Abu Dhabi, United Arab Emirates. STANDARD CONSTRUCTION SPECIFICATIONS (PART 1 - ROADS, Second Edition 2020) - page 50

 

 

S

YSTEM

 

 

AASHTO 

Designation 

ASTM 

Designation 

Title 

 

ASTM B189 - 

05(2010) 

Standard  Specification  for  Lead-Coated  and  Lead-Alloy-
Coated Soft Copper Wire for Electrical Purposes.  

 

ASTM B8 - 11 

Standard  Specification  for  Concentric-Lay-Stranded  Copper 
Conductors, Hard, Medium-Hard, or Soft.  

 

ASTM B33 - 

10 

Standard  Specification  for  Tin-Coated  Soft  or  Annealed 
Copper Wire for Electrical Purposes. 

 

ASTM D1248 - 

12 

Standard  Specification  for  Polyethylene  Plastics  Extrusion 
Materials for Wire and Cable.  

 

ASTM D1047 - 

11 

Standard  Specification  for  Poly(Vinyl  Chloride)  Jacket  for 
Wire and Cable.  

 

ASTM D372-

00(2006) 

Standard Specification for Flexible Treated Sleeving Used for 
Electrical Insulation (Withdrawn 2012).  

 

ASTM A27 / 

A27M - 10 

Standard  Specification  for  Steel  Castings,  Carbon,  for 
General Application.  

 

ASTM A606 / 

A606M - 09a 

Standard  Specification  for  Steel,  Sheet  and  Strip,  High-
Strength,  Low-Alloy,  Hot-Rolled  and  Cold-Rolled,  with 
Improved Atmospheric Corrosion Resistance. 

AASHTO M 

111M/M 111 

 

Standard  Specification  for  Zinc  (Hot-Dip  Galvanized) 
Coatings on Iron and Steel Products. 

 

ASTM B85 / 

B85M - 10 

Standard Specification for Aluminum-Alloy Die Castings.  

 

ASTM B108 / 

B108M - 12e1 

Standard  Specification  for  Aluminum-Alloy  Permanent  Mold 
Castings.  

 

ASTM B209 - 

10 

Standard  Specification  for  Aluminum  and  Aluminum-Alloy 
Sheet and Plate.  

Table 9-2: Designations and titles for BS and BS EN standards that apply to traffic control 

system works 

BS 

Designation 

BS EN 

Designation 

Title 

 

BS EN 12368-

2006 

Traffic Control Equipment. Signal Heads.  

 

BS EN 12966-

1:2005+A1:20

09 

Road  vertical  signs.  Variable  message  traffic  signs.  Product 
standard  

S

YSTEM

 

 

BS 

Designation 

BS EN 

Designation 

Title 

 

BS EN 12899-

1:2007 

Fixed, vertical road traffic signs. Fixed signs. 

9.2 

Foundations, Pullboxes and Conduits 

Main Contractor shall complete all civil works, including earthworks, grading, foundations, pullboxes 
and conduits for the traffic.  Civil work shall include installing conduits to the power source and the 
handhole or pullbox outside the power source as part of this work specified in this section. 

9.2.1 

Description 

Foundations and conduits for the traffic control system and Intelligent  transportation system (ITS) 
shall be as shown on the Contract plans, as specified herein and included in the Bills of Quantities.  
Work  shall  include,  but  not  by  way  of  limitation,  furnishing  and  installing  cast-in-place  concrete 
foundations for:  

  traffic signal and ITS poles;  

  ITS gantries;  

  traffic signal controllers and artery master controllers;  

  field equipment cabinets; 

  changeover switch (automatic transfer switch); 

  uninterruptible power supply (UPS);  

  communications cabinets; 

  video surveillance system (VSS) camera poles;  

  pullboxes; and  

  concrete-encased and non concrete encased conduits  

as  indicated  on  the  Contract  plans.  The  installation  shall  also  include  all  required  anchor  bolts, 
conduit,  ground rods,  pullboxes,  manholes  and  interconnecting  concrete-encased  conduits  to the 
foundations and to the detector loops and power source.  

9.2.2 

Materials 

Materials  to  be  furnished  and  installed  for  the  traffic  control  system  foundations,  pullboxes  and 
conduit  shall  be  as  indicated  on  the  Contract  plans,  as  specified  herein  and  as  approved  by  the 
Engineer 

9.2.2.1 

Approval of Materials 

Within 90 days after award of the Contract and before work is performed, the Contractor shall submit 
samples of all materials that will be used in this work for approval of the Engineer. 

9.2.2.2 

Conduit 

 

PVC  conduit  used  for  conduit  and  ducts  shall  meet  the  requirements  for  PVC  electrical  conduit 

specified in Section 10.4.3, Chapter 10, Lighting and Electrical Distribution Works, of these standard 
specifications.  

Galvanized metal conduit at pullboxes shall comply with the applicable clauses in Section 10.4.2, 
Chapter 10, Lighting and Electrical Distribution Works, of these standard specifications. 

S

YSTEM

 

 

9.2.2.3 

Concrete 

All concrete for foundations, pullboxes and concrete-encased conduct and ducts shall comply with 
the  applicable  requirements  of  Section  4.3  of  Chapter  4,  Concrete  works,  of  these  standard 
specifications. 

9.2.2.4 

Covers and Frames 

Contractor  shall  furnish  and  install  watertight  ductile  iron  covers  and  frames  as  indicated  on  the 
Contract plans and as specified herein. 

Covers and frames shall be ductile iron meeting the requirements for ductile iron covers and frames 
specified in Article 12.3.2.3 of Chapter 12, Stormwater Drainage, of these standard specifications.  
Rubber gasket seals shall be provided for watertightness and the covers shall be bolted to the frames 
with countersunk stainless steel hex head cap screws. 

Most covers and frames will be installed in non-traffic green or sidewalk areas and these shall be 
medium duty. Covers and frames installed in paved traffic areas shall be heavy duty. 

All covers or frames shall be identified with the words "T.C.S Traffic Control System" in both Arabic 
and English cast into the surface of the ductile iron as approved by the Engineer. 

All  covers  and  frames  shall  be  coated  on  all  exposed  surfaces  with  coat  tar  epoxy  meeting  the 
requirements of Section 24.5 of Chapter 24, Painting. 

Covers shall be equipped with cast-in lifting eyes, holes or other handling facilities and shall be made 
in sections as required for larger sizes (1.2 m and larger in one direction) to facilitate removal and 
lifting unless otherwise shown on the Contract plans or approved by the Engineer. 

Contractor shall supply one prying and lifting bar of approved design for each 30 covers (minimum 
of one tool for every type cover).  Prying and lifting bars shall be of approved appropriate design to 
match the different cover configurations. 

Covers shall have two keyed locking devices, one on each end, meeting the requirements of Article 
12.3.2.3 of Chapter 12, Stormwater Drainage, of these standard specifications, as directed by the 
Engineer.  

9.2.3 

Construction Requirements  

Construction  and  installation  of  the  traffic  control  system  foundations,  pullboxes  and  conduits 
(includes ducts) shall be as indicated on the Contract plans, as specified herein and as directed by 
the Engineer. 

9.2.3.1 

General  

Contractor shall furnish and install all traffic signal system and the VSS control system foundations, 
pullboxes and conduits (also referred to as the traffic control system civil works), which consists of 
concrete-encased  conduit,  manholes,  pullboxes,  junction  boxes,  concrete  foundations  for  traffic 
signal poles, controllers and VSS Camera poles and provisions for VSS camera mountings under 
bridge  structures  or  other  structures  e.g.  retaining  wall  structures  in  concrete  canyons,  where 
indicated on the Contract plans and as included in the Bills of Quantities.  Work shall include, but not 
by way of limitation, all labour, materials, tools, equipment and appurtenances.  

The Design Consultant shall perform a horizontal and vertical clash analysis during the development 
of the design to determine and resolve conflicts between the ITS infrastructure and the utilities. The 
Contractor  is  responsible  for  identifying  onsite  conflicts  between  the  ITS  infrastructure  and  the 
utilities. The Design Consultant and Contractor are responsible for resolving any conflicts between 
the ITS infrastructure and the utilities, particularly if an ITS corridor has not been allocated within the 
service reservation corridor. 

Traffic signal system and the ITS layouts as shown on the Contract plans are schematic. Contractor 
shall  verify  all  information  such  as  locations,  specifications,  construction  restrictions,  protection 

S

YSTEM

 

 

requirements and other data which shall be obtained by requesting the required information from the 
Engineer who will forward the written request to the Owner. 

Installation of the traffic signal system and ITS civil works shall include all excavation and backfilling, 
all required foundations complete with anchor bolts, conduit as indicated on the Contract plans, and 
all ancillary and related work.  Contractor shall verify the locations of the control system foundations, 
the  sizes  of  the  controller  foundations,  the  sizes  of  pole  foundations  and  the  anchor  bolt  sizes, 
locations,  and  orientation  for  all  foundations  with  the  manufacturer  and  the  Engineer  before 
placement of any foundations. 

The Engineer’s representative shall confirm the exact location of all 

traffic signal system and ITS equipment on site with the Contractor prior to installation. 

This  work  shall  comply  with  the  applicable  Sections  in  the  following  Chapters  of  these  Standard 
Specifications: 

  Chapter 2, Earthworks 

  Chapter 4, Concrete Works 

  Chapter 11, Utilities 

  Chapter 12, Stormwater Drainage 

9.2.3.2 

Foundations  

Foundations for the traffic signal system (various types 

– traffic signal poles, mast arms, pedestrian 

signal  pole/pylons,  and  free  right  turn  signal  poles),  traffic  violation  camera  poles,  VSS  system 
(various types), traffic signal controller, ITS control cabinet, changeover switch, and UPS foundations 
shall be as indicated on the Contract plans.  Number of anchor bolts, bolt locations, and anchor bolt 
dimensions shall be verified by the Contractor, as specified in these Standard Specifications or in 
the Particular Specifications.  Projecting portion of the anchor bolts and the nut and washer shall be 
treated by hot-dip galvanizing.  Raceway or conduit in various types of foundations for traffic signal 
and VSS support shall consist of PVC conduit or raceways with a bending radius as indicated on the 
Contract plans. 

All concrete for the traffic signal system (various types) and the ITS (various types) shall be cast-in-
place, Class C25/20.  All concrete work shall comply with all applicable requirements of Chapter 4, 
Concrete Works. Foundations shall be allowed to cure a minimum of 7 days before erecting poles, 
cabinets, or traffic signal controllers. 

All reinforcement steel in traffic signal system foundations and ITS system foundations shall be steel 
reinforcement  bars  complying  with  the  requirements  of  Chapter  5,  Reinforcing  Steel.  Reinforcing 
bars shall be uncoated plain deformed bars unless otherwise shown on the Contract plans. 

Anchor bolts for the support poles shall comply with the requirements of ASTM A307, Grade A. The 
anchor  bolts  shall  be  capable  of  supporting  the  traffic  signal  supports  and  signal  heads  with  the 
maximum bending moment. Bolts and nuts shall be hot-dip galvanized in accordance with ASTM 
A153. 

All  foundations  shall  be  furnished  with  an  earth  electrode  complying  with  Article  10.14.10.3  of 
Chapter 10, Lighting and Electrical Distribution Works, of these standard specifications. Type, size 
and installation of the earth electrode shall comply with  Section 10.14.10.3 of Chapter 10, unless 
otherwise indicated on the Contract plans. 

Holes for foundations shall be excavated to the dimensions required for construction. All excavating 
and backfilling shall comply with the requirements of Section 2.4 and 2.5 of Chapter 2, Earthworks.  
All unsuitable excavated materials shall be disposed of by the Contractor in accordance with Article 
2.4.2.7,  Disposal  of  unsuitable  or  excess  material,  of  Chapter  2.  Excavated  materials  that  are 
unsuitable shall not be used as backfill. All backfill shall be approved material compacted, in layers 
not to exceed 15 cm, to at least 95 % of the material's maximum density in accordance with Section 
2.5.3.2, Structural Backfill, of Chapter 2, Earthworks. 

Numbers  and  dimensions  of  anchor  bolts,  diameter  of  bolt  circles  and  sizing  of  base  plates  as 
indicated on the Contract plans are for description purposes only and shall be subject to the approval 

S

YSTEM

 

 

of the Engineer. Before placing concrete for any foundation, the Contractor shall verify size, location 
and related data of the foundation and anchor bolts with the Engineer. 

PVC  electrical raceways  or  conduit,  of the  size and  bend  radius  indicated  on the  Contract  plans, 
shall be installed in the support foundations as indicated on the Contract plans and as directed by 
the Engineer. 

Anchor bolts, ground rods and PVC conduits (or raceways and ducts) shall be located securely in 
position by the use of templates during the placing of foundation concrete. 

a.  Foundations for Traffic Signals, Type C and D 

Contractor shall include the furnishing and installing of all materials required for the construction of 
reinforced  concrete  foundations  for  traffic  signals,  Type  C  and  D.    Foundations  shall  be  in 
accordance  with  dimensions  as  indicated  on  the  Contract  plans  and  in  accordance  with  these 
Standard Specifications. 

Number  of  anchor  bolts,  bolt  locations,  and  anchor  bolt  dimensions  shall  be  verified  by  the 
Contractor,  as  specified  in  these  Standard  Specifications  or  in  the  Particular  Specifications.  
Projecting portion of the anchor bolts and the nut and washer shall be treated by hot-dip galvanizing.  
Raceway or conduit in traffic signal supports shall consist of PVC conduit or raceways with a bending 
radius as indicated on the Contract plans. 

Traffic signal foundations type C and D shall be drilled or bored in the manner, at the locations and 
to the penetration or depth indicated on the Contract plans, as specified herein and as approved by 
the Engineer.  Foundation construction shall meet the applicable requirements of Chapter 17, Drilled 
Piles, and as specified herein. 

Prior to proceeding with any foundation work for traffic signals, type C and D supports, the Contractor 
shall submit to the Engineer for approval, shop drawings, complete details, calculations for temporary 
or permanent metal casings, equipment data, and related particulars concerning the completion of 
the  proposed  traffic  signal  foundations,  type  C  and  D.    Shop  drawings  shall  also  indicate  the 
proposed method of conduit installation in the foundation.  Method of installation shall be subject to 
approval of the Engineer. 

Lengths indicated on the Contract plans are the estimated lengths to be required for the traffic signal 
foundations, type C and D. Final lengths of foundations shall be approved by the Engineer based 
upon actual conditions encountered in drilling or boring.  Contractor shall make his own analysis of 
the  subsoil  conditions  and  work  that  will  be  required  to  provide  the  drilled  or  bored  concrete 
foundation as specified. 

All  traffic  signal  foundations,  type  C  and  D,  shall  be  cast-in-place  Class  C30/20  concrete.    All 
concrete  work  shall  comply  with  the  applicable  requirements  of  Chapter  4,  Concrete  works.  
Foundations  shall  be  allowed  to  cure  a  minimum  of  7  days  before  erecting  traffic  signals  on  the 
foundations, type C and D. 

All reinforcement steel in traffic signal foundations,  type C and D, shall be in compliance with the 
requirements of Chapter 5, Reinforcing Steel. 

Anchor  bolts  for  the  support  poles  shall  comply  with  the  requirements  of  ASTM  A307,  Grade  A.  
Anchor  bolts  shall  be  capable  of  supporting  the  traffic  signal  supports  and  signal  heads  with  the 
maximum bending moment. Bolts and nuts shall be hot-dip galvanized in accordance with ASTM 
A153. 

All  foundations  for  traffic  signal  and  VSS  supports  shall  be  furnished  with  an  earth  electrode 
complying  with  Article  10.14.10.3  of  Chapter  10,  of  these  standard  specifications.    The  earth 
electrode shall be located as near as practicable to the foundation, as directed by the Engineer. Size 
of the earth electrode shall comply with Article 10.14.10.3 of Chapter 10, unless otherwise indicated 
on the Contract plans. 

Construction  of  all  foundations,  type  C  and  D,  for  traffic  signals  shall  comply  with  the  following 
requirements: 

S

YSTEM

 

 

1.  All excavations for these foundations shall be made by drilling, boring or sinking a casing in 

accordance with Chapter 17, Drilled Piles. 

2.  Contractor  shall  be  responsible  for  testing  all  soil  at  the  bearing  levels  indicated  on  the 

Contract plans, and shall submit written reports to the Engineer as to the bearing capacity at 
the depth indicated on the Contract plans and the coefficient of lateral subgrade reaction over 
the  proposed  length  of  pile,  and  the  acceptability  of  such  soil  to  support  the  proposed 
foundation and appurtenances.   

3.  Contractor  shall  make  boreholes  to  depths,  locations  and  frequencies  as  directed  by  the 

Engineer.  Frequency  and  depth  of  the  boreholes  shall  depend  upon  the  soil  conditions 
encountered and shall be at the discretion of the Engineer.  Total number of boreholes may 
or may not be equal to the total number of traffic signal foundations, type C and D.  Report 
on each borehole made shall include all information as directed by the Engineer and specified 
in Article 2.1.3.2 of Chapter 2, Earthworks. 

4.  In the event unsuitable soil is encountered throughout the length indicated on the Contract 

plans for the traffic signal foundations, type C and D, the Contractor shall advise the Engineer 
as to the unsuitability of such soil materials. Contractor shall be responsible for designing the 
extension of the depth of such traffic signal foundations to acceptable bearing.   Design of 
such foundations shall be in accordance with the applicable requirements of the "Drilled Shaft 
Manual", Volume II, Implementation Package 77-21, as published by the U.S. Department of 
Transportation  Office  of  Research  and  Development,  Implementation  Division  HDV-22, 
Washington,  D.C.  20590,  and  as  required  in  Chapter  17,  Drilled  Piles,  of  these  standard 
specifications.  

5.  Contractor  shall  employ  an  independent  chartered  engineer  or  registered  engineer  as 

approved  by  the  Owner  or  the  Engineer  to  design  the  increased  depth  of  any  such 
foundations.    Contractor  shall  submit  design  calculations  and  other  data  required  by  the 
Engineer for review before proceeding with extending the depth of such foundations. 

6.  Need for additional foundation depth shall be at the sole discretion of the Engineer. 
7.  Contractor  shall  not  proceed  with  further  construction  of  such  foundations  until  receiving 

written directions from the Engineer.  In the event the depths of the foundations are lowered 
below the elevations indicated on the Contract plans and as approved by the Engineer, the 
additional depths will be paid for as specified herein, or in the Particular Specifications, or the 
Bills of Quantities. 

8.  All drilled foundations shall be installed in the presence of the Engineer.  Engineer shall be 

notified  in  writing  a  minimum  of  48  hours  in  advance  that  the  Contractor  is  commencing 
operations  to  install  drilled  foundations  so  that  the  Engineer  can  be  present  during  the 
foundation  work  on  a  daily  basis  throughout  the  installation  of  the  foundations.    All 
foundations  shall  be  located to  the  lines  and  spacing  indicated  on the  Contract  plans  and 
shall be drilled vertically with a tolerance of one in fifty. 

9.  In cases where the intended bottom of foundation is in water, bailing will not be permitted by 

the Engineer.  Contractor shall take measures to ensure that the ground beneath the base of 
the drilled or bored excavation is not disturbed by upward seepage pressure.  In such cases 
the Contractor shall ensure the stability of the excavation base by maintaining a net positive 
hydraulic head within the casing. Concrete shall be placed by tremie in accordance with the 
requirements  of  Article  4.4.1.7  of  Chapter  4,  Concrete  Works,  of  these  Standard 
Specifications, all subject to the approval of the Engineer. 

10. Foundations shall be drilled with a casing being installed such that the bottom of the casing 

is maintained below the bottom of the excavation at all times.  If approved by the Engineer, 
the casing may be withdrawn as the concrete is placed provided the bottom of the casing is 
maintained  below  the  top  of  the  concrete  while  the  concrete  is  being  placed  and  if  the 
reinforcement, anchor bolts, and conduit can be maintained in their correct position during 
the  casing  withdrawal.  Otherwise,  the  casing  must  be  left  permanently  in  place  unless 
alternative construction methods are approved by the Engineer. 

11. In the event that conditions, during drilling of holes for the foundations, indicate that a drilled 

foundation  is  encountering  an  obstruction  before  reaching  proper  bearing  stratum,  the 
Contractor  shall  bore  or  drill  through  the  obstruction  (after  confirming  that  it  is  not  an 

S

YSTEM

 

 

underground utility) or shall use whatever means are necessary to remove or circumvent the 
obstruction, without additional cost to the Owner. 

12. In the event the Contractor excavates to an elevation below that indicated on the  Contract 

plans or approved by the Engineer, the Contractor shall furnish and place Class C15 concrete 
up  to  the  bottom  of  the  foundation  as  indicated  on  the  Contract  plans  or  as  directed  or 
approved by the Engineer at no additional cost to the Owner. 

13. Reinforcement steel cage shall be placed and secured symmetrically about the axis of the 

foundation and shall be securely blocked to clear the sides of the casing. 

14. Unless  tremie  methods  for  concrete  placement  are  approved  by  the  Engineer,  the  casing 

shall be clean and free of water before the reinforcement steel and concrete are placed. 

15. Drilling of holes for foundations, installation of reinforcement, placement of concrete and all 

appurtenant  work  shall  be  carried  out  in  a  continuous,  uninterrupted  operation.    Once  a 
foundation hole has been started, work shall be continuous so that concrete placement shall 
be completed on the foundation without interruption of the Contractor's operation and so that 
at no time shall work on a foundation be stopped or the drilled hole left open for any reason 
unless specifically approved in writing by the Engineer. 

16. Method of storing and handling of casings shall be such as to avoid damage to the casings. 
17. All exposed parts of the concrete foundations extending above the natural or finished ground 

line shall be given a Class 1 finish in accordance with Section 4.4.3 of Chapter 4, Concrete 
works.  Foundations, type C and D, for traffic signals shall not extend more than 100 mm 
above  the  finished  grade  unless  otherwise  indicated  on  the  Contract  plans.    Top  of  the 
foundations shall be constructed level to provide a proper horizontal surface for erecting all 
traffic signals. 

18. PVC electrical raceway or conduit, of the size and bend radius as indicated on the Contract 

plans, shall be installed in the support foundations as indicated on the Contract plans and as 
directed by the Engineer. 

19. Anchor  bolts and PVC raceway or  conduit shall be located securely in position during the 

placing of foundation concrete. 

9.2.3.3 

Cable and Conduit (Direct Bury) 

 This work shall consist of constructing a trench for the accommodation of the electric cable or PVC 
conduit (or ducts) and backfilling it at the locations indicated on the Contract plans.  Included is the 
furnishing  of  the  backfill  materials  and  disposing  of  the  surplus  materials  all  in  accordance  with 
Sections 2.4 and 2.5 of Chapter 2, Earthworks.  Trenches shall be excavated to a depth and width 
as indicated on the Contract plans, but in no case shall the depth be less than 534 mm and the width 
be less than 400 mm unless otherwise directed by the Engineer. All trench and backfill shall comply 
with the requirements of Section 2.4 and other applicable Sections in Chapter 2, Earthworks. 

Electric cable for the traffic controller shall be placed in the bottom of the trench and covered with 
backfill material as directed by the Engineer. 

Backfill  material  shall  be  thoroughly  compacted  to  a  density  as  required  by  Article  2.5.3.4, 
Compacting  embankments,  of  Chapter  2,  Earthworks,  and  in  such  a  manner  as  not  to  injure  the 
electric cable. 

Method and type of equipment to be used in compacting the backfill material shall be approved by 
the Engineer before any work is started. 

Installation and handling of PVC conduit shall meet the additional requirements in Section 10.4.3 of 
Chapter 10, Lighting and Electrical Distribution Works, as applicable. 

9.2.3.4 

Conduit (Concrete-encased) 

This  work  shall  consist  of  furnishing  and  installing  PVC  conduit  (or  ducts)  concrete-encased  to 
provide and permit the future routing, by others, of electric cable required for the traffic control system 
under the roadway. 

S

YSTEM

 

 

Ducts shall be encased in Class C25/20 concrete complying with the applicable Sections in Chapter 
4,  Concrete  Works.  Installation  of  conduits  shall  be  as  indicated  on  the  Contract  plans  and  as 
required in Section 10.12.3 of Chapter 10. 

All excavating and backfilling shall be in accordance with applicable  requirements of Sections 2.4 
and 2.5 of Chapter 2, Earthworks. 

Centreline of the duct shall be as indicated on the Contract plans. 

9.2.3.5 

Pullboxes (Manholes) 

Contractor shall furnish and install pullboxes (manholes) of the various types for the  traffic control 
system  as  indicated  on  the  Contract  plans,  as  specified  herein  and  as  directed  by  the  Engineer.  
Locations of pullboxes shall be determined on the site to suit the existing conditions.  Final locations 
shall be subject to the approval of the Engineer. 

All excavating and backfilling shall comply with the applicable requirements of Sections 2.4 and 2.5 
of Chapter 2, Earthworks. Pullboxes shall be reinforced, cast-in-situ Class C25 concrete complying 
with  the  dimensions  and  details  indicated  on  the  Contract  plans.    Concrete  work  shall  meet  the 
applicable requirements of Chapter 4, Concrete Works. Underside of the bottom slab and external 
faces  of  concrete  walls  shall  be  protected  with  Type  A  membrane  complying  with  the  applicable 
requirements of Section 28.2 of Chapter 28, Waterproofing. 

All covers shall be of the dimensions required to fit the respective pullboxes as shown on the Contract 
plans. Pullbox covers and frames shall be installed level and square, cast-in-situ with the concrete 
work for the upper portion of the pullbox, or as shown on the Contract plans.  All covers in traffic 
areas shall be checked to ensure that they are non-rocking and watertight.  Contractor shall take any 
measures approved by the Engineer, if the covers and/or frames need to be modified to be non-
rocking and watertight.  

Installation  of  pull  boxes  shall  meet  the  applicable  requirements  of  12.3.4,  Pull  boxes,  service 
chambers and vaults and as specified herein 

The conduits and pullboxes when completed shall be tested to the satisfaction of the Engineer for 
watertightness,  straightness  and  continuity.    The  method  of  testing  shall  be  determined  by  the 
Engineer.  No additional payment will be made by the Owner for testing. 

All pullboxes for the interconnection conduits installed within the service reservations shall be spaced 
a maximum of 100 m on centre unless otherwise indicated on the Contract plans or specified in the 
Particular Specifications. 

Installation of metal conduit at pullboxes shall be in accordance with Section 10.12.4 of Chapter 10. 

T

RAFFIC CONTROL 

S

YSTEM

 

 

9.3 

Pedestrian Poles 

9.3.1 

Description 

Contractor  shall  replace  existing  pedestrian  pylons  where  shown  on  the  Contract  plans  and  as 
directed by the Engineer. Existing pedestrian pylons shall not be reinstated after removal. Pedestrian 
pylons shall not be installed at new signalised intersections or midblock pedestrian crossings.  

All pedestrian poles shall be complete, in place, with all components as specified, as indicated on 
the  Contract  plans  and  as  required  for  the  installation.    Pedestrian  poles  shall  be  of  the  type  as 
indicated on the Contract plans. 

9.3.2 

Materials 

Pedestrian poles shall be as indicated on the Contract plans and as specified herein.  

Pedestrian poles shall include, but not by way of limitation, electrical wiring and work within the poles 
to the handhole in the supporting base or post, and all appurtenances and incidentals required for 
the installation of the poles.  All pedestrian poles shall be complete with all electrical lighting fixtures, 
lamps, ballasts, and internal wiring.  Further, each pedestrian pole shall be provided with an electrical 
protective device such as a fuse.  Protective device shall be located in a suitable, accessible location 
in the pedestrian pole. 

Contractor shall submit to the Engineer for approval, detailed shop drawings, material samples and 
such other data as may be required by the Engineer for the pedestrian poles, in accordance with 
Section 1.15, Submittal Procedures, of Chapter 1, General Requirements.  Accompanying the shop 
drawings, the Contractor shall submit colour samples on typical shapes for approval by the Engineer 
as well as certificates that the colour finish meets Specification requirements. 

Based upon the data as approved by the Engineer, and prior to production of all units, the Contractor 
shall  furnish  and  install  a  complete,  operative  and  detailed  prototype  of  the  pedestrian  pole  for 
approval by the Owner as confirmed by the Engineer.  No pedestrian pole shall be fabricated and 
delivered before the prototype has been approved by the Owner. 

All  materials  shall  be  as  indicated  on  the  Contract  plans  and  as  specified.    All  metal  shall  be  of 
suitable thickness and reinforced as required to ensure adequate structural strength and to prevent 
buckling, warping and/or denting.  Pedestrian poles and pylons shall be internally illuminated with 
cut out messages and other signs if the type requires it, as shown on the  Contract plans, and as 
directed by the Engineer.  Locks on the access doors shall be approved by the Owner and shall be 
master keyed as directed by the Engineer or Owner.  All keys shall be delivered to the Engineer to 
be forwarded to the Owner.  All fasteners shall be concealed. 

Materials of all parts used in the pedestrian pole shall be new and shall be the best of their respective 
kind  and  most  suitable  for  the  local  climatic  conditions,  thus  withstanding  the  variations  of 
temperature and other prevailing conditions without distortion or deterioration of any part of the pylon.  
In every case where a standard has been established for a particular type of material in question, 
the material shall comply with the provisions set forth in the standard.  Equipment included in these 
Specifications shall be so manufactured as to facilitate easy and proper erection and maintenance.  
Design of all equipment shall ensure satisfactory operation under the site conditions mentioned. 

Pedestrian Poles shall be fabricated to comply with the requirements of the Contract plans and as 
specified  herein.    All  members  and  plates  shall  be  fabricated  with  eased  or  rounded  corners  as 
detailed.  All assemblies shall be made by full welding in accordance with American Welding Society 
standards AWS with welds finished smooth and flush with adjacent surfaces. 

Removable base plate enclosure boxes shall be as detailed, fabricated of 6 mm thick ASTM A36 
steel,  all  welded  construction,  with  welds  ground  flush  and  smooth.    Enclosure  boxes  shall  be 
galvanized,  prime  and  finish  painted  as  specified  herein.    Stainless  steel  fasteners  shall  be  flat, 
phillips head, countersunk machine screws. 

S

YSTEM

 

 

Aluminium members of the pylon shall be solid, sized, and formed as indicated on the Contract plans.  
Aluminium shall comply with the values stated in ASTM B221 and B209.  Bar shapes shall be square 
cornered,  extruded  alloy  6061-T651  and/or  6063-T5.    Aluminium  plate  shall  be  alloy  6061-T651.  
Aluminium  welding  alloy  shall  be  the  type  best  suited,  and  as  recommended  by  the  aluminium 
manufacturer.  All base plate fastening hardware shall be stainless steel.  Bolts shall comply with 
ASTM A193, Grade B8, Class 2; nuts shall comply with ASTM A194, Grade 8; and flat washers with 
ASTM A240, Type 302. 

After  compete  fabrication,  the  pedestrian  pole  units  specified  to  receive  colour  coating  shall  be 
factory chemically pre-treated, then receive a thermocured inhibitive primer, then a factory applied 
fluoropolymer resin colour coating complying with the requirements of AAMA 2605,  followed by a 
clear, transparent protective topcoat. 

Finish colour coating shall be matte finish and shall match the AAMA dark bronze anodized finish 
colour.  Any surfaces or colour coating damaged during delivery shall be repaired or recoated to the 
satisfaction of the Engineer. 

9.3.3 

Construction Requirements 

All signal heads, control mechanisms, cables, outside conduit not indicated on the Contract plans, 
appurtenant work and final hook-up of the poles will be by a specialist subcontractor pre-approved 
by the Owner. 

Contractor shall include complete furnishing and installing of the pedestrian poles as included in the 
Bills of Quantities.  Work for the pedestrian pole shall include all materials, labour, tools, equipment 
and appurtenances to complete the Pedestrian Pole installation. Holes shall be provided in the base 
plate to allow conduits to pass through same.  Handholes shall be provided in the pedestrian poles 
to allow connection of all wiring. 

Pedestrian poles shall be provided with a fuse of adequate capacity in the base.  Electrical wiring 
within  the  pedestrian  poles  shall  be  earthed  and  bonded  in  accordance  with  the  requirements  of 
Section 10.11.10, Grounding and Bonding, of Chapter 10. 

Contractor shall verify location and size of conduit, height of conduit above top of foundation and 
similar details with the Engineer and the manufacturer before proceeding with this work. 

All conduit, cable and electrical wiring to the poles shall be included by the Contractor as a part of 
this Item and shall comply with the requirements specified in the applicable clauses of Chapter 10, 
Lighting and Electrical Distribution Works. 

All exposed surfaces and message panels shall be suitably cleaned before approval by the Engineer 
and/or acceptance by the Owner. 

9.4 

Existing and Temporary Traffic Signals 

9.4.1 

Description 

Maintenance, removal and disposal of the existing traffic signals and existing traffic signal controllers 
shall be as indicated on the  Contract plans, as specified herein and as directed by the Engineer.  
This  section  applies  only  to  temporary  signals  and  those  existing  traffic  signals  that  are  to  be 
removed/replaced by the Contractor.  All other traffic signals to remain within the contract limits will 
be maintained by the Owner. 

9.4.2 

Materials 

9.4.2.1 

General 

Contractor shall assume full maintenance responsibility for any temporary signals and for existing 
traffic  signals  and  controllers  that  are  to  be  removed  and/or  replaced  within  the  contract  limits.  
Contractor  shall  obtain  all  information  from  examination  of  the  existing  installations  or  from  the 
installers of the existing traffic signals and controllers.  Maintenance shall include, but not by way of 

S

YSTEM

 

 

limitation, the power to the units, controls for units, relamping as required, repair and replacement of 
damaged units or other maintenance as required for the continued operation of such existing units.  
Maintenance shall be round-the-clock (24 hours) and not during working hours only - necessary staff 
shall be on duty for this purpose till the need for the temporary signals is not required, as directed by 
the Engineer. 

9.4.2.2 

Technical Requirements 

Temporary signal assembly shall have the following capabilities: 

1.  All  temporary  traffic  signal  controllers  shall  be  similar.  When  there  is  more  than  one 

temporary signal in the project site, a master-slave controller concept shall be implemented. 

2.  All  vehicular,  pedestrian  signal  heads,  and  countdown  counters  shall  comply  with  their 

respective specification mentioned elsewhere in these specifications. 

3.  It shall be installed on prefabricated concrete blocks as shown on the Contract plans or on 

other means as approved by the Engineer. 

4.  It shall include wireless communication capability in order to send/receive data to/from the 

nearby central control unit (master controller) up to 150 m. Wireless band shall fit within the 
license-free band available at that location. 

5.  It shall include a GPRS module for distant operations greater than 150 m. 
6.  System shall have MS-windows based software to program the signal timing plans. Timing 

plans shall support multiple times of the day and day of the week. 

7.  Contractor shall submit for review and approval signal timing plans including switching    

make any necessary changes to the signal timing plans as directed by the Engineer. 

8.  It shall support and control up to 32 groups. 
9.  It shall support and include vehicle sensors for sub road conditions. 
10. It shall support and pedestrian signal applications. 
11. It shall include and support 300 mm LED countdown clocks. 
12. It shall include solar power supply kit according to the number of signal heads on each pole 

assembly as follows: 

i. 

20 w for each signal head. 

ii. 

20 w for each count down counter 

iii. 

Battery shall not be less than 150 Ampere-hour for 150 w assemblies and shall not 
be less than 250 Ampere-hour for 250 w assemblies. 

iv. 

Battery shall last for at least 3 continuous days at full capacity when solar supply is 
not available. 

9.4.3 

Construction Requirements 

Contractor shall remove, clean, load, transport, unload, protect and store the existing traffic signals 
and  controllers  as  indicated  on  the  Contract  plans,  as  specified  herein  and  as  approved  by  the 
Engineer. 

Contractor shall provide all labour, tools, equipment and accessories to carefully remove the existing 
traffic signals, poles, controllers, foundations, and cables and to clean them, transport, unload and 
place in the Owners storeyards, as designated by the Engineer. 

Contractor  shall  exercise  care  while  removing  the  existing  traffic  signals,  poles,  controllers, 
foundations,  cables  and associated  equipment  so  as  not to  damage  any  materials  or  equipment.  
Any materials or equipment damaged while removing, handling or transporting shall be replaced with 
new material or equipment or repaired as approved by the Engineer.  All signal heads and similar 
equipment removed shall be cleaned, packed, protected and carted as approved by the Engineer.  
All traffic signals, poles, controllers and associated equipment shall be loaded, transported, unloaded 
and placed in the Owners store yards, as directed by the Engineer. 

All traffic signal poles removed shall be cleaned of all concrete and deleterious material and suitably 
supported  during  handling  and  transporting  and  supported  by  blocking  or  other  approved  means 
when poles are placed in storage where directed by the Engineer or the Department.  All poles shall 
be covered with an approved protective cover securely anchored or tied in place. 

S

YSTEM

 

 

Contractor shall completely remove all foundations for traffic signal poles and controllers.  Resulting 
excavation shall be backfilled with borrow material, as approved by the Engineer, in accordance with 
the applicable requirements of Section 2.5 of Chapter 2, Earthworks.  Where backfilling occurs under 
pavement,  walks,  future  pavement,  or  similar  areas,  the  borrow  material  shall  be  placed  and 
compacted in accordance with Section 2.5 of Chapter 2. 

Prior  to  commencing  removal  of  existing  traffic  signals  and  associated  controllers  and  wiring  or 
cables, or installation of temporary signals, the Contractor shall make all necessary arrangements 
with the electrical authority and include, as a part of the work of this Item, all work required to remove 
and dispose of the electric service to existing traffic signal controllers from the point designated by 
the authority or supply/remove electric service to temporary signals. 

Removal of electric service to the existing traffic signals and controllers shall not commence until all 
temporary detours are in operation and approved by the Engineer. 

9.5 

Traffic Signal System 

9.5.1 

Description 

These  Standard  Specifications  cover  descriptions  and  requirements  of  the  components  and 
materials  forming  part of  the  traffic  signal  system, to  include  all  components,  items,  systems  and 
sub-systems supplied and/or implemented under this Contract shall strictly comply with requirements 
and specifications stipulated in these documents.  System shall be compatible to the existing system 
and operate in harmony with the existing system. 

9.5.1.1 

Subcontractor 

All  non-civil  works  required  under  this  section  shall  be  executed  by  an  Owner  pre-approved 
subcontractor (from herein referred to as Subcontractor).  Subcontractor shall be a well established 
traffic control systems supplier and shall have carried out a number of works of similar nature and 
magnitude  as  this  Contract.    Subcontractor  shall  have  previous  experience  in  the  hardware, 
software,  principles  and operational  aspects  of  a  computerized  urban traffic  control  systems,  and 
shall  be  technically  capable  of  integrating  the  traffic  signal  controllers  to  be  installed  under  this 
Contract with the existing traffic computer control system such that full compatibility is ensured. 

Subcontractor  shall  have the necessary  experience  and resources  to furnish,  install,  operate  and 
maintain all components of the traffic control system such as signal poles and mast arms, vehicular 
and pedestrian signals, pedestrian pushbuttons and inductive loop detectors, automatic transfer dual 
power  supply  panels,  local  and  master  traffic  signal  controllers,  audio  and  data  communications 
system, cabling and wiring, and all other components as specified in the Particular Specifications. 

Unit rates entered in the Bill of Quantities must include for all work as specified plus all on costs for 
the  main  Contractor's  work,  attendance,  overhead  and  profit.    Any  other  items  necessary  for  the 
satisfactory completion of the works but not specifically mentioned in the Contract documents will be 
considered as subsidiary obligations to this Contract. 

Main Contractor shall be responsible for the scheduling of the traffic signal works so that all works 
are completed by the authorized contract completion date. 

9.5.1.2 

Subcontractor’s Scope-of-works 

Scope  of  work  for  the  traffic  control  system  subcontractor  shall  cover  the  following  works  and 
services: 

1.  Supply  and  Installation  of  signalized  intersections,  arterial  progression  (if  required),  and 

computer  control  as  shown  on  the  relevant  Contract  plans  and  in  the  Particular 
Specifications. 

2.  Maintenance of all installations as specified in the Particular Specifications. 

S

YSTEM

 

 

9.5.1.3 

System Overview 

Traffic control system provides effective and progressive traffic flow conditions in the project area by 
utilizing  the  latest  hardware  and  software,  and  up-to-date  traffic  engineering  principles  and 
procedures.  Traffic system components provided under this sub-contract shall be integrated with 
the existing traffic control system as may exist in the project area, by providing safe, effective and 
progressive traffic flow conditions. 

Hardware and software to be supplied and installed as part of this Project should be operationally 
compatible with  any existing  traffic control system.   System to be provided  as part of this Project 
shall  consist  of  the  following  features  as  otherwise  required  in  the  Particular  Specifications  and 
approved by the Engineer: 

1.  Detection  equipment  shall  be  provided  including  vehicle  actuation  detectors,  pedestrian 

actuation  detectors  and  vehicle  system  detectors.  Actuation  detectors  shall  be  used  to 
identify  demands,  to  assign  phases  and  to  provide  information  to  control  timing  interval 
lengths.    All  vehicle  loops  shall  be  individually  connected  to  the  traffic  signal  controller.  
System  detectors  shall  provide  vehicle  volume  and  lane  occupancy  information  to  the 
existing central computer in a format operationally recognizable by the existing hardware 
and software of the central computer.  

 

2.  Poles, mast arms, vehicular and pedestrian signals shall be provided to give specific and 

clear indications to motorists and pedestrians of their rights-of-way. 

3.  Local  intersection  microprocessor  controllers  with  planning,  timing,  interconnection, 

coordination and emergency pre-emption equipment shall be provided to control and direct 
traffic flow at intersections.  Each intersection shall be capable of stand-alone operation, 
subsystem interconnection and computer controlled coordination from the existing central 
computer. Each controller shall be capable of pre-timed, semi-actuated and fully actuated 
operation.  Mode of operation shall be manually and remotely selectable at the controller 
without the use of special tools or equipment.  Automatic transfer dual power supply panels 
shall  be  provided  to  supply  power  for  the  traffic  signalling  related  equipment  at  an 
intersection. 

4.  Artery  master  controller  may  not  be  currently  implemented  in  the  area.  Contractor  shall 

implement an artery master controller as defined in these specifications, as directed by the 
Engineer  and  approved  by  the  Owner.  Artery  master  microprocessor  controller  shall  be 
provided to supervise and maintain interconnection and progressive traffic flow among the 
designated  intersections.    Artery  master  controller  shall  accept  information  from  system 
detectors and shall utilize such information to vary cycle lengths and offsets.  Artery master 
microprocessor  controller  shall  be  interconnected  to  the  local  intersection  traffic  signal 
controllers  by  means  of  communication  cables  routed  through  concrete  encased  PVC 
conduits. 

5.  Audio  transmission  equipment  which  will  provide  voice  communications  between  the 

central  computer  control  centre  and the  designated  local  intersection  controller  cabinets 
shall be provided.  Format and protocol of this audio communication system should be fully 
compatible with the existing audio communication system. 

6.  A data transmission system (communications system) shall be provided which shall carry 

commands from the central traffic control computer to the arterial master controllers and 
the local intersection traffic signal controller.  This system shall carry controller status and 
traffic surveillance data from the local intersection traffic signal controllers to central traffic 
control  computer.    Data  transmission  system  shall  be  fully  compatible  and  able  to  be 
integrated with the existing central computer system and shall be connected to the central 
computer  with  cables.    Cable  shall  be  supplied  and  installed  by  the  Subcontractor  and 
Contractor  in  concrete  encased  PVC  conduits.    Data  transmission  system  shall  also  be 
designed such that no more than four, 100 mm diameter ducts shall be used by the cable 
on any given cable run. 

7.  Local  intersection  traffic  signal  controllers  shall  be  placed  under  the  central  computer 

control.  All necessary software programming and additional hardware installation to the 

S

YSTEM

 

 

central computer control system shall be done such that full compatibility and integration 
with the existing control programs of the central computer control system is ensured. 

9.5.2 

Materials 

It  is  of  great  importance  that  all  systems  and  sub-systems  are  standard  products  of  the  same 
manufacturer  to  ensure  and  guarantee  proper  interface  and  smooth  operation  of  the  complete 
system. 

Subcontractor/Contractor shall submit an undertaking to guarantee the availability of the spare parts 
for all systems and sub-systems covered by his offer for a period of 10 years from the date of final 
handing-over of the system. 

9.5.2.1 

Standards and Codes 

Traffic control equipment furnished and installed shall meet the requirements of the internationally 
known  standards  and  governing  codes  of  the  regulating  authority.   Specific  standards  and  codes 
used as a guide for the design are as follows: 

AASHTO 

American Association of State Highway and Transportation Officials (USA) 

ASTM   

American Society for Testing Materials (USA) 

BSS 

 

British Standard Specifications (UK) 

CEE 

 

International Commission on Rules for the Approval of Electrical Equipment 

IEC 

 

International Electrotechnical Commission 

IMSA   

International Municipal Signal Association 

IPCEA  

Insulated Power Cable Engineers Association (USA) 

ITE 

 

Institute of Transportation Engineers 

NEMA   

National Electrical Manufacturers Association (USA) 

UL 

 

Underwriters Laboratories, Inc. (USA) 

NTCIP  

National  Transportation  Communications  for  Intelligent  Transportation  System 

Protocol 

9.5.2.2 

Definitions and Abbreviations 

Definitions and abbreviations used within this specification are as follows: 

Actuation - shall mean the operation of a detector for placing a call or operation of an electrical circuit 
for transferring the right-of-way from one phase to another. 

Cabinet - an outdoor enclosure for housing the controller and its associated equipment. 

Detectors - are electrical devices used for indicating the approach of traffic to an intersection. And 
the  provision  of  traffic counts,  speeds,  occupancy,  queue,  and  classification  data  at  per-lane  and 
aggregate basis.  Types of detectors are in-roadway (inductive loop) and over-roadway (microwave 
radar) detectors. 

Flasher unit - a complete electrical mechanism for flashing traffic signals. 

Interval - the part of signal cycle during which signal indications do not change. 

Phase  -  the  right-of-way  and  clearance  interval  in  a  cycle  assigned  to  a  movement  or  any 
combination of movements. 

Signal face - a combination of signal sections each capable of displaying its indication in any one 
direction. 

Signal head - an assembly containing one or more signal faces. 

S

YSTEM

 

 

Traffic actuated controller - a timing device used for the control of traffic signal lights in which the 
intervals  or  phases  are varied  in  accordance  with  demands  of traffic  as registered  by  the  vehicle 
actuation of detector. 

Master controller - a coordinating unit or units that governs 2 to 10 individual intersection controllers. 

9.5.2.3 

Submittals 

Materials of all parts used in the traffic control system shall be new and the best of their respective 
kind  and  the  most  suitable  for  working  under  the  weather  and  site  conditions  set  out  in  these 
Specifications,  thus  withstanding  the  variations  of  temperatures  and  other  prevailing  conditions 
without distortion or deterioration of any part of the traffic control system. 

Equipment included in these Specifications shall be so manufactured as to facilitate easy and proper 
erection and maintenance.   Design of all equipment shall ensure satisfactory operation under the 
weather and site conditions mentioned. 

In general, dissimilar metals in contact shall be avoided.  When, however, they have to be used, the 
contact points of dissimilar metals shall be adequately protected against galvanic corrosion. 

It is the intent of these Specifications that the Subcontractor shall be the manufacturer and/or supplier 
of the main items of the traffic control system meeting the requirements of the  Specifications and 
Contract plans.  All Subcontractor submittals required to be submitted to the Engineer, shall be made 
through the Contractor.  

Subcontractor shall submit for review and approval a complete list of equipment, and the associated 
model  numbers  and  materials  that  are  proposed  for  use.    List  shall  include  descriptive  literature, 
technical details and drawings sufficient to fully describe and explain the specified components of 
the traffic control system and its integration with the existing traffic system.  Where specified herein 
or when directed by the Engineer, samples of any of the materials and equipment proposed for use 
shall be submitted for review and approval. 

It shall be the responsibility of the Contractor to ensure that the performance of the Subcontractor 
complies  with  all requirements  specified  herein, and that  all  items  supplied for  use  in  this  Project 
comply  with  the  Specifications  and  approval  of  the  Engineer.  Contractor  shall  ensure  that  the 
Subcontractor does not deliver or install any equipment until the material submittal and applicable 
shop drawing has been approved by the Engineer. 

This  specification  governs  the  procedures  for  documentation  and  approval  of  all  materials  and 
equipment proposed for use on this Project. 

Subcontractor shall be responsible for the availability of the signal equipment and to ensure that all 
equipment  shall  be  in  strict  adherence  to  the  Specification,  Contract  plans  and  approved  shop 
drawings. 

All costs of work and materials required for satisfying these specifications shall be included in the 
Bill of Quantities under which the subject intersection or interchange type or material equipment shall 
be paid and no additional compensation will be allowed the Subcontractor for any incidental costs 
that may occur in fulfilling the requirements of the Contract Documents. 

Subcontractor shall comply with the following requirements for the control of traffic signal materials. 

a.  Within 30 days after the award of Contract and before work is performed, the Subcontractor 

shall submit the following for approval by the Engineer: 

1.  Complete  descriptive  literatures,  wiring  diagrams  and  instruction  drawings  and 

specifications of the traffic signal equipment that will be installed in accordance with the 
Contract. 

2.  Complete shop drawings of the mast arm assemblies and poles, showing in detail the 

fabrication thereof and the description of any materials used in the fabrication, anchor 
bolts and reinforcing materials. 

3.  Samples of all conduit and cable and sample of each type of cable splices that will be 

used in the work. 

S

YSTEM

 

 

4.  All the above items shall be collected by the Contractor and submitted to the Engineer 

at the same time.  

b.  Subcontractor  shall  provide  samples  and/or  prototypes  of  all  equipment,  and  components 

and parts thereof to the Engineer for his review and approval. Subcontractor shall not start 
the  supply,  procurement,  manufacturing  and/or  assembly  of  any  equipment,  components 
and/or parts, until after the Engineer's approval of the samples and/or prototypes.  

Engineer's 

approval 

of 

such 

samples 

and/or 

prototypes 

shall 

not 

relieve 

the 

Subcontractor/Contractor from his responsibilities of equipment performance under this Contract. 

c.  Owner  and/or  Engineer  shall  have  the  right  to  inspect  any  or  all  equipment,  components 

and/or parts of the traffic control system during its manufacture, preparation and/or assembly 
at  the 

manufacture’s  plant  and/or  Subcontractor's  home plant  and/or  at his  local  facilities.  

For  this  purpose the  Subcontractor  shall  notify the  Owner  in  writing  at  least  two  weeks  in 
advance of the commencement of such manufacture, preparation and/or assembly.  If the 
Owner  elects to  use  his  right  of  inspection,  no manufactured,  prepared and/or  assembled 
equipment,  component,  and/or  part  shall  be  shipped  to  the  job  site  without  bearing  the 
inspection approval tag of the Owner or Engineer. 

d.  Materials and signal equipment not complying with the above requirements that have been 

installed on the job will be done at the Subcontractor's own risk and may be subject to removal 
and disposal at the Subcontractor's expense. 

e.  Subcontractor shall be responsible for all commitments for the supply of materials and signal 

equipment so that he can complete the job within the specified time of the Contract.  Delays 
in  receipt  of  materials  and  signal  equipment  will  not  be  considered  as  a  valid  reason  for 
extension of time. 

f.  Subcontractor  shall  be  responsible  for  the  assembly  and  testing  of  the  traffic  controller 

system to make the system operational to the satisfaction of the Engineer. 

g.  All equipment, components and parts of the traffic control system shall continuously operate 

in  satisfactory  condition  for  one  month  on  the  job  site  before  they  will  be  conditionally 
accepted by the Engineer.  Engineer shall be the sole judge as to whether the equipment has 
operated in satisfactory condition. 

h.  Subcontractor  shall  be  responsible  for  the  maintenance  and  repair  work  on  the  signal 

controller and associated equipment until final handover. 

9.5.2.4 

Conduit 

All  necessary  conduits  and  pull  boxes  for  the  traffic  system  shall  be  supplied  and  installed  in 
accordance with Section 9.2. 

9.5.2.5 

Electric, Communications and Audio Transmission 
(Telephone) Cable 

Electric,  communications,  and  audio  transmission  cables  shall  be  rated  600  volts  minimum  and 
comply with the following requirements: 

1.  Conductors.  Conductors shall be of soft copper, solid or stranded.  Solid conductors shall 

meet  the  requirements  of  ASTM  B3

 

or  B189.  Stranded  conductors  shall  meet  the 

requirements of ASTM B8 or B33. 

2.  Insulation  and  jacket.    Electric  cables  shall  be  protected  with  either  one  of  the  following 

combinations of insulation and jacket.  The average thickness of the jacket shall be as shown 
in Table 9-3, and the average thickness of the insulation shall be as shown in Table 9-4, with 
a minimum thickness 90 % thereof in each case. 

 

 

 

 

 

 

 

 

 