Abu Dhabi, United Arab Emirates. STANDARD CONSTRUCTION SPECIFICATIONS (PART 2 - ROAD STRUCTURES, 2020) - page 5

 

  Index      Manuals     Abu Dhabi, United Arab Emirates. STANDARD CONSTRUCTION SPECIFICATIONS (PART 2 - ROAD STRUCTURES, 2020)

 

Search            copyright infringement  

 

   

 

   

 

Content      ..     3      4      5      6     ..

 

 

 

Abu Dhabi, United Arab Emirates. STANDARD CONSTRUCTION SPECIFICATIONS (PART 2 - ROAD STRUCTURES, 2020) - page 5

 

 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 21-15 

C

HAPTER 

21:

 

C

ONCRETE 

S

TRUCTURES

 

 

 

 

First Edition -January 2018 

 

 

Table 21-3: Normal-weight concrete slump test limits at the time of placement 

Type of Work 

Nominal Slump (mm)  Maximum Slump (mm) 

Formed Elements: 

Sections more than 300 mm thick 

Sections 300 mm thick or less 

 

25 

– 75 

25 

– 100 

 

125* 

125* 

Cast-in-place piles and drilled shafts not vibrated 

125 

– 200 

225 

Concrete placed under water 

125 

– 200 

225 

Filling for riprap 

75 

– 175 

200 

  *When GGBS is used the maximum slump may increase to 180. 

When Type F or G high-range, water-reducing admixtures are used, the Contractor may exceed the 
slump limits in  

 

Table 21-3, as permitted by the Engineer. 

When the consistency of the concrete is found to exceed the nominal slump, the  Contractor shall 
adjust the mixture of subsequent batches to reduce the slump to a value within the nominal range. 
Batches of concrete with a slump exceeding the maximum specified shall not be used in the work. 

If concrete of adequate workability cannot be obtained by the use of the minimum cement content 
and WC ratio allowed, adjustment shall be made with an approved admixture, and the WC ratio shall 
be maintained as low as possible as per approved concrete mix design. 

21.4.3 

Cement Control for Concrete Mixing 

Cement content minimums shall conform to the requirements of Table 4-16 of Chapter 4, Concrete 
Works, of these Standard Specifications

or as otherwise specified in the Contract documents. Actual 

cement content used shall sufficiently produce concrete of the required strength, consistency, and 
performance. 

21.4.4 

Concrete Admixtures 

Concrete admixtures shall comply with ASTM C494 / C494M 

– 12 or BS EN 480-2:1997, and shall 

be  added  to  the  concrete  mix  at  the  time  of  batching  the  concrete  and  in  accordance  with  the 
Manufacturer

’s written procedure, and as approved by the Engineer. Copies of the Manufacturer’s 

written procedure shall be furnished to the Engineer prior to use of any admixture. Any deviations 
from these written procedures shall be submitted to the Engineer for approval. Admixtures shall not 
be  added  to  the  concrete  with  the  modified  procedure  until  the  Engineer  has  approved  them  in 
writing.  

When  the  Contractor  proposes  to  use  admixtures  from  different  admixture  manufacturers,  the 
Contractor shall provide evidence from the Manufacturers to the Engineer that the admixture will be 
compatible and does not adversely affect the air-void system, strength, durability, and performance 
of  the  hardened  concrete.  Test  results  complying  with  ASTM  C457  /  C457M  -  11  shall  serve  as 
evidence to satisfy this requirement. 

Concrete admixtures shall not be used at site. 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 21-16 

C

HAPTER 

21:

 

C

ONCRETE 

S

TRUCTURES

 

 

 

 

First Edition -January 2018 

 

21.4.5 

Mineral Admixtures 

Mineral admixtures shall be used in the amounts specified in the Contract documents. When mineral 
admixtures are neither specified in the Contract documents nor prohibited, they shall be comparable 
to the specified type of cement, and  the Contractor shall comply with the requirements of  Section 
4.3.6 of Chapter 4, Concrete Works, of these Standard Specifications

21.4.6 

Chemical Admixtures 

Chemical  admixtures  shall  be  used  as  specified  in  the  Contract  documents.  Otherwise,  such 
admixtures may be used, at the option and expense of the Contractor, and when permitted by the 
Engineer, to increase the workability or alter the time-of-set of the concrete. Using calcium chloride 
shall not be permitted. Chemical admixtures for concrete shall be tested in accordance with ASTM 
C494 / C494M 

– 12. 

Methods  and  equipment  for  measuring  and  adding  additives  shall  be  approved  by  the  Engineer. 
Equipment at the batching plant that does not accurately dispense the correct amount of additive in 
an acceptable manner shall not be approved. 

21.4.7 

Corrosion Inhibitor for Structural Concrete Works 

Liquid concrete admixture shall be provided by the Contractor as required by the Contract documents 
to protect the steel reinforcement from corrosion induced by carbonation, chloride and atmospheric 
attack as specified herein and directed by the Engineer. The Contractor shall add to all Cast-In-Place 
(CIP)  structural  concrete  works  a  corrosion  inhibitor  as  recommended  by  the  Manufacturer,  as 
specified  in  Table  4.7  of  Chapter  4,  Concrete  Works,  of  these  Standard  Specifications,  and  as 
approved by the Engineer. The corrosion Inhibitor shall possess the following properties: 

1.  Proven effective when tested in accordance to ASTM G109 - 07 for a testing period not less 

than 10 years 

2.  Complies to requirements of ASTM C494 / C494M 

– 12 

3.  Complies to the requirements of ASTM C1582 / C1582M - 11 
4.  Proven effective in modified cracked beam testing 
5.  Established international and regional track-record in excess of 20 years 
6.  Protects both anodic and cathodic components of the corrosion cell 
7.  Homogeneous; settlement should not be observed with time 
8.  The  Manufacturer  shall  be  ISO  9001  and  ISO  14001  certified  for  the  design  and 

manufacturing of corrosion protection systems and concrete protection products with a valid 
(up-to-date) certificate. 

9.  Approved and certified by BBA, MPA Stuttgart or equivalent. 

21.5 

Manufacture of Concrete 

Ready-mixed concrete production and concrete produced by stationary plant shall conform to the 
requirements of AASHTO M157 and the requirements of Section 4.3 of Chapter 4, Concrete Works, 
of these Standard Specifications. 

21.5.1 

Delivery of Concrete 

To ensure continuous delivery, at the rate required for the Project, the company supplying concrete 
shall  have  sufficient  plant  capacity  and  transporting  apparatuses.  Concrete  delivery  rates  during 
concreting operations shall be such as to provide for the proper handling, placing, and finishing of 
the concrete. These rates shall ensure that the interval between batches does not exceed 20 minutes 
and shall sufficiently prevent joints within a monolithic pour caused by placing fresh concrete against 
concrete in which the initial set has already occurred. Delivery and handling methods shall facilitate 
concrete placing with minimal re-handling and without damaging the structure or the concrete. 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 21-17 

C

HAPTER 

21:

 

C

ONCRETE 

S

TRUCTURES

 

 

 

 

First Edition -January 2018 

 

21.5.2 

Concrete Sampling and Testing 

In addition to the requirements and standard methods provided in Section 4.3 of Chapter 4, Concrete 
Works, of these Standard Specifications

compliance with the requirements indicated in this section 

shall be determined in accordance with the following standard methods of the AASHTO, ASTM, or 
BS EN: 

  Sampling Fresh Concrete, AASHTO R 60-12 (ASTM C172 / C172M - 10) 

  Weight  per  Cubic  Metre,  Yield,  and  Air  Content  (Gravimetric)  of  Concrete,  AASHTO  T 

121M/T 121-12 (ASTM C138 / C138M - 12) 

  Sieve Analysis of Fine and Coarse Aggregate, AASHTO T27-11 (ASTM C136 - 06) 

  Slump of Portland Cement  Concrete,  AASHTO T 119M/T 119-11 (ASTM C143 / C143M  - 

10a) 

  Testing Fresh Concrete, Slump-Test, BS EN 12350-2:2009 

  Air Content of Freshly Mixed Concrete by the Pressure Method, AASHTO T 152-12 (ASTM 

C231 / C231M - 10) 

  Specific Gravity and Absorption of Fine Aggregate, AASHTO T 84-10 (ASTM C128 - 12) 

  Specific Gravity and Absorption of Coarse Aggregate, AASHTO T 85-10 (ASTM C127 - 12) 

  Determining Density of Structural Lightweight (Low-Density) Concrete, ASTM C567 / C567M 

- 11 

  Making  and  Curing  Concrete  Test  Specimens  in  the  Laboratory,  AASHTO  T  126  (ASTM 

C192 / C192M - 07) 

  Making and Curing Concrete Test Specimens in the Field, AASHTO T 23-08 (ASTM C31 / 

C31M - 12) 

  Testing  Hardened  Concrete,  Compressive  Strength  of  Test  Specimens,  BS  EN  12390-

3:2009 

21.5.2.1 

Concrete Sampling 

One set consisting of nine (9) cubes (15cm) shall be made in accordance with BS EN 12390-1:2000 
and  BS  EN  12390-2:2009  from  a  sample  taken  from  each  randomly  selected  batch  of  concrete. 
Samples shall be taken at the point of discharge from the delivery truck. Unless otherwise instructed 
by the Engineer the rate of sampling of randomly selected batches from same plant shall be as given 
in Table 21-4, but not less than one sample shall be taken on each day that concrete of that class is 
used.  

The nine cubes shall be numbered consecutively and marked with the date, the section of work from 
which it was taken and any other information required and dispatched to the approved laboratory for 
testing for compressive strength. 

Table 21-4: Rates of sampling and testing from same plant 

Number of trucks 

Rate 

(1) Truck 

(1) set 

(2-4) Trucks 

(2) sets 

(5-10) Trucks 

(3) sets 

(11-40) Trucks 

(4) sets 

> 40 

 One set for each 100 m

3

  

21.5.2.2 

Frequency of Testing for Concrete Aggregates 

Unless  otherwise  instructed  by  the  Engineer,  the  aggregates  in  use  shall  be  regularly  tested  in a 
laboratory acceptable to the Engineer at a frequency not less than that indicated in Table 21-5: 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 21-18 

C

HAPTER 

21:

 

C

ONCRETE 

S

TRUCTURES

 

 

 

 

First Edition -January 2018 

 

Table 21-5: Frequency of aggregate testing 

Test 

Frequency 

Remarks 

Particle size distribution by sieve analysis 

Weekly 

More frequently at start of production 

Clay, fine silt, et. 

Weekly 

 

Sand equivalent of fine aggregate 

Bi-weekly 

 

Fineness modulus of fine aggregate 

Bi-weekly 

 

Clay lumps 

Bi-weekly 

 

Flakiness index 

Bi-weekly 

Reducing to weekly when stable. 

Elongation index 

Bi-weekly 

Reducing to weekly when stable. 

Specific  Gravity  of  coarse  and  fine 
aggregates 

Weekly 

Reducing to bi-weekly when stable. 

Water absorption 

Weekly 

Reducing to bi-weekly when stable. 

Bulk density and voids of aggregate 

Weekly 

 

Organic impurities 

Weekly 

 

Aggregate crushing value 

Weekly 

 

10% fines 

Weekly 

 

Aggregate Impact Value 

Weekly 

 

Los Angeles abrasion resistance 

Bi-weekly 

 

Sulfate content 

Bi-weekly 

 

Chloride content 

Bi-weekly 

 

Voided Shell Content 

Bi-weekly 

Reducing to monthly when stable 

Cement 

– Aggregate Reactivity 

Initially  for  each  source  and  as  directed  by  the 
Engineer 

Sulfate soundness 

Monthly 

 

Drying Shrinkage 

Initially  for  each  source  and  as  directed  by  the 
Engineer 

Others 

As required by the Engineer 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 21-19 

C

HAPTER 

21:

 

C

ONCRETE 

S

TRUCTURES

 

 

 

 

First Edition -January 2018 

 

21.5.3 

Evaluation of Concrete Strength 

21.5.3.1 

Concrete Strength Tests 

Cubes Nos. 1, 5 and 9 shall be tested after 7 days. If the average of the three 7-day test cubes is 
below the minimum requirement, the Contractor must immediately stop all concreting until checks 
are  made  on  the  material  and  equipment  and  immediately  rectify  any  defect  which  has  become 
apparent as the result of such checking. If the Contractor elects to remove and replace the defective 
concrete without waiting for the results of the 28-day test, concreting can then continue entirely at 
the responsibility of the Contractor. Cubes Nos. 2 and 8, 3 and 7, and 4 and 6 will be considered 
three individual samples or sets and after 28 days of curing shall be tested as specified above. If 
either of the cubes in any set shows definite evidence, other than low strength, of improper sampling, 
molding, handling, curing or testing, said cube shall be discarded and the strength test shall consist 
of the strength of the remaining cubes. 

21.5.3.2 

Requirements for Controlling Construction Operations 

For determining adequacy of cure and protection, and for determining when loads or stresses can 
be applied to concrete structures, test cubes shall be cured at the structure site under conditions that 
are not more favourable than the most unfavourable conditions for the portions of the structure that 
they represent, as described in AASHTO T 23-08 (ASTM C31 / C31M - 12), Article 9.4. Sufficient 
test  cubes,  as  specified  in  Article  21.5.2.1,  shall  be  made  and  tested  at  the  appropriate  ages  to 
determine  when  operations,  such  as  release  of  falsework,  application  of  prestressing  forces,  or 
placing the structure in service, can occur. 

21.5.3.3 

Requirements for the Acceptance of Concrete 

All concrete shall be accepted based on adherence to the requirements of this chapter and Section 
4.3.12 of Chapter 4, Concrete Works, of these standard specifications.  

When determining compliance of concrete with a specified strength, test cubes shall be cured under 
controlled conditions, as described in Article 9.3 of AASHTO T 23-08 (ASTM C31 / C31M - 12); and 
shall be tested at the specified age.  

Final acceptance of the concrete works is based on 28 days' testing on the three sets of two cubes 
each.  The  work  is  considered  in  compliance  if  the  average  of  the  three  sets  of  cubes  equals  or 
exceeds the minimum specified for the class of concrete being placed, and if the average of the two 
cubes in any one set does not fall below the specified minimum strength by more than 3.4 MPa. If 
the  results  of  the  28-day  testing  are  unsatisfactory,  the  Contractor,  in  accordance  with  the 
instructions of the Engineer, shall conduct tests in the suspect parts of the structure. The concrete 
may be test loaded in-situ or cylindrical test cores may be drilled out and tested in accordance with 
BS  EN  12390-3:2009.  Should  the  tests  prove  that  the  concrete  is  unsatisfactory  or  below  the 
standards specified, the Engineer may order the concrete to be removed and replaced with concrete 
of the specified quality.  All the above shall be at the expense and responsibility of the Contractor. 

21.5.3.4 

Requirements for the Control of Mix Design 

Whenever the average of three consecutive strength tests that were made to determine acceptability 
of the concrete falls to less than 1.03 MPa below the specified strength, or any single strength test 
falls  more  than  1.38  MPa  below  the  specified  strength,  the  Contractor  shall,  at  the  Contractor's 
expense,  make  corrective  changes  in  the  materials,  mix  proportions,  or  concrete  manufacturing 
procedures before placing additional concrete from that class. Such changes shall be approved by 
the Engineer prior to use. 

a.  Precast Concrete Cured by Waterproof Cover Method, Steam, or Radiant Heat 

When a precast concrete member is cured by the waterproof cover method, steam, or radiant heat, 
the  compressive  strength  test  cubes  made  for  any  of  the  above  purposes  shall  be  cured  under 
conditions similar to the member. Such concrete shall be considered acceptable whenever  a test 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 21-20 

C

HAPTER 

21:

 

C

ONCRETE 

S

TRUCTURES

 

 

 

 

First Edition -January 2018 

 

indicates  that  the  concrete  has  reached  the  specified  compressive  strength  if  such  strength  is 
reached no later than the specified age for the compressive strength. 

Test cubes shall be cured by only one of the following methods: 

  For concrete with specified design compressive strengths less than or equal to 41.4 MPa, 

test cubes shall be stored next to the member and under the same covers so that the cubes 
are exposed to the same temperature conditions as the member. 

  For all specified concrete strengths, test cubes shall be match-cured in chambers in which 

the temperature  of  the  chamber  is  correlated  with  the  temperature  in  the  member  prior  to 
release  of  the  prestressing  strands.  Temperatures  of  the  chamber  and  member  shall  be 
verified  by  use  of  temperature  sensors  in  the  chamber  and  member.  Unless  specified 
otherwise,  temperature sensors  in I-beams shall  be  located  at the  centre  of gravity  of the 
bottom flange. For other members, the temperature sensors shall be located at the centre of 
the thickest section. Locations shall be specified in the Contract documents. After release of 
the  prestressing  strands,  cubes  shall  be  stored  in  a  similar  temperature  and  humidity 
environment as the member. 

21.6 

Protection of Concrete during Placing and Curing 

Precautions  shall  be  taken  as  needed  to  protect  concrete  from  damage  due  to  weather  or  other 
environmental  conditions  during  placing  and  curing  periods.  Concrete  damaged  by  weather 
conditions shall be either repaired to an acceptable condition or removed and replaced.  

21.6.1 

Rain Protection 

Under conditions of rain, the placing of concrete shall not commence, or shall stop, unless adequate 
protection  is  provided  to  prevent  damage  to  the  surface  mortar  or  damaging  flow  or  wash  of  the 
concrete surface. 

21.6.2 

Hot-weather Protection 

The  recommendations  of  the  American  Concrete  Institute  Standard  "Guide  to  Hot  Weather 
Concreting", ACI 305R-10

, and “Cooling and Insulating Systems for Mass Concrete”, ACI 207.4R-

05, shall be followed. Proposals for hot weather concreting shall be included with the submissions 
for trial mixes. 

Concrete mixture temperatures immediately before placement shall be between 10 degrees Celsius 
and 32 degrees Celsius, except as otherwise provided herein. 

When the ambient temperature is above 32 degrees Celsius, the forms, reinforcing steel, steel-beam 
flanges, and other surfaces that will come in contact with the mix shall be cooled to below 32 degrees 
Celsius by means of a water spray 

— or other approved methods. 

Concrete  temperatures at time of placement shall be maintained within the specified temperature 
range by any combination of the following:  

  Shading the materials storage areas or the production equipment;  

  Cooling the aggregates by sprinkling with water that conforms to the requirements of Article 

4.4.1.3 of Chapter 4, Concrete Works, of these Standard Specifications;

 

 

  Shading the steel reinforcement; 

  White painting the transit mixer and covering it with hasin; 

  Reducing the time between placing of concrete and start of curing to minimum possible; 

  Using chilled water of a temperature below 4

˚ C; 

  Cooling the aggregates or water by refrigeration or replacing a portion of the mix water with 

ice that is flaked or crushed to the extent that the ice will completely melt while mixing of the 
concrete; and,  

  Injecting liquid nitrogen. 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 21-21 

C

HAPTER 

21:

 

C

ONCRETE 

S

TRUCTURES

 

 

 

 

First Edition -January 2018 

 

21.6.3 

Special Requirements for Bridge Decks 

When placing concrete in bridge decks or other exposed slabs, the Contractor shall ensure that the 
evaporation rate does not exceed the bleeding rate. In no case the evaporation rate shall be more 
than 0.5 kg per square metre per hour. The evaporation rate maybe estimated from ACI 308R-01 
chart shown in Figure 21-1. 

When  necessary,  the  Contractor  shall  take  one  or  more  of  the  following  actions  to  reduce  the 
evaporation rate: 

  Construct  windbreaks  or  enclosures  to  effectively  reduce  the  wind  velocity  throughout  the 

area of placement; 

  Use  fog  sprayers  upwind  of  the  placement  operation  to  effectively  increase  the  relative 

humidity; and,  

  Reduce the temperature of the concrete according to Section 21.6.3. 

 

 

 

Figure 21-1: Evaporation rate nomograph from ACI 308 

During  periods  of  low  humidity,  wind,  or  high  temperatures,  and  prior  to  the  application  of  curing 
materials,  the  Contractor  shall  protect  concrete  being  placed  and  finished  for  bridge  decks  from 
damage due to rapid evaporation. Such protection shall prevent premature crusting of the surface 
or an increase in drying cracking. Such protection shall be provided by raising the humidity of the 
surrounding air with fog sprayers operated upwind of the deck, by employing wind-breaks or sun-

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 21-22 

C

HAPTER 

21:

 

C

ONCRETE 

S

TRUCTURES

 

 

 

 

First Edition -January 2018 

 

shades,  additionally  reducing  the  temperature  of  the  concrete,  scheduling  placement  during  the 
cooler times of days or nights, or any combination thereof. 

For bridge decks that are located over or adjacent to salt water or when specified in the Contract 
documents, the maximum temperature of the concrete at the time of placement shall be 27 degrees 
Celsius. 

21.6.4 

Concrete Exposed to Salt Water 

Unless  otherwise  specified  in  the  Contract  documents,  concrete  for  structures  exposed  to  salt  or 
brackish water shall comply with the requirements of Class C40/20 concrete. Such concrete shall be 
mixed for a period of not less than two minutes and the water content of the mixture shall be carefully 
controlled  and  regulated  so  as  to  produce  concrete  of  maximum  impermeability.  To  produce 
maximum  density  and  a  complete  lack  of  rock  pockets,  the  concrete  shall  be  thoroughly 
consolidated,  as  necessary.  Unless  otherwise  indicated  in  the  Contract  documents,  the  clear 
distance from the face of the concrete to the reinforcing steel shall be not  less than 100 mm. No 
construction joints shall be formed between levels of extreme low and high water, or the upper limit 
of  wave  action,  as  determined  by  the  Engineer.  Between  these  levels,  the  forms  shall  not  be 
removed,  or  other  means  provided,  to  prevent  salt  water  from  coming  in  direct  contact  with  the 
concrete  for  a  period  of  not  less  than  30  days  after  placement.  Except  for  the  repair  of  any  rock 
pockets and the plugging of form-tie holes, the original surface 

— as the concrete comes from the 

forms 

— shall be left undisturbed. Special handling shall be provided for precast members to avoid 

even slight deformation cracks. 

21.6.5 

Concrete Exposed to Sulphate Soils or Sulphate Water 

When the Contract documents identify the area as containing sulphate soils or sulphate water, the 
concrete that will come in contact with such soil or water shall be Class C40/20 and shall be mixed, 
placed, and protected from contact with soil or water, as required for concrete exposed to salt water; 
however, the protection period shall be not less than 72 hours. 

21.7 

Handling and Placing Concrete 

Concrete shall be handled, placed, and consolidated by methods that shall not cause segregation of 
the mix and will result in a dense homogeneous concrete that is free of voids and rock pockets. The 
Contractor-selected  methods  shall  not  cause  the  displacement  of  reinforcing  steel,  or  other 
materials, to become embedded in the concrete. Concrete shall be placed and consolidated prior to 
initial set and in no case more than 1.5 hours after the cement was added to the mix. This time limit 
maybe increased to 2.0 hours when plasticizer type F, G, or D is used.  Concrete shall not be re-
tempered. 

Concrete shall not be placed until the Engineer has inspected and approved the forms, all materials 
to  be  embedded,  and  the  adequacy  of  the  foundation  material  for  spread  footings.  Prior  to 
commencing placement, the Contractor shall remove all mortar from pervious placements, debris, 
and foreign material from the forms and steel. Immediately before placing the concrete against the 
forms and subgrade, it shall be thoroughly moistened with water. Temporary form spreader devices 
may be left in place until concrete placement precludes their need, after which they shall be removed.  

Placement  of  concrete  for  each  section  of  the  structure  shall  be  done  continuously  without 
interruption between planned construction or expansion joints.  Delivery rates, placing sequences, 
and methods shall be such that fresh concrete is always placed and consolidated against previously 
placed concrete before its initial set has occurred. 

During and after the placement of concrete, care shall be taken not to injure the concrete or break 
the bond with reinforcing steel. Workers shall not walk in fresh concrete. Platforms for workers and 
equipment shall not be supported directly on any reinforcing steel. Once the concrete is set, forces 
shall not be applied to the forms or to reinforcing bars that project from the concrete until the concrete 
is of sufficient strength to resist damage. 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 21-23 

C

HAPTER 

21:

 

C

ONCRETE 

S

TRUCTURES

 

 

 

 

First Edition -January 2018 

 

21.7.1 

Placement Sequences 

Whenever  a  concrete  placement  plan  or  schedule  is  specified  or  approved,  the  sequence  of 
placement  shall  conform  to  the  approved  plan.  Unless  otherwise  specifically  permitted  by  the 
Contract documents, the requirements of the following specifications shall apply. 

21.7.1.1 

Vertical Members 

Concrete for columns, substructure and culvert walls, and other similar vertical members shall be 
placed and allowed to set and settle for a period of time before placing concrete for integral horizontal 
members 

— such as caps, slabs, or footings. Settling periods shall adequately allow the completion 

of settlement due to loss of bleed water and shall be not less than 12 hours for vertical members 
measuring more than 4.5 m in height and not less than 30 minutes for members measuring more 
than  1.5  m,  but  not  more  than  4.5  m  in  height.  When  friction  collars  or  falsework  brackets  are 
mounted on vertical members, and unless otherwise approved, the vertical member shall have been 
in place at least seven days and shall have attained its specified strength before loads from horizontal 
members are applied. 

21.7.1.2 

Superstructures 

Unless  otherwise  permitted,  no  concrete  shall  be  placed  in  the  superstructure  until  substructure 
forms  have  been  stripped  sufficiently  to  determine  the  character  of  the  supporting  substructure 
concrete. 

d.

 

T-beams and Deck Girder Spans 

Concrete for T-beam or deck girder spans whose depth measures less than 1.2 m may be placed in 
one continuous operation or may be placed in two separate operations; first, to the top of the girder 
stems; and second, to completion. For T-beam or deck girder spans whose depth measures 1.2 m 
or more, and unless the falsework is non-yielding, such concrete shall be placed in two operations, 
and at least five days shall elapse after placement of stems before the top deck slab is placed. 

e. 

Concrete Box Girders 

Concrete for  box girders may  be  placed  in two  or  three separate  operations  consisting  of bottom 
slabs, girder stems, and top slabs. In either case, the bottom slab shall be placed first and, unless 
otherwise permitted by the Engineer, the top slab shall not be placed until the girder stems  have 
been in place for at least five days. 

Concrete sequence placement for the cast-in-place, multiple-cell box girders at bridges shall be as 
follows:  

The bottom slab, the exterior and interior web portions and the diaphragm portions shall be placed 
monolithically, as indicated on the Contract drawings, and as specified herein. 
Placement of the top slab shall occur. Top slabs shall not be placed until the girder webs have been 
in place for at least five days. 

Vertical  construction  joints  in  all  portions  of  the  multiple  cell  box  girders  shall  be  minimized  and, 
where proposed, shall preferably be placed at 0.2 of the span length on either side of a supporting 
pier.  Positive  moment  areas  shall  be  placed  first  followed  by  the  placement  of  concrete  for  the 
negative  moment  area  over  the  pier.  Dependent  upon  the  volume  of  concrete,  additional  vertical 
construction joints may be used 

— subject to the Engineer’s approval. 

A  concrete  pour  sequence  plan  shall  be  prepared  by  the  Contractor  for  each  superstructure  and 
submitted to the Engineer for approval prior to commencing any bridge superstructure work.  Pour 
sequence  plans  shall  show  the  locations  of  all  construction  joints  that  shall  be  bonded  joints,  as 
specified herein. Concrete pours within each element shall be alternated to eliminate shrinkage to 
the greatest extent possible. 

Concrete  placement  in  each  pour  shall  start  at  the  low  point  and  shall  continue  upgrade,  unless 
otherwise permitted by the Engineer. 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 21-24 

C

HAPTER 

21:

 

C

ONCRETE 

S

TRUCTURES

 

 

 

 

First Edition -January 2018 

 

Joints created due to the stopping of work shall be avoided as far as possible. Such joints shall be 
constructed as directed by the Engineer, when necessary. 

At  deck  median  locations  indicated  on  the  Contract  drawings,  the  Contractor  shall  apply  a 
commercial quality, bond-breaking compound to construction joint surfaces. 

21.7.1.3 

Arches 

Arch  ring  concrete  shall  be  placed  in  such  a  manner  as  to  load  the  centring  uniformly  and 
symmetrically. Arch rings shall be cast in transverse sections of such size that each section can be 
cast  in  a  continuous  operation.  Section  arrangements  and  placement  sequences  shall  be  as 
approved and shall avoid the creation of initial stress in the reinforcement. These sections shall be 
bonded together by suitable keys or dowels. Arch barrels for culverts and, unless prohibited by the 
Contract documents, other arches may be cast in a single, continuous operation. 

21.7.1.4 

Box Culverts 

In general, the base slab or footings of box culverts shall be placed and allowed to set before the 
remainder of the culvert is constructed. For culverts whose wall height measures 1.5 m or less, the 
sidewalls  and top  slabs may  be  placed  in  one  continuous  operation.  For  higher  culvert  walls,  the 
requirements for vertical members shall apply. 

21.7.1.5 

Tunnels and Underpasses 

Tunnel and underpass concrete shall be placed by pumping and shall be discharged into the work 
through a pipe inserted into the formed space.  Discharge lines shall be graduated to indicate the 
depth of filling at any time. Special care shall be taken to force concrete into all irregularities in work 
surfaces and to completely fill tunnel/underpass walls and crown. Only experienced operators shall 
operate placing equipment. Pumped concrete shall be vibrated by the Contractor. Concrete shall not 
be pumped through aluminium alloy pipe. 

21.7.1.6 

Tunnels and Underpasses on Rock Surfaces 

Rock surfaces against or upon which concrete is to be placed shall be clean; free of oil and other 
objectionable  coatings,  water,  mud,  debris,  dummy  rock,  and  loose  semidetached  or  unsound 
fragments;  and  shall  be  sufficiently  rough  to  assure  satisfactory  bond  with  the  concrete. 
Discontinuities shall be cleaned to hard rock on the sides, and to a depth that is approved by the 
Engineer.  All  overbreak  beyond  the  excavation  limit  shown  in  the  Contract  documents  shall  be 
backfilled with shotcrete or concrete at the Contractor's expense. 

21.7.1.7 

Precast Elements 

The  sequence  of  placement  for  concrete  in  precast  elements  shall  be  such  that  sound,  well 
consolidated  concrete  that  is  free  of  settlement  or  shrinkage  cracks  is  produced  throughout  the 
member. Placing and compacting prestressed concrete members shall conform to Section 21.7.2, 
Section 21.7.3, and Section 21.14.3 

21.7.2 

Concrete Placing Methods 

Concrete shall be placed in its final position, as nearly as possible, and the Contractor shall not use 
vibrators for extensive shifting of the weight of fresh concrete. 

Concrete shall be placed in horizontal layers of a thickness not exceeding the capacity of the vibrator 
to consolidate  the  concrete  and merge  it  with  the  previous  lift. In no case  shall the  depth  of a  lift 
exceed 600 mm. Concrete placement rates shall not exceed those rates assumed for the design of 
the forms 

— as corrected for the actual temperature of the concrete being placed. 

When  placing  operations  involve  dropping  the  concrete  more  than  1.5  m,  the  concrete  shall  be 
dropped through a tube fitted with a hopper head 

— or through other approved devices — to prevent 

segregation of the mix and spattering of mortar on steel and forms above the elevation of the lift 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 21-25 

C

HAPTER 

21:

 

C

ONCRETE 

S

TRUCTURES

 

 

 

 

First Edition -January 2018 

 

being placed. This requirement shall not apply to cast-in-place piling when concrete placement is 
completed before initial set occurs in the first placed concrete. 

21.7.2.1 

Concrete Placing Equipment 

All equipment used to place concrete shall be of adequate capacity and designed and operated so 
as to prevent segregation of the mix or loss of mortar. Such equipment shall not cause vibrations 
that  might  damage  freshly  placed  concrete.  Aluminium  parts  of  the  equipment  shall  not  come  in 
contact with the concrete. Between uses, the Contractor shall clean the mortar coating inside placing 
equipment that has set or dried out before its use is resumed.  

Chutes shall be lined with smooth watertight material and, when steep slopes are involved, shall be 
equipped with baffles or reverses. 

Operation  of  concrete  pumps  shall  product  a  continuous  stream  of  concrete  without  air  pockets. 
When  pumping  is  completed,  the  concrete  remaining  in  the  pipeline,  if  it  is  to  be  used,  shall  be 
ejected in such a manner that there will be no contamination of the concrete or separation of the 
ingredients. 

Conveyor belt systems shall be as approved by the Engineer, and shall not exceed a total length of 
168 m, measured from end to end of the total assembly. Belt assemblies shall be arranged so that 
each section discharges into a vertical hopper arrangement to the next section. To keep segregation 
to a minimum, scrapers shall be situated over the hopper of each section so as to remove mortar 
adhering to the belt and to deposit it into the hopper. Conveyor belt system discharge ends shall be 
equipped with a hopper and a chute 

— or suitable deflectors — which shall allow the concrete to 

drop vertically into the deposit area. 

21.7.3 

Consolidation Methods 

All  concrete,  except  concrete  placed  underwater  and  concrete  otherwise  exempt,  shall  be 
consolidated by mechanical vibration immediately after placement. 

Except  as  noted  herein,  vibration  shall  be  internal.  External  form  vibrators  may  be  used  for  thin 
sections when the forms have been designed for external vibration. 

Vibrators shall be of approved type, design, and of a size appropriate for the work. They shall be 
capable of transmitting vibration to the concrete at frequencies of not less than 75 Hz. 

A sufficient number of vibrators shall be provided by the Contractor to properly compact each batch 
of concrete immediately after it is placed in the forms. Additionally, the Contractor shall have at least 
one spare vibrator immediately available in case of breakdown. 

To  thoroughly  work  the  concrete  around  the  reinforcement  and  embedded  fixtures  and  into  the 
corners  and  angles  of the forms,  the  Contractor shall  manipulate the  vibrators.  Vibration  shall  be 
applied at the point of deposit and in the area of freshly deposited concrete; and the Contractor shall 
insert  vibrators  into  and  withdraw  them  from  the  concrete  slowly.  Finally,  vibration  shall  be  of 
sufficient duration and intensity to thoroughly consolidate the concrete but shall not be continued so 
as to cause segregation. 

Shall localized areas of grout form, vibration shall be halted. Vibrators applications shall be uniformly 
spaced and not farther apart than 1.5 times the radius over which the vibration is visibly effective. 
Vibration  shall  not  be  applied  directly  to,  or  through  the  reinforcement  to,  sections  or  layers  of 
concrete that have hardened to the degree that the concrete ceases to be plastic under vibration. 
Vibrators shall not be used to transport concrete in the forms. 

Where immersion-type vibrators are used to consolidate concrete around epoxy-coated reinforcing 
steel, the vibrators shall be equipped with rubber or another non-metallic coating. 

Vibration shall be supplemented by such spading as is necessary to ensure smooth surfaces and 
dense  concrete  along  form  surfaces  and  in  corners  and  locations  impossible  to  reach  with  the 
vibrators. 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 21-26 

C

HAPTER 

21:

 

C

ONCRETE 

S

TRUCTURES

 

 

 

 

First Edition -January 2018 

 

When approved by the Engineer, the Contractor may consolidate small noncritical elements by using 
suitable rods and spades. 

21.7.4 

Underwater Placement 

Generally,  the  Engineer  shall  not  permit  the  placement  of  concrete  in/or  underwater.  Where  the 
Engineer  specifically  approves  the  placement  of  concrete  in/or  underwater,  the  Contractor  shall 
submit 

its  proposed  construction  procedure  for  placing  the  concrete  for  the  Engineer’s  approval 

before proceeding with the work. 

Methods  for  placing  concrete  in/or  underwater  shall  keep  as  much  of  the  concrete  out  of  direct 
content with the water as possible to avoid any rapid movement or agitation of the exposed surface.  

Underwater concrete placement shall be continuous from start to finish. Concrete surfaces shall be 
kept as nearly horizontal as practicable. To ensure thorough bonding, each succeeding layer of seal 
shall be placed before the preceding layer has taken initial set. For large pours, more than one tremie 
or pump shall be used to ensure compliance with this requirement. 

To prevent segregation, concrete placed underwater shall be carefully placed in a compact mass, in 
its final position, by means of a tremie, concrete pump, or other approved method; and shall not be 
disturbed after being deposited. Still water shall be maintained at the point of deposit and the forms 
underwater shall be watertight. Cofferdams shall be vented during placement and while curing the 
concrete  to  equalize  the  hydrostatic  pressure  and  thus  prevent  water  from  flowing  through  the 
concrete. 

21.7.4.1 

Underwater Concrete Placement Equipment 

Tremies shall consist of a watertight tube with a diameter measuring not less than 250 mm and fitted 
with a hopper at the top. Aluminium pipes shall not be used. Tremies shall be supported so as to 
permit  free  movement  of  the  discharge  end  over  the  entire  top  surface  of  the  work  and  so  as  to 
permit rapid lowering, when necessary, to retard or stop the flow of concrete. To prevent water from 
entering the tube before it is filled with concrete, the Contractor shall seal the discharge ends closed 
at  the  start  of  work.  After  placement  begins,  the  tremie  tube  shall  be  kept  full  of  concrete  to  the 
bottom  of  the  hopper.  If  water  enters  the  tube  after  placement  has  begun,  the  tremie  shall  be 
withdrawn, the discharge end resealed, and the placement restarted. When a batch is dumped into 
the  hopper,  the  flow  of  concrete  shall  be  induced  by  slightly  raising  the  discharge  end,  always 
keeping it in the deposited concrete. Flows shall be continuous until the work is completed. When 
cofferdam struts prevent the tremie's lateral movement, the Contractor shall use one tremie in each 
bay. 

Concrete pumps used to place concrete underwater shall include a device at the end of the discharge 
tube to seal out water while the tube is first being filled with concrete. Once the flow of concrete has 
begun, the Contractor shall keep the end of the discharge tube full of concrete and below the surface 
of the deposited concrete until placement is completed. 

Detailed propo

sals for concreting shall be submitted by the Contractor for the Engineer’s approval. 

Where  concrete  is  to  be  placed  in/or  underwater,  the  actual  mix  proportions  and  selection  of 
aggregates shall ensure a resulting concrete with good flow and cohesion characteristics. 

Underwater cement content shall be 25 percent greater than for a comparable mix for use in dry 
conditions; and, the Engineer shall approve the minimum works cube strength for all concrete for the 
comparable mixes used in dry conditions. 

21.7.4.2 

Underwater Concrete Placement Cleanup 

Dewatering  may  proceed  after  test  specimens  cured  under  similar  conditions  indicate  that  the 
concrete  has  sufficient  strength  to  resist  the  expected  loads.  All  laitance,  or  other  unsatisfactory 
materials, shall be removed from the exposed surface by scraping, chipping, or other means  that 
shall not injure the concrete surface before placing foundation concrete. 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 21-27 

C

HAPTER 

21:

 

C

ONCRETE 

S

TRUCTURES

 

 

 

 

First Edition -January 2018 

 

21.7.5 

Reinforced-concrete Bridge Slabs 

This work shall form and construct reinforced-concrete bridge slabs in accordance with this chapter, 
the requirements of this section, and the Contract documents. 

Unless otherwise shown in the Contract drawings, all cast-in-place reinforced-concrete bridge slabs 
shall be Class C40/20. 

21.7.5.1 

Construction of Reinforced-concrete Bridge Slabs 

a.

 

Cast-in-place Slabs 

Conventional forms, permanent metal deck forms, or prestressed concrete panels shall be used by 
the Contractor as indicated in the Contract plans and in accordance with Article 1.20.8.2 of Chapter 
1, General Requirements, and as approved by the Engineer. Permanent metal deck or conventional 
forms shall be used by the Contractor for thickened slabs, diaphragms, or other regions 

— as shown 

in the Contract plans where prestressed concrete panels are not used.  

Slabs  shall  be  constructed  as  shown  in  the  Contract  plans  and  in  accordance  with  the  following 
pertinent requirements: 

  Chapter 4, Concrete Works, of these Standard Specifications;  

  Chapter 5, Reinforcing Steel, of these Standard Specifications; 

  Chapter 21, Concrete Structures, of these Standard Specifications; and, 

  Chapter 22, Prestressing Systems, of these Standard Specifications. 

Surface  evenness,  the  method  of  testing,  and  finishing  of  the  surface  shall  comply  with  the 
requirements specified in Section 21.10, Finishing Plastic Concrete. 

b.

 

Extending Existing Slabs 

Existing  slabs  shall  be  extended  by  the  Contractor  in  accordance  with  Section  21.23,  Extending 
Concrete Structures. 

c.

 

Prestressed Concrete Deck Panels 

Where the Project requires the use of prestressed concrete deck panels, the Contractor shall profile 
each  beam  to  determine  the  actual  camber,  or  sag,  of  the  beams  before  placing  the  panels.  To 
obtain the required cover over the slab reinforcement, and the required slab thickness, the profile 
grade line, panel elevation, and bearing seat elevations shall be adjusted, as needed. When a profile 
grade line adjustment is necessary, the Contractor shall make adjustments over suitable increments, 
depending on span lengths, so that the revised grade line will produce a uniform profile and good 
riding  qualities.  Grade  adjustments  shall  be  approved  by  the  Engineer  prior  to  placement  by  the 
Contractor. When adjusting the grade line, the actual beam camber shall be considered in adjacent 
spans  or  slab  placements.  Abutment  back-  and  wing  wall  portions  shall  be  placed  after  the 
Contractor adjusts the profile grade line. 

21.7.6 

Approach Slabs 

Approach  slabs  consisting  of  cast-in-place  concrete  shall  be  furnished  and  installed  by  the 
Contractor, as indicated in the Contract drawings and as directed by the Engineer. Concrete placed 
at  approach  slabs  shall  consist  of  Class  C40/20  concrete 

—  unless  otherwise  specified  in  the 

Contract  documents.  All  materials  for  the  concrete  in  approach  slabs  shall  comply  with  the 
requirements of this chapter. 

21.7.6.1 

Approach Slab Construction 

Concrete approach slabs shall be placed on an aggregate base course, as specified in Section 3.2.2 
of Chapter 3, Pavement, of these Standard Specifications. 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 21-28 

C

HAPTER 

21:

 

C

ONCRETE 

S

TRUCTURES

 

 

 

 

First Edition -January 2018 

 

All  approach  slab  concrete  shall  be  placed  in  accordance  with  the  applicable  clauses  under  this 
chapter. Surface evenness and methods for testing and finishing the surface shall comply with the 
requirements specified in Section 21.10, Finishing Plastic Concrete. 

21.7.7 

Blinding Concrete 

Blinding  concrete  shall  be  furnished  and  installed  by  the  Contractor,  as  indicated  in  the  Contract 
drawings, as specified herein, and as directed by the Engineer. 

Blinding  concrete  shall  be  constructed  with  Class  C15/20  concrete  and  shall  comply  with  all 
requirements of this chapter. 

21.7.7.1 

Blinding Concrete Construction 

Construction of all blinding concrete shall comply with the requirements of this chapter, or as directed 
by the Engineer. 

21.7.8 

Screed Concrete 

Screed  concrete  shall  be  furnished  and  installed  by  the  Contractor,  as  indicated  in  the  Contract 
drawings, as specified herein, and as directed by the Engineer. 

The  screed  concrete  shall  consist  of  one  part  Sulfate  Resistant  Portland  Cement  (SRC)  to  three 
parts sand by volume. The ingredients shall conform to and be mixed as specified for Class C40/20 
concrete  in  Section  4.3  of  Chapter  4,  Concrete  Works,  of  these  Standard  Specifications.  The 
concrete  substrate  onto  which  the  screed  is  to  be  applied  shall  be  broom-finished,  cleaned,  and 
coated  with  proper  bonding  agent  prior  to  application  as  specified  in  this  chapter  and  Chapter  4, 
Concrete Works, of these Standard Specifications. 

21.7.8.1 

Crack Control Additive 

The  screed  concrete  shall  be  mixed  with  a  crack  controlling  additive  of  high  performance 
micropolypropylene fiber complying with ASTM C1116 / C1116M - 10a Type II at a mixing rate of 
1.0 kg per 1 cubic meter of screed mix or as recommended by the Manufacturer and approved by 
the  Engineer.  Mixing  shall  be  in  accordance  with  the  M

anufacturer’s  recommendation  and  as 

approved by the Engineer. 

21.7.9 

Mass Concrete - Thermal Control 

Mass  concrete  placement  shall  be  defined  as  any  pour  in  which  the  concrete  being  cast  has 
dimensions of 1.00 metre or greater in all three directions (x, y, and z). For all mass concrete pours, 
the  mix  temperature  shall  not  exceed  25

o

  C  as  measured  immediately  prior  to  placement  of  the 

concrete into the forms. Further, the Contractor shall be required to maintain a core temperature of 
68

o

 C or less and a temperature differential of 20 degrees or less between the interior and exterior 

of all mass pour elements during curing. 

Mass concrete construction shall conform to the requirement and recommendation specified in ACI 
Publication  207.1R-05 

“Guide  to  Mass  Concrete”  and  ACI  207.2R-07”  Report  on  Thermal  and 

Volume Change Effects on Cracking of Mass Concrete

”. 

The  Contractor  shall  provide  temperature  monitoring  devices  to  record  temperature  development 
between the interior and exterior of the element at points approved by the Engineer and shall monitor 
the mass pours to measure temperature differential. Temperature monitoring shall continue until the 
interior  temperature  is  within  a  differential  of  20

o

  C  with  the  lowest  ambient  temperature  for  a 

maximum of two weeks. 

A proper thermal control plan shall be submitted by the Contractor describing the procedures to be 
used to minimize the temperature differentials and to be approved by the Engineer. The independent 
thermal control plan shall be submitted during the concrete mix design stage, and shall include the 
following: 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 21-29 

C

HAPTER 

21:

 

C

ONCRETE 

S

TRUCTURES

 

 

 

 

First Edition -January 2018 

 

a.  Concrete  Mix:  The  mix design  shall  be  optimized  with  supplementary  cementitious 

materials like GGBS, PFA, etc. to reduce the heat of hydration. 

b.  Mass  Concrete:  Placing  methods  and  time  of  placement  at  hot  &  cold  weather  , 

control of concrete delivery and placement temperatures , monitoring the core and 
ambient  temperatures  by  sensing  probes  placed  at  appropriate  locations,  curing 
methods to control temperature differentials, use of insulation, placing of concrete lifts 
along with successive timings, water cooling or water retention methods etc. 

c.  Formwork: Wooden forms shall be used, delayed form removal, protruding steel bars 

to be utilized as heat sinks to draw heat out of core concrete, etc. 

d.  Corrective  Measures:  Corrective  measures  shall  be  proposed  in  case  of  failure  to 

comply with the methodology and revised thermal control reports. 

The  Engineer  shall  be  provided  with  a  copy  of  each  set  of  readings  as  they  are  taken  and  a 
temperature  chart  for  each  mass  pour  element  showing  temperature  readings  vs.  time.  Prior  to 
placing any mass concrete on the Project, the Contractor shall submit for approval: 

a.  An  analysis  of  the  anticipated thermal  developments  within  mass  pour  placements 

using the proposed materials and casting methods. 

b.  A plan outlining specific measures to be taken to control the temperature differential 

within the limits noted above. 

c.  Their proposed monitoring system. 
d.  If the Contractor is proposing a special concrete mix design as part of the temperature 

control  plan, this  mix  design  shall  also  be  submitted for 

the Engineer’s review and 

approval. 

If monitoring indicates that the proposed measures are not controlling the concrete core temperature 
below 68

o

 C and the concrete temperature differential within the 20 degrees specified, the Contractor 

shall make the necessary revisions to the plan and submit the revised plan for approval. 

The Contractor shall assume all risks connected with the placing of mass pour concrete and approval 
of  the  Contractor’s  plan  will  in  no  way  relieve  the  Contractor  of  the  responsibility  for  satisfactory 
results.  Should  any  mass  concrete  placed  under  this  specification  proves  unsatisfactory,  the 
Contractor will be required to make the necessary repairs or remove and replace the material at the 
Contractor’s expense. 

Accumulation of water on the surface due to any cause during compaction shall be prevented as far 
as possible and any such water shall be removed before further concrete is placed. 

All costs associated with special temperature controls for mass concrete placement shall be included 
at the Contractor's expense, and shall be without additional specific compensation. Requirements 
for control of temperatures in mass concrete pours included in this article shall be in addition to any 
other applicable requirements found in the Contract plans and Contract documents. 

21.7.10 

Removal of Falsework and Forms 

Falsework and forms are temporary works that shall comply with the requirements of Section 1.20, 
Chapter 1, General Requirements of these standard specifications. 

The Contractor shall not remove falsework or forms without the Engineer’s approval. Any implicit or 
explicit  permission  in  these  specifications  to  remove  falsework  or  forms  shall  not  relieve  the 
Contractor  of  responsibilities  regarding  damages  to  the  concrete  works  that  result  from  the 
Contractor’s removal of the falsework or forms. 

To  determine  when  to remove falsework  and forms, the  Contractor  shall  consider  conditions  that 
influence  the  early  strength  of  concrete,  including  the  location  and  character  of  work  structures, 
weather, and materials used in concrete mixes. 

To  remove  falsework  and  forms,  the  Contractor  shall  not  use  any  methods  that  are  likely  to 
overstress the concrete or damage concrete surfaces. The Contractor shall remove supports in a 
way that uniformly and gradually applies stresses to a concrete work. 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 21-30 

C

HAPTER 

21:

 

C

ONCRETE 

S

TRUCTURES

 

 

 

 

First Edition -January 2018 

 

After removing formwork, the Contractor shall promptly request the Engineer’s inspection of concrete 
works  and  surfaces.  The  Contractor  shall  carry  out  any  remedial  treatment  to  surfaces  that  the 
Engineer requests without delay. The Engineer may reject any concrete surface that the Contractor 
treats before such inspection.  

The following defects and conditions may require repair or cleaning: 

1.  Crazing 
2.  Cracks 
3.  Spalls 
4.  Pop outs 
5.  Air Bubbles 
6.  Honeycombing 
7.  Holes left by rods and bolts 
8.  Surface deficiencies that penetrate to the reinforcement 
9.  Fins and other objectionable projections on the surface 
10. Stains and discolorations that cannot be removed by cleaning 

The Engineer may require the Contractor to remove and replace entire portions of defective concrete 
that cannot be easily repaired or cleaned.  

The Contractor shall remove falsework for  arch bridges uniformly and gradually, beginning at the 
crown and working toward the springing. At the same time, the Contractor shall remove the falsework 
for adjacent arch spans. 

Forms that support decks for box girders and forms in hollow abutments may remain in place when 
no  permanent  access  into  such  cells  is  available.  Before  reusing  formwork,  the  Contractor  shall 
thoroughly clean it and make it ready to the satisfaction of the Engineer. 

The Contractor shall remove forms that do not support the dead load of concrete members and forms 
for railings and barriers 24 hours after the placement of concrete. Exposed concrete surfaces shall 
be protected from damage. 

After use and removal, forms and falsework shall remain the property of the Contractor. Work areas 
shall be restored to their original or planned conditions and cleaned of all debris. 

For  structures  of two  or  more  spans, the  sequence  of falsework removal  shall  be  as  specified  or 
approved in Contract documents. 

21.7.10.1  Time of Removal 

The  Contractor  shall  time  the  removal  of  formwork  to  best  suit  curing  and  to  prevent  elastic 
shortening, shrinkage, or creep. 

The Contractor shall not remove forms and supports until sufficient time has passed after concrete 
placement, as indicated in Table 21-6. 

Table 21-6: Time of removal 

Structural member 

Time of 
Removal 

Forms and falsework that provide support for the following structures: 

 

  Spans over than 4.3 metres (slab spans, pan girders, reinforced concrete 

box (RCB) decks, or pier caps) 

14 days 

  Spans of 4.3 metres or less (bridges decks on girders, RCB decks, and 

diaphragms) 

10 days 

  Pile bent pier caps that are not yet supporting girders 

10 days 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 21-31 

C

HAPTER 

21:

 

C

ONCRETE 

S

TRUCTURES

 

 

 

 

First Edition -January 2018 

 

Structural member 

Time of 
Removal 

Forms that do not support the dead weight of concrete: 

 

  Side  forms  for  abutments  and  pier  caps,  sides  of  beams,  slabs, 

walls, and columns (unloaded) 

24 hours 

  Interior cells of box girders, railings, and barriers 

12 hours 

Special  notes  on  project  plans  that  detail  the  removal  of  forms  and  falsework  under  arches, 
continuous spans, and other special structures including pre-stressed concrete beams shall have 
precedence over the time limits for removal of forms and falsework shown in Table 21-6. 

The  Engineer  may  accelerate  the  removal  for  supporting  forms  or  falsework  (except  those  for 
columns, walls, side forms for abutment, pier caps, railing and barriers), requesting such removal as 
soon as concrete has attained 80 % of its specified strength. 

Time of removal for forms and falsework must meet the following additional requirements: 

1.  Forms  shall  not  be  removed  until  concrete  has  sufficient  strength  to  prevent  damage  to  the 

surface. 

2.  Falsework for post-tensioned portions of structures shall not be released until the prestressing 

steel has been tensioned. 

3.  Falsework that supports any span of a continuous or rigid frame bridge shall not be released until 

the  aforementioned  requirements  have  been  satisfied  for  all  of  the  structural  concrete  in  that 
span and in the adjacent portions of each adjoining span for a length equal to at least one-half 
the length of the span for which falsework is to be released. 

4.  Unless other specifications or approvals apply, falsework shall be released before the placement 

of railings, copings, or barriers for all types of bridges. For arch bridges, the time of falsework 
release relative to the construction of elements of the bridge above the arch shall be as shown 
on the plans or as directed by the Engineer. 

21.7.10.2  Extent of Removal 

The Contractor shall remove all falsework and forms except under the following conditions: 

1.  If portions of driven falsework piles are more than 300 mm below the subgrade within roadbeds, 

more than 600 mm below the original ground or finished grade outside of roadbeds, or more than 
600 mm below the established limits of any navigation channel 

2.  If the removal of footing forms  would endanger the safety of cofferdams or other work 
3.  If forms support enclosed cells where access is not provided 
4.  If deck forms in the cells of box girder bridges do not interfere with the future installation of utilities 

shown in Contract documents 

21.8 

Construction Joints 

Construction joints shall be made only where specified in the Contract documents, or shown in the 
pouring  schedule,  unless  otherwise  approved.  All  planned  reinforcing  steel  shall  extend 
uninterrupted through joints. In the case of emergencies, the Contractor shall place the construction 
joints as directed by the Engineer; and, if directed, additional reinforcing steel dowels shall be placed 
across the joint. Such additional steel shall be furnished and placed at the  Contractor's expense. 
Injection of construction joints shall be carried out in accordance with Section 21.9.3. 

21.8.1 

Horizontal Joints 

Generally, horizontal joints shall be made by pouring the concrete slightly above the grade of the 
construction joint, and after the surface has reached its final set, the surface shall be prepared as 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 21-32 

C

HAPTER 

21:

 

C

ONCRETE 

S

TRUCTURES

 

 

 

 

First Edition -January 2018 

 

outlined in Section 21.8.421.8.3, Bonding. Insert formwork shall be used to obtain neat, horizontal 
lines.  

21.8.2 

Vertical Joints 

Vertical joints shall be formed with substantial bulkheads or headers, as required. Feather-edged 
joints shall not be permitted. 

21.8.3 

Bonding 

Unless otherwise specified in the Contract documents, horizontal joints may be made without keys, 
and  vertical  joints  shall  be  constructed  with  shear  keys.  Surfaces  of  fresh  concrete  at  horizontal 
construction joints shall be rough-floated sufficiently to thoroughly consolidate the surface and left 
intentionally in a roughened condition. Shear keys shall consist of formed depressions in the surface 
covering approximately one-third of the contact surface. Key forms shall be bevelled so that removal 
shall not damage the concrete. 

All  construction  joints  shall  be  cleaned  of  surface  laitance,  curing  compounds,  and  other  foreign 
materials  before  fresh  concrete  is  placed  against  the  surface  of  the  joint.  Abrasive  blast  or  other 
approved  methods  shall  be  used  to  clean  horizontal  construction  joints  to  the  extent  that  clean 
aggregate  is  exposed.  All  construction  joints  shall  be  flushed  with  water  and  allowed  to  dry  to  a 
surface-dry condition immediately prior to placing concrete. 

21.8.4 

Bonding and Dowelling to Existing Structures 

When the Contract documents specify that new concrete be bonded to existing concrete structures, 
the existing concrete shall be cleaned and flushed, as specified in Section 21.8.3, Bonding. When 
the Contract documents show reinforcing dowels grouted into holes drilled in the existing concrete 
at such construction joints, the holes shall be drilled by methods that shall not shatter or damage the 
concrete adjacent to the holes. Drilled-hole diameters shall measure 6 mm larger than the nominal 
diameter of the dowels, unless shown otherwise in the Contract documents. Grout shall consist of a 
neat,  cement  paste  created  from  Portland  cement  and  water,  with  water  content  that  shall  not 
measure  more  than  0.36  litre/kg  of  cement.  Re-tempering  of  the  grout  shall  not  be  permitted. 
Immediately  prior  to  placing  the  dowels,  the  Contractor  shall  clean  the  holes  of  dust  and  other 
deleterious materials, and thoroughly saturate them with water and remove all free water, then the 
holes shall be dried to a saturated surface-dry condition. Sufficient grout shall be placed in the holes 
so that no voids remain after the dowels are inserted. Grout shall be cured for a period of at least 
three days, or until dowels are encased in concrete. 

When specified in the Contract documents, or approved by the Engineer, epoxy may be used in lieu 
of Portland cement grout for the bonding of dowels in existing concrete. When used, epoxy shall be 
mixed and placed in accordance with the Manufacturer's recommendations. 

21.8.5 

Forms at Construction Joints 

When  forms  at  construction  joints  overlap  previously  placed  concrete,  they  shall  be  retightened 
before depositing new concrete. 

Straight bulkheads or grade stripes shall be the Contractor’s tool 

for neatly forming the face edges of all joints that are exposed to view. If straight bulkheads or grade 
stripes are not available, the Contractor may otherwise carefully finish the face edges true to line 
and elevation. 

21.8.6 

Waterstops at Construction Joints 

Waterstops shall be installed at all construction joints in accordance with Article 21.9.1.6 and Article 
21.9.2.4. 

21.9 

Expansion and Contraction Joints 

Expansion and contraction joints shall be constructed at the locations, and in accordance with the 
details, specified in the Contract documents; and include open joints, filled joints, joints sealed with 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 21-33 

C

HAPTER 

21:

 

C

ONCRETE 

S

TRUCTURES

 

 

 

 

First Edition -January 2018 

 

sealants  or  water  stops,  joints  reinforced  with  steel  armour  plates  or  shapes,  and  joints  with 
combinations of each of these features.  

When  preformed  elastomeric  compression  joint  seals  or  bridge  deck  joint  seal  assemblies  are 
required, they shall conform to the requirements of Chapter 26, Bridge Deck Joint Systems. 

21.9.1 

Expansion and Contraction Joint Materials 

21.9.1.1 

Pre-moulded Expansion Joint Fillers 

Pre-moulded fillers shall conform to one of the following specifications: 

  Specification  for  Preformed  Expansion  Joint  Fillers  for  Concrete  Paving  and  Structural 

Construction, AASHTO M 213-01 (2010) (ASTM D1751 - 04(2008)). 

  Specification for Preformed Sponge Rubber and Cork Expansion Joint Fillers for Concrete 

Paving and Structural Construction, AASHTO M 153-06 (R2011) (ASTM D1752 - 04a(2008)). 
Type II (cork) shall not be used when resiliency is required. 

  Specification for  Preformed  Expansion  Joint  Filler for  Concrete,  AASHTO  M  33-99  (2012) 

(ASTM D994 / D994M - 11). 

21.9.1.2 

Polystyrene Board Fillers 

Board  fillers  shall  be  expanded  polystyrene  with  a  minimum  flexural  strength  of  0.24  MPa,  as 
determined by  ASTM C203 -  05a(2012) and compressive yield strengths measuring  between 0.1 
MPa to 0.3 MPa at five percent compression. When specified in the Contract documents, or where 
required to prevent damage during concrete placement, the surface of polystyrene board shall be 
faced  with  3-mm  thick  hardboard  conforming  to  American  National  Standards  Institute  (ANSI) 
A135.4. Density of the polystyrene board shall be as specified in the Contract documents. 

21.9.1.3 

Contraction Joint Material 

Material placed in contraction joints shall consist of asphalt-saturated felt paper or another approved 
bond-breaking material. 

21.9.1.4 

Pourable Joint Sealants 

Pourable sealants placed along the top edges of contraction or filled expansion joints shall conform 
to one of the following: 

  Hot-poured sealants shall conform to AASHTO M 282-99 (2012) (ASTM D3406 - 95(2006)); 

except when the sealant  comes in contact with asphaltic material, then it shall conform to 
AASHTO M301-01. 

  Cold-poured sealant shall be silicone-type, conforming to Federal Specification TT - S-1543, 

Class  A.  Sealants  shall  be  a  one-part,  low-modulus  silicone  rubber-type  with  an  ultimate 
elongation of 1,200%. 

  Polyethylene  foam  strips  used  when  shown  in  the  Contract  documents  shall  consist  of 

commercial quality with a continuous, impervious, glazed top surface, suitable for retaining 
the liquid sealant at the proper elevation in the joint while hardening. 

21.9.1.5 

Metal Armour 

Expansion  joint  armour  assemblies  shall  be  fabricated  from  steel  in  conformance  with  the 
requirements of Section 30.5 of Chapter 30, Miscellaneous Metal. Assemblies shall be accurately 
fabricated and straightened at the shop after fabrication and galvanizing, as necessary, to conform 
to the concrete section.  

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 21-34 

C

HAPTER 

21:

 

C

ONCRETE 

S

TRUCTURES

 

 

 

 

First Edition -January 2018 

 

21.9.1.6 

External and Internal Waterstops 

Waterstops shall consist of the type, size, and shape specified in the Contract documents. They shall 
be  dense,  homogeneous,  and  without  holes  or other  defects. Waterstops  shall  be furnished  by a 
manufacturer with a minimum of ten years experience in the Middle East. 

Shop drawings for the waterstops network shall be submitted by the Contractor for the approval of 
the Engineer. Samples of the proposed materials shall be submitted. Technical backup services and 
supervision on site during the application of the waterstops shall be provided by the Manufacturer. 

External waterstops in base slab expansion joints shall be minimum 350mm wide  with four bulbs 
and ten parallel lines of fins. The Centre box section shall be 25mm wide and flat to accept a filler 
board. The waterstop shall have an outer nailing flange with reinforced and profiled edge to resist 
tear when fixed to shuttering with double headed nails, and provide additional key when cast into the 
concrete. 

External waterstops in base slab construction and contraction joints shall be minimum 350mm wide 
with four bulbs and ten parallel lines of fins. The waterstop shall incorporate a central fin, 22mm high, 
as shutter stop. The waterstop shall have an outer nailing flange with a reinforced and profiled edge 
to resist tear when fixed to shuttering with double headed nails, and provide additional key  when 
cast into the concrete. 

Internal  waterstops  in  wall  and  roof  expansion  joints  shall  have  a  centre  box  to  accommodate 
movement, be minimum 350mm wide with four bulbs and ten parallel lines of fins. The centre box 
section shall be flat to accept a filler board. The web shall have a thickened central section to transfer 
stresses to the centre bulbs. The waterstop shall have a reinforced eyeleted outer flange for secure 
fixing of the waterstop into position. 

Internal  waterstops  in  wall  and  roof  construction  and  contraction  joints  shall  be  minimum  350mm 
wide with four bulbs and ten parallel lines of fins. The web shall have a thickened central section to 
transfer stresses to the centre bulbs. The waterstop shall have a reinforced eyeleted outer flange for 
secure fixing of the waterstop into position. 

Waterstops shall only be supplied by manufacturers operating a BS EN ISO 9001 quality assurance 
scheme. 

a.

 

Rubber Waterstops 

Rubber  waterstops  shall  be  formed  from  synthetic  rubber  made  exclusively  from  neoprene, 
reinforcing  carbon  black,  zinc  oxide,  polymerization  agents,  and  softeners.  This  compound  shall 
contain not less than 70% by volume of neoprene. Tensile strengths shall not be less than 19 MPa 
with an elongation at breaking of 600%. Shore durometer indication, or hardness, shall be between 
50 and 60. Tensile strengths shall not be less than 65% of the original after seven days in air at a 
temperature of 70 degrees Celsius, ±1 degree 

— or after four days in oxygen at 70 degrees Celsius, 

±1 degree, and 2 MPa pressure. 

To ensure the production of a uniform section with a permissible variation in dimension of ±0.8 mm, 
the Manufacturer shall form the rubber waterstops with an integral cross section in suitable moulds. 
No splices will be permitted in straight strips. Additionally, strips and special connection pieces shall 
be well cured in a manner that creates dense, homogeneous cross sections that are free from all 
porosity.  Junctions  in the  special  connection  pieces  shall  be  full  moulded.  During  the  vulcanizing 
period, the joints shall be securely held by suitable clamps. Materials at the splices shall be dense 
and homogeneous throughout the cross section. 

b.

 

Polyvinyl Chloride Waterstops 

Polyvinyl  chloride  (PVC)  waterstops  shall  be  manufactured  by  the  extrusion  process  from  an 
elastomeric plastic compound, the basic resin that consists of PVC. These compounds shall contain 
any  additional  resins,  plasticizers,  stabilizers,  or  other  materials  needed to  ensure  that,  when the 
material is compounded, it will meet the performance requirements given in this specification. No 
reclaimed PVC or other material shall be used. 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 21-35 

C

HAPTER 

21:

 

C

ONCRETE 

S

TRUCTURES

 

 

 

 

First Edition -January 2018 

 

Materials shall comply with the physical requirements presented in Table 21-7, when tested under 
the indicated ASTM test method. 

Table 21-7: ASTM test method requirements for PVC materials 

Size 

ASTM D5947 - 11 

Water Absorption 

ASTM D570 - 
98(2010)e1 

0.02 

Tear Resistance 

ASTM D624 - 00(2012) 

39.40 N/mm 

Specific Gravity 

ASTM D792 - 08 

1.40 maximum 

Durometer Hardness 

ASTM D2240 - 05(2010)  75 ± 5 

Tensile Strength 

ASTM D638 - 10 

13.80 MPa 
mini 

Elongation 

ASTM D638 - 10 

350% 

Cold Brittleness 

ASTM D746 - 07 

-37oC 

Stiffness in Flexure 

ASTM D747 - 10 

4.8 MPa 

Effect on Alkali after  7 days (Weight Change & Hardness 
Change) 

ASTM D543 - 06 

+  0.10%  
+ 1 Point 

Tensile strength after Accelerated Extraction 

CRD-C 572-74 

12.75 MPa 

Elongation  after Accelerated Extraction 

CRD-C 572-74 

350% 

a.

 

Copper Waterstops 

Sheet  copper  shall  conform  to  the  specifications  for  copper  sheet,  strip,  plate,  and  rolled  bar; 
AASHTO M 138M/M 138-08 (ASTM B152 / B152M - 09); and shall meet the embrittlement test of 
Section 10 of AASHTO M 138M/M 138-08 (ASTM B152 / B152M - 09). 

b.

 

Testing of Waterstops Material 

All waterstop materials shall be tested by the Manufacturer, either in company-owned or affiliated 
laboratories 

— or in a recognized commercial laboratory — and shall submit three certified copies 

of the test results to the Engineer. 

21.9.2 

Expansion and Contraction Joint Installation 

21.9.2.1 

Open Joints 

Open joints  shall  be  constructed  by  the  insertion  and  subsequent  removal  of  a  wood  strip,  metal 
plate,  or  other  approved  material.  Template  insertion  and  removal  shall  be  accomplished  without 
chipping or breaking concrete corners. When not protected by metal armour, open joints in decks 
and sidewalks shall be finished with an edging tool. Upon completion of concrete finishing work, all 
mortar and other debris shall be removed from open joints. 

21.9.2.2 

Filled Joints 

When filled joints are specified in the  Contract documents,  pre-moulded-type fillers  shall be used 
unless polystyrene board is specifically called for. Filler for each joint shall consist of as few pieces 
of material as possible. Abutting edges of filler material shall be accurately held in alignment with 
each  other  and  tightly  fitted  or  taped,  as  necessary,  to  prevent  the  intrusion  of  grout.  Joint  filler 
material shall be anchored to one side of the joint by waterproof adhesive or other methods so as to 
prevent it from working out of the joint, but not interfere with the compression of the material. 

21.9.2.3 

Sealed Joints 

Prior  to  the installation of pourable joint sealants, the Contractor shall remove  all foreign material 
from the joint, shall cut back the filler material to the depth shown or approved, and clean the surface 
of  the  concrete  that  will  be  in  contact  with  the  sealant  with  light  sandblasting.  When  required,  a 
polyethylene foam strip shall be placed in the joint to retain the sealant and isolate it from the filler 
material. Sealant materials shall then be mixed and installed in accordance with the Manufacturer's 
directions; and any material that fails to bond to the sides of the joint within 24 hours after placement 
shall be removed and replaced by the Contractor. 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 21-36 

C

HAPTER 

21:

 

C

ONCRETE 

S

TRUCTURES

 

 

 

 

First Edition -January 2018 

 

21.9.2.4 

Waterstops 

Waterstops shall be furnished and installed in accordance with the details indicated on the Contract 
drawings, the provisions of this section, and as directed by the Engineer. 

Waterstops  shall  conform  to  the  cross  section  and  to  the  minimum  dimensions  indicated  on  the 
Contract drawings. 

Adequate  water  stops  of  metal,  rubber,  or  plastic  shall  be  placed  as  specified  in  the  Contract 
documents. Where movement at the joint is provided for, the waterstops shall be of a type permitting 
such  movement  without  damage.  They  shall  be  spliced,  welded,  or  soldered  to  form  continuous 
watertight joints. 

No site welding of waterstops and no splices will be permitted in straight strips. Additionally, strips 
and special connection pieces shall be well cured in a manner that creates dense, homogeneous 
cross sections that are free from all porosity. All junctions in the special connection pieces shall be 
fully  moulded.  During  the  vulcanizing  period,  the  Contractor  shall  secure  the  joint  with  suitable 
clasps. Materials at the splices shall be dense and homogeneous throughout the cross sections. 

Field splices for rubber waterstops shall be either vulcanized, mechanical, using stainless steel parts; 
or made with a splicing union of the same stock as the waterstop, at the option of the Contractor. 

Field  splices  for  PVC  waterstops  shall  be  performed  by  heat  sealing  the  adjacent  surfaces  in 
accordance with the Manufacturer's recommendations. A thermostatically controlled electric source 
of heat shall be used to make all splices and shall sufficiently melt, but not char, the plastic. 

The waterstop network shall provide an integral four bulb system  with constant width throughout. 
Standard intersections shall be used to accommodate changes in direction. On site jointing shall be 
carried  out  using  metal  jigs  provided  by  the  Manufacturer  to  ensure  alignment  and  continuity  of 
section. 

To avoid bucking or distortion of the web or flange during waterstop installation, the Contractor shall 
cut and splice them at changes in directions, as may be necessary. 

Field splices shall develop water tightness equal to that of the unspliced material and have a tensile 
strength of not less than 50 percent of the unspliced material. 

Precautions  shall  be  taken  so  that  the  waterstops  shall  be  neither  displaced  nor  damaged  by 
construction operations, or other means. While the waterstop is being embedded in concrete, the 
Contractor shall keep all surfaces free from oil, grease, dried mortar 

— or any other foreign matter. 

Means shall be used to ensure that all portions of the waterstop designed for embedment shall be 
tightly enclosed by dense concrete. 

Waterstops shall be properly placed and tensioned prior to start concrete work. If, after placing the 
concrete  the  waterstops  are  materially  out  of  position  or  shape,  the  Contractor  shall  remove  the 
surrounding concrete, rest the waterstop, and replace the concrete 

— at its own expense. 

21.9.2.5 

Expansion Joint Armour Assemblies 

Armour assemblies shall be installed so the top surface matches the plane of the adjacent finished 
concrete  surface  throughout  the  length  of  the  assembly.  Positive  methods  shall  be  employed  in 
placing the assemblies to keep them in correct position during the placing of the concrete. Openings 
at expansion joints shall be that designated in the Contract documents at normal temperature, or as 
directed  by  the  Engineer  for  other  temperatures;  and,  the  Contractor  shall  take  care  to  avoid 
impairment of the clearance in any manner. 

21.9.2.6 

Sheet Packing, Preformed Pads, and Board Fillers 

Tempered hardboard shall conform to Federal Specification LLL-B-810, Type II; and shall be smooth 
on one side and plain. Hardboards shall measure at a minimum thickness of 3 mm, unless shown or 
specified otherwise. 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 21-37 

C

HAPTER 

21:

 

C

ONCRETE 

S

TRUCTURES

 

 

 

 

First Edition -January 2018 

 

Expanded polystyrene shall be a commercially available polystyrene board. Expanded polystyrene 
shall  have  a  flexural  strength  of  240  kPa,  minimum,  determined  in  conformance  with  the 
requirements in ASTM C203 - 05a(2012) and compressive yield strengths of between 110 kPa and 
275 kPa, at 5% compression. 

When  shown  in  the  Contract  documents,  surfaces  of  expanded  polystyrene  shall  be  faced  with 
hardboard,  which  shall  measure  at  a  minimum  thickness  of  3  mm,  conforming  to  Federal 
Specification  LLL-B-810,  any  type.  Other  facing  materials  may  be  used,  provided  they  furnish 
equivalent protection. Boards shall be held in place by nails, waterproof adhesives, or other means 
approved by the Engineer. 

21.9.3 

Injection of Expansion and Construction Joints 

Re-injectable  PVC  hoses  comprising  of  a  hollow  core  and  lateral  openings  covered  by  neoprene 
strips  and  webbed  nylon  mesh  (or  equivalent)  shall  be  installed  at  all  horizontal  and  vertical 
expansion and construction joints, in all structural elements exposed to water such as base slab, 
walls, and all underground structures as indicated in the Contract plans. 

The outside diameter of the hose shall be a minimum of 24 mm with a longitudinal internal injection 
hole diameter of 10 mm and discharge openings of 5 mm diameter at a maximum spacing of 300 
mm centre to centre. The hose shall be placed to the total length of expansion and construction joints 
with entry port and vent ends terminating in a junction box. The re-injectable hose shall be cleanable 
and re-injectable. The hose shall be clamped into position with clips spaced at 250 mm apart. 

21.9.3.1 

Construction Joints 

The concrete substrate along the length of the construction joint shall be free of debris and from any 
form of contaminants. Sharp areas shall be grinded off and loose concrete shall be removed by the 
Contractor. 

The Contractor shall place the re-injectable hoses between the internal and external waterstops and 
fix them firmly into the substrate. 

Initial injection of construction joints shall be carried out by the Contractor before demobilizing the 
dewatering  system  and  immediately  after  achieving  the  28  days  compressive  strength.  Approved 
cementatious flowable  grout  shall  be  used for  injection.  Installation  of  hose  and  injection  of grout 
shall be carried out exactly as per the  M

anufacturer’s instructions. Volumes of grout injected and 

pressure used  to inject shall be recorded.  All injection hoses shall be flushed out after the above 
mentioned injection is carried out to allow future re-injection. 

21.9.3.2 

Expansion Joints 

The Contractor shall install and fix the re-injectable hoses on both edges of internal waterstop. For 
all  expansions  joints  initial  injection  shall  be  carried  out  immediately  after  achieving  the  28  days 
compressive  strength.  Approved  acrylic  gel  (or  equivalent),  having  ultra  low  viscosity,  high 
expandability, strength, and accommodation of joint movements, shall be used. Installation of the 
hose  and  injection  of  the  resin  shall  be  carried  out  as  per  the  M

anufacturer’s  recommendations. 

Volumes of acrylic gel injected and pressure used to inject shall be recorded. All injection hoses shall 
be flushed out after the above mentioned injection is carried out to allow future re-injection. 

21.9.3.3 

Injection of Leaking Joints 

The Contractor shall identify the leakage locations on the joints of the structure and re-inject hoses 
satisfactorily in the leaking joints until all leaks have been stopped. 

No additional payment will be made by the Owner for these items and they shall be placed at the 
Contractor’s expense. 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 21-38 

C

HAPTER 

21:

 

C

ONCRETE 

S

TRUCTURES

 

 

 

 

First Edition -January 2018 

 

21.10 

Finishing Plastic Concrete 

Unless  otherwise  specified  in  the  Contract  documents,  after  the  Contractor  has  consolidated  the 
concrete 

— and prior to the application of cure — all surfaces of concrete that are not placed against 

forms shall be struck-off to the planned elevation or slope and the surface finished by floating with a 
wooden  float  sufficiently  to  seal  the  surface.  While  the  concrete  is  still  in  a  workable  state,  the 
Contractor shall carefully tool all expansion and construction joints with an edger. Joint filler shall be 
left exposed

.

 

21.10.1 

Roadway Concrete Surface Finish 

All bridge decks, approach slabs, and other concrete surfaces used by traffic shall be finished to a 
smooth  skid-resistant  surface  in  accordance  with  this  chapter.  During  finishing  operations,  the 
Contractor  shall  provide  suitable  and  adequate  work  bridges for  proper  performance  of the  work, 
including the application of fog sprays and curing compound, and for inspecting the work. 

21.10.1.1  Striking off and Floating 

After  the  concrete  is  placed  and  consolidated  according  to  the  specifications  in  Section  21.7, 
Handling  and  Placing  Concrete,  bridge  decks  or  top  slabs  of  structures  shall  be  finished  by  the 
Contractor  using  approved  power-driven  finishing  machines.  If  the  Engineer  approves  them,  the 
Contractor may use hand-finishing methods for short bridges measuring 15 m or less in length 

— or 

for irregular areas where the use of a machine would be impractical. 

All surfaces shall be struck-off by equipment supported by and travelling on rails or headers. Rails, 
headers, and strike-off equipment shall be of sufficient strength and be adjusted so that the concrete 
surface, after strike-off, will conform to the planned profile and cross section. Rails or headers shall 
be set on non-yielding supports and shall be completely in place and firmly secured for the scheduled 
length  for  concrete  placement  before  placing  of  concrete  will  be  permitted.  Rails  for  finishing 
machines  shall  extend  beyond  both  ends  of  the  scheduled  length  for  concrete  placement  for  a 
sufficient distance to permit the float of the finishing machine to fully clear the concrete to be placed. 
Rails or headers shall be adjustable for elevation and shall be set to allow for anticipated settlement, 
camber,  and  deflection  of  falsework 

—  as  necessary  —  to  obtain  a  finished  surface  true  to  the 

required grade and cross section. They shall be of a type and shall be so installed that no springing 
or  deflection  will  occur  under  the  weight  of  the  finishing  equipment  and  shall  be  so  located  that 
finishing equipment may operate without interruption over the entire surface. Rails or headers shall 
be adjusted, as necessary, to correct for unanticipated settlement or deflection that may occur during 
finishing operations. If rail supports are located within the area where concrete is being placed, the 
Contractor shall remove them to at least 50 mm below the finished surface, as soon as they are no 
longer needed, and shall fill the void with fresh concrete. 

Before the delivery of concrete, the finishing machine, or the hand-operated strike-off tool, shall be 
operated over the entire area to check for excessive rail deflections and for proper deck thickness 
and cover on reinforcing steel. This check will also verify operation of all equipment. Any necessary 
corrections shall be made before beginning concrete placement. 

Concrete finishing machine shall include, but not by way of limitation, the following: 

a.  Finishing machine shall be of a type approved by the Engineer, power driven and equipped 

with at least two screeds, and shall be fully and accurately adjustable to produce a crowned 
or flat surface. The finishing machine shall be designed and operated to strike-off, screed, 
and  consolidate  and  shall  have  a  minimum  of  one  reciprocating,  non-vibratory  screed. 
Finishing machines shall have ample strength and sufficient power and be so geared as to 
operate consistently, regularly, and smoothly. 

b.  Concrete finisher floats shall be attached to the finishing machine. They shall be equipped 

with independent wheels that ride on the rails and shall be of sufficient weight as to not flex 
under the pressure of the concrete. Floats shall be easily adjustable from crown to flat and 
shall be a minimum of 76 cm in length with a minimum 60 cm in contact with the concrete. 
Float  pans  shall  be  suspended  from  the  frame,  float  freely  on  the  concrete  and  shall  be 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 21-39 

C

HAPTER 

21:

 

C

ONCRETE 

S

TRUCTURES

 

 

 

 

First Edition -January 2018 

 

capable  of  being  adjusted  in  both  height  and  width.  Float  pans,  once  adjusted,  shall  be 
equipped  hydraulically,  or  by  other  suitable  means  so  that  they  may  be  raised  from  the 
operator's platform and when lowered shall automatically return to their pre-set positions. 

c.  Finishing machines shall be so constructed that the travel of the floating mechanism can be 

adjusted  to  conform  to  the  concrete  cross  section  indicated  in  the  Contract  drawings  or 
formed by the finishing machine. 

d.  Concrete bridge roadway decks and approach slabs shall be struck off and screeded with a 

finishing machine; the use of a vibratory screed shall not be permitted. 

e.  Consolidating methods for the concrete shall be as approved by the Engineer; and the use 

of vibrating equipment shall be subject to the approval of the Engineer. 

Finishing of concrete placed in bridge decks shall consist of striking off the surface of the concrete 
as placed, floating the surface so struck off, and finishing as specified herein. 

Concrete placement in bridge roadway decks shall not be permitted until the Engineer is satisfied 
that the rate of producing and placing concrete will be sufficient to complete the proposed operations 
within the scheduled time, that experienced finishing machine operators are employed to finish the 
deck, and that fogging equipment and all necessary finishing tools and equipment are on-site and in 
satisfactory condition for use. Finishing machines shall be set up sufficiently in advance of use to 
permit inspection by the Engineer during the daylight hours before each pour. 

All concrete on the bridge decks and approach slabs shall be formed and placed by the Contractor 
to comply with all lines, levels, and profiles 

— as indicated in the Contract drawings. This process 

shall include all depressions or notches to receive expansion joints, as indicated and as specified in 
Section 21.9, Expansion and Contraction Joints. 

Immediately prior to placing bridge deck concrete or approach slabs, the Contractor shall check all 
forms, falsework, and wedges and shall make all necessary adjustments. Care shall be exercised to 
ensure that settlement and deflection, due to the added weight of the bridge deck concrete, shall be 
a minimum. Suitable means, such as telltales, shall be provided by the Contractor to readily permit 
measurement by the Engineer of settlement and deflection as it occurs. 

If settlement, or other unanticipated events occur, which in the opinion of the Engineer shall prevent 
obtaining  bridge  deck  or  approach  slabs  that  comply  with  the  requirements  of  these  Standard 
Specifications,  placing  of  deck  concrete  shall  be  discontinued  until  corrective  measures  that  are 
satisfactory  to  the  Engineer  are  provided.  If  the  Contractor  fails  to  provide  satisfactory  measures 
prior to initial set of the concrete in the affected area, the placing of concrete shall be discontinued 
and a bulkhead installed at a location determined by the Engineer. All concrete in place beyond the 
bulkhead shall be removed. 

Concrete for bridge decks shall be placed in a uniform heading approximately normal to the structure 
centreline or, in the case of screeds supported on transverse headers, parallel to the centreline 

— 

as directed by the Engineer.  Concrete placing rates shall be limited to that which can be finished 
before the beginning of initial set. 

Immediately after the concrete has been placed and consolidated, the surface shall be struck off with 
the finishing machine until the required surface is obtained. 

Finishing machines shall go over each area of the surface as many times as required to obtain the 
required profile and cross section. A slight excess of concrete shall be kept in front of the cutting 
edge of the screed at all times. This excess shall be carried all the way to the edge of the pour or 
form and shall not be worked into the slab. It shall be wasted. 

After strike-off, the surface shall be finished with a float, roller, or other approved device to remove 
any local irregularities and to leave sufficient mortar at the surface of the concrete for later texturing. 

During finishing operations, excess water, laitance, or foreign materials brought to the surface during 
the  course  of  the  finishing  operations  shall  not  be  reworked  into  the  slab,  but  shall  be  removed 
immediately upon appearance by means of a squeegee or straightedge drawn from the centre of the 
slab toward either edge.  

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 21-40 

C

HAPTER 

21:

 

C

ONCRETE 

S

TRUCTURES

 

 

 

 

First Edition -January 2018 

 

Adding water to the concrete surface to assist in finishing operations shall not be permitted to avoid 
shrinkage cracks. 

Prior to their use, the strike-off method and equipment shall be subject to approval by the Engineer, 
who  can  withdraw  his  approval  if  performance  is  not  satisfactory.  Selected  equipment  shall  be 
capable  of  finishing  roadway  decks  within  the  surface  tolerances  set  forth  in  these  standard 
specifications. Improper adjustment  and  operation  that  results  in  unsatisfactory  consolidation  and 
smoothness shall be corrected immediately. Unsatisfactory performance may be cause for rejection 
of the equipment and removal of the in-place concrete. 

In  areas  inaccessible  to  a  finishing  machine 

—  and  where  permitted  by  the  Engineer  —  the 

Contractor may float the roadway or approach slab surfaces to a smooth, uniform surface following 
the completion of the strike-off by hand methods by means of floats measuring 3 m or more in length. 
When a finishing machine is used, the finished surface shall be floated in a similar manner 

— unless 

otherwise directed by the Engineer. Adequate floats shall be used to remove roughness and minor 
irregularities left by the strike board or finishing machine and to seal the concrete surface. Excessive 
working of the concrete surface  shall not be permitted by the Engineer. All floats shall be used in 
such a manner that each transverse pass overlaps the previous pass by a distance of at least one-
half the length of the float. 

When hand-operated float boards are used, they shall measure 3.5 m to 4.5 m long, and shall be 
ribbed and trussed to provide a rigid float. They shall also be equipped with adjustable handles at 
each end. Float shall consist of wood not less than 25 mm thick and a minimum of 200 mm wide. 
Adjusting screws spaced at no more than 600 mm on centres shall be provided between the float 
and the rib. Float boards shall be maintained free of twist and true at all times. 

Hand-operated  float  boards  shall  be  operated  from  transverse  finishing  bridges,  which  shall 
completely  span  the  bridge  roadway  deck  or  approach  slab  area  being  floated,  and  a  sufficient 
number of finishing bridges shall be provided to permit operation of the floats without undue delay. 
Not less than two transverse finishing bridges shall be provided when hand-operated float boards 
are used. When a finishing machine is used for longitudinal floating, one finishing bridge equivalent 
to the transverse finishing bridge specified herein shall be furnished for use by the Engineer. 

All finishing bridges shall be of rigid construction and shall be free of wobble and spring when used 
by the operators of longitudinal floats. They shall also be easily moved. 

21.10.1.2  Straight Edging 

After the floating has been completed, but while the concrete is still plastic, the slab surface shall be 
tested with a 3-m metal straightedge, which shall be held in contact with the surface in successive 
positions parallel to the bridge roadway deck or approach slab centreline and then at right-angles. 
Testing shall occur throughout the whole area, from one side of the deck or slab to the other. These 
tests  shall  be  in  successive  stages  of  not more than  one-half the  length  of  the  straightedge.  Any 
depressions found shall be filled at once with freshly mixed concrete, struck off, consolidated, and 
refinished. High areas shall be cut down and refinished. Testing and refinishing shall continue until 
the entire surface is found to be free from deviations of more than 3 mm from the testing edge of the 
straightedge. For deck surfaces that are to be overlaid with 25 mm or more of another material, such 
deviation  shall  not  exceed  10  mm  in  3  m.  Deviations  in  excess  of  these  requirements  shall  be 
corrected before the concrete sets. 

Allowances  shall  be  made  for  crown,  camber,  and  vertical  curvature.  Any  straight-edging  and 
corrective  work  performed  on  the  plastic  concrete  shall  not  relieve  the  Contractor  of  testing  the 
smoothness requirements on the hardened concrete, as outlined hereinafter. 

21.10.1.3  Texturing 

Surfaces shall be given a skid-resistant texture by either burlap or carpet dragging, brooming, tinning, 
or by a combination of these methods. Such equipment required to produce the final surface texture 
shall be secured to the finishing machine. Texturing operations shall be so executed that the surface 
is uniform in appearance and free from rough and porous spots, irregularities, and depressions. 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 21-41 

C

HAPTER 

21:

 

C

ONCRETE 

S

TRUCTURES

 

 

 

 

First Edition -January 2018 

 

Employed methods shall be as specified in the Contract documents, or as approved by the Engineer. 
Surfaces  that  are  to  be  covered  with  a  waterproofing  membrane  deck  seal  shall  not  be  coarse 
textured, but rather finished to a smooth surface, free of mortar ridges and other projections. 

This operation shall be done after floating and at such time, and in such manner, that the desired 
texture will be achieved while minimizing displacement of the larger aggregate particles. 

a.

 

Dragged 

If the surface texture is to be a drag finish, the surface shall be finished by dragging a seamless strip 
of damp burlap over the full width of the surface.  Sufficient layers  of burlap made up of sufficient 
lengths shall create the burlap drag that will connect with the concrete to slighting groove the surface. 
It shall be moved forward with a minimum bow of the lead edge. Drags shall be kept damp, clean, 
and free of particles of hardened concrete. As an alternative to burlap, the Engineer may approve or 
direct that carpet or artificial turf of an approved type and size be substituted. 

b.

 

Broomed 

If the Contract documents require the surface texture to consist of a broom finish, the surface shall 
be broomed when the concrete has hardened sufficiently. Brooms shall be of an approved type and 
strokes shall be square across the slab, from edge to edge, with adjacent strokes slightly overlapped. 
Strokes  shall  be  made  by  drawing  the  broom  without  tearing  the  concrete  but  producing  regular 
corrugations  not  more  than  3  mm  in  depth.  Surfaces,  as  thus finished,  shall  be  free from  porous 
spots,  irregularities,  depressions,  and  small  pockets  or  rough  spots  that  may  be  caused  by 
accidentally  disturbing  particles  of  coarse  aggregate  embedded  near  the  surface  during  the  final 
brooming operation.  

c.

 

Tined 

If the surface is to be tined, the tinning shall be in a transverse direction using a wire broom, comb, 
or finned-float having a single row of tines or fins. Tinning grooves shall be between 1.5 mm and 5 
mm wide and between 3 mm and 5 mm deep, spaced 12 mm to 20 mm on centres. Tinning shall be 
discontinued 300 mm from the curb line on bridge decks. Areas adjacent to the curbs shall be given 
a  light  broom  finish  longitudinally.  As  an  alternative,  tinning  may  be  achieved  using  an  approved 
machine designed specifically for tinning or grooving concrete pavements. 

21.10.1.4  Surface Testing and Correction 

After the concrete has hardened, the Engineer will inspect finished deck roadway surfaces that shall 
not be overlain with a wearing surface. Any variations in the surface that exceed 3 mm from a 3 m 
straightedge  will  be  marked  and  corrected  by  the  Contractor  by  the  use  of  concrete  planning  or 
grooving  equipment  that  produces  a  textured  surface  equal  in  roughness  to  the  surrounding 
unground concrete without shattering or otherwise damaging the remaining concrete. 

21.10.2 

Pedestrian Walkway Surface Finish 

After  placement  of  the  concrete  for  sidewalks  and  decks  of  pedestrian  structures,  it  shall  be 
consolidated and the surface shall be struck off by means of a strike board and floated with wooden 
or cork float. If directed, the surface shall then be lightly broomed in a transverse direction. An edging 
tool shall be used on edges and expansion joints. Surfaces shall not vary more than 3 mm under a 
1.5 m straightedge and shall have a granular or matte texture that shall not be slippery when wet. 

Sidewalk  surfaces  shall  be  laid  out  in  blocks  with  an  approved  grooving  tool,  as  specified  in  the 
Contract documents 

— or as directed by the Engineer. 

21.10.3 

Trowelled and Brushed Finish 

Surfaces  that  are  specified  in  the  Contract  documents  to  be  trowelled  shall  first  be  finished  as 
specified under Section 21.10, Finishing Plastic Concrete. Then, after the concrete is partially set, 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 21-42 

C

HAPTER 

21:

 

C

ONCRETE 

S

TRUCTURES

 

 

 

 

First Edition -January 2018 

 

the surface shall be finished to a smooth surface by trowelling with a steel trowel until a slick surface 
that is free of bleed water is produced and then brushed with a fine brush using parallel strokes. 

21.10.4 

Surfaces under Bearings 

When metallic masonry plates are placed directly on the concrete, or on filler material less than 3 
mm thick, the surface shall first be finished with a float finish. After the concrete has set, the area 
that will be in contact with the masonry plate shall be ground to provide full and even bearing. When 
such plates are set on filler material between 3 mm and 12 mm thick, the concrete surface shall be 
steel-trowel finished without brushing and the flatness of the finished surface shall not vary from a 
straightedge laid on the surface in any direction within the limits of the masonry plate by more than 
1.5 mm. Surfaces that fail to conform to the required flatness shall be ground until acceptable. 

Surfaces  under  elastomeric  bearings  and  under  metallic  masonry  plates  that  are  supported  on 
mortar or filler pads measuring 12 mm or greater in thickness shall be finished by wood floating to a 
flat and even surface free of ridges. 

21.11 

Curing Concrete 

All newly placed concrete shall be cured so as to prevent loss of water by use of one or more of the 
methods  specified  herein.  Except  for  high-performance  concrete  (HPC)  used  in  cast-in-place 
construction 

—  where  performance  criteria  in  addition  to  concrete  compressive  strengths  are 

specified 

— curing shall commence immediately after the free water has left the surface and finishing 

operations  are  completed.  For  HPC,  water  curing  shall  commence  immediately  after  finishing 
operations are complete. If the surface of the concrete begins to dry before the selected cure method 
can be applied, the surface of the concrete shall be kept moist by a fog spray applied so as not to 
damage the surface. 

Curing by other than waterproof cover, steam, or radiant-heat methods with precast concrete shall 
continue  uninterrupted for  seven  days 

— except for when pozzolans in excess of  10 percent, by 

weight, of the Portland cement are used in the mix. When such pozzolans are used, the curing period 
shall be 10 days with an appropriate curing suitable for pozzolans such as the insulated curing, all 
as  per  approved  thermal  control  plan.  For  other  than  top  slabs  of  structures  serving  as  finished 
pavements  and  HPC  concrete,  the  above  curing  periods  may  be  reduced  and  curing  terminated 
when test cubes cured under the same conditions as the structure indicate that concrete strengths 
of at least 70% of that specified have been reached. 

When deemed necessary by the Engineer during periods of hot weather, water shall be applied to 
concrete surfaces being cured by the liquid membrane method or by the forms-in-place method, until 
the Engineer determines that a cooling effect is no longer required. Such application of water shall 
be at no cost to the Owner. 

21.11.1 

Curing Concrete Materials 

21.11.1.1  Water 

Water shall conform to the requirements of  Section 4.3.8 of Chapter 4, Concrete Works, of these 
Standard Specifications. 

21.11.1.2  Liquid Membranes 

Liquid  membrane-forming  compounds  for  curing  concrete  shall  conform  to  the  requirements  of 
AASHTO M 148-05 (ASTM C309 - 11). 

21.11.1.3  Waterproof Sheet Materials 

Waterproof  paper,  polyethylene  film,  and  white  burlap  polyethylene  sheets  shall  conform  to  the 
requirements of AASHTO M 171-05 (ASTM C171 - 07). 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 21-43 

C

HAPTER 

21:

 

C

ONCRETE 

S

TRUCTURES

 

 

 

 

First Edition -January 2018 

 

21.11.2 

Curing Concrete Methods 

21.11.2.1  Forms-in-place Method 

Formed surfaces of concrete may be cured by retaining the forms in place without loosening for the 
required time. 

21.11.2.2  Water Method 

For this method, concrete surfaces shall be kept continuously wet by ponding, spraying, or covering 
with materials that are kept continuously and thoroughly wet. Such materials may consist of cotton 
mats,  multiple  layers  of  burlap,  or  other  approved  materials  that  do  not  discolour  or  otherwise 
damage the concrete. 

21.11.2.3  Liquid-membrane Curing Compound Method 

This  method  shall  not  be  used  on  surfaces  where  a  rubbed  finish  is  required  or  on  surfaces  of 
construction joints, unless it is removed by sand blasting prior to placement of concrete against the 
joint. Type 2, white pigmented, liquid membranes may be used only on the surfaces of bridge decks, 
on surfaces that shall not be exposed to view in the completed work, or on surfaces where their use 
has been approved by the Engineer. 

When membrane curing is used, the exposed concrete shall be thoroughly sealed immediately after 
the free water has left the surface. Formed surfaces shall be sealed immediately after the forms are 
removed  and  necessary  finishing  has  completed.  These  solutions  shall  be  applied  by  power-
operated atomizing spray equipment in one or two separate applications. Hand-operated sprayers 
may be used for coating small areas. Membrane solutions containing pigments shall be thoroughly 
mixed prior to use and agitated during application. If the solution is applied in two increments, the 
second application shall follow the first application within 30 minutes. To ensure a uniform coverage 
at  the  rate  of  0.27  litre/m

2

,  the  Contractor  shall  provide  satisfactory  equipment  together  with  the 

means to properly control and assure the direct application of the curing solution on the concrete 
surface. 

If rain falls on the newly coated concrete before the film has dried sufficiently to resist damage, or if 
the film is damaged in any other manner during the curing period, a new coat of the solution shall be 
applied to the affected portions equal in curing value to that specified above. 

21.11.2.4  Waterproof Cover Method 

This method shall cover the surface with a waterproof sheet material so as to prevent moisture loss 
from the concrete.  It may be used only when the covering can be secured adequately to prevent 
moisture loss. 

During installation, concrete shall be wet at the time the cover is installed; the sheets shall be of the 
widest practicable width; adjacent sheets shall overlap a minimum of 150 mm and shall be tightly 
sealed with pressure sensitive tape, mastic, glue,  or other approved methods to form a complete 
waterproof cover of the entire concrete surface. Waterproof sheets shall be secured so that wind 
shall not displace it. Shall any portion of the sheets be broken or damaged before expiration of the 
curing period, the broken or damaged portions shall be immediately repaired. Sections that have lost 
their waterproof qualities shall not be used. 

21.11.2.5  Steam or Radiant-heat Curing Method 

This method may be used only for precast concrete members manufactured in established plants. 

Steam  curing  or  radiant-heat  curing  shall  be  done  under  a  suitable  enclosure  to  contain  the  live 
steam or the heat. Steam shall be low-pressure and saturated. Temperature recording devices shall 
be employed to verify that temperatures are uniform throughout the enclosure and within the limits 
specified in the Contract documents. When HPC is used in prestressed concrete members 

— where 

a concrete compressive strength greater than 41.4 MPa is specified 

— the Contractor shall place 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 21-44 

C

HAPTER 

21:

 

C

ONCRETE 

S

TRUCTURES

 

 

 

 

First Edition -January 2018 

 

temperature-sensing devices within the concrete to verify that temperatures are uniform and within 
the limits specified. 

Initial applications of the steam, or of the heat, shall not occur prior to initial set of the concrete except 
to maintain the temperature within the curing chamber above the specified minimum temperature. 
Initial set times may be determined by the Standard Method of Test for Time of Setting of Concrete 
Mixtures by Penetration Resistance, AASHTO T 197M/T 197-11 (ASTM C403 / C403M - 08). 

During  the  waiting  period,  the  temperature  within  the  curing  chamber  shall  not  be  less  than  10 
degrees Celsius and live steam, or radiant heat, may be used to maintain the curing chamber at the 
proper minimum temperature. During this period, the concrete shall be kept wet. 

Application of live steam shall not be directed on the concrete or on the forms so as to cause localized 
high  temperatures.  During  the  initial  application  of  live  steam  or  of  radiant  heat,  the  temperature 
within the concrete shall increase at an average rate not exceeding  22 degrees Celsius per hour 
until the curing temperature is reached. Maximum curing temperatures within the concrete shall not 
exceed 71 degrees Celsius and shall be held until the concrete has reached the desired strength. In 
discontinuing the steam application, the concrete temperature shall not decrease at a rate to exceed 
22 degrees Celsius per hour until a temperature of 11 degrees Celsius above the temperature of the 
air to which the concrete will be exposed has been reached.  

Radiant  heat  may  be  applied  by  means  of  pipes  circulating  steam,  hot  oil,  or  hot  water 

—  or  by 

electric heating elements. Radiant-heat curing shall be done under a suitable enclosure to contain 
the heat, and moisture loss shall be minimized by covering all exposed concrete surfaces with plastic 
sheeting  or  by  applying  an  approved  liquid-membrane  curing  compound  to  all  exposed  concrete 
surfaces. Top surfaces of concrete members to be used in composite construction shall be clear of 
residue of the membrane curing compound so as not to reduce bonds below design limits. Surfaces 
of concrete members to which other materials will be bonded in the finished structure shall be clear 
of residue of the membrane curing compound so as not to reduce bond below design limits. 

For prestressed members, the transfer of the stressing force to the concrete shall be accomplished 
immediately after the steam or heat curing has been discontinued. 

21.11.2.6  Insulated Curing Method 

The insulated curing method shall be in accordance of the requirements of Article 4.4.2.6 of Chapter 
4, Concrete Works, of these standard specifications. 

21.11.3 

Bridge Decks 

Top  surfaces  of  bridge  decks  shall  be  cured  by  a  combination  of  the  liquid-membrane  curing 
compound method and the water method, and/or insulated curing method. Liquid membranes shall 
be  Type  2,  as  defined  in  AASHTO  M  148-05  (ASTM  C309  -  11),  white  pigmented,  and  shall  be 
applied from finishing bridges progressively and immediately after finishing operations are complete 
on  each  portion  of  the  deck.  Water  cures  shall  be  applied  not  later  than  four  hours  after  the 
completion of deck finishing or for portions of the decks on which finishing is completed. 

HPC, where performance criteria in addition to concrete compressive strengths are specified, tends 
to have little bleed, especially when the low-water to cementitious materials ratio is used with mineral 
admixtures.  Additional  performance  criteria  may  include  shrinkage,  chloride  permeability,  de-icer 
scaling resistance, abrasion resistance, or heat of hydration. As a result, the evaporation protection 
of  the  bleed  water  on  the  fresh  concrete  is  lost.  Therefore,  when  HPC  is  used  in  cast-in-place 
construction of bridge decks, water cure shall be applied immediately after the finishing of any portion 
of the deck is complete and shall remain in place for a minimum period of seven days irrespective of 
concrete  strength.  If  conditions  prevent  immediate  application  of  the  water  cure,  an  evaporation 
retardant  shall  be  applied  immediately  after  completion  of  finishing  or  fogging  shall  be  used  to 
maintain  a  high,  relative  humidity  above  the  concrete  to  prevent  drying  of  the  concrete  surface. 
Following the water-cure period, liquid-membrane curing compound may be applied to extend the 
curing period. 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 21-45 

C

HAPTER 

21:

 

C

ONCRETE 

S

TRUCTURES

 

 

 

 

First Edition -January 2018 

 

21.12 

Finishing Formed Concrete Surfaces 

Surface finishes for formed concrete surfaces shall be classified as follows: 

  Class 1: Ordinary surface finish 

  Class 2: Rubbed finish 

  Class 3: Tooled finish 

  Class 4: Sandblast finish 

  Class 5: Wire brush or scrubbed finish 

All concrete shall be given a Class 1 finish and, in addition, if further finishing is required, such other 
type of finish as is specified. 

If not otherwise specified in the Contract documents, exposed surfaces of piers, barriers, parapets, 
curbs, underside of copings, backwalls above bridge seats and such other surfaces where smooth, 
uniform  surfaces  are  specified  except  the  soffits  of  superstructures  and  the  interior  faces  and 
bottoms of concrete girders shall be given a Class 2 finish. 

Class 3, 4, or 5 finishes shall be applied only where specified in the Contract documents. 

The surface finish on piers shall include all exposed surfaces below the bridge seat to 300 mm below 
the finish ground line. 

21.12.1 

Class 1: Ordinary Surface Finish 

Immediately  following  the  removal  of  forms,  the  Contractor  shall  remove  all  fins  and  irregular 
projections  from  all  surfaces  that  are  to  be  exposed  or  waterproofed.  Bulges  and  offsets  in  such 
surfaces shall be removed with carborundum stones or discs. 

Localized, poorly bonded rock pockets or  honeycombed concrete shall be removed and replaced 
with  sound  concrete  or packed mortar,  as  specified  in  Section  21.18,  Mortar  and Grout. If,  in the 
opinion of the Engineer, rock pockets are of such an extent or character as to affect the strength of 
the structure materially or to endanger the life of the steel reinforcement, the Engineer may declare 
the  concrete  defective  and  require  the  removal  and  replacement  of  the  portions  of  the  structure 
affected. 

On all surfaces, the cavities produced by form ties; other holes, broken corners, or edges; and other 
defects shall be thoroughly cleaned and, after having been thoroughly saturated with water, shall be 
carefully pointed and trued with a mortar conforming to Section 21.18. For exposed surfaces, white 
cement  shall  be  added  to  the  mortar  in  an  amount  sufficient  to  result  in  a  patch  that,  when  dry, 
matches the surrounding concrete. Mortar used in pointing shall be not more than one hour old; and 
the  concrete  shall  be  rubbed,  if  required,  or  the  cure  continued  as  specified  in  Section  21.10, 
Finishing  Plastic  Concrete.  Construction  and  expansion  joints  in  the  completed  work  shall  be  left 
carefully tooled and free of mortar and concrete. Joint fillers shall be left exposed for the full length 
with clean and true edges. 

Resulting  surfaces  shall  be  true  and  uniform.  Appearances  of  repaired  surfaces  that  are  not 
satisfactory shall be rubbed as specified in Section 21.12.2, Class 2: Rubbed Finish.  

21.12.2 

Class 2: Rubbed Finish 

After the removal of forms, the rubbing of concrete shall begin as its condition will permit. Immediately 
before starting this work, the concrete shall be thoroughly saturated with water. Sufficient time shall 
have  elapsed  before  the  wetting  down  to  allow  the  mortar  used  in  the  pointing  of  rod  holes  and 
defects  to  thoroughly  set.  Surfaces  to  be  finished  shall  be  rubbed  with  a  medium-coarse 
carborundum stone, using a small amount of mortar, which shall be composed of cement and fine 
sand, mixed in proportions used in the concrete being finished. Rubbing shall be continued until form 
marks,  projections,  and  irregularities  have  been  removed;  voids  have  been  filled;  and  a  uniform 
surface has been obtained. Pastes produced by this rubbing shall be left in place. 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

   

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 21-46 

C

HAPTER 

21:

 

C

ONCRETE 

S

TRUCTURES

 

 

 

 

First Edition -January 2018 

 

After the completion of additional work that could affect the surface, the final finish shall be obtained 
by rubbing with a fine carborundum stone and water. This rubbing shall be continued until the entire 
surface is of a smooth texture and uniform colour.  

After the final rubbing is completed and the surface has dried, it shall be rubbed with burlap to remove 
loose  powder  and  shall  be  left  free  from  all  unsound  patches,  paste,  powder,  and  objectionable 
marks. 

When metal, fibre, lined, or plywood forms in good condition are used, the requirement for a Class 
2 finish may be waived by the Engineer when the uniformity of colour and texture obtained with Class 
1  finishing  are  essentially  equal  to  that  which  could  be  attained  with  the  application  of  a  Class  2 
finishing. In such cases, grinding with powered disc grinders or light sandblasting with fine sand or 
other means approved by the Engineer may be utilized in conjunction with Class 1 finishing. 

21.12.3 

Class 3: Tooled Finish 

Finish of this character for panels and other like work may be secured by the use of a bush hammer, 
pick, crandall, or other approved tool. Air tools, preferably, shall be employed. No tooling shall be 
done until the concrete has set for at least 14 days and as much longer as may be necessary to 
prevent the aggregate particles from being picked out of the surface. 

21.12.4 

Class 4: Sandblasted Finish 

Thoroughly cured concrete surfaces shall be sandblasted with hard, sharp sand to produce an even, 
fine-grained surface in which the mortar has been cut away, leaving the aggregate exposed. 

21.12.5 

Class 5: Wire-brushed or Scrubbed Finish 

As soon as the forms are removed, and while the concrete is still comparatively green, the Contractor 
shall  thoroughly  and  evenly  scrub  the  surface  with  stiff  wire  or  fibre  brushes,  using  a  solution  of 
muriatic acid in the proportion of one-part acid to four parts water by volume until the cement film or 
surface is completely removed and the aggregate particles are exposed. This process shall leave 
an even, pebbled texture that presents an appearance grading from that of fine granite to course 
conglomerate 

— depending upon the size and grading of the aggregate used. When the scrubbing 

has  progressed  sufficiently  to  produce  the  texture  desired,  the  entire  surface  shall  be  thoroughly 
washed with water to which a small amount of ammonia has been added, to remove all traces of 
acid. 

21.12.6 

Concrete Architectural Rustication 

Concrete  architectural  rustication  in  piers,  abutments,  wingwalls  and  retaining  walls  shall  be 
constructed as indicated on the Contract plans, as specified herein, or as directed by the Engineer. 

Concrete architectural rustication which shall include but not be limited to concrete form liners, rough 
texture  finish,  or  any  finishes  shown  on  the  Contract  plans,  in  piers,  abutments,  wingwalls  and 
retaining walls is a decorative treatment and as such is not designed to support any superimposed 
loads during construction or upon completion of the Works. 

21.12.6.1  Materials 

All  materials shall  comply  with  the requirements of  Section  4.3  of  Chapter  4,  Concrete Works,  of 
these Standard Specifications, and this chapter. 

21.12.6.2  Formwork 

Formwork  for  the  pier,  wingwall,  and  abutment  rustication  shall  be  constructed  of  fibreglass  or 
approved  metal.  The  Contractor  shall  submit  shop  drawings  of  his  proposed  formwork  to  the 
Engineer  for  approval  in  accordance  with  the  requirements  of  the  Contract  documents.  The  form 
release oil shall be nonstaining. 

 

 

 

 

 

 

 

Content      ..     3      4      5      6     ..