INDIAN RAILWAYS MAINTENANCE MANUAL FOR DIESEL LOCOMOTIVES - PART 24

 

  Index      Engines     INDIAN RAILWAYS MAINTENANCE MANUAL FOR DIESEL LOCOMOTIVES 2013 year

 

Search            

 

 

 

 

 

 

 

 

 

Content   ..  22  23  24  25   ..

 

 

INDIAN RAILWAYS MAINTENANCE MANUAL FOR DIESEL LOCOMOTIVES - PART 24

 

 

Document No: 

Chapter –4  System of Maintenance

 

Version No: 1.0-d0 

Date Issued: dd/mm/yyyy 

Document Title: MANUAL MAINTENANCE FOR  DIESEL LOCOMOTIVES 
 

Revised 2013 

Printed: 2015/03/08 

Page 88 of 303

 

 

 

4.  S

YSTEM OF 

M

AINTENANCE

 

  

 

4.1  Objective:  Indian Railways (IR) follows the system of preventive maintenance for its 

Rolling Stock so as to achieve the maximum possible availability and reliability in service. 
The system of preventive maintenance envisages a schedule for maintenance attention at 
regular  specified intervals including replacement of components. It aims to replace the 
components before they actually fail in service due to ageing, wear and tear, while also 
endeavoring to obtain maximum life possible for the components. The system also aims at 
synchronization of attention to all related components so that the manpower and engine-
days lost on account of the examination is minimized. 
 
However, IR needs to introduce the concept of predictive maintenance to bring down both 
cost and as well as down time for maintenance. To achieve this, it is necessary to lay down 
a list of parameters which are required to be monitored remotely and also during the last 
shed attention paid to arrive at the decision about next schedule to be given to the loco. 
Remote monitoring is an essential requirement in achieving this objective. It is 
recommended that, few locos should be put on trial on the system of predictive 
maintenance. 

 

4.2  Basis of Maintenance : The system of preventive maintenance has evolved on one of the 

following criterion: 

i. 

Time; 

ii. 

KM; 

iii. 

Engine hours  
 

Time basis is used for scheduling the preventive maintenance of diesel locos due to its 
simplicity. Time involved between schedules being adjusted according to the utilization of 
the locos. However, for POH of Alco locos, both time and Km basis is presently specified 
i.e. 10 lac Km or 8 years, whichever is earlier. 

 

4.2.1  Frequency of Maintenance Schedule: Periodicity of various maintenance 

schedules of Alco Locos have been enhanced substantially since the introduction of 
WDM2 locos. The schedule and periodicity of various maintenance schedules of 
Alco and HHP locos are  presently prescribed in the following documents of 
RDSO:- 

 

4.2.1.1 MP-MISC.-140 (Rev.1) of Sept’06- Schedule of Standard Examinations of Alco 

Locos of 2600 & 3100 HP with plain suspension bearings  

 
4.2.1.2 MP-MISC.-141(Rev.1) of Sept’06- Schedule of Standard Examinations of Alco 

Locos of 3100 & 3300 HP with roller suspension bearings  

 
4.2.1.3 MP-MISC.-212 of May’08 and Railway Board’s letter dated 2003/M(L)/466/20  

dated 27

th

 June’08 for enhancing trip schedule periodicity of 3100 & 3300 HP 

Alco locos to 30 days 

 

Draft

Document No: 

Chapter –4  System of Maintenance

 

Version No: 1.0-d0 

Date Issued: dd/mm/yyyy 

Document Title: MANUAL MAINTENANCE FOR  DIESEL LOCOMOTIVES 
 

Revised 2013 

Printed: 2015/03/08 

Page 89 of 303

 

 

4.2.1.4 MP-MISC.-236(Rev.0) of July’09 and Railway Board’s letter 

2003/M(L)/466/20  dated 13

th

 May’10 for enhancing trip schedule periodicity of 

3100 & 3300 HP Alco locos to 40 days 

4.2.1.5 MP-MISC.-285 of Aug’12- Schedule of Standard Examinations of HHP Locos 

of 4000 & 4500 HP  

 
4.2.1.6 MP-MISC.-285 of Aug’12- Schedule of Standard Examinations of HHP Locos 

of 5500 HP  

 
4.2.1.7 Apart from the above-mentioned Schedules of Standard Examination, RDSO 

regularly issues Instruction Bulletins (IBs), Modification Sheets (MOD Sheets), 
Investigation Reports (INV), Maintenance Guides (Guide), Diagram Books (D-
Book), Minutes of Diesel Maintenance Group (DMG) Meetings, Miscellaneous 
Reports (MISC), Indian Railway Standard (IRS) Specifications of various 
items, Specifications of various items (Spec), Project Reports (PROJ), Test 
Procedures (TPs) and Drawings of items. All these are hosted on a website 
called IR Diesel Power (www.irdieselpower.in) for online reference. These 
should be regularly taken into cognizance by the sheds for the purpose of 
maintenance and procurement of material and for building up infrastructure. 

 
4.2.1.8 DLW also issues a periodical Technical Publication called “Soochna” which 

contains latest developments made in manufacturing of locos, Design Bulletins, 
Failure Investigations, Important Change Notices, Important Corrective and 
Preventive Action (CAPA) and Trial Items fitment details. This technical 
publication is available on official website of DLW 
‘www.dlw.indianrailways.gov.in

. It should be referred regularly by the sheds 

for making themselves aware of the latest developments and for purpose of 
maintenance and monitoring performance of materials supplied by new 
vendors/new design products. 

 
4.2.1.9 Schedule periodicity of Alco locos is as under:- 

 

S. 

No. 

Schedules 

Original 

Periodicity 

Current Schedules for Alco Locos 

Name of Sch  Periodicity 

Trip or Weekly 

Max. 7 days  T1* 

15, 20, 30 & 40 days 

Fortnightly 

15 days 

T2* 

15, 20, 30 & 40 days 

Monthly 

30 days 

M-2 

60 days  

Quarterly 

90 days 

M-4 

120 days 

Half Yearly 

180 days 

M-12 

12 Months 

Yearly 

1 year 

M-24 

24 Months 

2 yearly 

2 years 

3 Yearly 

3 years 

M-48 

48 Months 

POH 

6 years 

M-96 

96 Months 

*Periodicity of: 
-15 days for WDM2, WDM3A & WDG3A with plain suspension bearing. In these types 
of locos T2(T-30) contains all items of T-15 + some additional items like fuel oil filter 
change, compressor discharge valves cleaning, alternator/generator cleaning , rectifier 
cleaning and suspension bearing examination.   
-20 days for Roller Suspension Bearing locos including WDM3D locos. In these types of 
locos T2(T-40) contains all items of T-20 + some additional items like compressor 

Home 

Ch-4 

Ch-4 

Draft

Document No: 

Chapter –4  System of Maintenance

 

Version No: 1.0-d0 

Date Issued: dd/mm/yyyy 

Document Title: MANUAL MAINTENANCE FOR  DIESEL LOCOMOTIVES 
 

Revised 2013 

Printed: 2015/03/08 

Page 90 of 303

 

 

discharge valves cleaning, alternator cleaning , rectifier  cleaning and roller suspension 
bearing examination.   
-30 days for Locos fitted with Microprocessor Based Control System (MBCS) and Pure 
Air Brake (applicable to locos having 20 days trip schedule) 
-40 days for locos fitted additionally with REMMLOT, Small Auxiliaries motors (CCE, 
FPM, DEBM) in AC variant, MCBG & Upgraded Compressor (applicable to locos 
having 30 days trip schedule). In these types of locos monthly will be done after 80 days, 
Quarterly after 160 days and Half Yearly after 400 days 

 

4.2.1.10 The schedule periodicity of HHP locos is as under (as given in RDSO report no. 

MP.Misc-285 of Aug’12) : 

 

 

 

S.No. 

Schedules 

Periodicity 

Trip/Monthly 

Trip/30 days 

90/180 days 

90/180 days 

Yearly 

1 year 

2 yearly 

2 years 

3- Yearly 

3 years 

6-Yearly 

6 years 

POH 

18 years 

 

4.3  Maintenance Schedule:  The schedule of attention to various items in the loco and the 

frequency of attention shall be as indicated in the Schedule of Standard Examination, issued 
by RDSO from time to time. The current schedules issued are mentioned in para 4.2.1. 
 
Any changes warranted to the above schedules shall be authorized only by CME and such 
changes shall be discussed in the ensuing DMG meeting for final adoption, if considered 
necessary.  

 
4.4  Maintenance  Methods:  Maintenance methods followed shall be in conformity with the 

DMI(s) issued from RDSO or OEM’s instructions, if in case RDSO has not issued DMI(s) 
on the subject. The number of copies of DMI(s) distributed to each Shed shall be adequate 
to cater to  all the officers and senior supervisors of the Shed. After attending to the 
Schedule, the same shall be certified in the relevant cards/registers maintained for the 
purpose. All DMI(s) and OEM’s instructions should also be available in soft copies on a 
central server with each section which should have a dedicated computer through which 
these DMI(s) and OEM’s instructions can be accessed. This system can also be used for 
conveying important instructions issued by HQ, Sr.DME and various other information 
relevant to maintenance, reliability, safety at work place, environment management, etc. 
 

4.5  Use of Advance/Diagnostic Methods for increasing the effectiveness of Preventive 

Maintenance:  

 

4.5.1  Present practice of diesel loco maintenance is based upon preventive maintenance 

schedules.  Preventive maintenance schedules entails planned replacement / 
checking of diesel loco components on pre-defined maintenance periodicity.  
Currently diesel sheds are replacing most of the items during M24 / M48 and very 
few items during M12 / M4 schedules.  Though this system has served IR very 
well, but sometimes components do not follow predefined maintenance frequency.  
Certain components have a tendency to fail prematurely; before planned 
replacement cycle. 

Draft

Document No: 

Chapter –4  System of Maintenance

 

Version No: 1.0-d0 

Date Issued: dd/mm/yyyy 

Document Title: MANUAL MAINTENANCE FOR  DIESEL LOCOMOTIVES 
 

Revised 2013 

Printed: 2015/03/08 

Page 91 of 303

 

 

 
4.5.2  Predictive maintenance technique tries to plug the loophole of preventive 

maintenance by incorporating condition monitoring of component parameters.  
These parameters are mostly temperature, vibration, Insulation Resistance, current, 
run down time, energy consumed, rpm, drop in level, concentration, condition of 
lube oil & fuel oil. etc. 

 
4.5.3  At present, the only diagnostic method being used to carry out predictive 

maintenance is testing of the lube oil in which presence of various elements is 
ascertained and if found beyond a limit,  the causes for the same are looked for. 
Also, to some extent Fuel Oil Pressure (FOP), Lube Oil Pressure (LOP) and 
Booster Air Pressure (BAP) readings recorded by Loco Pilots during running of the 
locos are analyzed to see if there is any need to undertake  investigation of a 
particular assembly/area. However, now-a-days technology has become advanced 
and there are many advanced diagnostic methods available for increasing 
effectiveness of maintenance. Some of them are mentioned hereunder: 

 

4.5.3.1 Trend analysis of loco parameters:  Logging of various performance 

parameters of Loco like current in individual traction motors, Insulation 
Resistance, turbo run down time, logging of transient faults, FOP, LOP, BAP, 
etc. By analysis of these parameters, it can be seen whether there is any trend 
which indicates problem in a particular component or area and accordingly 
timely preventive action can be taken. This can also be remotely monitored by 
using REMMLOT and thus be quite effective in improving online reliability of 
locos. 

 
4.5.3.2 Vibration Measurement and Vibration Analysis:  Use of vibration level of 

loco and engine at various places to pinpoint deficiency in the fitment/defect in 
a component. A single low cost hand held vibration meter or shock pulse meter 
can give advance indication about the health of the loco components. Condition 
of the component can be judged by either of the following two methods: 

 

a)  Rise in vibration reading from previous reading of same loco in identical 

condition and  location  
 

b)  Variation in vibration reading of same component from other locos. Reading 

should  be  taken at identical locations. Any change in type and increase in 
intensity of sound is a cause of alarm.  Engineer’s stethoscope can also be 
used for listening sound.  However, it is a qualitative technique. 

 

4.5.3.3 Ferrography:  Use of ferrography to determine ferrous content in grease of 

traction motors and axle box bearings gives an indication of signs of incipient 
failures, which if taken care of in time, can prevent potential failures. 

 
4.5.3.4 Thermography & Temperature measurement: It is a very simple technique. 

Measurement is made by using a low cost laser based temperature gun. Properly 
interpreting the data and observing the temperature rise trend, health of loco 
components  can be predicted. It is based on the premise that efficient/well 
maintained assembly will consume least amount of energy and will have a 
minimum heat loss. Higher heat loss indicates deterioration in performance and 

Home 

Ch-4 

Home 

Ch-4 

Draft

 

 

 

 

 

 

 

Content   ..  22  23  24  25   ..