|
|
Situation Manual
Ohio Hospital Association (OHA)
(SITMAN)
Tabletop Exercise (TTX)
Exercise Schedule
8:30-9:00am
Registration
9:00-9:15am
Welcome and Introductions
9:15-10:15am
Module 1-Initial Response
• Situation Briefing
• Facilitated Discussion
10:15-11:15am
Module 2-Ongoing Response
• Situation Briefing
• Facilitated Discussion
11:15-11:45am
LUNCH!
11:45-12:45pm
Module 3-MOUs and Partnerships
• Situation Briefing
• Facilitated Discussion
12:45-1:45pm
Module 4-Interagency Coordination
• Situation Briefing
• Facilitated Discussion
1:45-2:00pm
BREAK!
2:00-2:45pm
Module 5-Hot Wash
• Provide one strength in current plans and processes
• Provide one change that should be considered to improve
current plans and processes
2:45-3:00pm
Closing Comments and Next Steps
Exercise Schedule
5
The Ohio Hospital Association
FOR OFFICIAL USE ONLY
Situation Manual
Ohio Hospital Association (OHA)
(SITMAN)
Tabletop Exercise (TTX)
MODULE 1: INITIAL RESPONSE
Scenario Events
9:15am
It has been a stormy day throughout Ohio. The area has
been hit with several severe thunderstorms and Ohio
Emergency Management Agency (OEMA) reports receiving
information about
12 separate tornados throughout the
state. The region is currently under a tornado watch.
9:30am
The tornado sirens sound. Initial news reports indicate that a mile wide
EF4 tornado has ripped through a densely populated part of town.
Emergency Medical Service (EMS) has notified your hospital that an
estimated 15 patients are en route to your facility due to a building
collapse at a shopping center.
9:45am
Your hospital receives the following casualties:
•
11 REDs all in critical, unstable condition
•
2 YELLOWS both with multiple broken bones and lacerations
•
2 Greens, both young adults with mild injuries
•
EMS reports more casualties are expected to be transported to surrounding hospitals.
An estimated 60 casualties have been accounted for at this time.
• The hospital inpatient beds are at 80% capacity and there are several patients waiting
in the Emergency Department (ED) to be admitted.
Points of Discussion:
• The Hospital Incident Command System (HICS) has been activated.
• Who is the Hospital Incident Commander (position)?
• What other HICS roles would be activated at this point?
• What communications have been established and with whom?
• Ohio Department of Health (ODH) and the State Emergency Operations Center (EOC)
have requested a bed availability update---how would this be communicated and
shared?
• What safety and security issues are being addressed?
• What do community partners expect from the hospital at this point?
• What are the initial response objectives for the hospital and overall incident?
Modules
5
The Ohio Hospital Association
FOR OFFICIAL USE ONLY
Situation Manual
Ohio Hospital Association (OHA)
(SITMAN)
Tabletop Exercise (TTX)
MODULE 2: ONGOING RESPONSE
Scenario Events:
10:25 am
• A severe thunderstorm warning
has been issued.
Heavy
downpours, dangerous lightening
and winds up to 50 mph have been
noted with this storm.
• The storm in combination with the
tornado has caused downed trees
and power lines leading to a broad
power failure across a
35 mile
area. The outage is impacting
homes and businesses.
• First responders are quickly
becoming overwhelmed with calls from the public requesting assistance. Power
officials fear the damage to be extensive.
• Your hospital has lost all external power and emergency generators are supplying
emergency power to the facility. It is uncertain how long the power will be out.
• OEMA reports many roads are closed due to downed lines, trees and standing water.
As of 10:30am your hospital has received:
•
20 REDS (Trauma Centers have received an additional 40 critical patients)
•
15 YELLOWS
•
25 GREENS, including walk-ins
•
10 critical patients transported by EMS to your hospital expired shortly upon arrival to
the Emergency Department (Trauma Centers have experienced 20 fatalities).They
were victims of the collapsed shopping center.
Facility Update:
• Emergency generator has less than 24 hour fuel supply
• Water is leaking in both the Emergency Department and Intensive Care Unit from the
ceiling
• Potable water supply-Advised by Public Works that water is potentially unsafe due to
storm water surge
• HVAC system is not working
• Cell phones are not reliable due to system overload
Modules
5
The Ohio Hospital Association
FOR OFFICIAL USE ONLY
Situation Manual
Ohio Hospital Association (OHA)
(SITMAN)
Tabletop Exercise (TTX)
Points of Discussion:
• Command (Incident Command System (ICS) / Unified
Command System (UCS))
• Evacuation vs. Shelter in Place
• Fatalities (morgue spaces, supplies)
• Safety and Security
• Communication Plan (internal/external) The
switchboard is overwhelmed; ED is inundated with
phone calls
• Media /Family and Friends (deceased, current in-patients)
• Patient Care Considerations
• Resources(Staffing, Fuel, Supplies, Beds, Other)
Modules
5
The Ohio Hospital Association
FOR OFFICIAL USE ONLY
Situation Manual
Ohio Hospital Association (OHA)
(SITMAN)
Tabletop Exercise (TTX)
MODULE 3: MEMORANDUMS OF UNDERSTANDING
Scenario Update 11:45 a.m.
• Power officials indicate electricity will not be restored for
up to a week
• The hospital is becoming overwhelmed with persons
seeking electricity and a safe haven
• Family and community members are gathering in the
hospital lobby and ED, appear to be agitated due to lack of
coordinated information
•
2 primary vendors (materials and pharmaceuticals) have
difficulty reaching the hospital due to road closures,
shipments are delayed
• Staff members are anxious about their own families and
homes
•
30% of staff have called off for the next shift
What MOUs and Partnerships have been activated?
• Local (Hospitals, Community Organizations, First Responders)
• Regional Coordination
• State Coordination
• Resource Requests
• Staffing
• Vendors
• Transportation
• Other
Modules
5
The Ohio Hospital Association
FOR OFFICIAL USE ONLY
Situation Manual
Ohio Hospital Association (OHA)
(SITMAN)
Tabletop Exercise (TTX)
MODULE 4: INTERAGENCY COORDINATION
Roles, Responsibilities and Expectations
• Affected Hospital
• Regional Coordinator/Ohio Department of Health
• EMA/OEMA
• Coroner
• Public Health
• Fire/EMS
• Law Enforcement
• Red Cross
• Other agencies
Discussion Questions
1. How do HIPAA and EMTALA come into play throughout the scenario?
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
2. What reporting and communication expectations exist among response agencies?
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
3. Is there a standardized method of communicating and reporting information
throughout the incident?
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
Scenario Update
• A total of 205 casualties reported state-wide
•
36 fatalities occurred within the region
•
Power officials expect power will be restored within 10 days
•
Streets will be re-opened within 3-5 days
•
A federal declaration was received
Modules
5
The Ohio Hospital Association
FOR OFFICIAL USE ONLY
Situation Manual
Ohio Hospital Association (OHA)
(SITMAN)
Tabletop Exercise (TTX)
MODULE 5: HOT WASH
Points of Discussion
• Strengths in Plans and Processes
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
• Recommended Improvement to Plans and Processes
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
• Any Significant Findings
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
• Any Questions that Remain Unanswered
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
Modules
5
The Ohio Hospital Association
FOR OFFICIAL USE ONLY
OHSAS 18001 Requirements Checklist
Page 1 of 17
OHSAS 18001-2007 OCCUPATIONAL HEALTH
& SAFETY MANAGEMENT SYSTEM
REQUIREMENTS CHECKLIST
AzSPU-HSE-DOC-00106-2
Authority:
Yuliy Zaytsev
Custodian:
Elman Shikhkerimov
AzSPU Safety & Compliance
COW / Safety Systems Lead
Manager
Scope:
AzSPU Functions &
Document
HSE Document Coordinator
Operating Areas
Administrator:
Issue Date:
24 April, 2009
Issuing Dept:
AzSPU HSSE
Revision Date:
25 October, 2010
Control Tier:
2- AzSPU
Next Review
25 October, 2011
Date:
Control Tier:
2-AzSPU
Revision Date: 25 October 2010
Document Number: AzSPU-HSSE-DOC-00106-2
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING.
THE CONTROLLED VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/
OHSAS 18001 OHSAS MS Requirements Checklist
Page 2 of 17
Parameter
Observation
4.1 GENERAL REQUIREMENTS
What is the scope of the Occupational Health and Safety management
system?
Is the scope of the OH&S MS defined and formally documented within your
company’s OH&S management system (OHSMS) documentation?
Are there activities that are excluded from the scope of the OHS MS and
are the reasons for exclusion acceptable?
4.2 Occupational Health & Safety Policy
Has top management defined and approved the OH&S policy?
o
Is the policy consistent with the scope of the OH&S MS?
o
Is the policy appropriate to the nature, scale and OH&S risks in
your activities, products or services?
o
What commitment does the policy make to continual
improvement?
o
What commitment does the policy make to prevention of injury
and ill health in the workplace?
o
Does the OH&S policy include a commitment to comply with
relevant OH&S legislation and regulations, and with other
requirements to which the company subscribes that relate to the
OH&S hazards?
o
Does the policy provide the framework for setting and reviewing
OH&S objectives?
o
Is the OH&S policy documented, implemented and maintained
and how is it communicated to all persons?
o
How the policy is made available to the public and all interested
parties?
o
Is the policy reviewed at regular intervals and what triggers will
result in the review to be undertaken by the company?
4.3 PLANNING
Control Tier:
2-AzSPU
Revision Date: 25 October 2010
Document Number: AzSPU-HSSE-DOC-00106-2
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING.
THE CONTROLLED VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/
OHSAS 18001 OHSAS MS Requirements Checklist
Page 3 of 17
Parameter
Observation
4.3.1 Hazard Identification, Risk Assessment & Determining Controls
Has a procedure been established, implemented and maintained to
identify for the ongoing identification of hazards, assessment of risks and
determining the necessary controls?
How do the procedure(s) for the hazard identification and risk
assessment:-
(a)
Take into account the routine and non-routine activities?
(b)
Take into account how the activities for all persons accessing the
workplace including contractors and visitors?
(c)
Take into account the human behavior, capabilities and other
human factors?
(d)
Take into account the identified hazards, including those that may
originate from outside the workplace that are capable of adversely
affecting the health and safety of the persons under the control of
the company within the workplace?
(e)
Take into account how the company control created vicinity of
workplace during work-related activities?
(f)
Take into account how the infrastructure, equipment and materials
at the workplace from all sources affect the company?
(g)
Take into account how the company identifies the changes or
proposed changes to its activities or materials it uses?
(h)
Take into account how modifications to OH&S system, whether
they be temporary or not, impact on the operations, processes
and activities of the company?
(i)
Take into account any applicable legal obligations relating to risk
assessment and implementation of controls?
(j)
Take into account how the company’s identified the legal
requirements for health and safety of persons beyond the
immediate workplace, including those who are exposed to the
workplace activities?
Control Tier:
2-AzSPU
Revision Date: 25 October 2010
Document Number: AzSPU-HSSE-DOC-00106-2
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING.
THE CONTROLLED VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/
OHSAS 18001 OHSAS MS Requirements Checklist
Page 4 of 17
Parameter
Observation
(k) Take into account the effects of the design of the work areas,
processes, installations, machinery/equipment, operating
procedures and work organizations, including their adaptation to
human capabilities?
How does the company’s methodology for hazard identification and risk
assessment:-
(a) Defined with respect to its scope, nature and timing to ensure it is
proactive rather than reactive? and
(b) How does it provide for the identification, prioritization, and
documentation of the risks and the applications of the controls to
be used?
How does the company identify, for the management of change, the
OH&S hazards and OH&S risks associated with the changes in the
company, and OH&S management system, its activities, prior to
introducing the changes?
How does the company ensure that results of these assessments are
taken into account when determining the controls to be used?
How do the control determined, or when considering changes to the
existing controls, also take into account the reduction of the risks using the
hierarchy of controls in order of:
(a) Elimination;
(b) Substitution;
(c) Engineering controls;
(d) Signage/warning and/or administrative controls;
(e) Personal protective equipment?
How does the company document and keep the results of the
identification of hazards, risk assessment and determination of controls
up-to-date?
How it is ensured that OH&S risks and determined controls are taken into
account when establishing, implementing and maintaining OH&S
Control Tier:
2-AzSPU
Revision Date: 25 October 2010
Document Number: AzSPU-HSSE-DOC-00106-2
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING.
THE CONTROLLED VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/
OHSAS 18001 OHSAS MS Requirements Checklist
Page 5 of 17
Parameter
Observation
management system?
4.3.2 Legal and Other Requirements
Has a procedure been established and implemented to identify how to
access legal and other OH&S requirements that are applicable to it?
How are these identified applicable legal and other requirements the
company subscribes to, are taken into account when establishing and
implementing OH&S Management system (e.g. objectives, monitoring,
training, auditing etc.)
How are the above procedure(s) maintained?
How does the company ensure the legal and other requirements are kept
up-to-date?
How the legal and other requirements are communicated to the company
personnel and any other relevant interested parties? (i.e. to employees,
contractors, visitors and any other interested person).
4.3.3 Objectives, and Program(s)
Have documented OH&S objectives been established, implemented and
maintained within the company?
Have these been established at relevant functions and levels within the
company?
Has a program(s) been established, implemented and maintained to
achieve these objectives?
Are the objectives measurable and are they consistent with the following:
¾ OH&S Policy,
¾ Prevention of Injury and ill health,
¾ Applicable legal and other requirements it subscribes to,
¾ Continual Improvement
How were the following considered when setting OH&S objectives:
¾ Applicable Legal and other requirements it subscribes to?
Control Tier:
2-AzSPU
Revision Date: 25 October 2010
Document Number: AzSPU-HSSE-DOC-00106-2
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING.
THE CONTROLLED VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/
OHSAS 18001 OHSAS MS Requirements Checklist
Page 6 of 17
Parameter
Observation
¾ OH&S risks?
How the followings are taken into account:
¾ Technological options?
¾ Financial, operational and business requirements?
¾ Views of interested parties?
Who is responsible at the different levels of your company for
implementing the program(s)?
What are the means and timeframes for achieving the different objectives?
How is ensured that program(s) are amended as a result of new
developments, new or modified activities, products and services?
Has the planned intervals been set to review and adjust the objective so
that they are achieved?
4.4 IMPLEMENTATION AND OPERATION
4.4.1 Resources, Roles, Responsibility, Accountability and Authority
How does the company demonstrate that ultimate responsibility for OH&S
and OH&S management system lies with it?
Does the top management demonstrate its commitment by:
(a) Ensuring that resources essential to establishing, maintaining and
improving the OH&S management system are available? Do
these resources include?
I. Human resources?
II. Specialized skills?
III. Organizational structure?
IV. Technology
V. Financial resources
(b) How are the roles and responsibilities, accountabilities and
authorities defined and documented and communicated in order
to achieve effective OH&S management system?
Control Tier:
2-AzSPU
Revision Date: 25 October 2010
Document Number: AzSPU-HSSE-DOC-00106-2
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING.
THE CONTROLLED VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/
OHSAS 18001 OHSAS MS Requirements Checklist
Page 7 of 17
Parameter
Observation
Has the company appointed members from Top management, with
specific responsibilities and defined roles and authority to:
(a) Ensuring that OH&S management system is established,
implemented and maintained in accordance with the OHSAS
18001 standard?
(b) Ensuring that reporting on the performance of the OH&S
management system is presented to Top Management for review
and used as a basis to identify improvements of the OH&S
management system?
How the Top Management appointee is made available to all persons
working under the control of the company?
How do those with management responsibility to demonstrate their
commitment to continual improvement of OH&S performance?
How does the company ensure that persons in the workplace take
responsibility for the aspects of OH&S over which that have control,
including adhering to the company’s applicable OH&S requirements?
4.4.2 Competence, Training and Awareness
How does the company ensure that all persons working for or under their
control are competent to undertake the tasks that can impact on OH&S?
Has the company retained competency and associated records?
How does the company identify training needs associated with its OH&S
risks and its OH&S management system?
Has training and other actions required to meet these needs been
delivered, the effectiveness of the training evaluated, and associated
records retained?
Has a procedure(s) been established, implemented and maintained to
ensure that the people working for, or under the control of the company
are aware of :
(a) The OH&S consequences, actual or potential, of their work
activities, their behaviors and the OH&S benefits of improved
personal performance?
Control Tier:
2-AzSPU
Revision Date: 25 October 2010
Document Number: AzSPU-HSSE-DOC-00106-2
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING.
THE CONTROLLED VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/
OHSAS 18001 OHSAS MS Requirements Checklist
Page 8 of 17
Parameter
Observation
(b) The roles and responsibilities and importance of conforming to the
OH&S Policy, procedures and to the requirements of OH&S
management system?
(c) Do they also understand their roles and responsibilities in
emergency preparedness and response requirements?
(d) Do they understand the potential consequences if they deviate
from the specified procedures?
Does the training procedures take into account different levels of:
I. Responsibility
II. Ability
III. Language skills
IV. Literacy
V. Risk
4.4.3 Communication, Participation and Consultation
4.4.3.1 Communication
As relevant to its OH&S risks and OH&S Management Systems, has the
company establish, implemented and maintained procedure(s) for:
(a) Internal communication between the various levels and functions
of the company?
(b) Communication with contractors and other visitors to workplace?
(c) Receiving, documenting and responding to relevant
communication from external interested parties?
4.4.3.2 Participation and Consultation
Are workers informed about the arrangement of their participation and who
is their representative(s) on OH&S matters?
Has the company established, implemented and maintained procedure(s)
for:
(a) The participation of workers and has this taken into account -
I. Their involvement in hazard identification, risk assessments
Control Tier:
2-AzSPU
Revision Date: 25 October 2010
Document Number: AzSPU-HSSE-DOC-00106-2
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING.
THE CONTROLLED VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/
OHSAS 18001 OHSAS MS Requirements Checklist
Page 9 of 17
Parameter
Observation
and determining controls?
II. Their involvement in incident investigations?
III. Their involvement in the development and review of the OH&S
Policies and objectives?
IV. That they be consulted where there are changes that affect
their OH&S?
V. That they have representation on OH&S matters?
(b) The consultation with contractors where there are changes that
affect their OH&S?
How does the company ensure that, when appropriate, the relevant
external interested parties are consulted about pertinent OH&S matters?
4.4.4 Documentation
Does the company’s OH&S management system documentation include:
¾ The OH&S policy, objectives?
¾ A description of the scope of the OH&S management systems?
¾ A description of the main elements of the OH&S management
system, their interaction and reference to related documents?
¾ Documents and records required by this Standard?
¾ Documents, including records, necessary for the effective
planning, operation and control of processes related to its OH&S
risks?
How is this being maintained?
4.4.5 Control of Documents
Have procedures been established, implemented and maintained to
control all documents required by the OHSAS 18001 standard?
Does the procedure address:
(a) Who approves the documents for adequacy before they are
issued?
Control Tier:
2-AzSPU
Revision Date: 25 October 2010
Document Number: AzSPU-HSSE-DOC-00106-2
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING.
THE CONTROLLED VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/
OHSAS 18001 OHSAS MS Requirements Checklist
Page 10 of 17
Parameter
Observation
(b) How they are periodically reviewed, updated and re-approved as
necessary?
(c) How changes and the current revision status are identified?
(d) How current versions of relevant documents are made available at
points of use?
(e) How the eligibility and identification of the documents is ensured?
(f) How external documents, as determined by the company for
effective planning and operation of the safety management
system are identified and controlled?
(g) How to prevent obsolete documents against unintended use, and
apply suitable identification to them if they are retained for any
purpose?
4.4.6 Operational Control
How has the company determined the operations and activities that are
associated with the identified hazard(s) and implemented controls to
manage the OH&S risk(s)?
Have the identified hazard(s) controls to manage the risk(s) also included
the management of change (4.3.1)
From the identified hazard(s) and OH&S risk(s) has the company:
(a) Implemented the operational controls, as applicable to the
company and its activities?
(b) Integrated the operational controls into its OH&S management
system?
(c) Implemented the controls related to purchased goods, equipment
and services?
(d) Implemented the controls related to contractors and other visitors
to the workplace
(e) Implemented documented procedures, to cover situations where
the absence of a procedure could lead to deviations from the
OH&S policy and the OH&S objectives?
Control Tier:
2-AzSPU
Revision Date: 25 October 2010
Document Number: AzSPU-HSSE-DOC-00106-2
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING.
THE CONTROLLED VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/
OHSAS 18001 OHSAS MS Requirements Checklist
Page 11 of 17
Parameter
Observation
(f) Implemented the stipulated operating criteria where their absence
could lead to deviations from the OH&S policy and OH&S
objectives?
How are the above procedure(s) maintained?
4.4.7 Emergency Preparedness and Response
Have procedures been established, implemented and maintained:
(a) To identify the potential emergency situations?
(b) And to response to such emergency situations?
Does the procedure(s) cover how the company will respond to actual
emergency situations?
Does the procedure(s) cover how the company will prevent or mitigate the
associated adverse OH&S consequences?
How does the company plan its emergency response and does it take into
account the needs of relevant interested parties?
How does the company test these procedure(s) to be able to respond to
these emergency situations and, where practicable, does the company
involve relevant interested parties?
Is this testing, above, periodically undertaken and at what intervals?
Does the company periodically review, revise and update its emergency
preparedness and response procedure(s) after the completion of the
scheduled test and after the occurrence of an emergency situation, where
necessary?
4.5 CHECKING
4.5.1 Performance Measurement and Monitoring
Have procedures been established and maintained to monitor and
measure OH&S performance, on a regular basis and does the
procedure(s) provide for:
(a) Both qualitative and quantitative measures, as appropriate for the
company needs?
Control Tier:
2-AzSPU
Revision Date: 25 October 2010
Document Number: AzSPU-HSSE-DOC-00106-2
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING.
THE CONTROLLED VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/
OHSAS 18001 OHSAS MS Requirements Checklist
Page 12 of 17
Parameter
Observation
(b) Monitoring of the extent to which the company’s OH&S objectives
are met?
(c) Monitoring the effectiveness of controls for both health and
safety?
(d) Proactive measures of performance that monitor the conformance
of the OH&S programme(s), controls and operational criteria?
(e) Reactive measures of performance that monitor ill health,
incidents, accidents, near misses, potential incidents, etc and
other historical evidence of deficient performance?
(f) Recording of data and results of monitoring and measurement
sufficient to assist in the analysis of corrective and preventive
actions?
How is monitoring and measuring equipment calibrated or verified and
maintained?
Are calibration and maintenance records retained?
4.5.2 Evaluation of compliance
Has the company established, implemented and maintained a
procedure(s) for periodically evaluating its compliance with the applicable
legal and other requirements identified in 4.3.2 of this standard?
Has the company evaluated its compliance with other requirements
identified in 4.3.2 of this check list?
Are the records of the results of the periodic evaluations been maintained?
4.5.3 Incident investigation, nonconformity, corrective action and preventive action
4.5.3.1 Incident Investigation
Has the company established, implemented and maintained a
procedure(s) to record, investigate and analyze incidents:
(a) In order to determine any underlying OH&S deficiencies and other
factors that might be causing or contributing to the occurrence of
incidents?
Control Tier:
2-AzSPU
Revision Date: 25 October 2010
Document Number: AzSPU-HSSE-DOC-00106-2
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING.
THE CONTROLLED VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/
OHSAS 18001 OHSAS MS Requirements Checklist
Page 13 of 17
Parameter
Observation
(b) In order to identify the need for corrective action
(c) In order to identify opportunities for preventative action and
continual improvement
(d) In order to communicate the results of the investigation.
Does the company undertake these investigations in a timely manner?
Does your company use the Non-conformity, Corrective & Preventive
Action system to deal with any actions?
4.5.3.2 Non-conformity, Corrective action & Preventive action
Has the company established, implemented and maintained procedure(s)
for:
(a) Dealing with actual and potential non-conformities, and
(b) Corrective and preventive action?
Do the procedures define requirements for:
(a) Identifying and correcting non-conformities and taking action to
mitigate the resulting OH&S consequences?
(b) Investigating the non-conformities, determining their cases and
take action to avoid their recurrence?
(c) Evaluating the need for actions to be taken to prevent non-
conformities, and implementing appropriate actions?
(d) Recording the results of corrective and preventive actions taken?
(e) Reviewing the effectiveness of corrective and preventive actions?
When the company’s corrective and preventive action system identifies
new or changed hazards and controls, does the procedure require the
company to undertake a risk assessment prior to implementation (of the
actions)?
How is it decided that the action(s) taken to eliminate the causes of actual
and potential non-conformities are appropriate to the magnitude of the
problem(s) and proportional to the OH&S risk(s) encountered?
How is it ensured that changes (if any) are made in the OH&S
management system documentation?
Control Tier:
2-AzSPU
Revision Date: 25 October 2010
Document Number: AzSPU-HSSE-DOC-00106-2
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING.
THE CONTROLLED VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/
OHSAS 18001 OHSAS MS Requirements Checklist
Page 14 of 17
Parameter
Observation
4.5.4 Control of Records
Has the company established, implemented and maintained the
procedures for identification, storage, protection, retrieval, retention and
disposal of OH&S records?
How are these updated?
Do these records include those that are necessary to demonstrate
conformity to the requirements of the standard and include (for example),
records of:
(a) Competence, training & awareness?
(b) Communication?
(c) Evaluation of compliance with legal and other requirements?
(d) Monitoring and measurement?
(e) Corrective & preventive action?
(f) Internal audits?
(g) Management review?
Are the environmental records legible, identifiable and traceable?
How are the OH&S records stored in order that they are readily retrievable
and protected against damage, deterioration or loss?
Does the company have a backup procedure for electronic records?
4.5.5 Internal Audit
Have program(s) and procedures for periodic internal audits been
established, implemented and maintained?
Do these internal audits determine whether or not the environmental
management system:
(a) Conforms to planned arrangements for environmental
management including the requirements of OHSAS18001, and
(b) Has been properly implemented and maintained?
(c) Is effective in meeting the company’s policy and objectives?
Control Tier:
2-AzSPU
Revision Date: 25 October 2010
Document Number: AzSPU-HSSE-DOC-00106-2
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING.
THE CONTROLLED VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/
OHSAS 18001 OHSAS MS Requirements Checklist
Page 15 of 17
Parameter
Observation
How does the audit program take into account the OH&S risk
assessments of your company’s concerns, and the results of previous
audits?
How does the company provide information on the results of audits to
management?
Does the audit procedure cover:
(a) The responsibilities and requirements for planning and conducting
audits, reporting results and retention of associated records?
(b) The determination of audit criteria, scope, frequency and
methods?
How the competency of the OH&S auditors used is determined?
How does the selection of auditors and the conduct of audits ensure
objectivity and impartiality of the audit process?
4.6 MANAGEMENT REVIEW
Has the company’s top management (at planned intervals) reviewed the
OH&S management system, to ensure its continuing suitability, adequacy
and effectiveness?
Does the review include assessing opportunities for improvement and the
need for changes to the OH&S Management System, including the OH&S
policy an OH&S objectives?
Do the inputs to management review include:
(a) Results from internal audits and evaluations of compliance with
legal and other requirements?
(b) The results of participation and consultation?
(c) Relevant communication from external parties, including
complaints?
(d) The OH&S performance of your company?
(e) The extent to which the objectives have been met?
(f) The status of incident investigations, corrective and preventive
Control Tier:
2-AzSPU
Revision Date: 25 October 2010
Document Number: AzSPU-HSSE-DOC-00106-2
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING.
THE CONTROLLED VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/
OHSAS 18001 OHSAS MS Requirements Checklist
Page 16 of 17
Parameter
Observation
actions
(g) Follow-up actions from previous management reviews
(h) Changing circumstances, including developments in legal and
other requirements related to OH&S, and
(i) Recommendations for improvement?
Do the outputs from the management review include decisions and
actions related to possible changes to the OH&S policy, objectives,
resources, OH&S performance and other elements of the OH&S
management system, and consistent with the commitment to continual
improvement?
Are the records of the management reviews retained and made available
for communication and consultation?
Control Tier:
2-AzSPU
Revision Date: 25 October 2010
Document Number: AzSPU-HSSE-DOC-00106-2
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING.
THE CONTROLLED VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/
OHSAS 18001 Requirements Checklist
Page 17 of 17
Notes:
Persons Interviewed:
Documents Reviewed:
Revision/Review Log
Revision Date
Authority
Custodian
Revision Details
24 April 2009
Yuliy Zaytsev
Idrak Nazarov
Initial Issue
Safety &
HSE MS Team
Compliance
Leader
Manager
25 October 2010
Yuliy Zaytsev
Elman
Custodian updated in line with AzSPU
Safety &
Shikhkerimov
re-organisation.
Compliance
COW / Safety
Manager
Systems Lead
Control Tier:
2-AzSPU
Revision Date: 25 October 2010
Document Number: AzSPU-HSSE-DOC-00106-2
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/
DEPARTMENT OF THE NAVY
NAVAL AIR STATION WHIDBEY ISLAND
OAK HARBOR, WASHINGTON 98278-5000
NASWHIDBEYINST 3770.1E
N3
12 Jul 10
NASWHIDBEY INSTRUCTION 3770.1E
From: Commanding Officer
Subj: PACIFIC NORTHWEST TRAINING RANGE COMPLEX MANUAL
(PACNORWEST TRCM)
Ref:
(a) OPNAVINST 3770.2K
(b) OPNAVINST 3710.7T
(c) FAA Order JO7400.2F
(d) FAA Order JO7610.4M
(e) NASWHIDBEYINST 3722.3C
(f) CINCPACFLTINST 3624.1G
Encl:
(1) PACNORWEST TRCM
1. Purpose. Enclosure (1) provides PACNORWEST TRCM Operation
Area (OPAREA) users with an overview of Naval Air Station (NAS)
Whidbey Island training airspace areas. This manual
incorporates guidance provided in references (a) through (f) and
outlines safety precautions and procedures for scheduling;
describes special use airspace (SUA) and surface facilities and
establishes procedures for training within NAS Whidbey Island
PACNORWEST TRCM OPAREAs. This revision incorporates the
following updated and additional information:
a. The addition of information giving the legal description
of both the Chinook A and B Military Operating Areas (MOAs).
b. The addition of information regarding the use of
depleted Uranium ammunition per DOD Directive 4715.11P.
c. The addition of concept of operations for scheduling and
use of the AN/UPQ-8 (V) Threat Emitter Simulators.
d. The addition of information regarding frequency and
telephone number changes.
2. Cancellation. NASWHIDBEYINST 3770.1D
3. Policy and Guidance
a. The PACNORWEST TRCM OPAREA is an air, surface and
subsurface operating area off the coast of Washington and inland
NASWHIDBEYINST 3770.1E
12 Jul 10
Oregon and Washington. It includes the area covered by W-237,
R-6701, R-5701, R-5706, A-680, Naval Weapons System Training
Facility (NWSTF) Boardman, Boardman MOA/Air Traffic Control
Assigned Airspace (ATCAA), Okanogan MOA/ATCAA, Molson ATCAA,
Roosevelt MOA/ATCAA, Republic ATCAA, Olympic MOA/ATCAA, Chinook
MOA and various air and surface training areas as defined in
this instruction. The OPAREA is used for various air, surface,
subsurface, air-to-surface and surface to air exercises.
b. Per reference (a), Department of the Navy (DON) Airspace
Procedures Manual, real time joint-use of SUA shall be the goal
and is the only reasonable manner to conduct training in
peacetime. At those times when SUA is not activated or being
used by the designated using agency, every reasonable attempt
shall be made to provide the airspace to other users. DON
activities must ensure a mutual use doctrine that provides for
timely turnover of airspace to the Federal Aviation
Administration (FAA). Activities requiring exclusive-use
airspace must be identified and must provide justification.
c. Per reference (a), Fleet Area Control and Surveillance
Facility (FACSFAC), San Diego, California is designated as the
DON Regional Airspace Coordinator (RAC) and is the focal point
and central clearinghouse for all SUA matters that pertain to
any DON airspace related activity within their regional area of
responsibility. NAS Whidbey Island acts as a direct airspace
liaison to the RAC and is responsible for the scheduling and
management of all airspace matters that pertain to the
PACNORWEST TRCM OPAREA.
4. Recommended Changes. Forward recommended changes to:
Mail: Commanding Officer (N331)
NAS Whidbey Island
3730 N Charles Porter Ave
Oak Harbor, WA 98278-5300
Message:
NAS WHIDBEY ISLAND WA//N3/N33/N331//
FAX:
DSN 820-1283, COMM (360) 257-1283
Telephone:
DSN 820-2877, COMM (360) 257-2877
E-mail:
WHDB_Range_Schedules_All_Hands@navy.mil
/s/
G. K. DAVID
Distribution:
Electronic only, via CNIC Gateway Portal,
2
NASWHIDBEYINST 3770.1E
12 Jul 10
0Whidbey%20Island/NAS%20Admin%20Documents/default.aspx
Copy to:
CNO (N8852)
COMNAVREGNORTHWEST
COMTHIRDFLT
COMNAVAIRPAC
NAVREP, FAA Western Pacific Region (AWP-930)
COMSTRKFIGHTWINGPAC
COMSEACONTROLWINGPAC
COMAFLOATTRAGRUPAC SAN DIEGO
COMCARGRU ONE
COMCARGRU THREE
COMCARGRU SEVEN
COMCRUDESGRU THREE
COMCRUDESGRU FIVE
NAVUNSEAWARCENDIV KEYPORT WA
NWAC Corona, CA (SE 43)
NW Air Defense Sector, McChord AFB
Squadron 407, Comox, B.C. Canada
62AW McChord AFB (DOV)
FACSFAC San Diego
USS JOHN C STENNIS
USS CARL VINSON
USS ABRAHAM LINCOLN
CVW-2
CVW-9
CVW-11
CVW-14
FAIRECONRON THREE
MARPACHQ ESQUIMALT
MAWTS ONE, MCAS Yuma, AZ
142 FG Portland, OR
120 FIG Great Falls, MT
114 FS Kingsley Field, OR
391 FS Mountain Home AFB, ID
389 FS Mountain Home AFB, ID
190 FS Boise Air Terminal, ID
FAA Seattle ARTCC AUBURN SEATTLE WA (MOS)
AFREP, FAA Northwest Mountain Region (ANM-900)
3
NASWHIDBEYINST 3770.1E
12 Jul 10
THIS PAGE INTENTIONALLY LEFT BLANK
4
NASWHIDBEYINST 3770.1E
12 Jul 10
PACIFIC NORTHWEST TRAINING RANGE COMPLEX MANUAL
(PACNORWEST TRCM)
NASWHIDBEYINST 3770.1E
Enclosure (1)
NASWHIDBEYINST 3770.1E
12 Jul 10
THIS PAGE INTENTIONALLY LEFT BLANK
2
NASWHIDBEYINST 3770.1E
12 Jul 10
PACIFIC NORTHWEST TRAINING RANGE COMPLEX MANUAL
TABLE OF CONTENTS
............................................................Page
............................................................No.
CHAPTER 1 - GENERAL
1-1
1.1 GENERAL
1-1
1.2 NOISE ABATEMENT POLICY
1-1
1.3 DEFINITIONS
1-1
1.3.1 Air Combat Maneuvering (ACM)
1-1
1.3.2 Air Traffic Control Assigned Airspace (ATCAA)
1-1
1.3.3 Exclusive Use
1-1
1.3.4 Co-Usage
1-1
1.3.5 Cold Area
1-2
1.3.6 Hot Area
1-2
1.3.7 Notice to Airman (NOTAM)
1-2
1.3.8 Notice to Mariners (NOTMARS)
1-2
1.3.9 Practice Bomb
1-2
1.3.10 Restricted Area
1-2
1.3.11 Scheduling Authority
1-2
1.3.12 Special Use Airspace (SUA)
1-2
1.3.13 Warning Area
1-2
1.3.14 Military Training Routes (MTR)
1-2
1.3.15 Military Operations Areas (MOA)
1-2
1.4 WARNINGS, CAUTIONS, AND NOTES
1-2
1.5 GENERAL PRUDENTIAL RULES
1-3
1.6 USER RESPONSIBILITIES
1-3
1.7 NAS WHIDBEY ISLAND, RANGE SCHEDULES DIVISION
1-3
1.8 SAFETY PRECAUTIONS
1-4
1.8.1 General
1-4
1.8.2 Scope
1-4
1.9 REGULATIONS APPLICABLE TO BOTH AIR AND SURFACE UNITS...1-4
1.9.1 Clear Range
1-4
1.9.2 Firing with Cloud Cover
1-5
1.9.3 Firing Areas
1-5
1.9.3.1 Firing Exercises Near Commercial Shipping Lanes
1-5
i
NASWHIDBEYINST 3770.1E
12 Jul 10
1.10 ADDITIONAL SAFETY PRECAUTIONS FOR FIRING EXERCISES BY
SURFACE UNITS
1-6
1.10.1 Responsibility
1-6
1.10.2 Lookouts
1-6
1.10.3 Observers
1-6
1.10.4 Sight Setters
1-6
1.10.5 Bravo Flag
1-6
1.10.6 Cease Fire
1-6
1.11 SURFACE GUNNERY EXERCISES
1-6
1.11.1 Clear Range
1-6
1.11.2 Safety Bearings
1-6
1.11.3 Communications
1-6
1.12 ANTI-AIRCRAFT GUNNERY
1-6
1.12.1 Restrictions
1-6
1.12.2 Communications
1-6
1.13 ANTI-SUBMARINE WARFARE EXERCISES
1-7
1.14 ADDITIONAL SAFETY PRECAUTIONS/RANGE REGULATIONS
FOR AIR UNITS
1-7
1.14.1 Responsibility
1-7
1.14.2 Visual Inspection
1-7
1.14.3 Ordnance Jettison
1-7
1.14.4 Hung Ordnance
1-7
1.14.5 Air Separation
1-7
1.14.6 Target Identification
1-7
1.14.7 Cease Fire for Safety
1-7
1.14.8 Runs on Submarines
1-7
1.14.9 Clearance from Helicopters
1-8
1.14.10 Disturbance of Wildlife
1-8
1.14.11 Reporting Danger to Life or Property
1-8
1.15 AIR-TO-AIR GUNNERY EXERCISES
1-8
1.15.1 Armament Switch
1-8
1.15.2 Range Clear
1-8
1.15.3 Target Safety Cone
1-8
1.15.4 Break-aways
1-8
1.15.5 Visibility
1-8
1.16 AIR-TO-SURFACE EXERCISES
1-9
1.16.1 Characteristics of Ordnance
1-9
1.16.2 Populated Areas
1-9
1.16.3 Armament Switch
1-9
1.16.4 Direction of Runs
1-9
1.17 AIR-TO-AIR EXERCISES
1-9
ii
NASWHIDBEYINST 3770.1E
12 Jul 10
1.18 OTHER MISSILE EXERCISES
1-9
1.19 DEPLETED URANIUM AMMUNITION
1-9
CHAPTER 2 - SCHEDULING PROCEDURES
2-1
2.1 GENERAL
2-1
2.2 SCHEDULING
2-1
2.2.1 NAS Whidbey Island Range Schedules Division
2-1
2.2.2 Hours of Operations
2-1
2.2.3 Scheduling Times
2-1
2.2.4 Notice to Mariners (NOTMARS)
2-1
2.3 CHANGES AND CANCELLATIONS
2-2
2.3.1 Times
2-2
2.3.2 Notices to Airman (NOTAM)
2-2
2.3.3 Extensions
2-2
2.3.4 Military Training Routes (MTRs)
2-2
2.4 PRIORITIES
2-2
2.4.1 Conflict Resolution
2-3
2.4.2 Scheduling
2-3
2.5 REQUESTS VIA MESSAGE
2-3
2.5.1 Message Format
2-3
2.6 ELECTRONIC COUNTERMEASURES (ECM) AND CHAFF REQUESTS
2-4
2.6.1 ECM Area
2-4
2.6.2 ECM Coordination
2-4
CHAPTER 3 - MILITARY OPERATIONS AREAS (MOAs)/AIR TRAFFIC
CONTROL ASSIGNED AIRSPACE (ATCAA)
3-1
3.1 GENERAL
3-1
3.1.1 Description
3-1
3.1.2 Operating Hours
3-1
3.1.3 Scheduling
3-1
3.1.4 Communications
3-1
3.2 OKANOGAN MOA/ATCAA
3-2
3.2.1 Okanogan A Boundaries
3-2
3.2.2 Okanogan B Boundaries
3-2
3.2.3 Okanogan C Boundaries
3-2
3.2.4 Molson ATCAA
3-3
3.3 ROOSEVELT A MOA/ATCAA
3-3
3.3.1 Roosevelt A Boundaries
3-3
3.3.2 Roosevelt B Boundaries
3-4
iii
NASWHIDBEYINST 3770.1E
12 Jul 10
3.3.3 Republic ATCAA
3-4
3.4 OLYMPIC A MOA/ATCAA
3-4
3.4.1 Olympic A Boundaries
3-5
3.4.2 Olympic B Boundaries
3-5
3.5 FILING PROCEDURES
3-5
3.6 REAL-TIME COORDINATION
3-6
3.7 MOA OPERATING PROCEDURES
3-6
3.8 CROP DUSTING ACTIVITY
3-8
3.9 FLARE DROPS
3-8
3.10 WHIDBEY ISLAND SURVIVAL AREA
3-8
3.10.1 Point of Contact/Scheduling
3-9
3.10.2 Altitude Assignment
3-9
3.11 CRESCENT HARBOR NAVAL OPERATIONS AREA
3-9
3.11.1 Point of Contact/Scheduling
3-9
3.11.2 Procedures for Ordnance Use
3-9
3.12 NAVY EXCHANGE (NEX) LZ/DZ
3-9
3.12.1 Point of Contact/Scheduling
3-9
3.13 CHINOOK A AND B MOAs
3-10
3.13.1 Chinook A Boundaries
3-10
3.13.2 Chinook B Boundaries
3-10
3-14 RESTRICTED AREA R-6701, ADMIRALTY INLET BOUNDARIES
3-10
3-15 ALERT AREA A-680, OLF COUPEVILLE BOUNDARIES
3-10
CHAPTER 4 - DARRINGTON OPERATING AREA
4-1
4.1 GENERAL
4-1
4.1.1 Description
4-1
4.1.2 Scheduling
4-1
4.1.3 Communications
4-1
4.2 AREA BOUNDARIES
4-1
4.2.1 Darrington West Boundaries
4-1
4.2.2 Darrington East Boundaries
4-1
4.3 OPERATING PROCEDURES
4-2
iv
NASWHIDBEYINST 3770.1E
12 Jul 10
CHAPTER 5 - WASHINGTON COASTAL WARNING AREAS
5-1
5.1 GENERAL
5-1
5.1.1 Description
5-1
5.1.2 Operating Hours
5-1
5.1.3 Scheduling
5-1
5.1.4 Communications
5-1
5.2 AIRSPACE BOUNDARIES
5-2
5.2.1 Warning Area W-237A Low/High
5-2
5.2.2 Warning Area W-237B Low/High
5-2
5.2.3 Warning Area W-237C
5-2
5.2.4 Warning Area W-237D
5-3
5.2.5 Warning Area W-237E
5-3
5.2.6 Warning Area W-237F
5-3
5.2.7 Warning Area W-237G
5-3
5.2.8 Warning Area W-237H
5-4
5.2.9 Warning Area W-237J
5-4
5.3 OLYMPIC COAST NATIONAL MARINE SANCTUARY (OCNMS)
5-4
5.3.1 OCNMS Boundaries
5-5
5.3.2 OCNMS Authorized Activities
5-5
5.3.3 OCNMS Restrictions
5-5
5.4 USE OF ORDNANCE
5-6
5.4.1 Authorized Ordnance
5-6
5.4.2 Ordnance Scheduling Procedures
5-6
5.4.3 Notice to Mariners (NOTEMARS)
5-6
5.4.4 Preferential Drop Zones
5-7
5.4.4.1 DZ 1
5-7
5.4.4.2 DZ 2
5-7
5.4.4.3 DZ 3
5-8
5.4.4.4 DZ 4
5-8
5.4.4.5 DZ 5
5-8
5.4.4.6 DZ 6
5-8
5.4.4.7 DZ Identification
5-8
5.4.5 Preferential Routings
5-8
5.5 REAL-TIME COORDINATION
5-10
5.6 OPERATING PROCEDURES
5-10
5.7 ELECTRONIC COUNTERMEASURES (ECM)
5-12
5.8 CANADIAN MARITIME PACIFIC (MARPAC) COORDINATION
5-12
5.9 HELICOPTER SERVICES
5-12
5.10 POST OVERHAUL REQUIREMENTS
5-12
v
NASWHIDBEYINST 3770.1E
12 Jul 10
5.11 SHIP - SHORE COMMUNICATIONS
5-13
CHAPTER 6 - MILITARY TRAINING ROUTES (MTRs)
6-1
6.1 GENERAL
6-1
6.1.1 Preflight Planning
6-2
6.1.2 Operating Procedures
6-2
CHAPTER 7 - CVN OPERATING PROCEDURES
7-1
7.1 GENERAL
7-1
7.2 COORDINATION
7-1
7.2.1 Planning Conference
7-1
7.2.2 ATC Briefs/Liaison Ship riders
7-2
7.3 PRE-SAIL COORDINATION MESSAGES
7-2
7.3.1 Summary of Operations
7-2
7.3.2 Divert Alerts
7-3
7.3.3 OPAREA Requests
7-3
7.3.4 ALTRV Requests
7-3
7.3.5 IFF Requests
7-3
7.4 FLIGHT PLANNING
7-3
7.4.1 OPAREA Modifications
7-3
7.4.2 Daily Air Plan
7-3
7.4.3 Flight Information Messages
7-4
7.4.4 Flight Plans
7-4
7.4.5 Overhead Messages
7-4
7.5 AT-SEA COORDINATION
7-4
7.6 COMMUNICATIONS
7-5
7.6.1 Landline Communications
7-5
7.6.2 Ship-to-Shore Radio Communications
7-5
7.6.3 Air-to-Ground Communications
7-6
7.7 BINGO/DIVERTS TO SHORE FACILITIES
7-6
7.7.1 Bingo
7-6
7.7.2 Diverts
7-7
7.8 CONDUCT OF FLIGHT
7-7
7.8.1 W-237 Complex Operations
7-7
7.8.2 Strait of Juan De Fuca/Puget Sound Operations
7-7
7.9 STRAIT OF JUAN DE FUCA (SOJDF) CARRIER OPERATIONS
7-7
7.9.1 General Special Use Airspace
7-7
7.9.2 Aircraft Carrier (CVN) use of SOJDF
7-7
vi
NASWHIDBEYINST 3770.1E
12 Jul 10
7.9.3 SOJDF Airspace for CVN Use
7-8
CHAPTER 8 - NAVAL WEAPONS SYSTEM TRAINING FACILITY
BOARDMAN, OREGON
8-1
8.1 DESCRIPTION
8-1
8.1.1 Operating Hours
8-1
8.1.2 Boardman MOA and ATCAA Boundaries
8-1
8.1.3 Boardman Restricted Area 5701 Area (a)
8-2
8.1.4 Boardman Restricted Area 5706 Area (b)
8-2
8.1.5 Boardman Restricted Area 5701 Area (c)
8-2
8.1.6 Boardman Restricted Area 5701 Area (d)
8-2
8.1.7 Boardman Restricted Area 5701 Area (e)
8-2
8.1.8 Boardman Restricted Area 5706
8-3
8.2 OPERATING PROCEDURES
8-3
8.2.1 General
8-3
8.2.2 Entering Boardman Range
8-3
8.2.3 Departing Boardman Range
8-3
8.3 MAIN TARGET
8-4
8.3.1 Target (1)
8-4
8.3.2 Navigation Check Point
8-4
8.4 STRAFING PIT
8-4
8.5 RANGE PRIORITY
8-5
8.6 TYPE EXERCISE/ORDNANCE
8-5
8.7 PATTERNS
8-6
8.8 EXIT PROCEDURES
8-6
8.9 AN/UPQ-8 (V) THREAT EMITTER SIMULATORS
8-6
LIST OF ILLUSTRATIONS
1. OKANOGAN/ROOSEVELT MOAs/ATCAAs,REPUBLIC,MOLSON ATCAAs
2. OLYMPIC MOAs/ATCAAs, W-237, and OLYMPIC COAST NATIONAL
MARINE SANCTUARY
3. BOARDMAN MOA, ATCAA, and RESTRICTED AREAS
4. DARRINGTON AREA
5. PREFERENTIAL DROP ZONES
6. CASE I OPAREA
7. SURVIVAL AREA, CRESCENT HARBOR RESTRICTED AREA, NEX LZ
8. NWSTF BOARDMAN TARGET DESCRIPTION
9. SAFE HAVEN AREAS
vii
NASWHIDBEYINST 3770.1E
12 Jul 10
THIS PAGE INTENTIONALLY LEFT BLANK
viii
NASWHIDBEYINST 3770.1E
12 Jul 10
LIST OF ABBREVIATIONS/ACRONYMS
A
AA
Anti Aircraft
ACM
Air Combat Maneuver
ADIZ
Air Defense Identification Zone
AIROPS
Air Operations
AR
Air Refueling Route
ARTCC
Air Route Traffic Control Center
ASW
Anti Submarine Warfare
ATA
Advance Tactical Assessment
ATC
Air Traffic Control
ATCAA
Air Traffic Control Assigned Airspace
C
CADIZ
Canadian Air Defense Identification Zone
CATCC
Carrier Air Traffic Control Center
CCA
Carrier Controlled Approach
CIWS
Close in Weapons System
CNI
Communications, Navigation and Identification
equipment
CV1
CV-1 TACAN Approach
D
DACM
Defensive Air Combat Maneuvers
DU
Depleted Uranium Ammunition
E
ECM
Electronic Counter Measures
F
FCLP
Fleet Carrier Landing Practice
FCF
Functional Check Flight
FLEETEX
Fleet Exercise
FLIP
Flight Information Publication
I
IAF
Initial Approach Fix
IAS
Indicated Air Speed
IFF
Identification friend or foe
IFR
Instrument flight rules
IR
Instrument Flight Rules Military Training Route
ix
NASWHIDBEYINST 3770.1E
12 Jul 10
M
MARPAC
Canadian Maritime Pacific
MARSA
Military Assumes Responsibility for Separation of
Aircraft
MOA
Military Operations Area
MTR
Military Training Route
N
NAS
Naval Air Station or National Air Space
NOTAM
Notice to Airman
NOTMAR
Notice to Mariners
NORAD
North American Air Defense Command
NWSTF
Naval Weapons System Training Facility
NVD
Night Vision Device
O
OCNMS
Olympic Coast National Marine Sanctuary
OLF
Outlying Landing Field
OPAREA
Operation Area
ORE
Operational Readiness Exercise
ORI
Operational Readiness Inspection
P
PACNORWEST TRCM OPAREA Pacific North West Training Range
Complex Manual Operation Area
PSNS
Puget Sound Naval Station
R
READYEX Readiness Exercise
S
SAR
Search and Rescue
T
TACAN
Tactical Air Navigation
U
UNICOM
Universal Integrated Communications
x
NASWHIDBEYINST 3770.1E
12 Jul 10
V
VFR
Visual Flight Rules
VR
Visual Flight Rules Military Training Route
W
WADS
Western Air Defense Sector
xi
NASWHIDBEYINST 3770.1E
12 Jul 10
THIS PAGE INTENTIONALLY LEFT BLANK
xii
NASWHIDBEYINST 3770.1E
12 Jul 10
CHAPTER 1
GENERAL
1.1 GENERAL
1. Per reference (a), NAS Whidbey Island is assigned scheduling
responsibility to manage offshore and inland operating areas
dedicated for military use by surface and air platforms. This
manual contains a comprehensive listing of all PACNORWEST TRCM
OPAREAs. Chapters 2 through 7 include detailed descriptions of
these areas.
2. All military training (to the maximum extent possible)
should be conducted within the established OPAREAs.
1.2 NOISE ABATEMENT POLICY. It is Commanding Officer, Naval Air
Station Whidbey Island policy to conduct required training and
operational flights with a minimum impact on surrounding
communities. The importance of maintaining continued good
relations with the public and other federal agencies dictate
strict compliance with the provisions contained in reference (b)
and this instruction. Each aircrew shall be familiar with the
noise profiles of their aircraft and shall be committed to
minimizing noise impacts without compromising operational and
safety requirements.
1.3 DEFINITIONS
1.3.1 Air Combat Maneuvering (ACM). Flight of two or more
aircraft involved in abrupt changes in flight path/altitude-
scheduled as an exclusive operation.
1.3.2 Air Traffic Control Assigned Airspace (ATCAA). ATCAA of
defined vertical/lateral limits are established by ATC for the
purpose of separating military training activities from other
IFR traffic. ATCAA is designed and established in controlled
airspace normally above 18,000 feet Mean Sea Level (MSL) to
accommodate daily training missions and planned exercises.
1.3.3 Exclusive Use. OPAREA scheduling term, which indicates an
area, is reserved for the unit, which scheduled the area. Non-
participants are prohibited from entering the area.
1.3.4 Co-Usage. Concurrent use of an area by two or more units.
Implies that units are able to conduct the operation safely even
though other units are operating or transiting the area. Co-use
of an area requires approval of the scheduling unit.
1-1
NASWHIDBEYINST 3770.1E
12 Jul 10
1.3.5 Cold Area. OPAREA wherein no hazardous operations are
being conducted.
1.3.6 Hot Area. Air or surface OPAREA wherein ordnance is being
fired/dropped or other operations are being conducted that
presents a hazard to non-participants.
1.3.7 Notice to Airman (NOTAM). A broadcast or published flight
advisory to disseminate information affecting safety of flight,
issued on a temporary basis.
1.3.8 Notice to Mariners (NOTMARS). A broadcast or published
navigation advisory to disseminate information affecting
navigation within a limited geographic area.
1.3.9 Practice Bomb. Inert ordnance.
1.3.10 Restricted Area. An area in which special restricted
measures are employed to prevent non-participants from entering
the area.
1.3.11 Scheduling Authority. Exercises administrative control
of OPAREAS and coordinates and schedules usage.
1.3.12 Special Use Airspace. Airspace wherein activities must
be confined because of their nature, and/or wherein limitations
are imposed on non-participating aircraft includes MOAs, Warning
Areas, Alert Areas, and Restricted Areas.
1.3.13 Warning Area. A specified area over international waters
where hazardous activities may occur.
1.3.14 Military Training Route (MTR). Designated airspace for
military low altitude, high-speed navigation and tactics to be
flown in excess of 250 KIAS below 10,000 feet Mean Sea Level
(MSL).
1.3.15 Military Operations Area (MOA). An airspace area
designated for non-hazardous military activity to segregate non-
participating IFR aircraft from participating military
operations and to inform the VFR pilot when such activity is
being conducted.
1.4 WARNINGS, CAUTIONS, AND NOTES. The following definitions
apply to "WARNINGS,” “CAUTIONS," and "Notes" found throughout
this manual.
1-2
NASWHIDBEYINST 3770.1E
12 Jul 10
a. Warning. An operating procedure, practice or condition,
etc., that may result in injury or death if not carefully
observed or followed.
b. Caution. An operating procedure, practice or condition
that may result in damage to equipment if not carefully observed
or followed.
c. Note. An operating procedure, practice or condition
that must be emphasized.
1.5 GENERAL PRUDENTIAL RULES
1. This manual has been prepared per references (a) and (b).
It shall not be construed as modifying or superseding directives
issued by higher authority.
2. OPAREA users shall comply with this manual and are expected
to exercise their best judgment when encountering conditions not
covered.
1.6 USER RESPONSIBILITIES. The primary purposes of OPAREAs are
to support the needs of the user. To permit effective
utilization of all areas, the user also has certain
responsibilities.
1. Unless otherwise directed by higher authority, users shall
comply with procedures, weather minimums, and ordnance
employment restrictions contained in this manual.
2. Schedule proposed activities within NAS Whidbey Island
PACNORWEST TRCM OPAREAs directly with NAS Whidbey Island, Range
Schedules Division.
3. Provide a minimum of 60 days prior notice for large-scale
(i.e., Feet Exercise (FLEETEX), Readiness Exercise (READEX),
Operational Readiness Inspection/Exercise, Advanced Tactical
Assessment (ORI/ORE, ATA)) events.
1.7 NAS WHIDBEY ISLAND, RANGE SCHEDULES DIVISION
1. Responsible for overall management of the PACNORWEST TRCM
OPAREA airspace described in this manual. Establish, enforce,
and publish procedures for effective safe utilization of
assigned OPAREAs.
2. Approving authority for all matters relating to the
scheduling and use of these areas. De-conflict and assign
priority to airspace usage.
1-3
NASWHIDBEYINST 3770.1E
12 Jul 10
3. Provide briefings concerning scheduling and use of NAS
Whidbey Island PACNORWEST TRCM OPAREAs.
4. Coordinate services, ensure issuance of NOTAMS/NOTMARS,
issue schedules, and prescribe additional regulations as
necessary.
5. Submit usage reports per references (a), (c), and (d).
6. Schedule Field Carrier Landing Practice, Carrier Controlled
Approach, CV-1 Tactical Air Control and Navigation (TACAN)
Approach, Night Vision Device (FCLP/CCA/CV1/NVD) periods at NAS
Whidbey Island and FCLP at Outlying Field (OLF) Coupeville.
7. Schedule Hot Pit periods at NAS Whidbey Island.
8. Schedule all Visual Flight Rules Military Training Routes
(VRs), Instrument Flight Rules Military Training Routes (IRs),
MOAs, and W-237 areas.
1.8 SAFETY PRECAUTIONS
1.8.1 General. The purpose of safety precautions and
regulations are to prevent personnel injury or property damage
that might result from ships or aircraft training within the
PACNORWEST TRCM OPAREAs. These safety precautions and range
regulations are not intended to conflict with, or to reduce, the
full exercise by any command of responsibilities assigned by
competent authority. In any situation, the commanding officer
or senior aviator in the flight shall use proper discretion to
implement measures, which will achieve maximum safety.
1.8.2 Scope. This chapter sets forth the safety precautions and
range regulations applicable to NAS Whidbey Island PACNORWEST
TRCM OPAREAs. Those safety precautions and range regulations,
which apply only to specific operating areas or targets, are
included in the appropriate chapter of this manual.
1.9 REGULATIONS APPLICABLE TO BOTH AIR AND SURFACE UNITS
1.9.1 Clear Range. The operational commander conducting an
exercise shall be satisfied that the range is clear prior to
beginning the exercise. Procedures to ensure a clear range may
be established based on visual and/or radar surveillance. The
Officer Conducting Exercise (OCE) shall take into consideration
all applicable factors in arriving at the final decision, such
as urgency of the mission, density of air and surface traffic,
local visibility, distance offshore, type and expected
1-4
NASWHIDBEYINST 3770.1E
12 Jul 10
reliability of the ordnance and the availability, accuracy,
reliability, and completeness of radar coverage. When
surveillance of the range is conducted partially or solely by
radar, surface and/or airborne, commanders shall ensure that the
radar is operated and monitored by well-trained and competent
personnel. Regardless of what surveillance method is used,
there must be assurance that the RANGE IS CLEAR. Surface or air
firing exercises shall be suspended at any time visual or radar
warning indicates the presence of any vessel or aircraft within
firing range.
1.9.2 Firing with Cloud Cover. No ordnance shall be expended
through overcast or over an under-cast, or when there is more
than 3/10 cloud coverage in the area, unless the criteria
established in reference (b) are met.
1.9.3 Firing Areas. Firing exercises are permitted only within
the NWSTF Boardman/R-5701 and the offshore warning areas. Live
fire in the offshore warning areas must be per COMNAVSURFPACINST
3120.8F in coordination with Commander, Naval Surface Force,
U.S. Pacific Fleet (COMNAVSURFPAC), San Diego, CA and scheduled
no less than two weeks prior to date of event. Exercises must
be within the area/target assigned.
1.9.3.1 Firing Exercises near commercial shipping lanes
1. As far as is safe and practicable for prevailing condition
and mission requirements, all units involved in live firing
exercises within W237E, should to the maximum extent possible,
conduct firing operations well clear of the vessel shipping
lanes to avoid impacting navigation safety of commercial
shipping in the Tofino Traffic Area of Operations. This area is
defined as north of 48N latitude and east of 127W longitude and
within 50 NM of Vancouver Island.
2. All units, surface and air, engaged in live firing exercises
within the Tofino Traffic Area of Operations shall ensure
communications are established and maintained with “Tofino
Traffic” on Channel 74 VHF-FM. The following notifications
shall be made:
a. Prior to the commencement of any live firing exercise,
contact Tofino Traffic to ensure a safe firing position.
b. Provide Tofino Traffic with the danger radius, firing
bearing (if known), expected commencement time, and during of
the exercise.
c. Notify Tofino Traffic of completion of the exercise.
1-5
NASWHIDBEYINST 3770.1E
12 Jul 10
1.10 ADDITIONAL SAFETY PRECAUTIONS FOR FIRING EXERCISES BY
SURFACE UNITS
1.10.1 Responsibility. The commanding officer of each ship or
unit is responsible for compliance with these safety precautions
and range regulations.
1.10.2 Lookouts. A sufficient number of qualified lookouts
shall be posted during all firing exercises.
1.10.3 Observers. A fully qualified check sight safety observer
must be stationed at each firing turret or mount.
1.10.4 Sight Setters. Sights will be set continuously in
elevation and deflection during all firing exercises.
1.10.5 Bravo Flag. The Bravo Flag shall be displayed close-up
during all firing exercises.
1.10.6 Cease Fire. All firing will be secured when cease-fire
orders are received from competent authority or when the line of
fire is endangering any object other than the designated target.
1.11 SURFACE GUNNERY EXERCISES
1.11.1 Clear Range. The range must be clear to the extreme
range of the gun.
1.11.2 Safety Bearings. The safety bearings established by FXP-
3E shall be observed.
1.11.3 Communications. During surface gunnery exercises
involving a towed target, two-way communications must be
maintained between the firing unit and the towing vessel.
1.12 ANTI-AIRCRAFT (AA) GUNNERY
1.12.1 Restrictions. No heavy AA firing (3 inch or larger)
shall be conducted when the projectile would pass closer than
1,000 yards to the towing or controlling planes or other non-
target aircraft.
1.12.2 Communications. AA firing exercises involving a towed
target or a target aircraft may be conducted only while two-way
communications between the firing unit and the towing or
controlling aircraft are maintained.
1-6
NASWHIDBEYINST 3770.1E
12 Jul 10
1.13 ANTI-SUBMARINE WARFARE EXERCISES. ASW exercises must be
per COMNAVSURFPACINST 3120.8F. No live depth charges or other
live underwater ordnance shall be dropped for exercise purposes
except as authorized by COMNAVSURFPAC, San Diego, CA.
1.14 ADDITIONAL SAFETY PRECAUTIONS AND RANGE REGULATIONS FOR AIR
UNITS
1.14.1 Responsibility. The responsibility for compliance with
these safety precautions is vested in the commanding officer of
each user squadron or unit.
1.14.2 Visual Inspection. Pilots shall visually inspect
ordnance equipment and armament loading prior to take-off.
1.14.3 Ordnance Jettison. Live ordnance may be jettisoned
"safe" in the target area. The pilot is responsible for
clearing the target area prior to any ordnance deliveries.
Planned ordnance drops in offshore warning areas must be
coordinated with COMNAVSURFPAC, San Diego, CA, per
COMNAVSURFPACINST 3120.8F, and scheduled no less than two weeks
prior to the event.
1.14.4 Hung Ordnance. Detailed instructions for hung ordnance
at NAS Whidbey Island are contained in the Air Operations
Manual, NASWHIDBEYINST 3710.1W.
1.14.5 Air Separation. Users shall be responsible for
separation of their units from other air units, both military
and civilian.
1.14.6 Target Identification. Positive identification of the
target by each participating pilot must be attained by making an
identification pass over the intended target prior to dropping
or firing ordnance. The only exceptions to this will be
observed competitive exercises.
1.14.7 Cease Fire for Safety. When any doubt exists as to the
safety of continued firing or bombing, any member of the flight
so in doubt shall call "Cease Fire" and indicate the reason the
range is foul. In the event of such a call, all firing or
bombing shall cease until any doubt to safety is removed.
1.14.8 Runs on Submarines. Aircraft runs on friendly submarines
are prohibited unless joint aircraft-submarine exercises are
specifically scheduled.
1-7
NASWHIDBEYINST 3770.1E
12 Jul 10
1.14.9 Clearance from Helicopters. Aircraft flying below 700
feet should maintain a minimum lateral clearance of at least
one-half mile from all helicopters over water.
1.14.10 Disturbance of Wildlife. When it is necessary to fly
over known habitat of wild fowl, an altitude of at least 3,000
feet shall be maintained, conditions permitting.
1.14.11 Reporting Danger to Life or Property. It is mandatory
that a report be made as soon as possible to NAS Whidbey Island
Operations Duty Officer, DSN 820-2681/2682 or COMM (360) 257-
2681 by any pilot who:
a. Drops a bomb, a drop tank, fires a gun, fires a rocket,
or any other missile outside the limits of a regularly scheduled
impact area.
b. Upon return from flight, finds that bombs, rockets, or
any other missiles have been unaccountably expended.
c. Considers that any ammunition expended or any flight
maneuvers employed may have endangered the life or property of
another person, or who considers that such other person may
reasonably believe that their life or property had been
endangered.
1.15 AIR-TO-AIR GUNNERY EXERCISES. Minimum Range from Shore:
Minimum firing range from the shoreline for air-to-air over
water gunnery at any altitude shall be 10 miles outbound and 15
miles inbound within the assigned air area.
1.15.1 Armament Switch. The master armament switch shall be in
the “SAFE” position except, after proper clearance, for a live
(HOT) run.
1.15.2 Range Clear. The range shall be clear before each firing
run is started.
1.15.3 Target Safety Cone. No firing may be done within the 15-
degree safety cone of the target or if the firing aircraft is
below the level of the tow plane.
1.15.4 Break-aways. All break-aways shall be up and over the
target line of flight. On losing sight of target, a break-away
shall be executed immediately.
1.15.5 Visibility. Pilots must maintain visual contact with the
target and other aircraft in the formation, and the flight path
must permit safe break-away at all times during a run.
1-8
NASWHIDBEYINST 3770.1E
12 Jul 10
1.16 AIR-TO-SURFACE EXERCISES
1.16.1 Characteristics of Ordnance. Pilots will be fully
cognizant of the safety precautions applicable to the ordnance
carried including the installed fuses.
1.16.2 Populated Areas. Aircraft carrying service or practice
ordnance shall avoid passing over ships or populated areas.
1.16.3 Armament Switch. The master armament switch shall be in
the "SAFE" position except, after proper clearance, for a live
(HOT) run.
1.16.4 Direction of Runs.
All runs shall be made in the
direction specified by the target observer, and no runs may be
made at an angle of less than 30 degrees with the course of a
towed surface target.
1.17 AIR-TO-AIR EXERCISES. Air-to-air missiles may be expended
within the offshore operating areas. Because of the varying
characteristics of missiles used, varying safety precautions and
attack methods must be adhered to. Each mission shall be
specifically briefed and necessary safety precautions applied.
No missile shall be fired when there is any possibility that it
will not fall in a safe area within the assigned operating area.
No missile will be fired when the possibility exists that it may
be locked on anything other than the assigned target. When
head-on runs are used, both the target and firing aircraft shall
be under the positive control of a qualified Air Intercept
Controller.
1.18 OTHER MISSILE EXERCISES. Surface-to-Air and Surface-to-
Surface missiles may be expended within offshore OPAREAs.
Because of the varying characteristics of the missiles used by
the Navy, varying safety precautions and attack methods must be
used. Each mission or exercise shall be briefed and the
necessary safety precautions applied. No missile shall be fired
when there is a chance it will not fall in a safe area within
the OPAREA.
1.19 DEPLETED URANIUM (DU) AMMUNITION. DU policy, per DODD
4715.11P, paragraph 5.4.9, Commanders will minimize the use of
munitions that contain submunitions or DU to that required to
support national security objectives.
1-9
NASWHIDBEYINST 3770.1E
12 Jul 10
THIS PAGE INTENTIONALLY LEFT BLANK
1-10
NASWHIDBEYINST 3770.1E
12 Jul 10
CHAPTER 2
SCHEDULING PROCEDURES
2.1 GENERAL. When scheduling OPAREAs, users shall request only
as much area, airspace, and time necessary to complete the
mission.
2.2 SCHEDULING
2.2.1 NAS Whidbey Island Range Schedules Division. All users of
NAS Whidbey Island administered areas shall schedule their
proposed activities with NAS Whidbey Island Range Schedules
Division. Range Schedules is the sole approving authority for
OPAREAs and MTRs contained in this manual. Airspace may be
scheduled via the following medium:
Mail:
Commanding Officer
NAS Whidbey Island
3730 N. Charles Porter Ave
Oak Harbor, WA 98278-5300
Message:
NAS WHIDBEY ISLAND
WA//N3/N33/N331//
FAX:
DSN:
820-1283
COMM: (360) 257-1283
Telephone:
DSN:
820-2877
COMM: (360) 257-2877
E-mail: WHDB_Range_Schedules_All_Hands@navy.mil
2.2.2 Hours of Operations. Range Schedules Division hours of
operation are 0700-1600 local, Monday through Friday except
holidays. Schedulers are located in the NAS Whidbey Island
Operations Building (BLDG 385).
2.2.3 Scheduling Times. Scheduling requests shall be made no
later than 1600 local the day prior to desired usage and not
later than 1600 local on Friday for weekends/Mondays. In order
to prevent scheduling conflicts, requests will be accepted from
designated Scheduling Officers or the Operations Officer only.
2.2.4 Notice to Mariners (NOTMARS). Requests for offshore
Warning Areas requiring a NOTMAR must be received at least 1
week in advance. The using agency is responsible for sending
all NOTMARS.
2-1
NASWHIDBEYINST 3770.1E
12 Jul 10
2.3 CHANGES AND CANCELLATIONS
2.3.1 Times. Users of SUA/MTRs shall notify Range Schedules
Division of all requested changes and/or cancellations as soon
as they occur.
2.3.2 Notices to Airman (NOTAM). Change, including additions,
to scheduled SUA times shall be requested a minimum of 2 1/2
hours (4 hrs for W-237H/J) prior to desired usage to allow for
issuance of necessary NOTAMs.
2.3.3 Extensions. Flights shall not extend beyond the scheduled
period without approval from Seattle ARTCC. Requests will
normally be approved provided there is not a conflict with
succeeding flights or release of airspace to Seattle ARTCC.
Otherwise, aircraft must vacate when instructed to do so or at
the expiration of scheduled time.
2.3.4 Military Training Routes (MTRs). In the interest of
flight safety, and to allow Flight Service Stations sufficient
time to disseminate advisory information, MTR entry times are
firm; slides are not authorized. MTR requests must be scheduled
before 1600 the day prior to being flown. Same-day scheduling
may be accomplished 0700-1130 local for entry times after 1400
local. Actual IR entry times must be within 5 minutes of
scheduled time. Actual VR entry times must be within 3 minutes
of scheduled time.
2.4 PRIORITIES. NAS Whidbey Island will normally schedule
OPAREAs and services as requested. Accordingly, the following
priority system is established for initial scheduling. It is
not intended to be all-inclusive and is used for planning
purposes only. Exceptions can be made for special mission
requirements.
a. PRI 1: Major exercises or special circumstance
b. PRI 2: Seattle ARTCC, WADS, CVWP, and EAWS.
c. PRI 3: VAQ-129 (until 1200 the day prior)
d. PRI 4: NAS Whidbey Island-based fleet squadrons in
order of nearest deployment dates
e. PRI 5: Other U.S. Navy units and other U.S. forces
f. PRI 6: Foreign military forces
g. PRI 7: All other authorized users
2-2
NASWHIDBEYINST 3770.1E
12 Jul 10
2.4.1 Conflict Resolution. When a scheduling conflict occurs,
Range Schedules Division will determine priority of use and make
every effort within operational guidelines to coordinate
adjustments to areas, times, altitudes, etc., to resolve the
conflict. Units that do not receive their requested times will
be notified and offered other available airspace or time
periods.
2.4.2 Scheduling. In order to prevent scheduling conflicts,
requests will be accepted from designated Scheduling Officers or
the Operations Officer only. Fleet Replacement Squadron (VAQ-
129) has scheduling priority (per Paragraph 2.4c) until 1200
local the day prior for all MTRs, Olympic MOA, Okanogan MOA, and
the Boardman Complex. After 1200 local the day prior, these
areas are scheduled on a first-come-first-served basis. All
other areas including Roosevelt MOA and all offshore Warning
Areas are reserved on a first-come-first-served basis. Airspace
for special exercises or events shall be reserved 14 days in
advance. All times will be submitted in Zulu.
2.5 REQUESTS VIA MESSAGE
2.5.1 Message Format
1. Requests for OPAREAs generally should be UNCLASSIFIED and
shall be in the following format (omit non-applicable items):
a. Requesting Unit (ship/unit or squadron name) and number
of participants.
b. Type exercise.
c. Exclusive or co-usage (exclusive for hazardous
operations).
d. Area or target requested, include desired altitudes.
e. Date and COMEX/FINEX of each period.
f. Weapon information.
g. Type of weapon or aircraft.
h. Type of ordnance to be used.
i. For ships: Max ordinate and range of weapon. For
aircraft: Max operating altitudes or max ordnance altitude.
2-3
NASWHIDBEYINST 3770.1E
12 Jul 10
j. Type target.
k. Acceptable alternate area(s), date(s), or time(s) and
amplifying remarks.
l. TACP/TAC (A) requirements.
m. Remarks and/or services requested to include a point of
contact and phone number.
2. Requests for multiple exercises/areas should be submitted in
the same message using the format described above.
2.6 ELECTRONIC COUNTERMEASURES (ECM) AND CHAFF REQUESTS
2.6.1 ECM Area. The Continental United States ECM Area extends
to the outer boundaries of the coastal Air Defense
Identification Zone (ADIZ) or a perimeter 150 Nautical Miles
(NM) seaward from the coastal states, whichever is farther,
except where this infringes on territorial limits of other
nations/states. ECM procedures can be found in CJCSM 3212.02,
(Performing Electronic Attack in the United States and Canada
for Tests, Training, and Exercises.)
2.6.2 ECM Coordination. All ECM activity (including chaff)
shall be coordinated by the unit planning the ECM mission with
the FAA Frequency Management Office (425)-227-2637 and the NAS
Whidbey Island Frequency Manager (360) 257-2181. Reference (d)
applies. In addition, use of chaff requires coordination with
Western Air Defense Sector, DQM/AST; telephone DSN 382-4604.
2-4
NASWHIDBEYINST 3770.1E
12 Jul 10
CHAPTER 3
MILITARY OPERATIONS AREAS (MOAs)/AIR TRAFFIC CONTROL ASSIGNED
AIRSPACE (ATCAA)
3.1 GENERAL
3.1.1 Description. The Okanogan, Roosevelt, Boardman, and
Olympic MOAs are designated for the purpose of conducting
special military training operations, such as combat tactics,
aerobatics, intercepts, instrument training, aerial refueling,
and formation flight training. Nonparticipating IFR traffic
will be provided separation from operations within the MOAs by
Seattle ARTCC. Nonparticipating VFR traffic is urged to remain
clear of the area. Should it become necessary to transit
Okanogan or Roosevelt when training activities are being
conducted, exercise extreme caution.
3.1.2 Operating Hours. All MOAs are published "continuous by
NOTAM" and are available 24 hours each day. A minimum of 2 1/2
hours-prior notice is required to allow sufficient time to
disseminate the NOTAMs.
3.1.3 Scheduling. Missions or exercises involving multiple
units/commands that extend two or more days shall be coordinated
at least 30 days in advance to comply with Seattle ARTCC
requirements. Refer to Chapter 2 paragraph 2.4.2 for additional
scheduling procedures. ATCAA is available above FL180 and may
be requested with at least 30 minutes prior notice.
3.1.4 Communications. Communications in MOAs shall be
maintained with the designated controlling agency, additionally
the Okanogan, Roosevelt and Olympic MOAs have assigned UNICOM
frequencies for military aircraft that all pilots will monitor
while in the respective MOA (Table 1).
MOA COMMUNICATIONS
AREA
AGENCY
CALL SIGN
FREQUENCY
Okanogan
Seattle ARTCC
Seattle Center
291.6 MHZ
Roosevelt
Seattle ARTCC
Seattle Center
291.6 MHZ
Olympic
Seattle ARTCC
Seattle Center
291.6 MHZ
Okanogan
UNICOM
252.5 MHZ
Roosevelt
UNICOM
258.5 MHZ
Olympic
UNICOM
234.55 MHZ
Table 1
3-1
NASWHIDBEYINST 3770.1E
12 Jul 10
3.2 OKANOGAN MOA/ATCAA. Illustration (1)
3.2.1 Okanogan A Boundaries.
Beginning at:
49º 00' 00"N 119º 45' 04"W to
49º 00' 00"N 119º 20' 04"W to
49º 00' 00"N 119º 00' 04"W to
48º 03' 30"N 119º 00' 04"W to
48º 05' 00"N 120º 20' 04"W to
48º 06' 30"N 119º 45' 04"W to
48º 08' 29"N 120º 27' 34"W to
48º 54' 40"N 120º 03' 04"W to
48º 54' 40"N 119º 45' 04"W to
the point of beginning.
1. Altitudes:
9,000 feet MSL to, but not including, FL180.
ATCAA: FL180 to, but not including, FL240.
3.2.2 Okanogan B Boundaries.
Beginning at:
48º 08' 29"N 120º 27' 34"W to
48º 54' 40"N 120º 03' 04"W to
48º 54' 40"N 119º 45' 04"W to
48º 06' 30"N 119º 45' 04"W to
the point of beginning.
1. Altitudes:
300 feet AGL to, but not including, 9,000 feet
MSL, excluding that airspace 1,500 feet and below within a 3NM
radius of the following airports: Twisp Municipal Airport, WA
and the Methow Valley State Airport, Winthrop, WA.
(Underlies
Western portion of Okanogan A.)
3.2.3 Okanogan C Boundaries.
Beginning at:
48º 05' 00"N 119º 20' 04"W to
49º 00' 00"N 119º 20' 04"W to
49º 00' 00"N 119º 00' 04"W to
48º 03' 30"N 119º 00' 04"W to
the point of beginning.
1. Altitudes:
300 feet AGL to, but not including, 9,000 feet
MSL.
(Underlies eastern portion of Okanogan A.)
3-2
NASWHIDBEYINST 3770.1E
12 Jul 10
3.2.4 Molson ATCAA. Illustration (1)
1. MOLSON NORTH ATCAA Boundaries:
Beginning at:
49°00’00”N/119°45’04”W to
48°54’40’N/119°45’04”W to
48°54’40”N/120°03’04”W to
48°30’30”N/120°16’00”W to
48°09’00”N/119°00’00”W to
49°00’00”N/119°00’04”W to
49°00’00”N/119°20’04”W to
the point of beginning.
Altitudes: FL240 to and including FL500.
2. MOLSON SOUTH LOW/HIGH ATCAA. Illustration (1)
Beginning at:
48°30’30”N/120°16’00”W to
48°08’29”N/120°27’34”W to
48°03’30”N/119°00’04”W to
48°06’30”N/118°51’30’W to
the point of beginning.
Altitudes:
MOLSON SOUTH LOW: FL240 to, but not including, FL290.
MOLSON SOUTH HIGH: FL290 to and including FL500.
(Five days
advance coordination required.)
WARNING
VFR civil traffic is authorized in this MOA. Military
aircrew must be alert for civilian controlled traffic.
3.3 ROOSEVELT A MOA/ATCAA. Illustration (1)
3.3.1 Roosevelt A Boundaries
Beginning at:
49º 00' 00"N 119º 00' 04"W to
49º 00' 00"N 117º 23' 04"W to
49º 00' 00"N 116º 48' 04"W to
48º 22' 00"N 117º 28' 04"W to
48º 22' 00"N 118º 06' 04"W to
48º 19' 30"N 118º 14' 34"W to
48º 03' 30"N 119º 00' 04"W to
the point of beginning.
1. MOA Altitudes: 9,000 feet MSL to, but not including, FL180.
3-3
NASWHIDBEYINST 3770.1E
12 Jul 10
2. ATCAA: FL180 to, but not including, FL240.
3.3.2 Roosevelt B Boundaries
Beginning at:
48º 03' 30"N 119º 00' 04"W to
49º 00' 00"N 119º 00' 04"W to
49º 00' 00"N 117º 23' 04"W then
via a line parallel to and 2 NM west of the west bank of the
Pend Oreille River, WA to
48º 38' 00"N 117º 25' 04"W to
48º 38' 00"N 118º 10' 34"W then
via a line parallel to and 2 NM west of the west bank of the
Columbia River, WA to the point of beginning.
1. Altitudes: 300 feet AGL to, but not including, 9,000 feet
MSL. Excluding the airspace 1,500 feet and below within a 3 NM
radius of the Ferry County Airport, Republic, WA.
(Underlies a
portion of Roosevelt A.)
3.3.3 Republic ATCAA. Illustration (1)
1. REPUBLIC ATCAA
Beginning at:
49°00’00”N/119°00’04”W to
48°09’00”N/119°00’00”W to
48°06’30”N/118°51’30”W to
48°19’30”N/118°14’34”W to
48°22’00”N/118°06’04”W to
48°22’04”N/117°28’04”W to
49°00’00”N/116°48’04”W to
49°00’00”N/117°23’04”W to
the point of beginning
Altitudes: FL240 to and including FL500.
WARNING
VFR civil traffic is authorized in this MOA. Military
aircrew must be alert for civilian air traffic.
3.4 OLYMPIC A MOA/ATCAA. Illustration (2)
3-4
NASWHIDBEYINST 3770.1E
12 Jul 10
3.4.1 Olympic A Boundaries
Beginning at:
47º 41' 29"N 124º 33' 05"W to
47º 41' 29"N 123º 43' 35"W to
47º 37' 59"N 123º 40' 05"W to
47º 14' 59"N 123º 40' 05"W to
47º 05' 59"N 124º 14' 53"W then
northbound 3 miles parallel to the shoreline, to the point of
beginning.
1. Altitudes:
6,000 feet MSL to, but not including, FL180,
excluding that airspace below 1,200 feet AGL.
2. ATCAA: FL180 up to and including FL350.
3.4.2 Olympic B Boundaries
Beginning at:
48º 08' 59"N 124º 48' 05"W to
48º 08' 59"N 124º 30' 35"W to
47º 59' 59"N 124º 07' 05"W to
47º 41' 29"N 123º 43' 35"W to
47º 41' 29"N 124º 33' 05"W then
northbound 3 miles parallel to the point of beginning.
1. Altitudes:
6,000 feet MSL to, but not including, FL180,
excluding that airspace below 1,200 feet AGL.
2. ATCAA: FL180 up to and including FL350.
WARNING
VFR civil traffic is authorized in this MOA. Military
aircrew must be alert for civil/uncontrolled traffic.
3.5 FILING PROCEDURES. For Okanogan MOA/ATCAA file via FAIROPS
(Whidbey Island-based units) or to EPH 320/055 and indicate MOA
delay time.
1. For Roosevelt MOA/ATCAA file via FAIROPS (Whidbey Island-
base units) or to EPH 005/060 and indicate MOA delay.
2. For Olympic A IVIOA/ATCAA file via FAIROPS (Whidbey Island-
based units) or to HQM 327/033 and indicate MOA delay.
3. For Olympic B MOA/ATCAA file via FAIROPS (Whidbey Island-
based units) or HQM 335/066 and indicate MOA delay.
3-5
NASWHIDBEYINST 3770.1E
12 Jul 10
4. For aerial refueling operations, receiver aircraft flight
plans shall include, in the remarks section, the call sign(s) of
tanker aircraft and a statement that MARSA will be applied.
3.6 REAL-TIME COORDINATION. Seattle ARTCC releases SUA on a
real-time basis and requires a 30-minute notice prior to
entering any MOA so the area can be cleared of IFR traffic. For
coordination purposes, it is the responsibility of the mission
commander to ensure that Whidbey Clearance Delivery or Seattle
ARTCC is notified at least 30 minutes prior to scheduled MOA
entry time.
3.7 MOA OPERATING PROCEDURES. MARSA is a condition, which
applies to those aircraft operating within the MOAs/ATCAAs. If
more than one unit is scheduled to operate within a MOA/ATCAA,
each unit will be briefed on the vertical and/or lateral
assignments of the other units by the NAS Whidbey Island Range
Schedules Division.
1. All operations within the MOAs are subject to a Letter of
Agreement between NAS Whidbey Island and Seattle ARTCC.
Controlling agency is Seattle ARTCC. Using/scheduling agency is
NAS Whidbey Island. No military operations are permitted within
these MOAs without prior approval.
2. Aircrews shall not expect to enter MOAs/ATCAAs before their
scheduled entry time. Seattle ARTCC will not issue entry
clearance for early arrivals if the MOA/ATCAA is in use.
3. All aircraft shall have operable communications, navigation,
and identification (CNI) equipment on all flights. A
malfunction on CNI equipment is cause to cancel/abort missions.
4. Upon check-in with Seattle ARTCC, provide call sign and
event number of aircraft to operate in MOA/ATCAA (include each
aircraft within a formation), area(s) scheduled and altitudes
required.
5. Aircraft shall monitor Seattle ARTCC frequency while
operating within the MOA/ATCAA unless otherwise approved. If
change to tactical/MOA Universal Integrated Communication
(UNICOM) frequency is authorized, monitor Guard 243.0 MHZ.
6. Pilots cleared to operate within the MOAs/ATCAAs are
responsible for remaining within the vertical and lateral
confines of the MOA/ATCAA as specified in the ATC clearance.
3-6
NASWHIDBEYINST 3770.1E
12 Jul 10
NOTE
Seattle
ARTCC
is
equipped
with
error
detection
software to ascertain when spill outs occur.
Seattle
ARTCC may file Pilot deviation reports when spill outs
are detected.
7. Clearance to operate in the MOA/ATCAA shall be considered
similar to holding instructions, not a cancellation of IFR,
further clearance is required prior to departing the MOA/ATCAA.
8. Aircraft that must continuously transit FL180 shall use the
local altimeter setting as authorized in FAR Exemption 2861A.
9. Aircraft operating within any SUA shall squawk the Mode 3
code assigned by Air Traffic Control. Aircraft not previously
assigned a Mode III discrete code shall squawk 4000.
10. Supersonic flights are not normally conducted in NAS
Whidbey MOAs/ATCAAs. When required, supersonic operations shall
be conducted per OPNAVINST 3710.7 and applicable Air Force
Regulations.
11. Unless safety of flight dictates, no aircraft shall depart
assigned MOAs/ATCAAs until ATC clearance is received from
Seattle ARTCC. Under normal circumstances, aircraft should
provide Seattle ARTCC at least 5 minutes advance notice of
intent to depart. This provides needed time for flight data
processing and coordination when required.
12. Lost communications shall be as outlined in DOD FLIP.
13. UNICOM/SAFE HAVEN procedures are as follows:
a. All aircraft entering a MOA/ATCAA will contact Seattle
ARTCC on appropriate frequency (Table 1) for entry using call
sign and appropriate event number. Event numbers will be
assigned by Range Schedules Division at (360) 257-2877. If
multiple aircraft are scheduled for the same event or co-use of
the area is approved, aircraft entering a MOA/ATCAA will check
in via the appropriate UNICOM frequency with call sign and event
number. If no communication can be established aircraft will
proceed to SAFE HAVEN which is described by a lateral area
extending from the border of the MOA/ATCAA to 3 NM into the
MOA/ATCAA (Illustration 9). Additionally altitudes for each
SAFE HAVEN area are described in Illustration 9. Once
established in the SAFE HAVEN area aircraft will continue to try
and contact playmates or co-use aircraft and, if still no
communication can be established, then aircraft will coordinate
exiting the MOA/ATCAA with Seattle ARTCC.
3-7
NASWHIDBEYINST 3770.1E
12 Jul 10
b. When ready to exit the MOA/ATCAA aircraft will coordinate
with Seattle ARTCC on appropriate frequency (Table 1) prior to
leaving the MOA/ATCAA assigned. If multiple aircraft for the
same event are in the MOA/ATCAA, the last aircraft departing the
MOA/ATCAA shall advise Seattle ARTCC, i.e.
“SEATTLE CENTER
PUGET52 EVENT 30001 LAST AIRCRAFT OUT.” Upon reporting last
aircraft out, Seattle ARTCC will close the event number and the
airspace will be deactivated.
3.8 CROP DUSTING ACTIVITY. Extensive crop dusting occurs in the
agricultural lands of the Columbia River Basin. Aircrew using
MTRs originating or terminating in the Boardman Range Complex
should be aware that crop dusting activity occurs in non-Navy
land areas that lie beneath R-5701/5706. Uncharted airfields in
the vicinity of the Boardman Range from which crop dusters
originate include:
1. Taggares Farms Airport, OR approximately 10NM west of the
Boardman Bull at 45°45.1’N/119°36.4’W.
2. Eastern Oregon Farms Airport, at 45041.4’N/118050.3’W
3. Patterson Airport, WA at 45o57.4’N/119o37.2’W
3.9 FLARE DROPS. The dispensing of self-protection flares is
authorized in all MOAs with the following limitations:
1. Planned use shall be coordinated with Range Schedules
Division.
2. Minimum altitude for dispensing is 500' AGL for fixed wing
and 700' AGL for helicopters.
3. Use of illumination flares is not authorized.
3.10 WHIDBEY ISLAND SURVIVAL AREA (Illustration 7)
Beginning at:
48° 17' 56.47"N 122° 35' 30.00" W to
48° 18’ 06.91”N 122° 35’ 31.00” W to
48° 18’ 26.00”N 122° 34’ 50.60” W to
48° 18’ 25.80”N 122° 33’ 21.15” W to
48° 16’ 50.50”N 122° 33’ 21.20” W to
48° 16’ 44.50”N 122° 33’ 33.00” W to
48° 16’ 45.90”N 122° 33’ 35.75” W
then north along shoreline to point of origin.
1. This area can be used for, but is not limited to, small
amphibious landings, LCAC training, helicopter training, small
3-8
NASWHIDBEYINST 3770.1E
12 Jul 10
unit training (under 2000 people), ground training and survival
training.
3.10.1 Point of Contact/Scheduling. Scheduling will be done
through Range Schedules Division at (360) 257-2877.
3.10.2 Altitude Assignment. Altitudes are not specifically
defined; however, Whidbey Approach Control may assign a maximum
altitude.
NOTE
This area underlies NAS Whidbey Class C Airspace.
Review all Aeronautical Charts and procedures before
operating aircraft in this area.
Concerns shall be
directed to
(360)
257-2681, the NAS Whidbey Island
Operations Duty Officer.
3.11 CRESCENT HARBOR NAVAL OPERATIONS AREA (Illustration 7).
Located in Crescent Harbor, Saratoga Passage, Oak Harbor, WA.
The site is in waters adjacent to the NAS Whidbey Island
Seaplane Base. The area is drawn from the Polnell Point Light
(48° 16' 22"N 122° 33' 30 W) west-southwest to a point in
central Crescent Harbor (48° 16' 00"N 122° 36' 00 W) and then
due north to a point along Crescent Harbor’s shoreline on
Whidbey Island (48° 17' 55"N 122° 36' 00 W.)
1. Exercises can only occur when all non-participating vessels
and persons are clear of the area.
2. Effective times are by NOTAM/NOTMAR and available 24 hours a
day.
3.11.1 Point of Contact/Scheduling. Scheduling will be done
through Range Schedules Division at (360) 257-2877.
3.11.2 Procedures for Ordnance Use. Procedures for ordnance use
can be found in COMNAVSURFPACINST 3120.8D (PROCEDURES FOR
DISPOSAL OF EXPLOSIVES AT SEA/FIRING OF DEPTH CHARGES AND OTHER
UNDERWATER ORDNANCE).
3.12 NAVY EXCHANGE (NEX) LZ/DZ (Illustration 7). Located on the
NAS Whidbey Island Seaplane Base. The LZ encompasses all of the
parking area north of the NEX. Units using this LZ will be
required to provide their own physical security, as well as
fire/rescue requirements and comply with all federal laws, state
laws, local laws, and air traffic control procedures.
3.12.1 Point of Contact/Scheduling. Coordination must be made
at least 30 days in advance to use this LZ/DZ (except local
tenant units.)
3-9
NASWHIDBEYINST 3770.1E
12 Jul 10
Scheduling will be done through Range Schedules Division at
(360) 257-2877. For use of this area Range Schedules Division
will coordinate with Navy Region Northwest Deputy Director for
Range Support at (360) 257-3315. Navy Region Northwest Deputy
Director for Range Support will assist in the coordination with
a multitude of agencies for use of this area. The Range
Schedules Division will schedule this only after prior
coordination with all parties involved has been accomplished.
NOTE
This area underlies NAS Whidbey Island Class C
Airspace.
Review
all
Aeronautical
Charts
and
procedures before operating aircraft in this area.
Concerns shall be directed to (360) 257-2681, the NAS
Whidbey Island Operations Duty Officer.
3.13 CHINOOK A AND B MOAs
3.13.1 Chinook A Boundaries. A north/south corridor 2 NM wide,
1 NM either side of a line beginning at the hood canal Bridge,
port Gamble, WA (lat 47º 52’14”N., long. 122º 38’05”W.),
extending on a bearing of 000 T to Restricted Area R-6701.
1. Altitudes:
300 feet MSL to 5000 feet MSL.
3.13.2 Chinook B Boundaries. An east/west corridor 2 NM wide, 1
NM either side of the line beginning at lat. 48º 13’59”N., long.
123º 04’35”W., extending on a bearing of 110 T until reaching R-
6701.
1. Altitudes:
300 feet MSL to 5000 feet MSL.
3.14 Restricted Area R-6701, Admiralty Inlet Boundaries.
Beginning at:
48° 09° 59"N 122° 34' 53"W to
48° 05' 44"N 122° 31' 35"W to
48° 06' 05"N 122° 41' 17"W to
48° 09' 59"N 122° 41' 01"W to
the point of beginning.
1. Altitudes: Surface to 5,000 feet MSL.
3.15 Alert Area A-680, OLF Coupeville Boundaries.
3 NM radius
of 48° 10' 59"N 122° 38' 05"W.
1. Altitudes: Surface to and including 3,000 feet MSL.
3-10
NASWHIDBEYINST 3770.1E
12 Jul 10
CHAPTER 4
DARRINGTON OPERATING AREA
4.1 GENERAL
4.1.1 Description. The Darrington Area is a block of airspace
established by Letter of Agreement with Seattle ARTCC for ESM,
ECM, DECM and functional check flight missions. This area is
not a designated MOA and is for use by NAS Whidbey Island-based
units only. See Illustration (4).
4.1.2 Scheduling. All scheduling is controlled through Seattle
ARTCC on a "first-come-first-served" basis. The route to
Darrington is defined by the NUW-Darrington FAIROPS route in
reference (e).
4.1.3 Communications
1. Whidbey Approach: 270.8 MHZ
2. Seattle ARTCC: 270.3 MHZ
4.2 AREA BOUNDARIES (Illustration 4)
4.2.1 Darrington West Boundaries.
Beginning at:
48º 46' 00"N 122º 09' 00"W to
48º 45' 55"N 122º 00' 45"W to
48º 38' 30"N 121º 58' 00"W to
48º 15' 11"N 121º 58' 00"W to
48º 15' 00"N 122º 33' 00"W to
48º 21' 00"N 122º 44' 00"W to
48º 38’ 00”N 122º 15’ 00”W to
48º 54’ 40”N 120º 03’ 04”W to
the point of beginning.
1. Altitudes: Not specifically defined, however minimum
altitude assignment by Seattle ARTCC will not be lower than
10,000 feet MSL.
4.2.2 Darrington East Boundaries
Beginning at:
48º 45’ 55”N 122º 00’ 45”W to
48º 45’ 00”N 120º 42’ 00”W to
48º 15’ 00”N 120º 42’ 00”W to
48º 15’ 11”N 121º 58’ 00”W to
48º 38’ 30”N 121º 58’ 00”W to
point of beginning.
4-1
NASWHIDBEYINST 3770.1E
12 Jul 10
1. Altitudes: Not specifically defined, however altitude
assignments by Seattle ARTCC will not be lower than 13,000 feet
MSL.
CAUTION
The Darrington Area is not special use airspace.
Military aircrew must be alert for civil/uncontrolled
traffic.
4.3 OPERATING PROCEDURES
1. Electronic countermeasures training and EA6/EA18/P3/EP3
functional check flights (FCFs) only.
2. VFR on-top operations, aerobatics, ACM/DACM, and aerial
refueling/practice plugs are not authorized.
3. Seattle ARTCC reserves the right to limit the number of
aircraft that can operate in the area at any given time.
4. Maximum number of aircraft in formation flight is two.
Aircrew shall ensure that each aircraft has filed an IFR flight
plan for individual flight in the Darrington Area if flight
break-up is planned.
5. IFR procedures are mandatory. Aircraft shall remain on
Seattle ARTCC frequency when operating in the area, unless
otherwise coordinated.
6. Aircraft cleared to operate in Darrington Area shall remain
within the lateral and vertical limits of the area as assigned
by Seattle ARTCC.
7. Lost communications shall be as outlined in DOD FLIP.
NOTE
Supersonic flight is NOT authorized in the Darrington
Operating Area
4-2
NASWHIDBEYINST 3770.1E
12 Jul 10
CHAPTER 5
WASHINGTON COASTAL WARNING AREAS
5.1 GENERAL
5.1.1 Description. The W-237 complex includes Warning Areas
W-237A through W-237J. They are offshore areas used for joint
air/surface operations such as missile firings, air-to-surface
bombing, air-to-air firing, combat tactics, intercepts, aerial
refueling, instrument training, aerobatics, and formation
flight training. The W-237 complex is also a designated ASW
range for coordinated ASW operations, sonobuoys, practice
depth charges, and smoke markers. See Illustration (2).
5.1.2 Operating Hours. W-237 areas are published intermittently
by NOTAM, and are available 24 hours a day. For areas A through
G, a minimum of 2 1/2 hours prior notice is required to allow
sufficient time to disseminate NOTAMs. A minimum of 4 1/2 hours
prior notice is required if areas H or J are scheduled.
5.1.3 Scheduling. Missions or exercises involving multiple
units/commands (i.e., Advanced Training Assessment (ATA),
Operational Readiness Inspections/Evaluations (ORI/ORE), etc.)
that extend two or more days shall be coordinated at least 60
days in advance. Refer to Chapter 2, paragraph 2.4.2 for
additional scheduling procedures.
5.1.4 Communications
1. Seattle ARTCC
Radio:
319.2/125.1 MHZ (North)
269.0/128.3 MHZ (South)
Telephone:
DSN 891-1241
COMM (253) 351-3523
2. Western Air Defense Sector (Bigfoot)
Radio:
364.3 MHZ
Telephone:
DSN 382-4352
COMM (253) 984-4604
3. Canadian Air Defense Sector (Sidecar)
Radio:
364.2 MHZ
Telephone:
DSN 319-628-6701
COMM (705) 494-2011
(ID Section)
DSN 382-4604
DSN 319-628-6419 (MCC)
4. UNICOM:
227.5 MHZ
5-1
NASWHIDBEYINST 3770.1E
12 Jul 10
5.2 AIRSPACE BOUNDARIES
5.2.1 Warning Area W-237A Low/High
1. Beginning at:
47º 31' 59"N 125º 41' 05"W to
47º 41' 29"N 124º 33' 05"W then
southbound 3 NM parallel to the shoreline ending at
47º 05' 59"N 124º 14' 53"W to
47º 00' 29"N 124º 30' 05"W to
46º 49' 59"N 126º 24' 05"W to
the point of beginning.
2. Altitudes:
a. W-237A Low - Surface to, but not including, FL230.
b. W-237A High - FL230 to, but not including, FL500.
5.2.2 Warning Area W-237B Low/High
1. Beginning at:
48º 08' 59"N 125º 56' 05"W to
48º 08' 59"N 124º 48' 05"W then
southbound 3 NM parallel to the shoreline ending at
47º 41' 29"N 124º 33' 05"W to
47º 31' 59"N 125º 41' 05"W to
the point of beginning.
2. Altitudes:
a. W-237B Low - Surface to, but not including, FL230.
b. W-237B High - FL230 up to, but not including, FL500.
5.2.3 Warning Area W-237C
1. Beginning at:
48º 08' 59"N 125º 56' 05"W to
47º 00' 00"N 125º 28' 03"W to
47º 00' 00"N 126º 15' 00"W to
48º 08' 59"N 126º 15' 00"W to
the point of beginning.
2. Altitudes: Surface to unlimited
5-2
|
||
|
|
|