AUTOMOTIVE INDUSTRY RETAIL, SERVICE & REPAIR - part 14

 

  Index      Transport     AUTOMOTIVE INDUSTRY RETAIL, SERVICE & REPAIR

 

Search            copyright infringement  

 

 

 

 

 

 

 

 

 

Content   ..  12  13  14  15   ..

 

 

AUTOMOTIVE INDUSTRY RETAIL, SERVICE & REPAIR - part 14

 

 

Automotive Industry RS&R  

AURM3405A Conduct non-destructive testing 

©Australian National Training Authority 

 AUR99 Version 4.00 Review by 30 June 2004 

69 

 

AURM3405A Conduct 

non-destructive 

testing 

Unit descriptor 

This unit covers the competency to perform non-destructive 
testing on competition vehicle components and material. It 
includes dye penetrant, magnetic particle, Rockwell and Brinell 
hardness testing. 

 

ELEMENT PERFORMANCE 

CRITERIA 

1.  Prepare for 

non-destructive testing 

1.1 

Team instructions, controlling body rules, category rules, 
supplementary regulations and component supplier 
specifications are used to determine job requirements 
including quality, material, equipment, and quantities 

1.2 

OH&S requirements including personal protection needs 
are observed throughout the work  

1.3 

Inspection areas are cleaned and prepared for testing 
using appropriate procedures and material 

1.4 

Tools and equipment are identified and checked for safe 
and effective operation 

1.5 

Testing equipment is prepared for non-destructive testing 
in accordance with equipment manufacturer/component 
supplier instructions and team requirements 

1.6 

Problems with the work area and/or the operation of the 
equipment are identified and reported to appropriate 
persons 

2.  Perform 

non-destructive testing 

2.1 

Appropriate testing method/s are identified using 
standard operating procedures and team requirements  

2.2 

Hazards associated with testing are determined, and 
safety requirements identified 

2.3 

Testing is carried out in accordance with relevant task 
instructions, team procedures and OH&S requirements 

2.4 

Non-conformance and defects are identified against 
component manufacturer/component supplier 
specifications and team standards 

2.5 

Test results are verified where appropriate by using 
reliable alternative or optional processes 

2.6 

Test results are documented in accordance with team 
procedures 

AURM3405AA Conduct non-destructive testing 

 

Automotive Industry RS&R 

70 

AUR99 Version 4.00 Review by 30 June 2004 

©Australian National Training Authority 

 

ELEMENT PERFORMANCE 

CRITERIA 

3.  Clean up work area 

3.1 

Testing equipment is maintained and stored in 
accordance with team procedures and OH&S 
requirements 

3.2 

Work area is cleaned and prepared for subsequent use 

 

RANGE STATEMENT  

The Range Statement provides advice to interpret the scope and context of this unit of 
competency, allowing for differences between enterprises and workplaces. It relates to the unit 
as a whole and facilitates holistic assessment. The following variables may be present for this 
particular unit: 

Unit scope 

•  Work involves the non-destructive testing of competition 

vehicle components in order to determine component 
serviceability by checking for material 
defects/malfunctions 

•  Non-destructive testing equipment includes dye penetrant, 

magnetic particle, Rockwell and Brinell hardness testing 
equipment 

•  Magnetic particle testing includes portable or fixed (yoke 

or bench) testing techniques 

•  Components to be tested include those used in the 

construction of competition vehicles (e.g. final drive, 
steering, brake, roll cage, gear components etc)  

Unit context 

•  OH&S requirements include relevant state and 

commonwealth legislation, safety management systems, 
controlling body requirements, manufacturer/component 
supplier specifications and safe operating procedures 

•  Work is carried out in accordance with legislative 

obligations (including environmental requirements), 
relevant health regulations, manual handling procedures 
and insurance requirements  

•  Work requires individuals to demonstrate discretion, 

judgement and problem solving skills in the detection of 
material defects through observation and testing 

•  Competency may be demonstrated in workplaces involved 

in the design, development, manufacture and maintenance 
of performance vehicles and/or performance vehicle 
components and assemblies used in motorsport 

Automotive Industry RS&R  

AURM3405A Conduct non-destructive testing 

©Australian National Training Authority 

 AUR99 Version 4.00 Review by 30 June 2004 

71 

 

RANGE STATEMENT  

Tools and equipment 

• 

Tools and equipment are to include dye penetrant test kit, 
magnetic particle test kit, Rockwell hardness tester and 
Brinell hardness tester 

Material 

• 

Material include material used for construction of 
competition vehicle components 

Personal protective 
equipment 

• 

Personal protective equipment is to include that 
prescribed under legislation, regulations and team 
policies and practices 

Information and 
procedures 

•  Team procedures relating to the use of tools and equipment 

•  Work instructions, including work sheets, material safety 

data sheets, assembly procedures, plans, drawings, designs 
and check lists 

•  Workplace and team procedures relating to reporting and 

communication 

•  Manufacturer/component supplier specifications and 

operational procedures 

•  Controlling body rules, category rules and supplementary 

regulations 

 

EVIDENCE GUIDE 

The Evidence Guide identifies the critical aspects, knowledge and skills to be demonstrated to 
confirm competency for this unit. This is an integral part of the assessment of competency and 
should be read in conjunction with the Range Statement. 

Critical aspects of 
evidence 

•  Interpret and apply team requirements, controlling body 

rules, category rules and supplementary regulations  

•  Apply safety requirements including the use of personal 

protective equipment 

•  Follow task instructions, operating procedures and 

inspection processes to:  

•  minimise the risk of injury to self and others 

•  prevent damage to competition vehicle or equipment 

•  achieve required outcomes within team time and quality 

standards 

•  Prepare equipment for testing (including zeroing and 

calibration checks where appropriate) 

AURM3405AA Conduct non-destructive testing 

 

Automotive Industry RS&R 

72 

AUR99 Version 4.00 Review by 30 June 2004 

©Australian National Training Authority 

 

EVIDENCE GUIDE 

Critical aspects of 
evidence (continued)
 

•  Correctly conduct non-destructive testing on a minimum of 

four (4) components. Each component must be tested using 
at least two (2) testing methods as detailed in the range 
statement. Each of the following must be covered: 

•  select and apply appropriate testing method/s 

•  verify results using reliable alternative process 

•  record outcomes 

•  Perform work within relevant team quality and timeliness 

standards 

•  Work effectively with others 

•  Modify activities to cater for variations in workplace 

context and environment 

Underpinning knowledge 

•  Principles and methods of penetrant, magnetic, Rockwell 

and Brinell hardness testing, including limitations, 
advantages and hazards associated with testing 

•  Non-destructive testing terminology 

•  OH&S policies and procedures related to non-destructive 

testing 

•  Non-destructive testing equipment use, maintenance and 

storage 

•  Non-destructive testing preparation procedures 

•  Non-destructive testing verification methods and 

techniques 

•  Non-destructive testing analysis techniques 

•  Techniques for recording results of non-destructive testing 

Automotive Industry RS&R  

AURM3405A Conduct non-destructive testing 

©Australian National Training Authority 

 AUR99 Version 4.00 Review by 30 June 2004 

73 

 

EVIDENCE GUIDE 

Underpinning skills 

These include a number of processes that are learnt throughout work and life, which are 
required in most jobs. Some of these are covered by the national key competencies, although 
others may be added. The questions below highlight how these processes are applied in this 
competency unit. The number in brackets indicates the level to which the key competency 
needs to be demonstrated where (1) is where work is within set conditions and process, (2) is 
where the management or facilitation of conditions or process is exercised, and (3) is where 
the design and/or development of conditions or process is required. 

How will the candidate 
apply the following key 
competency in this unit? 

The candidate will need to: 

Collect, analyse and 
organise information 

 

Collect, analyse, organise and understand information related to 
non-destructive test results. 

 (Level 2)

Communicate ideas and 
information 

 

Communicate ideas and information to enable confirmation of 
work requirements, coordination of work with technical 
supervisors, other technicians and workers, and the reporting of 
work outcomes and problems. 

(Level 2)

Plan and organise 
activities 

 

Plan and organise activities including the preparation and layout 
of the work area and obtaining equipment and material to avoid 
any back-tracking, workflow interruptions or wastage. 

(Level 2)

Work with others and in 
a team 

 

Work with others and in a team by recognising dependencies and 
using cooperative approaches to optimise workflow and 
productivity. 

(Level 2)

Use mathematical ideas 
and techniques 

 

Use mathematical ideas and techniques to correctly complete 
measurements and estimate material requirements. 

(Level 2)

Solve problems 

 

Use pre-checking and inspection techniques to anticipate issues, 
avoid reworking and wastage. 

(Level 2)

Use technology 

 

Use the workplace technology related to non-destructive testing 
including tools, equipment and measuring devices. 

(Level 2)

AURM3405AA Conduct non-destructive testing 

 

Automotive Industry RS&R 

74 

AUR99 Version 4.00 Review by 30 June 2004 

©Australian National Training Authority 

 

EVIDENCE GUIDE 

Resource implications 

•  Access to tools and equipment as identified in the Range 

Statement, and relevant technical references or information 

Method of assessment 

•  Assessment methods must confirm consistency of 

performance over time and in a range of workplace relevant 
contexts 

•  Assessment should be by direct observation of tasks and 

questioning on underpinning knowledge 

•  Assessment should be conducted over time and may be in 

conjunction with assessment of other units of competency 

Context/s of assessment 

•  Assessment may occur on the job or in a workplace 

simulated facility with relevant process equipment, material, 
work instructions and deadlines 

 

 

Automotive Industry RS&R  

AURM3406A Construct hose/pipe assemblies for competition vehicles 

©Australian National Training Authority 

 AUR99 Version 4.00 Review by 30 June 2004 

75 

 

AURM3406A 

Construct hose/pipe assemblies for 
competition vehicles 

Unit descriptor 

This unit covers the competency to construct hose/pipe 
assemblies for competition vehicles. This includes calculating 
material, selecting components, constructing and testing 
hose/pipe assemblies.  

 

ELEMENT PERFORMANCE 

CRITERIA 

1.  Prepare for work 

 

1.1 

Team instructions, supplementary regulations and 
component supplier specifications are used to determine 
job requirements including design, quality, material, 
equipment, and quantities 

1.2 

OH&S requirements including equipment and system 
isolation requirements and personal protection needs are 
observed throughout the work 

1.3 

Specifications are checked and clarification of 
specifications is sought where required 

1.4 

Hose/pipe type and fittings are determined according to 
application 

1.5 

Tools and equipment are identified and checked for safe 
and effective operation 

1.6 

Work area is cleaned and laid out appropriately for job 
requirements 

1.7 

Problems with the work area and/or the operation of the 
equipment are identified and reported to appropriate 
persons 

1.8 

Procedures for minimising waste material are determined 

2.  Construct hose/pipe 

assemblies 

2.1 

Hose/pipe length is measured/calculated 

2.2 

Hose/pipe is cut to length 

2.3 

Hose/pipe is bent to conform to fitting requirement 

2.4 

Fittings are installed and secured in accordance with 
component suppliers’ specifications and procedures 
and/or team requirements 

2.5 

Assembly is cleaned and pressure-tested 

AURM3406A Construct hose/pipe assemblies for competition vehicles  

Automotive Industry RS&R 

76 

AUR99 Version 4.00 Review by 30 June 2004 

©Australian National Training Authority 

 

ELEMENT PERFORMANCE 

CRITERIA 

3.  Clean up work area and 

maintain records 

 

3.1 

Tools are maintained and returned to storage 

3.2 

Surplus components/consumables are tagged and 
shelved/stored 

3.3 

All surplus material is removed from work area 

3.4 

Any spillage from work area and vehicle is cleaned up 

3.5 

Team/component supplier documentation is completed 

 

RANGE STATEMENT  

The Range Statement provides advice to interpret the scope and context of this unit of 
competency, allowing for differences between enterprises and workplaces. It relates to the unit 
as a whole and facilitates holistic assessment. The following variables may be present for this 
particular unit: 

Unit scope 

•  This unit covers the competency to construct hose/pipe 

assemblies for competition vehicles. This includes 
calculating material, selecting components, constructing 
and testing hose/pipe assemblies 

•  Techniques may include: 

•  measuring 

•  calculating 

•  cutting 

•  bending 

•  flaring 

•  assembling 

•  testing 

•  Components may include, but are not limited to: 

•  braided hose (fabric, metal, kevlar covered etc.) 

•  replaceable hose ends and fittings 

•  metal pipe 

•  flared and ferrule fittings 

 

 

 

 

 

 

 

Content   ..  12  13  14  15   ..