S
TANDARD
C
ONSTRUCTION
S
PECIFICATIONS
P
ART
2
–
R
OAD
S
TRUCTURES
Page 29-49
C
HAPTER
29:
M
ISCELLANEOUS
I
TEMS FOR
S
TRUCTURES
First Edition -January 2018
I
NDEX
abandoned existing structures, 29-7
absorption, 29-17, 29-31, 29-45
access covers, 29-1, 29-42
Adhesive, 29-1, 29-2, 29-27, 29-30, 29-31, 29-
32, 29-33, 29-34
adhesives, 29-28, 29-31, 29-32, 29-33, 29-34,
29-35
alternative system, 29-35
anchors, 29-1, 29-30, 29-32, 29-33, 29-34, 29-
35
asphaltic concretes, 29-36
average weight, 29-31
backfilling, 29-5, 29-43, 29-44
blast cleaning, 29-38, 29-39
blasting, 29-6, 29-7, 29-8, 29-9, 29-16, 29-18,
29-38, 29-45
borrow materials, 29-44
bridge deck, 29-11, 29-36, 29-42
Bridge Deck, 29-1, 29-36
Bridge drainage systems, 29-1
casing, 29-10, 29-11
castings, 29-12, 29-13
Certificate of Compliance, 29-37
channel grates, 29-11
chipping, 29-6, 29-39
coal tar, 29-25, 29-29, 29-43
coarse brooming, 29-38
Cofferdams, 29-10
components, 29-11, 29-13, 29-15, 29-20, 29-
21, 29-27, 29-30, 29-38
Compression strength test, 29-42
concrete gutters, 29-11
contamination, 29-19, 29-33, 29-38, 29-39,
29-46
Continuous-type mixers, 29-39
cotton ball, 29-24
cotton strand, 29-24
cracks, 29-1, 29-9, 29-12, 29-15, 29-16, 29-
20, 29-22, 29-23, 29-33, 29-42, 29-45
culverts, 29-6
curing, 29-18, 29-24, 29-27, 29-32, 29-33, 29-
38, 29-40, 29-42
daily log, 29-20
demolition, 29-6, 29-8
density, 29-10, 29-31, 29-45
deteriorated concrete, 29-16
dewatering, 29-8, 29-9, 29-43
dimensions, 29-12, 29-47
dowels, 29-1, 29-30, 29-32, 29-33, 29-34
drainage blankets, 29-11
drilling, 29-6, 29-12, 29-16, 29-33, 29-35
Drip check angles, 29-1
ducts, 29-1, 29-42, 29-43, 29-44
edge distance, 29-35
End walls, 29-1, 29-42
end-bent piling, 29-10
Epoxy compounds, 29-1, 29-25
Epoxy injection, 29-1
equipment, 29-9, 29-10, 29-14, 29-15, 29-18,
29-20, 29-22, 29-23, 29-32, 29-33, 29-36,
29-38, 29-39, 29-40, 29-41, 29-46, 29-47
excavation, 29-5, 29-7, 29-8, 29-9, 29-10, 29-
42
Excavation, 29-9, 29-43
existing bridge structures, 29-1
Explosives, 29-6
falsework, 29-7
field test, 29-33, 29-34
Fillers, 29-30
finishing machine, 29-40, 29-41
fluid, 29-24, 29-25
frames, 29-11, 29-12, 29-13, 29-42
freshly placed concrete, 29-11, 29-44
geocomposite drainage systems, 29-11, 29-
15
grading, 29-10, 29-44, 29-45, 29-46
grinding, 29-6, 29-16, 29-24
ground elevation, 29-6
hazardous materials, 29-8
heat straightening, 29-6
high winds, 29-40
hot applied, 29-29
independent testing, 29-33
initiator, 29-21, 29-22
internal access walkways, 29-1
latex-modified concrete, 29-36, 29-37, 29-38,
29-40, 29-41
Lockable doors, 29-1, 29-42
low humidity conditions, 29-40
major structures, 29-5
mix designs, 29-28
mobile distribution, 29-23
monomer, 29-21, 29-22, 29-23
mortar, 29-14, 29-26, 29-28
navigation beacons, 29-48
navigation channel, 29-48
navigation direction signs, 29-48
Oscillating screed-type machines, 29-40
penetrant sealers, 29-17
perforated pipes, 29-13
personnel, 29-15, 29-16, 29-20, 29-23
Piezometers, 29-9
promoter, 29-21, 29-22
rain, 29-23, 29-40, 29-42