Standard Specifications for Road, Bridge, and Municipal Construction 2020 (M 41-10) - page 6

 

  Главная      Manuals     Standard Specifications for Road, Bridge, and Municipal Construction 2020 (M 41-10)

 

Search            copyright infringement  

 

 

 

 

 

 

 

 

 

 

 

Content      ..     4      5      6      7     ..

 

 

 

Standard Specifications for Road, Bridge, and Municipal Construction 2020 (M 41-10) - page 6

 

 

Page 40 

8-13  Monument Cases  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-85

8-13.1 Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-85

8-13.2 Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-85

8-13.3 

Construction Requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-85

8-13.4 Measurement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-85

8-13.5 Payment  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-85

8-14  Cement Concrete Sidewalks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-86

8-14.1 Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-86

8-14.2 Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-86

8-14.3 

Construction Requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-86

8-14.3(1) Excavation  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-86

8-14.3(2) Forms  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-86

8-14.3(3) 

Placing and Finishing Concrete  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-87

8-14.3(4) Curing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-87

8-14.3(5) 

Detectable Warning Surface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-87

8-14.4 Measurement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-87

8-14.5 Payment  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-88

8-15 Riprap  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-89

8-15.1 Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-89

8-15.2 Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-89

8-15.3 

Construction Requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-89

8-15.3(1) 

Excavation for Riprap . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-89

8-15.3(2) 

Loose Riprap  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-89

8-15.3(3) 

Hand Placed Riprap  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-90

8-15.3(4) Vacant. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-90

8-15.3(5) Vacant. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-90

8-15.3(6) 

Quarry Spalls . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-90

8-15.3(7) 

Filter Blanket . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-90

8-15.4 Measurement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-90

8-15.5 Payment  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-91

 Contents

8-16  Concrete Slope Protection  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-92

8-16.1 Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-92

8-16.2 Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-92

8-16.3 

Construction Requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-92

8-16.3(1) 

Footing and Preparation of Slope   . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-92

8-16.3(2) 

Placing Semi-Open Concrete Masonry Units   . . . . . . . . . . . . . . . . . . .

8-92

8-16.3(3) 

Poured in Place Cement Concrete . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-93

8-16.3(4) 

Pneumatically Placed Concrete  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-93

8-16.4 Measurement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-94

8-16.5 Payment  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-94

8-17  Impact Attenuator Systems   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-95

8-17.1 Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-95

8-17.2 Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-95

8-17.3 

Construction Requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-95

8-17.4 Measurement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-96

8-17.5 Payment  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-96

8-18  Mailbox Support  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-97

8-18.1 Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-97

8-18.2 Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-97

8-18.3 

Construction Requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-97

8-18.3(1) 

Type 3 Mailbox Support   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-97

8-18.4 Measurement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-98

8-18.5 Payment  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-98

8-19 Vacant . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-99

8-20  Illumination, Traffic Signal Systems, Intelligent Transportation Systems, and Electrical  . . . . .

8-100

8-20.1 Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-100

8-20.1(1) 

Regulations and Code  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-100

8-20.1(2) 

Industry Codes and Standards  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-101

8-20.1(3) 

Permitting and Inspections  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-102

8-20.2 Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-102

8-20.2(1) 

Equipment List and Drawings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-102

8-20.3 

Construction Requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-103

8-20.3(1) General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-103

8-20.3(2) 

Excavating and Backfilling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-105

8-20.3(3) 

Removing and Replacing Improvements . . . . . . . . . . . . . . . . . . . . . . .

8-105

8-20.3(4) Foundations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-106

8-20.3(5) Conduit   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-108

Page 42 

8-20.3(6) 

Junction Boxes, Cable Vaults, and Pull boxes   . . . . . . . . . . . . . . . . . .

8-116

8-20.3(7) 

Messenger Cable, Fittings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-117

8-20.3(8) Wiring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-117

8-20.3(9) 

Bonding, Grounding  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-121

8-20.3(10) 

Service, Transformer, and Intelligent Transportation System  
(ITS) Cabinets   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-122

8-20.3(11) Testing  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-123

8-20.3(12) Painting   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-124

8-20.3(13) 

Illumination Systems   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-124

8-20.3(14) 

Signal Systems   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-127

8-20.3(15) Grout   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-130

8-20.3(16) 

Reinstalling Salvaged Material  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-130

8-20.3(17) 

“As Built” Plans  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-130

8-20.4 Measurement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-130

8-20.5 Payment  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-131

8-21  Permanent Signing  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-132

8-21.1 Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-132

8-21.2 Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-132

8-21.3 

Construction Requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-132

8-21.3(1) 

Location of Signs   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-132

8-21.3(2) 

Placement of Signs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-132

8-21.3(3) 

Sign Covering   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-133

8-21.3(4) 

Sign Removal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-133

8-21.3(5) 

Sign Relocation  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-134

8-21.3(6) 

Sign Refacing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-134

8-21.3(7) 

Sign Message Revision. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-135

8-21.3(8) 

Sign Cleaning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-135

8-21.3(9) 

Sign Structures  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-135

8-21.3(10) 

Sign Attachment  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-139

8-21.3(11) 

Multiple Panel Signs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-139

8-21.3(12) 

Steel Sign Posts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-139

8-21.4 Measurement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-140

8-21.5 Payment  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-140

 Contents

8-22  Pavement Marking  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-141

8-22.1 Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-141

8-22.2 Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-141

8-22.3 

Construction Requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-141

8-22.3(1) 

Preliminary Spotting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-141

8-22.3(2) 

Preparation of Roadway Surfaces  . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-141

8-22.3(3) 

Marking Application . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-142

8-22.3(4) 

Tolerances for Lines  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-146

8-22.3(5) 

Installation Instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-146

8-22.3(6) 

Removal of Pavement Markings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-147

8-22.4 Measurement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-147

8-22.5 Payment  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-148

8-23  Temporary Pavement Markings  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-151

8-23.1 Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-151

8-23.2 Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-151

8-23.3 

Construction Requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-151

8-23.3(1) General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-151

8-23.3(2) 

Preliminary Spotting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-151

8-23.3(3) 

Preparation of Roadway Surface  . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-151

8-23.3(4) 

Pavement Marking Application   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-151

8-23.4 Measurement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-153

8-23.5 Payment  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-153

8-24  Rock and Gravity Block Wall and Gabion Cribbing   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-154

8-24.1 Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-154

8-24.2 Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-154

8-24.3 

Construction Requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-154

8-24.3(1) 

Rock Wall . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-154

8-24.3(2) 

Gravity Block Wall  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-156

8-24.3(3) 

Gabion Cribbing  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-156

8-24.4 Measurement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-158

8-24.5 Payment  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-158

General Requirements For Structures 

6-01

Content

Label  

Background Color

Lettering  

Utility Color

Electrical Power

Red

Black

Gas, Oil, Steam, Petroleum, and other gaseous materials

Yellow

Black

CATV, Telecommunication, Alarm, and Signal

Orange

Black

Potable Water

Blue

White

Reclaimed Water, Irrigation, Slurry

Purple

White

Sewer and Storm Drain

Green

White

The purple color background for the label for reclaimed water, irrigation, and slurry, shall 
be generated by placing transparent film over white reflective material. The purple tint of 
the transparent film shall match SAE AMS Standard 595, Color No. 37100.

The label text shall identify the utility contents and include the One-Number Locator 
Service phone number 1-800-424-5555.

The minimum length of the label color field shall be the longer of either 1 letter width 
beyond each end of the label text, or the length specified below:

Minimum Pipe O.D. 

(inches)

Maximum Pipe O.D. 

(inches)

Minimum Length of Label 

Color Field (inches)

Letter Height 

(inches)

¾

8

½

2

8

¾

6

12

8

10

24

12

32

Utility pipes and conduit systems shall be labeled on both sides of each bridge pier, 
and adjacent to each entrance hatch into a box girder cell. For utility pipes and conduit 
systems within bridge spans exceeding 300 feet, labels shall also be applied to the utility 
pipes and conduit systems between the piers at a maximum spacing of 300 feet. The label 
shall be visible at a normal eye height.

6-01.11 

Name Plates

The Contractor shall install no permanent plates or markers on a Structure unless the 
Plans show it.

6-01.12 

Final Cleanup

When the Structure is completed, the Contractor shall leave it and the entire site in 
a clean and orderly condition. Structure decks shall be clean. Temporary buildings, 
falsework, piling, lumber, equipment, and debris shall be removed. The Contractor shall 
level and fine grade all excavated material not used for backfill, and shall fine grade all 
slopes and around all piers, bents, and abutments.

Page 6-4 

General Requirements For Structures

6-01.13 Vacant
6-01.14 

Premolded Joint Filler

When the Plans call for premolded joint filler, the Contractor shall fasten it with 
galvanized wire nails to 1 side of the joint. The nails must be no more than 6 inches apart 
and shall be 1½ inches from the edges over the entire joint area. The nails shall be at least 
1½ inches longer than the thickness of the filler.

The Contractor may substitute for the nails any adhesive acceptable to the Engineer. This 
adhesive, however, shall be compatible with the material specified in 

Section 9-04.1(2)

 

and capable of bonding the filler to portland cement concrete.

6-01.15 

Normal Temperature

Bridge Plans state dimensions at a normal temperature of 64ºF. Unless otherwise noted, 
these dimensions are horizontal or vertical.

6-01.16 

Repair of Defective Work

6-01.16(1)  General

When using repair procedures that are described elsewhere in the Contract Documents, 
the Working Drawing submittal requirements of this section shall not apply to those 
repairs unless noted otherwise.

Repair procedures for defective Work shall be submitted as Type 2 Working Drawings. 
Type 2E Working Drawings shall be submitted when required by the Engineer. As an 
alternative to submitting Type 2 or 2E Working Drawings, defective Work within the 
limits of applicability of a pre-approved repair procedure may be repaired using that 
procedure. Repairs using a pre-approved repair procedure shall be submitted as a 
Type 1 Working Drawing.

Pre-approved repair procedures shall consist of the following:

• 

The procedures listed in 

Section 6-01.16(2)

• 

For precast concrete, repair procedures in the annual plant approval process 
documents that have been approved for use by the Contracting Agency.

All Working Drawings for repair procedures shall include:

• 

A description of the defective Work including location, extent and pictures

• 

Materials to be used in the repair. Repairs using manufactured products shall 
include written manufacturer recommendations for intended uses of the product, 
surface preparation, mixing, aggregate extension (if applicable), ambient and surface 
temperature limits, placement methods, finishing and curing.

• 

Construction procedures

• 

Plan details of the area to be repaired

• 

Calculations for Type 2E Working Drawings

Page 44 

8-25  Glare Screen   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-159

8-25.1 Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-159

8-25.2 Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-159

8-25.3 

Construction Requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-159

8-25.3(1) 

Glare Screen Fabric   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-159

8-25.3(2) Slats   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-159

8-25.3(3) Posts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-160

8-25.3(4) 

Tension Wire  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-160

8-25.4 Measurement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-160

8-25.5 Payment  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-160

8-26 Vacant . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-161

8-27 Vacant . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-162

8-28 Vacant . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-163

8-29  Wire Mesh Slope Protection   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-164

8-29.1 Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-164

8-29.2 Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-164

8-29.3 

Construction Requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-164

8-29.3(1) Submittals  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-164

8-29.3(2) Anchors  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-164

8-29.3(3) 

Wire Rope  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-165

8-29.3(4) 

Wire Mesh . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-165

8-29.4 Measurement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-165

8-29.5 Payment  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8-165

 Contents

Division 9  Materials  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-1

9-00  Definitions and Tests  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-1

9-00.1 Fracture   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-1

9-00.2 

Wood Waste  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-1

9-00.3 

Test for Mass of Galvanizing  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-1

9-00.4 

Sieves for Testing Purposes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-1

9-00.5 

Dust Ratio   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-1

9-00.6 

Sand/Silt Ratio . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-1

9-00.7 

Galvanized Hardware, AASHTO M232  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-1

9-00.8 

Sand Equivalent . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-2

9-00.9 

Field Test Procedures  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-2

9-01 Cement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-3

9-01.1 

Types of Cement  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-3

9-01.2 Specifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-3

9-01.2(1) 

Portland Cement. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 

9-3

9-01.2(2) 

Rapid Hardening Hydraulic Cement  . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-4

9-01.3 

Tests and Acceptance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-4

9-01.4 

Storage on the Work Site . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-5

9-02  Bituminous Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-6

9-02.1 

Asphalt Material, General  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-6

9-02.1(1) Vacant. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 

9-6

9-02.1(2) Vacant. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 

9-6

9-02.1(3) Vacant. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 

9-6

9-02.1(4) 

Performance Graded (PG) Asphalt Binder  . . . . . . . . . . . . . . . . . . . . . . .

9-6

9-02.1(5) Vacant. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 

9-7

9-02.1(6) 

Cationic Emulsified Asphalt   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-7

9-02.1(7) 

Vacant. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 

9-7

9-02.1(8) 

Flexible Bituminous Pavement Marker Adhesive  . . . . . . . . . . . . . . . . .

9-7

9-02.2 

Sampling and Acceptance  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-8

9-02.2(1) 

Certification of Shipment  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-8

9-02.2(2) Samples  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-8

9-02.3 

Temperature of Asphalt  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-9

9-02.4 

Anti-Stripping Additive . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-9

9-02.5 

HMA Additive  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-9

Page 46 

9-03 Aggregates . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-10

9-03.1 

Aggregates for Concrete  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-10

9-03.1(1) 

General Requirements  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-10

9-03.1(2) 

Fine Aggregate for Concrete   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-11

9-03.1(3) Vacant. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-12

9-03.1(4) 

Coarse Aggregate for Concrete  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-12

9-03.1(5) 

Combined Aggregate Gradation for Concrete  . . . . . . . . . . . . . . . . . . .

9-14

9-03.2 

Aggregate for Job-Mixed Portland Cement or Blended Hydraulic Cement Mortar .

9-15

9-03.2(1) 

Grading for Surface Finishing Applications   . . . . . . . . . . . . . . . . . . . . .

9-15

9-03.2(2) 

Grading for Masonry Mortar Applications  . . . . . . . . . . . . . . . . . . . . . .

9-15

9-03.3 Vacant  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-16

9-03.4 

Aggregate for Bituminous Surface Treatment   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-16

9-03.4(1) 

General Requirements  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-16

9-03.4(2) 

Grading and Quality . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-16

9-03.5 Vacant  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-17

9-03.6 Vacant  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-17

9-03.7 Vacant  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-17

9-03.8 

Aggregates for Hot Mix Asphalt  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-17

9-03.8(1) 

General Requirements  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-17

9-03.8(2) 

HMA Test Requirements  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-17

9-03.8(3) Grading . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-19

9-03.8(4) Vacant. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-19

9-03.8(5) 

Mineral Filler  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-19

9-03.8(6) 

HMA Proportions of Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-20

9-03.8(7) 

HMA Tolerances and Adjustments   . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-20

9-03.9 

Aggregates for Ballast and Crushed Surfacing  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-21

9-03.9(1) Ballast . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-21

9-03.9(2) 

Permeable Ballast . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-22

9-03.9(3) 

Crushed Surfacing  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-22

9-03.9(4) 

Maintenance Rock  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-23

9-03.10  Aggregate for Gravel Base . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-23

9-03.11  Streambed Aggregates  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-24

9-03.11(1) 

Streambed Sediment  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-24

9-03.11(2) 

Streambed Cobbles  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-25

9-03.11(3) 

Streambed Boulders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-26

9-03.11(4) 

Habitat Boulders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-26

 Contents

9-03.12  Gravel Backfill  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-27

9-03.12(1) 

Gravel Backfill for Foundations  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-27

9-03.12(2) 

Gravel Backfill for Walls   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-27

9-03.12(3) 

Gravel Backfill for Pipe Zone Bedding   . . . . . . . . . . . . . . . . . . . . . . . . .

9-28

9-03.12(4) 

Gravel Backfill for Drains. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-28

9-03.12(5) 

Gravel Backfill for Drywells   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-29

9-03.13  Backfill for Sand Drains  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-29

9-03.13(1) 

Sand Drainage Blanket   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-29

9-03.14 Borrow  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-30

9-03.14(1) 

Gravel Borrow . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-30

9-03.14(2) 

Select Borrow  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-30

9-03.14(3) 

Common Borrow   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-31

9-03.14(4) 

Gravel Borrow for Structural Earth Wall . . . . . . . . . . . . . . . . . . . . . . . .

9-31

9-03.15  Native Material for Trench Backfill . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-32

9-03.16 Vacant  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-32

9-03.17  Foundation Material Class A and Class B  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-32

9-03.18  Foundation Material Class C  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-32

9-03.19  Bank Run Gravel for Trench Backfill . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-33

9-03.20  Test Methods for Aggregates  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-33

9-03.21  Recycled Material  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-33

9-03.21(1) 

General Requirements  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-33

9-04  Joint Sealing Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-41

9-04.1 

Premolded Joint Fillers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-41

9-04.1(1) 

Asphalt Filler for Contraction and Longitudinal Joints in  
Concrete Pavements  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-41

9-04.1(2) 

Premolded Joint Filler for Expansion Joints  . . . . . . . . . . . . . . . . . . . . .

9-41

9-04.1(3) Vacant. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-41

9-04.1(4) 

Elastomeric Expansion Joint Seals . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-41

9-04.2 

Joint Sealants . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-42

9-04.2(1) 

Hot Poured Joint Sealants . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-42

9-04.2(2) 

Poured Rubber Joint Sealer . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-42

9-04.2(3) 

Polyurethane Sealant . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-43

9-04.3 

Joint Mortar  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-43

9-04.4 

Pipe Joint Gaskets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-43

9-04.4(1) 

Rubber Gaskets for Concrete Pipes and Precast Manholes   . . . . . . .

9-43

9-04.4(2) Vacant. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-44

9-04.4(3) 

Gaskets for Aluminum or Steel Culvert or Storm Sewer Pipe  . . . . . .

9-44

9-04.4(4) 

Rubber Gaskets for Aluminum or Steel Drain Pipe  . . . . . . . . . . . . . . .

9-44

9-04.4(5) 

Protection and Storage  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-44

 

 

 

 

 

 

 

Content      ..     4      5      6      7     ..