Page 6-200
Quality assurance testing may include the following tests:
1. Environmental conditions for painting in accordance with ASTM E337.
2. Cleanness of abrasive blasting media and ionic contamination of abrasive blasting
media in accordance with ASTM D4940.
3. Cleanness of compressed air in accordance with ASTM D4285.
4. Pictorial of surface preparation guides in accordance with SSPC-VIS 1, 3, 4, and 5.
5. Surface profile by Keanne-Tator comparator in accordance with ASTM D4417 and
SSPC PA17.
6. Surface profile by replica tape in accordance with ASTM D4417.
7. Wet film thickness in accordance with ASTM D4414.
8. Dry film thickness by magnetic gage in accordance with SSPC-PA 2 modified.
9. Dry film thickness by Tooke gage in accordance with ASTM D4138.
The Contractor shall repair all damage to paint resulting from Contracting Agency’s quality
assurance inspections at no additional cost or time to the Contracting Agency.
6-07.3(4) Paint System Manufacturer’s Technical Representative
The paint system manufacturer’s technical representative shall be present at the jobsite
for the pre-painting conference and for the first day of paint application, and shall
be available to the Contractor and Contracting Agency for consultation for the full
project duration.
6-07.3(5) Pre-Painting Conference
A pre-painting conference shall be held 5 to 10 working days before beginning painting
operations to discuss the painting plan, construction operations, personnel, and
equipment to be used. Those attending shall include:
1. (Representing the Contractor) The superintendent, on-site supervisors, and all crew
members in charge of cleaning and preparing the surfaces, containing, collecting
and disposing of all removed materials, applying the paint, and performing all quality
control inspections, measurements and tests; and the paint system manufacturer’s
technical representative; and
2. (Representing the Contracting Agency) The Engineer, key inspection assistants, and
representatives of the WSDOT HQ Construction Office.
If the Contractor’s key personnel change between any work operations, an additional
conference shall be held if requested by the Engineer.
For projects that include painting of multiple structures, a separate conference may be
held for each structure, at the discretion of the Engineer.