Standards and Codes 

Standards and codes shall be as specified in these specifications, in the Contract documents, if any, 
and the following, in their latest edition: 

AASHTO LRFD  American Association of State Highway and Transportation Officials - load and 

resistance factor design, Bridge Construction Specifications; 

AASHTO LRFD  American Association of State Highway and Transportation Officials - load and 

resistance factor design, Bridge Design Specifications; 

AASHTO 

Standard Specifications for Transportation Materials and Methods of Sampling 
and Testing; 

ADQCC (TR-516) Road Structures Design Manual; 

AISC 

American Institute of Steel Construction; 

AISC 204-08 

AISC Certification Program for Bridge and Highway Metal Component 
Manufacturers; 

ANSI 

American National Standards Institute; 

ANSI B18.2.1-1981Square and Hex Bolts and Screws; 

ANSI/AWS D1.1/  Structural Welding Code-Steel; 

D1.1M:2010 

ASNT 

American Society for Nondestructive Testing; 

ASTM 

American Society for Testing and Materials; 

AWS 

American Welding Society; 

AWS QC1:2007  Standard for AWS Certification of Welding Inspectors; 

ISO 

International Organization for Standardization; 

ISO 9001:2015 

Quality management systems 

– Requirements. 

The  Contractor  shall  manufacture  and  test  bridge  deck  joint  systems  in  accordance  with  these 
specifications  and  in  compliance  with  AASHTO/ASTM  standards.  Where  joint  systems  are 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 26-4 

C

HAPTER 

26:

 

B

RIDGE 

D

ECK 

J

OINT 

S

YSTEMS

 

 

First Edition -January 2018 

 

manufactured  and  tested  by  standards  other  than  AASHTO/ASTM,  products  conforming  to 
equivalent or higher standards will be acceptable if proven to be suitable. 

Table  26-1  below  presents  American  Association  of  State  Highway  and  Transportation  Officials 
(AASHTO) and American Society for Testing and Materials (ASTM) Standards that are related to 
bridge deck joint system materials. It also includes designations and titles.  

Table 26-1: Designations and titles for AASHTO and ASTM standards that apply to bridge 

deck joint systems 

AASHTO 
Designation 

ASTM 
Designation 

Title 

 

ASTM D4070 - 
08 

Standard Specification for Adhesive Lubricant for 
Installation of Preformed Elastomeric Bridge 
Compression Seals in Concrete Structures 

AASHTO M 220-
84 (2012) 

ASTM D2628 - 
91(2011) 

Standard Specification for Preformed Polychloroprene 
Elastomeric Joint Seals for Concrete Pavements 

 

ASTM D3575 - 
08 

Standard Test Methods for Flexible Cellular Materials 
Made From Olefin Polymers 

 

ASTM D624 - 
00(2012) 

Standard Test Method for Tear Strength of Conventional 
Vulcanized Rubber and Thermoplastic Elastomers  

 

ASTM C881 / 
C881M - 10 

Standard Specification for Epoxy-Resin-Base Bonding 
Systems for Concrete 

 

ASTM A240 / 
A240M - 12 

Standard Specification for Chromium and Chromium-
Nickel Stainless Steel Plate, Sheet, and Strip for 
Pressure Vessels and for General Applications 

 

ASTM A123 / 
A123M - 12 

Standard Specification for Zinc (Hot-Dip Galvanized) 
Coatings on Iron and Steel Products 

 

ASTM D412 - 
06ae2 

Standard Test Methods for Vulcanized Rubber and 
Thermoplastic Elastomers

—Tension 

 

ASTM D695 - 10 

Standard Test Method for Compressive Properties of 
Rigid Plastics 

 

ASTM D570 - 
98(2010)e1 

Standard Test Method for Water Absorption of Plastics 

 

ASTM C882 / 
C882M - 12 

Standard Test Method for Bond Strength of Epoxy-Resin 
Systems Used With Concrete By Slant Shear 

 

ASTM D395 - 
03(2008) 

Standard Test Methods for Rubber Property

Compression Set 

 

ASTM D471 - 12 

Standard Test Method for Rubber Property

—Effect of 

Liquids 

 

ASTM D573 - 
04(2010) 

Standard Test Method for Rubber

—Deterioration in an 

Air Oven 

 

ASTM D1149 - 
07(2012) 

Standard Test Methods for Rubber Deterioration

Cracking in an Ozone Controlled Environment 

 

ASTM D2240 - 
05(2010) 

Standard Test Method for Rubber Property

—Durometer 

Hardness 

 

ASTM D638 - 10 

Standard Test Method for Tensile Properties of Plastics 

 

ASTM D1299-
55(1979)E01 

Test Method for Shrinkage of Molded and Laminated 
Thermosetting Plastics at Elevated Temperature 
(Withdrawn 1992) 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 26-5 

C

HAPTER 

26:

 

B

RIDGE 

D

ECK 

J

OINT 

S

YSTEMS

 

 

First Edition -January 2018 

 

AASHTO 
Designation 

ASTM 
Designation 

Title 

AASHTO M 297-
10 

ASTM D3542 - 
08 

Standard Specification for Preformed Polychloroprene 
Elastomeric Joint Seals for Bridges 

 

ASTM D5973 - 
97(2007) 

Standard Specification for Elastomeric Strip Seals with 
Steel Locking Edge Rails Used in Expansion Joint 
Sealing 

 

ASTM D3574 - 
11 

Standard Test Methods for Flexible Cellular Materials

Slab, Bonded, and Molded Urethane Foams 

 

ASTM C39 / 
C39M - 12 

Standard Test Method for Compressive Strength of 
Cylindrical Concrete Specimens 

 

ASTM C884 / 
C884M - 
98(2010) 

Standard Test Method for Thermal Compatibility 
Between Concrete and an Epoxy-Resin Overlay 

AASHTO T 42-
10 

ASTM D545 - 08 

Standard Test Methods for Preformed Expansion Joint 
Fillers for Concrete Construction (Nonextruding and 
Resilient Types) 

AASHTO T 27-
11 

ASTM C136 - 06 

Standard Method of Test for Sieve Analysis of Fine and 
Coarse Aggregates  

 

ASTM A307-10 

Standard Specification for Carbon Steel Bolts and Studs, 
60 000 PSI Tensile Strength  

 

ASTM A588 / 
A588M - 10 

Standard Specification for High-Strength Low-Alloy 
Structural Steel, up to 50 ksi [345 MPa] Minimum Yield 
Point, with Atmospheric Corrosion Resistance 

 

ASTM D746 - 07 

Standard Test Method for Brittleness Temperature of 
Plastics and Elastomers by Impact 

 

ASTM A1011 / 
A1011M - 12b 

Standard Specification for Steel, Sheet and Strip, Hot-
Rolled, Carbon, Structural, High-Strength Low-Alloy, 
High-Strength Low-Alloy with Improved Formability, and 
Ultra-High Strength 

 

ASTM A36 / 
A36M - 08 

Standard Specification for Carbon Structural Steel 

 

ASTM A153 / 
A153M - 09 

Standard Specification for Zinc Coating (Hot-Dip) on Iron 
and Steel Hardware 

 

ASTM D6297 - 
13 

Standard Specification for Asphaltic Plug Joints for 
Bridges 

 

ASTM D5329 - 
09 

Standard Test Methods for Sealants and Fillers, Hot-
Applied, for Joints and Cracks in Asphaltic and Portland 
Cement Concrete Pavements 

 

ASTM D36 / 
D36M - 12 

Standard Test Method for Softening Point of Bitumen 
(Ring-and-Ball Apparatus) 

 

ASTM D113 - 07 

Standard Test Method for Ductility of Bituminous 
Materials 

 

ASTM D6690 - 
12 

Standard Specification for Joint and Crack Sealants, Hot 
Applied, for Concrete and Asphalt Pavements 

 

ASTM D5167 - 
13 

Standard Practice for Melting of Hot-Applied Joint and 
Crack Sealant and Filler for Evaluation 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 26-6 

C

HAPTER 

26:

 

B

RIDGE 

D

ECK 

J

OINT 

S

YSTEMS

 

 

First Edition -January 2018 

 

AASHTO 
Designation 

ASTM 
Designation 

Title 

 

ASTM D5249 - 
10 

Standard Specification for Backer Material for Use with 
Cold- and Hot-Applied Joint Sealants in Portland-Cement 
Concrete and Asphalt Joints 

 

ASTM D5 / D5M - 
13 

Standard Test Method for Penetration of Bituminous 
Materials 

 

ASTM D217 - 10 

Standard Test Methods for Cone Penetration of 
Lubricating Grease 

AASHTO T 
132:1987 
(R2013) 

 

Method of Test for Tensile Strength of Hydraulic Cement 
Mortars  

AASHTO M 85-
12  

ASTM C150 / 
C150M - 12 

Standard Specification for Portland Cement 

 

ASTM C190-85 

Method of Test for Tensile Strength of Hydraulic Cement 
Mortars 

26.3 

Submittals for Bridge Deck Joint Systems 

The Contractor shall submit complete shop drawings of all expansion and fixed joints. The Engineer 
may  request  the  Contractor  to  furnish  whatever  samples  may  be  required  to  perform  the  tests 
specified to qualify the material. Acceptance of the joint  system to be used in the Project shall be 
subject  to  written  approval  of  the  Engineer.  The  shop  drawings  shall  include  a  movement  chart 
showing the total anticipated movement of the structure and the required setting width of the joint 
assembly at various temperatures. All movements due to shrinkage, creep, mid-slab deflection, and 
similar data, shall not be incorporated into this chart but shall be considered by the Contractor and 
approved by the Engineer prior to final installation and adjustment.  

Submittals  for  bridge  deck  expansion  and  fixed  joints  used  on  the  Project  shall  comply  with  the 
specifications outlined in this section. 

26.3.1 

Working Drawing Submissions 

If the Contract documents do not include details that show joint settings that are required for their 
installation,  the  Contractor  shall  submit  calculations  to  the  Engineer for approval  before  installing 
joints in any bridge deck. The Contractor shall submit working drawings to the Engineer that cover 
the installation procedure and joint assembly for bridge decks using proprietary joint systems. The 
Contractor shall submit shop drawings for the 

Engineer’s approval for all joints. 

The  Contractor  shall  not  perform  any  work  on  a  deck  joint  system  before  receiving  approval  for 
working  drawings  from  the  Engineer.  Such  approval  shall  not  relieve  the  Contractor  of  any 
responsibility under the Contract documents for successful completion of the work. 

The Contractor shall assume responsibility for conforming to these specifications and the Contract 
plans, and shall include the following items in the submission to the Engineer:  

  The 

Manufacturer’s  brochure  on  the  proposed  joint,  showing  physical  dimensions  for 

components,  installation  procedures,  material  certifications,  and  a  table  of  variable 
temperatures and dimensions. 

  Presetting details. 

  Drawings that detail the 

joint’s installation and indicate the lengths of component members, 

treatment of directional changes, and shop splices for steel locking rails. 

  Expansion joint fabricator documentation. 

The  Contractor  shall  ensure  that  the  expansion  joint  fabricator  have  American  Institute  of  Steel 
Construction (AISC)  certification,  as  defined  in their  AISC  204-08,  AISC Certification  Program for 

 

 

 

 

 

 

 