Joints shall be filled as soon as practical after compaction, before the termination of each work day, Dimensional accuracy, uniformity of joint games, alignment, and squareness of the paver installation Completed sidewalks shall meet the requirements of the following tolerances, or the Contractor shall ’s expense, failing areas: a. Surface level shall be ±5 mm of the design level b. Maximum deviation within the compacted surface shall be 3 mm or less, as measured with a 3 m straightedge c. Level of any 2 adjacent blocks shall not differ by more than 1 mm Exposed paver surfaces shall be washed clean after installation. Prior to final acceptance, any loose, 7.6.7 Tile Sidewalks Unless otherwise shown or specified, tile installation for sidewalks shall comply with applicable Tile sidewalks shall be installed by the Contractor with at least 3 years experience in the installation Prior to installation of tile sidewalks, the Contractor shall submit the following to the Engineer for • Evidence of the Contractor ’s 3 years of experience, including contact information for the owner of each project • Three samples of each type, class, and colour of tile for each form of construction and finish • Detailed shop drawings showing proposed widths, lines, grades, accesses, layout of all field tiles, trim shapes, jointing patterns, and any other details necessary to properly construct the • Test panels, measuring not less than 300 mm on a side, shall consist of a plywood backing with tile grouted as required for installation in the works using materials indicated for the work. ’s approval shall be for colour, pattern, texture and joint width only. Compliance with all other requirements is the exclusive responsibility of the Contractor No tiles shall be fabricated nor delivered before approval of shop drawings. Laying tile sidewalks a. Subgrade shall be prepared in accordance with Article 7.6.3.17.6.3.2 and the Contractor shall ensure that: 1. Substrates for setting tile are firm, dry, and clean and free from oil or waxy films or curing compounds 2. Grounds, anchors, recessed frames, electrical and mechanical units of work, and similar items located in or behind tile have been completed before installing tile |