|
|
|
Fig. 80: Intake Manifold Bolt Tightening Sequence (Right) 4. Tighten the intake manifold bolts/nuts in the sequence shown. Tighten: Tighten the bolts/nuts to 21 N.m (15 lb ft). 5. Install the right fuel rail. Refer to Fuel Rail Fuel Feed Pipe Replacement - Right Side . 6. Install the center intake manifold. Refer to Center Intake Manifold Replacement. INTAKE MANIFOLD REPLACEMENT - RIGHT SIDE Removal Procedure NOTE: Refer to Fastener Notice .
2008 Chevrolet Silverado 1500 2008 ENGINE Engine Mechanical - 6.6L - Cab & Chassis Sierra, Cab & Chassis Silverado, Sierra & Silverado
|