R

 

1.11.8.5

 

Health and safety plan (HSP)......................................................................... 1-45

 

1.11.8.6

 

Accident Reports ........................................................................................... 1-45

 

1.11.8.7

 

Reports .......................................................................................................... 1-45

 

1.11.9

 

Contract Plans ...................................................................................................... 1-47

 

1.11.9.1

 

Compliance with the Contract Plans .............................................................. 1-47

 

1.11.9.2

 

Additional Plans ............................................................................................. 1-47

 

1.11.9.3

 

Record Drawings and Specifications .............................................................. 1-47

 

1.11.10

 

Mistakes in Information ......................................................................................... 1-48

 

1.12

 

Regulatory Requirements ............................................................................................ 1-49

 

1.12.1

 

Description ............................................................................................................ 1-49

 

1.12.2

 

Codes ................................................................................................................... 1-49

 

1.12.3

 

Government Bodies .............................................................................................. 1-49

 

1.12.4

 

Permits, Licenses and No Objection Certificates................................................... 1-49

 

1.12.5

 

Notice of Intent ..................................................................................................... 1-49

 

1.12.6

 

Protection of Existing Property and Utilities ........................................................... 1-51

 

1.12.7

 

Health and Safety ................................................................................................. 1-52

 

1.12.8

 

Housekeeping ....................................................................................................... 1-63

 

1.12.9

 

Final Conditions of Work ....................................................................................... 1-64

 

1.13

 

Contractor Quality Control............................................................................................ 1-64

 

1.13.1

 

Contractor Quality Control References ................................................................. 1-65

 

1.13.2

 

Submittals during Construction ............................................................................. 1-65

 

1.13.3

 

Information for the Engineer.................................................................................. 1-65

 

1.13.4

 

Contractor Quality Control Program Requirements ............................................... 1-65

 

1.13.5

 

Contractor Quality Control Organization ............................................................... 1-65

 

1.13.5.1

 

Duties ............................................................................................................ 1-66

 

1.13.5.2

 

Qualifications ................................................................................................. 1-66

 

1.13.6

 

Contractor Quality Control Requirements.............................................................. 1-66

 

1.13.7

 

Contractor Quality Control Planning Meeting ........................................................ 1-67

 

1.13.8

 

Coordination ......................................................................................................... 1-67

 

1.13.9

 

Contractor Quality Control Meetings ..................................................................... 1-67

 

1.13.10

 

Three phases of Contractor Quality Control .......................................................... 1-68

 

1.13.10.1

 

Preparatory Phase ........................................................................................ 1-68

 

1.13.10.2

 

Initial Phase .................................................................................................. 1-68

 

1.13.10.3

 

Follow-up Phase ........................................................................................... 1-69

 

1.13.11

 

Contractor Quality Submittal Review and Approval ............................................... 1-69

 

1.13.12

 

Contractor Quality Control Testing ........................................................................ 1-69

 

1.13.13

 

Inspection of Testing Laboratories ........................................................................ 1-69

 

1.13.14

 

Contractor Quality Certifications ........................................................................... 1-70

 

1.13.15

 

Contractor Quality Control Documentation ............................................................ 1-70

 

1.13.15.1

 

The Contractor Production Report ................................................................. 1-70

 

1.13.15.2

 

The Contractor Quality Control Report .......................................................... 1-71

 

1.13.15.3

 

Testing Plan and Log .................................................................................... 1-71

 

1.13.15.4

 

Rework Items List.......................................................................................... 1-71

 

1.13.15.5

 

As-Built Drawings .......................................................................................... 1-72

 

1.14

 

Utility Coordinator ........................................................................................................ 1-72

 

1.14.1

 

Utility Coordinator Submittal for Review ................................................................ 1-72

 

1.14.2

 

Utility Coordinator’s Required Duties .................................................................... 1-72

 

1.14.3

 

Utility Coordination Documentation ....................................................................... 1-72

 

1.14.4

 

Coordination of Submittals .................................................................................... 1-73

 

1.14.5

 

Coordination of Substitutions and Modifications .................................................... 1-73

 

1.14.6

 

Observation of Work ............................................................................................. 1-73

 

1.14.7

 

Documentation ..................................................................................................... 1-73

 

1.14.8

 

Mains Electricity and Liaison with ADEWA ............................................................ 1-73

 

1.14.9

 

Utility Service and Process Interruption ................................................................ 1-74

 

1.14.10

 

Equipment Start-up ............................................................................................... 1-74

 

1.14.11

 

Inspection and Acceptance of Equipment ............................................................. 1-74

 

1.14.12

 

Scheduling ............................................................................................................ 1-74

 

 

G

ENERAL 

R

 

 

 

1.15

 

Construction Facilities and Temporary Controls ........................................................... 1-74

 

1.15.1

 

Submittals ............................................................................................................. 1-74

 

1.15.2

 

Site Mobilization.................................................................................................... 1-75

 

1.15.3

 

Protection of Work and Property ........................................................................... 1-75

 

1.15.3.1

 

General .......................................................................................................... 1-75

 

1.15.3.2

 

Site Security .................................................................................................. 1-76

 

1.15.3.3

 

Trees and Plantings ....................................................................................... 1-76

 

1.15.3.4

 

Dewatering .................................................................................................... 1-77

 

1.15.3.5

 

Archaeological Finds ..................................................................................... 1-77

 

1.15.3.6

 

Endangered Species ..................................................................................... 1-77

 

1.15.4

 

Engineer’s Field Offices ........................................................................................ 1-78

 

1.15.5

 

Agency Representatives Field Offices .................................................................. 1-78

 

1.15.6

 

Information Technology ........................................................................................ 1-78

 

1.15.7

 

Site Laboratory ..................................................................................................... 1-78

 

1.15.7.1

 

Description..................................................................................................... 1-78

 

1.15.7.2

 

Use of the Laboratory .................................................................................... 1-78

 

1.15.7.3

 

Location of the Laboratory ............................................................................. 1-78

 

1.15.7.4

 

Maintenance of the Laboratory ...................................................................... 1-78

 

1.15.7.5

 

Approval of the Laboratory ............................................................................. 1-79

 

1.15.7.6

 

Building Requirements ................................................................................... 1-79

 

1.15.7.7

 

Equipment List A............................................................................................ 1-80

 

1.15.7.8

 

Equipment List B............................................................................................ 1-84

 

1.15.8

 

Project Signs ........................................................................................................ 1-88

 

1.15.9

 

Temporary Controls .............................................................................................. 1-88

 

1.15.10

 

Storage Yards and Buildings................................................................................. 1-89

 

1.15.11

 

Access Roads ....................................................................................................... 1-89

 

1.15.12

 

Parking Areas ....................................................................................................... 1-90

 

1.15.13

 

Traffic Control, Detour Schemes and Pedestrian Safety ....................................... 1-90

 

1.15.13.1

 

Temporary Traffic Control Devices (Detour Safety Items) ............................. 1-92

 

1.16

 

Temporary Works ...................................................................................................... 1-111

 

1.16.1

 

Working Drawings for Temporary Works............................................................. 1-111

 

1.16.2

 

Design Details for Temporary Works .................................................................. 1-112

 

1.16.3

 

Materials for Temporary Works ........................................................................... 1-112

 

1.16.4

 

Concrete Placement for Temporary Works ......................................................... 1-112

 

1.16.5

 

Openings in Temporary Works ........................................................................... 1-112

 

1.16.6

 

Requirements for Temporary Works ................................................................... 1-113

 

1.16.7

 

Removal of Temporary Works ............................................................................ 1-113

 

1.16.8

 

Falsework and Forms ......................................................................................... 1-113

 

1.16.8.1

 

Materials for Falsework ................................................................................ 1-113

 

1.16.8.2

 

Materials for Forms ...................................................................................... 1-114

 

1.16.8.3

 

Falsework Design and Construction............................................................. 1-115

 

1.16.8.4

 

Formwork Design and Construction ............................................................. 1-118

 

1.16.8.5

 

Removal of Falsework and Forms ............................................................... 1-123

 

1.16.9

 

Cofferdams ......................................................................................................... 1-123

 

1.16.9.1

 

Protection of Concrete by Cofferdams ......................................................... 1-124

 

1.16.9.2

 

Removal of Cofferdams ............................................................................... 1-124

 

1.16.10

 

Shoring ............................................................................................................... 1-124

 

1.16.11

 

Temporary Water Control Systems ..................................................................... 1-125

 

1.16.11.1

 

Working Drawings for Water Control Systems ............................................. 1-125

 

1.16.11.2

 

Operation of Water Control Systems ........................................................... 1-125

 

1.16.12

 

Temporary Bridges ............................................................................................. 1-126

 

1.16.12.1

 

Detour Bridges ............................................................................................ 1-126

 

1.16.12.2

 

Maintenance for Temporary Bridges ........................................................... 1-128

 

1.17

 

Sediment and Pollution Control .................................................................................. 1-128

 

1.17.1

 

Description .......................................................................................................... 1-128

 

1.17.2

 

Protective Fencing .............................................................................................. 1-128

 

1.17.3

 

Sediment Controls .............................................................................................. 1-128

 

 

G

ENERAL 

R

 

 

 

1.17.4

 

Pollution Controls ................................................................................................ 1-129

 

1.17.5

 

Materials ............................................................................................................. 1-130

 

1.17.5.1

 

Submittals .................................................................................................... 1-130

 

1.17.5.2

 

Geotextile .................................................................................................... 1-131

 

1.17.5.3

 

Plastic .......................................................................................................... 1-131

 

1.17.5.4

 

Erosion Control Blankets/Mats ..................................................................... 1-131

 

1.17.5.5

 

Anchors ....................................................................................................... 1-132

 

1.17.5.6

 

Pipe Slope Drains ........................................................................................ 1-132

 

1.17.5.7

 

Fabric Fence ................................................................................................ 1-133

 

1.17.5.8

 

Rock and Aggregate .................................................................................... 1-133

 

1.17.5.9

 

Gravel Bags ................................................................................................. 1-134

 

1.17.5.10

 

Fibre Rolls ................................................................................................... 1-134

 

1.17.5.11

 

Temporary Fence ........................................................................................ 1-134

 

1.17.6

 

Construction Requirements................................................................................. 1-135

 

1.17.6.1

 

Preservation of Existing Vegetation and Topsoil .......................................... 1-135

 

1.17.6.2

 

Soil Surface Coverings ................................................................................ 1-136

 

1.17.6.3

 

Concentrated flow diversions ....................................................................... 1-137

 

1.17.6.4

 

Pipe slope drain ........................................................................................... 1-138

 

1.17.6.5

 

Sediment trapping ........................................................................................ 1-138

 

1.18

 

Basic Product Requirements, Product Options .......................................................... 1-142

 

1.18.1

 

Products ............................................................................................................. 1-142

 

1.18.2

 

Transportation and Handling ............................................................................... 1-143

 

1.18.3

 

Products List ....................................................................................................... 1-143

 

1.18.4

 

Product Substitutions .......................................................................................... 1-143

 

1.18.5

 

Product Acceptance ............................................................................................ 1-143

 

1.18.6

 

Utility Coordinator ............................................................................................... 1-144

 

1.18.7

 

Operation and Maintenance Data ....................................................................... 1-144

 

1.18.8

 

Submittals ........................................................................................................... 1-144

 

1.19

 

Product Substitution Procedures ................................................................................ 1-144

 

1.19.1

 

Definitions ........................................................................................................... 1-144

 

1.19.2

 

Product Substitution Requirements ..................................................................... 1-144

 

1.19.3

 

Engineer’s Approval of Alternatives and Substitutes ........................................... 1-145

 

1.19.4

 

Product Storage and Handling Requirements ..................................................... 1-146

 

1.19.5

 

Storage and Protection ....................................................................................... 1-146

 

1.20

 

Testing of Systems, Start-up and Commissioning ...................................................... 1-147

 

1.20.1

 

Definitions ........................................................................................................... 1-147

 

1.20.2

 

Quality Control .................................................................................................... 1-147

 

1.20.3

 

Submittals ........................................................................................................... 1-148

 

1.20.4

 

Sequencing and Scheduling ............................................................................... 1-149

 

1.20.5

 

Start-up Requirements ........................................................................................ 1-149

 

1.20.6

 

Temporary Connections ...................................................................................... 1-149

 

1.20.7

 

Operating Fluids ................................................................................................. 1-149

 

1.20.8

 

Spare Parts ......................................................................................................... 1-150

 

1.20.9

 

Component and System Validation ..................................................................... 1-150

 

1.20.10

 

Validation Prerequisites ...................................................................................... 1-150

 

1.20.11

 

Validation Preparation......................................................................................... 1-151

 

1.20.12

 

Preliminary Testing ............................................................................................. 1-151

 

1.20.13

 

Field Quality Control ........................................................................................... 1-152

 

1.20.14

 

Performance Testing .......................................................................................... 1-152

 

1.20.14.1

 

Description .................................................................................................. 1-152

 

1.20.14.2

 

General ....................................................................................................... 1-152

 

1.20.14.3

 

Performance ............................................................................................... 1-152

 

1.20.14.4

 

Performance Test Execution ....................................................................... 1-153

 

1.21

 

Execution ................................................................................................................... 1-156

 

1.21.1

 

General Requirements ........................................................................................ 1-156

 

1.21.2

 

Submittals ........................................................................................................... 1-156

 

1.21.3

 

Delivery, Storage, and Handling ......................................................................... 1-157

 

R

 

1.21.4

 

Examination ........................................................................................................ 1-157

 

1.21.5

 

Preparation ......................................................................................................... 1-157

 

1.21.6

 

Construction Layout ............................................................................................ 1-158

 

1.21.7

 

Field Engineering ................................................................................................ 1-158

 

1.21.8

 

Installation .......................................................................................................... 1-159

 

1.21.9

 

Owner-installed Products .................................................................................... 1-160

 

1.21.10

 

Progress Cleaning .............................................................................................. 1-160

 

1.21.11

 

Starting and Adjusting ......................................................................................... 1-160

 

1.21.12

 

Protection of Installed Construction ..................................................................... 1-161

 

1.21.13

 

Correction of the Work ........................................................................................ 1-161

 

1.22

 

Cleaning .................................................................................................................... 1-161

 

1.22.1

 

Equipment .......................................................................................................... 1-161

 

1.22.2

 

Cleaning Execution ............................................................................................. 1-161

 

1.22.3

 

Disposal of Waste ............................................................................................... 1-162

 

1.23

 

Contract Close-out ..................................................................................................... 1-163

 

1.23.1

 

General Requirements ........................................................................................ 1-163

 

1.23.2

 

Prerequisites for Turnover .................................................................................. 1-163

 

1.23.3

 

Prerequisites for Final Inspection ........................................................................ 1-164

 

1.23.4

 

Project Close-out Procedure ............................................................................... 1-164

 

1.23.5

 

Approvals from Public Authorities ....................................................................... 1-164

 

1.23.6

 

Final Cleaning ..................................................................................................... 1-164

 

1.23.7

 

Project Record Documents (As-builts) ................................................................ 1-165

 

1.23.8

 

Equipment Operating Data ................................................................................. 1-166

 

1.23.9

 

Guarantees, Warranties, and Bonds ................................................................... 1-166

 

1.23.10

 

Spare Parts and Maintenance Materials ............................................................. 1-167

 

1.24

 

Closeout Submittals ................................................................................................... 1-167

 

1.24.1

 

Closeout Submittal .............................................................................................. 1-167

 

1.24.2

 

Warranties .......................................................................................................... 1-168

 

1.24.3

 

Spare Parts and Maintenance Materials ............................................................. 1-169

 

1.25

 

Demonstration and Training ....................................................................................... 1-170

 

1.25.1

 

Training Requirements ........................................................................................ 1-170

 

1.25.2

 

Submittals ........................................................................................................... 1-171

 

1.25.3

 

Quality Assurance ............................................................................................... 1-172

 

1.25.4

 

Training Area ...................................................................................................... 1-172

 

1.25.5

 

Sequencing and Scheduling ............................................................................... 1-173

 

1.25.6

 

Training Materials ............................................................................................... 1-173

 

1.26

 

Operation and Maintenance Data .............................................................................. 1-173

 

1.26.1

 

Definitions ........................................................................................................... 1-173

 

1.26.2

 

Sequencing and Scheduling ............................................................................... 1-173

 

1.26.3

 

Data Format ........................................................................................................ 1-174

 

1.26.4

 

Submittals ........................................................................................................... 1-176

 

1.26.5

 

Data for Equipment and Systems ....................................................................... 1-176

 

1.26.5.1

 

Content for Each Unit (or Common Units) and System ................................ 1-176

 

1.26.5.2

 

Content for Each Electric or Electronic Item or System ................................ 1-178

 

1.26.5.3

 

Maintenance Summary: ............................................................................... 1-178

 

1.26.5.4

 

Guideline Outline Form ................................................................................ 1-179

 

1.26.6

 

Data for Materials and Finishes .......................................................................... 1-179

 

1.26.7

 

Irrigation System and Landscaping ..................................................................... 1-180

 

Index

  1-181

 

 

1.  Removing  trees,  snags,  brush,  other  vegetation,  upturned  stumps,  large  rocks  and

boulders,  debris,  and  other  unsightly  matter  outside  the  areas  staked  for  clearing  or 
grubbing within  project right-of-way 

2.  Trimming trees or brush

3.  Filling holes and smoothing and contouring the ground

4. 

Shaping  the  ends  of  cuts  and  fills  to  fit  adjacent  terrain  and  to  enhance  the  area’s
appearance 

5.  Obliterating  abandoned  roads  and  reshaping  the  areas  to  blend  naturally  with

surroundings within the project right-of-way 

Methods and equipment used in roadside cleanup shall be approved by the Engineer. 

2.2.2.7 

Disposal of Material 

Material obtained from clearing, grubbing, and removal of topsoil shall be disposed of as approved 
by the Engineer. Materials to be disposed of shall generally be hauled to a waste site obtained and 
provided by the Contractor or placed in borrow pits or other suitable places and covered up with soil 
or gravel, with full coordination and approvals from the concerned authorities.  Trees and brush to 
be removed may be chipped in place.  Topsoil to be reused, shall be stockpiled. 

Burning of material shall only be permitted by prior  written approval of the Engineer. All statutory 
provisions with regards to environmental constraint and air pollution shall be carefully observed. 

2.3 

Removal of Structures and Obstructions 

2.3.1 

Description 

This  section  describes  the  removal  and  disposal  of  structures  that  obtrude,  encroach  upon,  or 
otherwise obstruct the work. 

2.3.2 

Construction Requirements 

2.3.2.1 

General 

Contractor  shall  remove  and  dispose  of  all  buildings,  foundations,  bridges,  drainage  structures, 
pavement, railings, barriers, fences and other obstructions within the limits of the work, except items 
designated  to  remain  and  utilities  and  obstructions  to  be  removed  under  other  provisions  of  the 
Contract. 

All designated salvage material shall be removed, without damage, in sections or pieces that may 
be readily transported, and shall be stored by the Contractor or transported to the Owner warehouse 
by the Contractor, as directed by the Engineer. 

Basements or cavities left by structure removal shall be filled to the level of the surrounding ground 
and shall be compacted in accordance with the relevant requirements in this specification. 

Existing utilities running through or near existing structures shall be protected and/or relocated in 
accordance with the Contractor’s coordination with the appropriate utility authority. 

2.3.2.2 

Removal of Structures and Foundations 

Demolition,  removal,  and  disposal  of  all  buildings  and  structures  designated  for  removal  on  the 
Contract plans or in the particular specifications shall be completed by the Contractor. Work shall 
include  the  removal  and  disposal  of  all  excess  debris  and  the  removal  of  all  other  foundations, 
paving, concrete floor slabs, sidewalks, signs, sheds,  garages, fences, and tanks, as well as any 
other  miscellaneous  work  necessary  to  fully  complete  the  removal  of  the  buildings  and 
appurtenances. 

 

E

ARTHWORKS

 

 

 

Discontinuance  of  all  utility  services  that  serve  the  building  or  structure  shall  be  arranged  by  the 
Contractor, who shall also properly remove, disconnect, and plug all such services in accordance 
with the requirements of the respective utility agency. 

Existing underground storage tanks on-site or within the buildings shall be removed and disposed of 
by the Contractor, who shall take all necessary precautions to remove any remaining fluids within 
the  tanks.  Any  hazardous  materials  and  petroleum  products  shall  be  handled  and  disposed  of  in 
accordance  with  Section  2.3.2.5.    When  removing  foundations,  the  Contractor  shall  perform  the 
following:  

1.  Remove foundations to a depth of at least 300 mm below finished ground elevation or 

subgrade elevation, whichever is lower. 

2.  Break up basement floors to promote drainage. 

3.  Fill basements or other cavities left by the removal of structures. Fill shall match the level 

of the surrounding ground. Fill within the area of the roadway embankment prism, under 
pedestrian pavement, or adjacent to other structures and utilities that require lateral or 
bearing support. Fill shall be compacted to meet the requirements of Section 2.5.3.1. 

2.3.2.3 

Removal of Bridges, Culverts, and Drainage Structures 

Bridges, culverts, and other drainage structures shall not be removed until the Contractor has made 
satisfactory  arrangements  to  accommodate  traffic  and  the  flow  of  water.  Contractor  shall  not 
commence removal work before preparing and submittal and the Engineers approval of a Removal 
Method  Statement  which  provides  a  detailed  description  of  the  Contractor

’s  proposed  removal 

methods, public and traffic safety accomodations, noise and dust controls, disposal methods and 
locations, and any other item as required by the Engineer. 

Unless otherwise indicated, the existing substructures shall be removed 300 mm below the natural 
ground surface. Portions of existing structures within the limits of a new structure shall be removed 
to accommodate the construction of the proposed structure. 

Work includes removal and disposal of underground obstructions, including walls; individual rocks; 
structures; abandoned drainage structures, pipe lines, and utilities; foundations; and other structures 
of steel or concrete. 

Removal of existing utilities required to permit the orderly progression of work shall be accomplished 
in coordination with the appropriate agency. Contractor shall contact the proper agency or owner 
and arrange for its removal. 

Bridges designated as salvaged material shall be dismantled without damage and match-marked. 
Structures designated to become the property of the Contractor shall be removed from the site. 

Blasting  or  other  operations  necessary  for  removing  existing  structures  or  obstructions  that  may 
damage new construction shall be completed by the Contractor prior to placing new work. Use of 
explosives shall be governed by Section 2.4.2.4. 

Where partial demolition of obstructions or structures is indicated, the Contractor shall remove the 
indicated structure with care and caution so as not to damage the remaining portions of the existing 
structure. 

2.3.2.4 

Removal  of  Pavement,  Barriers,  Railings,  Sidewalks,  Kerbs, 
and Gutters 

Existing pavement shall be removed to the subgrade level at locations identified in the Contract plans 
or the particular specifications. Where existing pavement is removed along a section of pavement to 
remain, the Contractor shall saw-cut to neat lines along the break line in such a manner as to avoid 
damage to the pavement that is to remain. Any damage to pavement areas that is to remain shall 
be restored to the satisfaction of the Engineer and in accordance with Section 3.4.3.2 of Chapter 3, 
Pavement, of these Standard Specifications. 

 

E

ARTHWORKS

 

 

 

Existing asphalt pavement shall be broken up and stockpiled for reuse in aggregate-based coarse 
layers as stipulated in Section 3.2.2 of Chapter 3, Pavement, of these Standard Specifications. 

After removal of pavements, the old roadbed shall be scarified or ploughed to mix the remaining road 
material thoroughly with earth and shall be graded and smoothed to a pleasing appearance to match 
and blend in with the existing contours and terrain. 

Where barriers, railings, kerbs and gutters are to be removed adjacent to pavement to remain, the 
work shall be carried out without damaging the existing pavement. Haunching and foundations shall 
be included in the removal. Removed railings kerbs, sidewalks, gutters, and barriers shall be properly 
disposed of, and shall not be reused on the project. 

2.3.2.5 

Disposal of Materials 

As much as practicable, waste concrete, asphalt, and masonry shall be broken into suitably sized 
pieces and incorporated in embankment slopes or basement fills. Any broken concrete or masonry 
and all other materials not considered suitable for use in construction or elsewhere shall be disposed 
of by the Contractor at approved locations. In no case shall any discarded materials be left adjacent 
to or within the site. 

Engineer will approve the manner in which materials are disposed and their location, which shall not 
create an unpleasant or objectionable view. When the Contractor requires a disposal area outside 
of  the  jobsite,  the  Contractor  shall  obtain  permission  in  writing  from  the  appropriate  agency  and 
waste disposal operation, and file this information with the Engineer. 

If  the  Contractor  or  Engineer  finds  any  evidence  that  excavated  or  waste  material  has  become 
contaminated  with  petroleum  products  or  other  hazardous  materials,  as  determined  by  visual, 
olfactory,  or  other  means,  the  potentially  contaminated  material  shall  be  stockpiled  separately, 
sampled, and analysed to determine disposal options. 

2.4 

Roadway Excavation 

2.4.1 

Description 

Excavation consists of the following: 

1. 

Roadway  excavation  consists  of  all  materials  excavated  from  within  the  right-of-way  or 
easement  areas,  (including  all  material  encountered  regardless  of  its  nature  or 
characteristics)  except  sub-excavation  described  in  2  below  and  structure  excavation 
described in 4 below. 

2. 

Subexcavation

 

consists of material excavated from below subgrade elevations in cut sections 

or  from  below  the  original  ground  line  in  embankment  sections.  Subexcavation  does  not 
include the work required in Section 2.2.2.5. 

3. 

Borrow excavation

 

includes the material used for embankment and other fill construction that 

is obtained from outside of the roadway prism. 

4. 

Structural excavation

 

consists of material excavated for purposes of structure construction. 

Work  described  in  this  section,  regardless  of  the  nature  or  type  of  the  materials  encountered, 
includes  excavating  and  grading  the  roadway,  excavating  in  borrow  pits  (sites  providing  fill 
materials), excavating below-grade, excavating channels, excavating and grading non-load bearing 
areas outside of the traffic and pedestrian pavement areas, removing slide material, and disposing 
of all excavated material. These activities may be performed in making cuts, embankments, slopes, 
roadway  ditches,  approaches,  parking  areas,  intersections,  and  pedestrian  walkways,  and  in 
completing related work. 

 

 

 

 

 

 

 