|
|
|
Fig. 335: View Of Charge Air Inlet Pipe 12. Position the cooling fan shroud bracket (2). 13. Install the cooling fan shroud bracket bolts (1). Tighten: Tighten the fan shroud bolt to 8 N.m (71 lb in). Tighten: Tighten the fan shroud bracket to engine block bolts to 58N.m (63 lb ft). 14. Install the charge air inlet pipe. Refer to Charge Air Cooler Inlet Pipe Replacement . 15. Fill the cooling system. Refer to Cooling System Draining and Filling (Vac-N-Fill) or Cooling System Draining and Filling (Static Fill) . ENGINE OIL PRESSURE SENSOR AND/OR SWITCH REPLACEMENT
2008 Chevrolet Silverado 1500 2008 ENGINE Engine Mechanical - 6.6L - Cab & Chassis Sierra, Cab & Chassis Silverado, Sierra & Silverado
|