Standard Specifications for Road, Bridge, and Municipal Construction 2020 (M 41-10) - page 7

 

  Главная      Manuals     Standard Specifications for Road, Bridge, and Municipal Construction 2020 (M 41-10)

 

Search            copyright infringement  

 

 

 

 

 

 

 

 

 

 

 

Content      ..     5      6      7      8     ..

 

 

 

Standard Specifications for Road, Bridge, and Municipal Construction 2020 (M 41-10) - page 7

 

 

Page 6-196 

including paint containing lead and other hazardous materials, with reapplication of 
a three-component moisture-cured polyurethane paint system. The documentation 
shall include the name and size of the project, the dates of the work, the owner’s 
name, and name and contact information for an owner’s contact person.

2.  The Contractor’s quality control inspector(s) for the project shall be NACE-certified 

CIP Level 3 or SSPC Protective Coating Inspector (PCI) Level 3.

6-07.3(2) Submittals

The Contractor shall submit a painting plan consisting of one comprehensive submittal 
including all components described in this Section. The Contractor shall submit Type 2 
Working Drawings of the painting plan components. Each component of the plan shall 
identify the specification section it represents.

For shop application of paint, the painting plan shall include the documents and samples 
listed in Sections 

6-07.3(2)B

, 6-07.3(2)C, and 

6-07.3(2)E

.

For field application of paint, the painting plan shall include the documents and samples 
listed in 

Section 6-07.3(2)A

 through 

6-07.3(2)F

.

6-07.3(2)A 

Work Force Qualifications Submittal Component

The work force qualifications submittal component of the painting plan shall include the 
following:
1.  Documentation of the Contractor’s workforce qualifications as specified in 

Section 6-07.3(1)

.

2.  Resumé of qualifications and contact information for the Contractor’s on-site 

supervisors. Each on-site supervisor shall have 3 years’ minimum of industrial 
painting field experience with 1 year minimum of field supervisory or management 
experience in bridge painting projects.

6-07.3(2)B 

Contractor’s Quality Control Program Submittal Component

The Contractor’s quality control program submittal component of the painting plan shall 
include the following:
1.  Description of the inspection procedures, tools, techniques and the acceptance 

criteria for all phases of work.

2.  Procedure for implementation of corrective action for non-conformance work.
3.  The paint system manufacturer’s recommended methods of preventing defects.
4.  The Contractor’s frequency of quality control inspection for each phase of work.
5.  Example of each completed form(s) of the daily quality control report used to 

document the inspection work and tests performed by the Contractor’s quality 
control personnel.

Painting 6-07

6-07.3(2)C 

Paint System Manufacturer and Paint System Information 

Submittal Component

The paint system manufacturer and paint system information submittal component of the 
painting plan shall include the following:
1.  Product data sheets and Safety Data Sheets (SDS) on the paint materials, paint 

preparation, and paint application, as specified by the paint manufacturer, including:
a.  All application instructions, including the mixing and thinning directions.
b.  Recommended spray nozzles and pressures.
c.  Minimum and maximum drying time between coats.
d.  Restrictions on temperature and humidity.
e.  Repair procedures for shop and field applied coatings.
f. 

Maximum dry film thickness for each coat.

g.  Minimum wet film thickness for each coat to achieve the specified minimum dry 

film thickness.

2.  Identification of, and contact information for, the paint system manufacturer’s 

technical representative.

3.  For painting of new steel, the friction coefficient of the faying surface, including 

test results and the paint manufacturer’s Certificate of Compliance in support of the 
friction coefficient.

6-07.3(2)D 

Hazardous Waste Containment, Collection, Testing, and Disposal 

Submittal Component

The hazardous waste containment, collection, testing, and disposal shall meet all Federal 
and State requirements, and the submittal component of the painting plan shall include 
the following:
1.  Abrasive blasting containment system attachment and support in accordance with 

Section 6-07.3(10)A

with a complete description of each attachment device.

2.  Details of jobsite material storage facilities and containment waste storage facilities, 

including location, security, and environmental control.

3.  Methods and materials used to contain, collect, and dispose of all containment waste 

and all construction-related waste, including transportation of waste.

4.  Details of the containment waste sampling plan conforming to 

WAC

 

173-303 

for 

waste designated as dangerous waste or extremely hazardous waste.

5.  The name of, and contact information for, the accredited analytical laboratory 

performing the testing of the containment waste samples in accordance with 

Section 6-07.3(10)F

.

6.  Process for tracking the disposal of hazardous waste, including a sample form of the 

tracking documentation.

Page 6-198 

7.  When a wind speed threshold is specified, a description of the method to lower or 

withdraw tarps, plastic exterior, and other containment components presenting an 
exposed face to wind, and the estimated time required to accomplish this action.

8.  Provisions for dust and debris collection, ventilation, and auxiliary lighting within the 

containment system.

6-07.3(2)E 

Cleaning and Surface Preparation Submittal Component

The cleaning and surface preparation submittal component of the painting plan shall 
include the following:
1.  Details of the abrasive blast cleaning operation, including:

a.  Description of the abrasive blast cleaning procedure.
b.  Type, manufacturer, and brand of abrasive blast material and all associated 

additives, including Safety Data Sheets (SDS).

c.  Description of the abrasive blast cleaning equipment to be used.

6-07.3(2)F 

Paint Application Equipment and Operations Submittal 

Component 

The paint application equipment and operations submittal component of the painting plan 
shall include the following:
1.  Description of the equipment used for paint application operations.
2.  Details of jobsite material storage facilities, including location, security, and 

environmental control.

3.  Description of the supports and platforms used to support equipment, materials, and 

workers, including scaffolds, platforms, accordion lifts, and barges, and the methods 
used to attach, moor, and anchor these supports and platforms.

4.  Drip tarps in accordance with 

Section 6-07.3(10)O

.

5.  Methods and materials used to protect surrounding structures, equipment, and 

property from exposure to, and damage from, painting operations.

6.  Details of paint application operations for areas of limited and restricted access.
7.  Description of the method for the removal of any accidental spills or drips on traffic 

that occur during the normal painting operations, and provisions for providing a 
vehicle-cleaning station.

6-07.3(2)G 

Painting Plan Meeting

At the option of the Contracting Agency, a painting plan meeting may be scheduled 
following review of the Contractor’s initial submittal of the plan. The Contractor shall be 
represented by the superintendent, on-site supervisors, and quality control inspectors.

Page 48 

9-04.5 

Flexible Plastic Gaskets  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-44

9-04.6 

Expanded Polystyrene  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-45

9-04.7 

Expanded Rubber  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-45

9-04.8 

Flexible Elastomeric Seals  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-45

9-04.9 

Solvent Cements  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-45

9-04.10  Butyl Rubber and Nitrile Rubber   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-45

9-04.11  Butyl Rubber Sealant  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-45

9-04.12  External Sealing Band . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-45

9-05  Drainage Structures and Culverts  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-46

9-05.0 

Acceptance and Approval of Drainage Structures, and Culverts . . . . . . . . . . . . . . . . .

9-46

9-05.1 

Drain Pipe . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-46

9-05.1(1) 

Concrete Drain Pipe . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-46

9-05.1(2) 

Zinc Coated (Galvanized) or Aluminum Coated (Aluminized) 
Corrugated Iron or Steel Drain Pipe  . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-46

9-05.1(3) 

Corrugated Aluminum Alloy Drain Pipe  . . . . . . . . . . . . . . . . . . . . . . . .

9-47

9-05.1(4) Vacant. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-47

9-05.1(5) 

PVC Drain Pipe, Couplings, and Fittings . . . . . . . . . . . . . . . . . . . . . . . .

9-47

9-05.1(6) 

Corrugated Polyethylene Drain Pipe, Couplings, and Fittings 
(Up to 10 inch)   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-47

9-05.1(7) 

Corrugated Polyethylene Drain Pipe, Couplings, and Fittings 
(12 inch Through 60 inch)  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-47

9-05.2 

Underdrain Pipe   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-48

9-05.2(1) Vacant. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-48

9-05.2(2) 

Perforated Concrete Underdrain Pipe   . . . . . . . . . . . . . . . . . . . . . . . . .

9-48

9-05.2(3) Vacant. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-48

9-05.2(4) 

Zinc Coated (Galvanized) or Aluminum Coated (Aluminized) 
Corrugated Iron or Steel Underdrain Pipe  . . . . . . . . . . . . . . . . . . . . . .

9-48

9-05.2(5) 

Perforated Corrugated Aluminum Alloy Underdrain Pipe  . . . . . . . . .

9-48

9-05.2(6) 

Perforated PVC Underdrain Pipe . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-49

9-05.2(7) 

Perforated Corrugated Polyethylene Underdrain Pipe  
(Up to 10 inch)   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-49

9-05.2(8) 

Perforated Corrugated Polyethylene Underdrain Pipe (12-Inch 
Through 60-Inch Diameter Maximum), Couplings, and Fittings  . . . .

9-49

9-05.3 

Concrete Culvert Pipe  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-50

9-05.3(1) 

Plain Concrete Culvert Pipe  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-50

9-05.3(2) 

Reinforced Concrete Culvert Pipe  . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-50

9-05.3(3) 

Beveled Concrete End Sections  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-51

 Contents

9-05.4 

Steel Culvert Pipe and Pipe Arch  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-52

9-05.4(1) 

Elliptical Fabrication  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-52

9-05.4(2) 

Mitered Ends . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-52

9-05.4(3) 

Protective Treatment  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-52

9-05.4(4) 

Asphalt Coatings and Paved Inverts  . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-53

9-05.4(5) 

Polymer Protective Coating  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-53

9-05.4(6) 

Spun Asphalt Lining  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-53

9-05.4(7) 

Coupling Bands . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-54

9-05.4(8) 

Steel Nestable Pipe   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-54

9-05.4(9) 

Steel End Sections  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-55

9-05.5 

Aluminum Culvert Pipe   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-55

9-05.5(1) 

Elliptical Fabrication  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-55

9-05.5(2) 

Mitered Ends . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-55

9-05.5(3) Vacant. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-56

9-05.5(4) Vacant. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-56

9-05.5(5) 

Coupling Bands . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-56

9-05.5(6) 

Aluminum End Sections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-56

9-05.6 

Structural Plate Pipe, Pipe Arch, Arch, and Underpass  . . . . . . . . . . . . . . . . . . . . . . . . .

9-56

9-05.6(1) General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-56

9-05.6(2) Fabrication . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-56

9-05.6(3) 

Elliptical Fabrication  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-57

9-05.6(4) 

Structural Plate Pipe Arch  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-57

9-05.6(5) 

Structural Plate Arch  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-57

9-05.6(6) 

Structural Plate Underpass  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-57

9-05.6(7) Concrete   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-57

9-05.6(8) Plates  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-57

9-05.7 

Concrete Storm Sewer Pipe   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-58

9-05.7(1) 

Plain Concrete Storm Sewer Pipe  . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-58

9-05.7(2) 

Reinforced Concrete Storm Sewer Pipe  . . . . . . . . . . . . . . . . . . . . . . . .

9-58

9-05.7(3) 

Concrete Storm Sewer Pipe Joints   . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-58

9-05.7(4) 

Testing Concrete Storm Sewer Pipe Joints . . . . . . . . . . . . . . . . . . . . . .

9-58

9-05.8 

Vitrified Clay Sewer Pipe  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-59

9-05.9 

Steel Spiral Rib Storm Sewer Pipe  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-60

9-05.9(1) 

Continuous Lock Seam Pipe  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-60

9-05.9(2) Vacant. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-60

9-05.9(3) 

Coupling Bands . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-61

9-05.10  Steel Storm Sewer Pipe  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-61

9-05.10(1) 

Coupling Bands . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-61

9-05.10(2) 

Basis for Acceptance  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-61

Page 50 

9-05.11  Aluminum Storm Sewer Pipe   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-62

9-05.11(1) 

Coupling Bands . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-62

9-05.11(2) 

Basis for Acceptance  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-62

9-05.12  Polyvinyl Chloride (PVC) Pipe  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-62

9-05.12(1) 

Solid Wall PVC Culvert Pipe, Solid Wall PVC Storm Sewer Pipe, 
and Solid Wall PVC Sanitary Sewer Pipe   . . . . . . . . . . . . . . . . . . . . . . .

9-62

9-05.12(2) 

Profile Wall PVC Culvert Pipe, Profile Wall PVC Storm Sewer Pipe, 
and Profile Wall PVC Sanitary Sewer Pipe  . . . . . . . . . . . . . . . . . . . . . .

9-62

9-05.13  Ductile Iron Sewer Pipe  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-63

9-05.14  ABS Composite Sewer Pipe   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-63

9-05.15  Metal Castings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-64

9-05.15(1) 

Manhole Ring and Cover . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-64

9-05.15(2) 

Metal Frame, Grate, and Solid Metal Cover for Catch Basins  
or Inlets   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-64

9-05.15(3) 

Cast Metal Inlets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-65

9-05.16  Grate Inlets and Drop Inlets   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-65

9-05.17  Aluminum Spiral Rib Storm Sewer Pipe . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-65

9-05.17(1) 

Continuous Lock Seam Pipe  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-66

9-05.17(2) 

Coupling Bands . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-66

9-05.18  Safety Bars for Culvert Pipe   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-66

9-05.19  Corrugated Polyethylene Culvert Pipe, Couplings, and Fittings  . . . . . . . . . . . . . . . . .

9-66

9-05.20  Corrugated Polyethylene Storm Sewer Pipe, Couplings, and Fittings  . . . . . . . . . . . .

9-67

9-05.21  Steel Rib Reinforced Polyethylene Culvert Pipe   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-67

9-05.22  Steel Rib Reinforced Polyethylene Storm Sewer Pipe . . . . . . . . . . . . . . . . . . . . . . . . . .

9-68

9-05.23  High-Density Polyethylene (HDPE) Pipe. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-68

9-05.24  Polypropylene Culvert Pipe, Polypropylene Storm Sewer Pipe, and 

Polypropylene Sanitary Sewer Pipe  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-69

9-05.24(1) 

Polypropylene Culvert Pipe and Storm Sewer Pipe  . . . . . . . . . . . . . .

9-69

9-05.24(2) 

Polypropylene Sanitary Sewer Pipe . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-70

9-05.30 Vacant  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-70

9-05.40 Vacant  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-70

9-05.50  Precast Concrete Drainage Structures   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-70

9-05.50(1) 

Fabrication Tolerances and Requirements  . . . . . . . . . . . . . . . . . . . . . .

9-70

9-05.50(2) Manholes  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-71

9-05.50(3) 

Precast Concrete Catch Basins   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-71

9-05.50(4) 

Precast Concrete Inlets  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-71

9-05.50(5) 

Precast Concrete Drywells  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-72

9-05.50(6) Vacant. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-72

9-05.50(7) Vacant. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-72

 Contents

9-05.50(8) Vacant. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-72

9-05.50(9) 

Synthetic Fibers for Precast Units  . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-72

9-05.50(10)  Synthetic Structural Fibers for Precast Units . . . . . . . . . . . . . . . . . . . .

9-72

9-06  Structural Steel and Related Materials  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-73

9-06.1 

Structural Carbon Steel  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-73

9-06.2 

Structural Low Alloy Steel  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-73

9-06.3 

Structural High-Strength Steel  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-73

9-06.4 Vacant  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-73

9-06.5 

Bolts and Rods . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-73

9-06.5(1) 

Unfinished Bolts  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-73

9-06.5(2) Vacant. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-73

9-06.5(3) 

High-Strength Bolts  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-73

9-06.5(4) 

Anchor Bolts and Anchor Rods   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-75

9-06.6 Vacant  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-76

9-06.7 Vacant  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-76

9-06.8 

Steel Castings   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-76

9-06.9 

Gray Iron Castings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-76

9-06.10  Malleable Iron Castings  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-76

9-06.11  Steel Forgings and Steel Shafting  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-76

9-06.12  Bronze Castings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-76

9-06.13 Vacant  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-76

9-06.14  Ductile Iron Castings   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-77

9-06.15  Welded Shear Connectors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-77

9-06.16  Roadside Sign Structures  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-77

9-06.17  Noise Barrier Wall Access Door  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-79

9-06.18  Metal Bridge Railing  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-79

9-06.19 Vacant  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-80

9-06.20 Vacant  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-80

9-06.21 Vacant  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-80

9-06.22  Bolts, Washers, and Other Hardware   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-80

9-07  Reinforcing Steel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-81

9-07.1 General  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-81

9-07.1(1) 

Acceptance by Manufacturer’s Certification  . . . . . . . . . . . . . . . . . . . .

9-81

9-07.1(2) Bending  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-82

9-07.1(3) Lengths . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-83

9-07.1(4) Vacant. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9-83

 

 

 

 

 

 

 

Content      ..     5      6      7      8     ..