Page 6-196 including paint containing lead and other hazardous materials, with reapplication of 2. The Contractor’s quality control inspector(s) for the project shall be NACE-certified CIP Level 3 or SSPC Protective Coating Inspector (PCI) Level 3. 6-07.3(2) Submittals The Contractor shall submit a painting plan consisting of one comprehensive submittal For shop application of paint, the painting plan shall include the documents and samples , 6-07.3(2)C, and For field application of paint, the painting plan shall include the documents and samples 6-07.3(2)A Work Force Qualifications Submittal Component The work force qualifications submittal component of the painting plan shall include the 2. Resumé of qualifications and contact information for the Contractor’s on-site supervisors. Each on-site supervisor shall have 3 years’ minimum of industrial 6-07.3(2)B Contractor’s Quality Control Program Submittal Component The Contractor’s quality control program submittal component of the painting plan shall criteria for all phases of work. 2. Procedure for implementation of corrective action for non-conformance work. document the inspection work and tests performed by the Contractor’s quality |