Performance Measures
GO
NO-GO
1. Ensured unit maintenance procedures are in accordance with AR 750-1, DA PAM
——
——
750-3, and local and major Army command (MACOM) policies.
a. Reviewed unit SOPs for maintenance.
b. Informed unit personnel of changes in policy and new policy that impacts unit
SOP.
2. Provided technical assistance to unit maintenance activities.
——
——
a. Inspected unit maintenance operations.
b. Identified shortcomings.
c. Made recommendations for corrective actions.
d. Provided training in maintenance procedures.
e. Provided training and technical assistance as needed for operations under
extreme heat (up to 125 degrees Fahrenheit [F]).
(1) Cooled systems. Check coolant level daily. Maintain coolant levels
approximately two inches below the radiator overflow pipe if so
equipped. Check radiator air passages for obstructions frequently.
Check fan belt for proper tension. Check coolant temperature
indicators frequently for any indication of overheating.
(2) Lubricated. Made sure that lubricants used are as specified for the
prevailing ambient temperature in the current lubrication order.
(3) Fueled system. When filling the fuel tanks, allow sufficient space for
fuel expansion.
(4) Batteries. Checked electrolyte level frequently. Add distilled water as
required to compensate for evaporation.
(5) Engine. Kept the external surface of the engine as clean as possible.
f. Provided training and technical assistance as needed for operations in dusty
or sandy areas.
(1) General. If possible, provide shelter for the equipment. Use available
natural barriers to shield the equipment from blowing dust or sand.
(2) Cleaned. Wiped dust and sand from the equipment frequently. When
possible, thoroughly washed down with clean water.
(3) Engine. Shorten the service interval for the engine air cleaner and oil
filter to compensate for intake of additional dust or dirt. Kept external
surface of engine as clean as possible.
(4) Fueled systems. Drain sediment from fuel tanks, fuel strainers, and fuel
filters frequently. Was particularly careful to prevent dust or dirt from
entering the fuel tank/fuel system. Shorten the service intervals for the
fuel filters appropriately.
(5) Lubrication. Lubricated intervals must be shortened appropriately.
Use particular care to keep lubricants from becoming contaminated with
dust or dirt.
3. Provided maintenance management to units.
——
——
a. Reviewed reports (Materiel Condition Status Report [MCSR]).
b. Coordinated with higher-level maintenance activities.
c. Directed cross-leveling of maintenance assets/workloads.
d. Prioritize maintenance efforts of units.
Evaluation Guidance: Score the Soldier GO if all performance measures are passed. Score the Soldier
NO-GO if any performance measure is failed. If the Soldier fails any performance measure, show what was
done wrong and how to do it correctly.
3-290
20 May 2010
STP 9-91A14-SM-TG
References
Required
Related
AR 385-10
AR 600-55
AR 700-138
AR 700-4
AR 710-2
AR 725-50
AR 735-5
AR 750-1
AR 750-43
DA PAM 710-2-2
DA PAM 750-1
DA PAM 750-3
FM 4-30.3
20 May 2010
3-291
STP 9-91A14-SM-TG
Manage Maintenance Information Systems Reports
091-CLT-3012
Conditions: While stationed in Iraq, your Brigade is given the new Standard Army Maintenance System-1E
(SAMS-1E) systems. As the shop foreman for your company, you must Identify the Objectives, Functions,
and Management Tools of the SAMS-1E. In a contemporary operational environment (COE) given a
computer system or systems with Standard Army Maintenance System-Level 1 Enhanced (SAMS-1E)
software, database of equipment files, SAMS-1E operator, Automated Information Systems Manual
(AISM)-25-L21-AHN-ZZZ-EM, AISM-25-L26-AHO-ZZZ-EM, Department of the Army (DA) Form 2407
(Maintenance Request), DA Pamphlet (PAM) 750-8, and applicable references.
Standards: Supervise SAMS-1E functions of a field level maintenance shop in accordance with applicable
references.
Performance Steps
1. Ensure necessary equipment and publications were available.
2. Ensure SAMS-1E operator was adequately trained.
3. Review the SAMS-1E system and the flow of information to and from system interfaces.
4. Review the purpose and use of SAMS-1E categories and codes.
5. Supervise the processing of maintenance requests (DA Form 2407).
6. Interpret SAMS-1E report to identify maintenance trends and problems.
7. Request and interpret ad hoc reports, as necessary.
Evaluation Preparation: None
Performance Measures
GO
NO-GO
1. Ensured necessary equipment and publications were available.
——
——
2. Accessed the SAMS-1E system.
——
——
3. Reviewed the SAMS-1E system and the flow of information to and from system
——
——
interfaces.
4. Reviewed the purpose and use of SAMS-1E categories and codes.
——
——
5. Supervised the processing of maintenance requests (DA Form 2407).
——
——
6. Interpreted SAMS-1E report to identify maintenance trends and problems.
——
——
7. Requested and interpreted ad hoc reports, as necessary.
——
——
Evaluation Guidance: Score the Soldier GO if all performance measures are passed. Score the Soldier
NO-GO if any performance measure is failed. If the Soldier fails any performance measure, show what was
done wrong and how to do it correctly.
References
Required
Related
AISM-25-L21-AHN-ZZZ-EM
AISM-25-L26-AHO-ZZZ-EM
DA Form 2407
DA PAM 750-8
3-292
20 May 2010
STP 9-91A14-SM-TG
Subject Area 8: TECHNICAL TASKS (SKILL LEVEL 3)
Perform Diagnostic Procedures on the AGT 1500 Turbine Engine of the M1 Series Track Vehicle
091-91A-3028
Conditions: In a contemporary operational environment (COE) given an applicable vehicle; repair parts;
tool kit, multi-capable; DA Form 5988-E (Equipment Inspection Maintenance Worksheet) stating "Perform
Diagnostic Procedures on the AGT 1500 Turbine Engine of the M1 Series Track Vehicle"; test,
measurement, and diagnostic equipment (TMDE); and equipment as indicated in technical manuals (TMs);
applicable technical publications; and supervision/assistance.
Standards: Maintain the gas turbine powerplant or pack and replace or repair its components in
accordance with the applicable technical publication procedures and specifications.
(See Maintenance
Allocation Chart for exact procedures authorized for each military occupational specialty (MOS) and skill
level (SL).) When this task is completed, the vehicle or equipment is fully mission-capable, or
maintenance actions required to be performed by other than MOS 91A personnel are identified.
Performance Steps
1. Review work request.
2. Perform initial inspection.
3. Determine maintenance action to be performed.
4. Ensure task was within shop capability/authorization.
5. Ensure proper tools were available.
6. Identify and requisition repair parts, if required.
a. AGT-1500.
b. M1A1 Fuel Supply System.
7. Ensure TAMMS procedures are followed
8. Determine maintenance action required:
a. Replace the inlet guide vane cable.
b. Adjust the feedback voltage.
9. Ensure applicable publications are available.
10. Assign personnel to perform task.
11. Ensure all safety precautions are followed.
12. Provide assistance, if necessary.
13. Ensure task was performed to acceptable standards.
14. Conduct an in-process inspection.
15. Perform a final inspection.
16. Critique personnel on performance of task.
17. Ensure maintenance forms are completed, as required.
18. Ensure tools and equipment are properly maintained.
20 May 2010
3-293
STP 9-91A14-SM-TG
Evaluation Preparation:
WARNING
The following safety precautions must be adhered to when performing
the tasks listed in this manual: Do not remove a radiator cap or surge
tank cap unless the engine is cool. While working on electrical
systems, remove all rings, watches, and jewelry. Before working on
the exhaust system, make sure it is cool. Disconnect the negative
battery cable prior to performing any electrical system maintenance or
when performing repairs in the locality of electrical components.
When working around engines that are operating, wear hearing
protection. When removing components over 75 pounds, two
personnel are required.
Performance Measures
GO
NO-GO
1. Reviewed work request.
——
——
2. Performed initial inspection.
——
——
3. Determined maintenance action to be performed.
——
——
4. Ensured task was within shop capability/authorization.
——
——
5. Ensured proper tools were available.
——
——
6. Identified and requisitioned repair parts, if required.
——
——
a. AGT-1500.
b. M1A1 Fuel Supply System.
7. Ensured TAMMS procedures are followed.
——
——
8. Determined maintenance action required.
——
——
a. Replaced the inlet guide vane cable.
b. Adjusted the feedback voltage.
9. Ensured applicable publications are available.
——
——
10. Assigned personnel to perform task.
——
——
11. Ensured all safety precautions are followed.
——
——
12. Provided assistance, if necessary.
——
——
13. Ensured task was performed to acceptable standards.
——
——
14. Conducted an in-process inspection.
——
——
15. Performed a final inspection.
——
——
16. Critiqued personnel on performance of task.
——
——
17. Ensured maintenance forms are completed, as required.
——
——
18. Ensured tools and equipment are properly maintained.
——
——
3-294
20 May 2010
STP 9-91A14-SM-TG
Evaluation Guidance: Score the Soldier GO if all performance measures are passed. Score the Soldier
NO-GO if any performance measure is failed. If the Soldier fails any performance measure, show what was
done wrong and how to do it correctly.
References
Required
Related
DA PAM 750-8
LO 9-2350-264-13
TM 9-2350-264-10-1
TM 9-2350-264-20-1-1
TM 9-2350-264-20-1-2
TM 9-2350-264-20-1-3
TM 9-2350-264-20-1-4
TM 9-2350-264-20-1-5
TM 9-2350-264-24-1
TM 9-243
20 May 2010
3-295
STP 9-91A14-SM-TG
Perform Diagnostic Procedures on the Electrical Mechanical Fuel Management System of the M1
Series Track Vehicle
091-91A-3034
Conditions: In a contemporary operational environment (COE) given an M1 series Main Battle Tank; tool
kit, multi-capable; DA Form 5988-E (Equipment Inspection Maintenance Worksheet) stating "Perform
Diagnostic Procedures on the Electrical Mechanical Fuel Management System"; Technical Manual (TM)
9-2350-264-10-1; TM 9-2350-264-10-2; TM 9-2350-264-20-1-1; TM 9-2350-264-20-1-2; TM
9-2350-264-20-1-3; TM 9-2350-264-20-1-4; TM 9-2350-264-20-1-5; TM 9-2350-264-24-1; TM
9-2350-264-34-1-1; TM 9-2350-264-34-1-2; necessary tools and equipment as indicated in the TMs; test,
measurement, and diagnostic equipment (TMDE); replacement parts; and supervision/assistance.
Standards: Perform diagnostic procedures on gas turbine fuel systems. Documented required
maintenance actions. Supervise and assist personnel assigned to perform maintenance actions to ensure
repair is performed to standard, with equipment being fully mission-capable. When this task is completed,
the vehicle or equipment is fully mission-capable or maintenance actions required to be performed by other
than military occupational specialty (MOS) 91A personnel are identified.
Performance Steps
1.
Review work request.
2.
Ensure task was within shop capability/authorization.
3.
Ensure applicable technical publications were available.
4.
Ensure proper tools were available to inspect, repair/replace, and tested the gas turbine fuel system.
5.
Perform initial inspection.
6.
Diagnose Gas Turbine Fuel System fault(s) by troubleshooting the M1A1 Fuel Supply System.
7.
Determine maintenance action to be performed.
8.
Identify repair parts and requisition, if required.
9.
Assign personnel to perform task.
10. Ensure all safety precautions and procedures are followed.
11. Provide assistance, when necessary.
12. Ensure task is performed in accordance with appropriate TMs and references.
13. Conduct an in-process inspection.
14. Perform a final inspection to ensure gas turbine fuel system is fully mission-capable.
15. Critique personnel on performance of task.
16. Ensure maintenance forms are completed, as required.
17. Ensure tools and equipment are properly maintained.
3-296
20 May 2010
STP 9-91A14-SM-TG
Evaluation Preparation:
WARNING
The following safety precautions must be adhered to when performing
the tasks listed in this manual: Do not remove a radiator cap or surge
tank cap unless the engine is cool. While working on electrical
systems, remove all rings, watches, and jewelry. Before working on
the exhaust system, make sure it is cool. Disconnect the negative
battery cable prior to performing any electrical system maintenance or
when performing repairs in the locality of electrical components.
When working around engines that are operating, wear hearing
protection. When removing components over 75 pounds, two
personnel are required.
Performance Measures
GO
NO-GO
1. Reviewed work request.
——
——
2. Ensured task was within shop capability/authorization.
——
——
3. Ensured applicable technical publications were available.
——
——
4. Ensured proper tools were available to inspect, repair/replace, and tested the gas
——
——
turbine fuel system.
5. Performed initial inspection.
——
——
6. Diagnosed Gas Turbine Fuel System fault(s) by troubleshooting the M1A1 Fuel
——
——
Supply System.
7. Determined maintenance action to be performed.
——
——
8. Identified repair parts and requisition, if required.
——
——
9. Assigned personnel to perform task.
——
——
10. Ensured all safety precautions and procedures are followed.
——
——
11. Provided assistance, when necessary.
——
——
12. Ensured task is performed in accordance with appropriate TMs and references.
——
——
13. Conducted an in-process inspection.
——
——
14. Performed a final inspection to ensure gas turbine fuel system is fully
——
——
mission-capable.
15. Critiqued personnel on performance of task.
——
——
16. Ensured maintenance forms are completed, as required.
——
——
17. Ensured tools and equipment are properly maintained.
——
——
Evaluation Guidance: Score the Soldier GO if all performance measures are passed. Score the Soldier
NO-GO if any performance measure is failed. If the Soldier fails any performance measure, show what was
done wrong and how to do it correctly.
20 May 2010
3-297
STP 9-91A14-SM-TG
References
Required
Related
DA Form 5988-E
DA PAM 750-8
TM 9-2350-264-10-1
TM 9-2350-264-20-1-1
TM 9-2350-264-10-2
TM 9-2350-264-20-1-2
TM 9-2350-264-34-1-1
TM 9-2350-264-20-1-3
TM 9-2350-264-34-1-2
TM 9-2350-264-20-1-4
TM 9-2350-264-20-1-5
TM 9-2350-264-24-1
TM 9-243
3-298
20 May 2010
STP 9-91A14-SM-TG
Perform Diagnostic Procedures on the Air Induction System of the M1 Series Track Vehicle
091-91A-3035
Conditions: In a contemporary operational environment (COE) given an M1 series Main Battle Tank; tool
kit, multi-capable; DA 5988-E (Equipment Inspection Maintenance Worksheet) stating "Perform Diagnostic
Procedures on the Air Induction System of the M1 Series Track Vehicle"; Technical Manual (TM)
9-2350-264-10-1; TM 9-2350-264-10-2; TM 9-2350-264-20-1-1; TM 9-2350-264-20-1-2; TM
9-2350-264-20-1-3; TM 9-2350-264-20-1-4; TM 9-2350-264-20-1-5; TM 9-2350-264-24-1; TM
9-2350-264-34-1-1; TM 9-2350-264-34-1-2; necessary tools and equipment as indicated in the TMs, test,
measurement, and diagnostic equipment (TMDE); replacement parts; and supervision/assistance.
Standards: Perform diagnostic procedures on air induction system. Document required maintenance
actions. Supervise and assist personnel assigned to perform maintenance actions to ensure repair is
perform to standard, with equipment being fully mission-capable. When this task is complete, the vehicle
or equipment is fully mission-capable, or maintenance actions required to be performed by other than
military occupational specialty (MOS) 91A personnel are identified.
Performance Steps
1. Perform administrative action.
a. Review work request.
b. Perform initial inspection.
2. Ensure task was within shop capability/authorization.
a. Select applicable technical publications.
b. Select proper tools and test equipment.
3. Diagnose Air Induction System fault and determine maintenance action to be performed.
a. Determine maintenance action to be performed.
b. Identify repair parts and requisition, if required.
c. Assign personnel to perform task.
4. Ensure all safety precautions and procedures are followed.
5. Ensure task is performed in accordance with appropriate TMs and references.
a. Conduct an in-process inspection.
b. Perform a final inspection to ensure air induction system is fully mission-capable.
6. Critique personnel on performance of task.
7. Ensure maintenance forms are completed, as required.
8. Ensure tools and equipment are properly maintained.
20 May 2010
3-299
STP 9-91A14-SM-TG
Evaluation Preparation:
WARNING
The following safety precautions must be adhered to when performing
the tasks listed in this manual: While working on electrical systems,
remove all rings, watches, and jewelry. Before working on the exhaust
system, make sure it is cool. Disconnect the negative battery cable
prior to performing any electrical system maintenance or when
performing repairs in the locality of electrical components. When
working around engines that are operating, wear hearing protection.
When removing components over 75 pounds, two personnel are
required.
Performance Measures
GO
NO-GO
1. Performed administrative action.
——
——
a. Reviewed work request.
b. Performed initial inspection.
2. Ensured task was within shop capability/authorization.
——
——
a. Selected applicable technical publications.
b. Selected proper tools and test equipment.
3. Diagnosed Air Induction System fault and determine maintenance action to be
——
——
performed.
a. Determined maintenance action to be performed.
b. Identified repair parts and requisition, if required.
c. Assigned personnel to perform task.
4. Ensured all safety precautions and procedures are followed.
——
——
5. Ensured task is performed in accordance with appropriate TMs and references.
——
——
a. Conducted an in-process inspection.
b. Performed a final inspection to ensure air induction system is fully
mission-capable.
6. Critiqued personnel on performance of task.
——
——
7. Ensured maintenance forms are completed, as required.
——
——
8. Ensured tools and equipment are properly maintained.
——
——
Evaluation Guidance: Score the Soldier GO if all performance measures are passed. Score the Soldier
NO-GO if any performance measure is failed. If the Soldier fails any performance measure, show what was
done wrong and how to do it correctly.
References
Required
Related
TM 9-2350-264-10-1
TM 9-2350-264-24P-1
TM 9-2350-264-10-2
TM 9-2350-264-20-1-1
TM 9-2350-264-20-1-2
TM 9-2350-264-20-1-3
TM 9-2350-264-20-1-4
TM 9-2350-264-20-1-5
3-300
20 May 2010
STP 9-91A14-SM-TG
Perform Diagnostic Procedures on the Starting System of the M1 Series Track Vehicle
091-91A-3037
Conditions: In a contemporary operational environment (COE) given an applicable vehicle; repair parts;
tool kit, multi-capable; additional tools; DA Form 5988-E (Equipment Inspection Maintenance Worksheet)
stating "Perform Diagnostic Procedures on the Starting System of the M1 Series Track Vehicle"; test,
measurement, and diagnostic equipment (TMDE); and equipment as indicated in technical manuals (TMs);
applicable technical publications; and supervision/assistance.
Standards: Perform diagnostic procedures on the Starting System of the M1 Series Track Vehicle in
accordance with applicable technical publications. When this task is completed, the vehicle or equipment
is fully mission-capable or maintenance actions required to be performed by other than military
occupational specialty (MOS) 91A personnel are identified.
Performance Steps
1. Select and use applicable technical publications.
2. Select and use applicable tools and TMDE.
3. Practice shop safety and maintenance discipline.
4. Inspect vehicle starting system and components
5. Diagnose fault(s) by troubleshooting the vehicle starting system.
6. Determine maintenance action to be performed.
7. Adjust and/or replace vehicle starting system and components.
8. Perform a final operational test to verify that the vehicle starting system malfunction is corrected to
specification.
9. Annotate corrective actions taken on the DA Form 5988-E.
10. Maintain tools and equipment.
Evaluation Preparation:
WARNING
The following safety precautions must be adhered to when performing
the tasks listed in this manual: Do not remove a radiator cap or surge
tank cap unless the engine is cool. While working on electrical
systems, remove all rings, watches, and jewelry. Before working on
the exhaust system, make sure it is cool. Disconnect the negative
battery cable prior to performing any electrical system maintenance or
when performing repairs in the locality of electrical components.
When working around engines that are operating, wear hearing
protection. When removing components over 75 pounds, two
personnel are required.
20 May 2010
3-301
STP 9-91A14-SM-TG
Performance Measures
GO NO-GO
1. Selected and used applicable technical publications.
——
——
2. Selected and used applicable tools and TMDE.
——
——
3. Practiced shop safety and maintenance discipline.
——
——
4. Inspected vehicle starting system and components.
——
——
5. Diagnosed fault(s) by troubleshooting the vehicle starting system.
——
——
6. Determined maintenance action to be performed.
——
——
7. Adjusted and/or replaced vehicle starting system and components.
——
——
8. Performed a final operational test to verify that the vehicle starting system
——
——
malfunction is corrected to specification.
9. Annotated corrective actions taken on the DA Form 5988-E.
——
——
10. Maintained tools and equipment.
——
——
Evaluation Guidance: Score the Soldier GO if all performance measures are passed. Score the Soldier
NO-GO if any performance measure is failed. If the Soldier fails any performance measure, show what was
done wrong and how to do it correctly.
References
Required
Related
DA PAM 750-8
TM 9-2350-256-10
TM 9-2350-256-20-1
TM 9-2350-256-20-2
TM 9-2350-264-10-1
TM 9-2350-264-20-1-1
TM 9-2350-264-20-1-2
TM 9-2350-264-20-1-3
TM 9-2350-264-20-1-4
TM 9-2350-264-20-1-5
TM 9-243
TM 9-8000
3-302
20 May 2010
STP 9-91A14-SM-TG
Perform Diagnostic Procedures on the Hull Electrical System of the M1 Series Track Vehicle
091-91A-3038
Conditions: In a contemporary operational environment (COE) given an applicable vehicle; repair parts;
tool kit, multi-capable; DA Form 5988-E (Equipment Inspection Maintenance Worksheet) stating "Perform
Diagnostic Procedures on the Hull Electrical System of the M1 Series Track Vehicle"; test, measurement,
and diagnostic equipment (TMDE); and equipment as indicated in technical manuals (TMs); applicable
technical publications; and supervision/assistance.
Standards: Perform diagnostic procedures on the Hull Electrical System or pack and replace or repair its
components in accordance with the applicable technical publication procedures and specifications.
(See
Maintenance Allocation Chart for exact procedures authorized for each military occupational specialty
(MOS) and skill level (SL).) When this task is completed, the vehicle or equipment is fully mission-capable
or maintenance actions required to be performed by other than MOS 91A personnel are identified.
Performance Steps
1. Perform administrative action.
a. Select and use applicable TMs.
b. Select and use applicable tools and TMDE.
c. Practice shop safety and maintenance discipline.
2. Diagnostic Hull Electrical System faults and determine maintenance action to be completed.
a. Troubleshoot cable circuits, as applicable.
b. Troubleshoot component, as applicable.
3. Repair electrical system cable, if damaged
4. Replace faulty component, as necessary.
5. Ensure all safety precautions and procedures are followed.
6. Perform final operational test to verify faults have been corrected.
7. Complete The Army Maintenance Management System (TAMMS) forms, as required.
Evaluation Preparation:
WARNING
The following safety precautions must be adhered to when performing
the tasks listed in this manual: Do not remove a radiator cap or surge
tank cap unless the engine is cool. While working on electrical
systems, remove all rings, watches, and jewelry. Before working on
the exhaust system, make sure it is cool. Disconnect the negative
battery cable prior to performing any electrical system maintenance or
when performing repairs in the locality of electrical components.
When working around engines that are operating, wear hearing
protection. When removing components over 75 pounds, two
personnel are required.
20 May 2010
3-303
STP 9-91A14-SM-TG
Performance Measures
GO NO-GO
1. Performed administrative action.
——
——
a. Selected and used applicable TMs.
b. Selected and used applicable tools and TMDE.
c. Practiced shop safety and maintenance discipline.
2. Diagnosed Hull Electrical System faults and determine maintenance action to be
——
——
completed.
a. Troubleshoot cable circuits, as applicable.
b. Troubleshoot component, as applicable.
3. Repaired electrical system cable, if damaged.
——
——
4. Replaced faulty component, as necessary.
——
——
5. Ensured all safety precautions and procedures are followed.
——
——
6. Performed final operational test to verify faults have been corrected.
——
——
7. Completed The Army Maintenance Management System (TAMMS) forms, as
——
——
required.
Evaluation Guidance: Score the Soldier GO if all performance measures are passed. Score the Soldier
NO-GO if any performance measure is failed. If the Soldier fails any performance measure, show what was
done wrong and how to do it correctly.
References
Required
Related
TM 9-2350-264-10-1
TM 9-2350-264-24P-1
TM 9-2350-264-10-2
TM 9-2350-264-20-1-1
TM 9-2350-264-20-1-2
TM 9-2350-264-20-1-3
TM 9-2350-264-20-1-4
TM 9-2350-264-20-1-5
3-304
20 May 2010
STP 9-91A14-SM-TG
Perform Diagnostic Procedures on the Transmission Assembly of the M1 Series Track Vehicle
091-91A-3040
Conditions: In a contemporary operational environment (COE) given an applicable vehicle; repair parts;
tool kit, multi-capable; DA Form 5988-E (Equipment Inspection Maintenance Worksheet) stating "Perform
Diagnostic Procedures on the Transmission Assembly of the M1 Series Track Vehicle"; required tools and
test equipment; and with minimum supervision.
Standards: Maintain the transmission assembly and replace or repair its components in accordance with
the applicable technical publication procedures and specifications.
(See Maintenance Allocation Chart for
exact procedures authorized for each military occupational specialty (MOS) and skill level (SL).) When
this task is completed, the vehicle or equipment is fully mission-capable or maintenance actions required to
be performed by other than MOS 91A personnel are identified.
Performance Steps
1. Perform administrative action.
a. Select and use applicable TMs.
b. Select and use applicable tools and TMDE.
c. Practice shop safety and maintenance discipline.
2. Diagnose transmission assembly faults and determine maintenance action to be completed.
a. Diagnose electrical components as applicable.
b. Diagnose mechanical components as applicable.
3. Replace faulty component, as necessary.
4. Ensure all safety precautions and procedures are followed.
5. Perform final operational test to verify faults have been corrected.
6. Complete The Army Maintenance Management System (TAMMS) forms, as required.
Evaluation Preparation:
WARNING
The following safety precautions must be adhered to when performing
the tasks listed in this manual: Do not remove a radiator cap or surge
tank cap unless the engine is cool. While working on electrical
systems, remove all rings, watches, and jewelry. Before working on
the exhaust system, make sure it is cool. Disconnect the negative
battery cable prior to performing any electrical system maintenance or
when performing repairs in the locality of electrical components.
When working around engines that are operating, wear hearing
protection. When removing components over 75 pounds, two
personnel are required
20 May 2010
3-305
STP 9-91A14-SM-TG
Performance Measures
GO NO-GO
1. Performed administrative action.
——
——
a. Selected and used applicable TMs.
b. Selected and used applicable tools and TMDE.
c. Selected and used applicable tools and TMDE
2. Diagnosed transmission assembly faults and determined maintenance action to be
——
——
completed.
a. Diagnosed electrical components as applicable.
b. Diagnosed mechanical components as applicable.
3. Replaced faulty component, as necessary.
——
——
4. Ensured all safety precautions and procedures were followed.
——
——
5. Performed final operational test to verify faults were corrected.
——
——
6. Completed The Army Maintenance Management System (TAMMS) forms, as
——
——
required.
Evaluation Guidance: Score the Soldier GO if all performance measures are passed. Score the Soldier
NO-GO if any performance measure is failed. If the Soldier fails any performance measure, show what was
done wrong and how to do it correctly.
References
Required
Related
DA PAM 750-8
LO 9-2350-264-13
TM 9-2350-264-10-1
TM 9-2350-264-20-1-1
TM 9-2350-264-20-1-2
TM 9-2350-264-20-1-3
TM 9-2350-264-20-1-4
TM 9-2350-264-20-1-5
TM 9-243
3-306
20 May 2010
STP 9-91A14-SM-TG
Perform Diagnostic Procedures on the Ready Ammo Door of the M1 Series Track Vehicle
091-91A-3046
Conditions: In a contemporary operational environment (COE) given an M1A1 tank with basic issue items
(BII); repair parts; tool kit, multi-capable; safety equipment; additional tools, DA Form 5988-E (Equipment
Inspection Maintenance Worksheet) stating "Perform Diagnostic Procedures on the Ready Ammo Door of
the M1 Series Track Vehicle"; test, measurement, and diagnostic equipment (TMDE); and equipment as
indicated in technical manuals (TMs); applicable technical publications; and supervision/assistance.
Standards: Perform diagnostic procedures of the ready ammo door system in accordance with applicable
technical publications. When this task is completed, the vehicle or equipment is fully mission-capable or
maintenance actions required to be performed by other than military occupational specialty (MOS) 91A
personnel are identified.
Performance Steps
1. Perform administrative action.
a. Select and use applicable TM's.
b. Select and use applicable tools and TMDE.
c. Practice shop safety and maintenance discipline.
2. Diagnose ready ammo door and determine maintenance action to be performed.
3. Replace faulty component, as necessary.
4. Ensure all safety precautions and procedures are followed.
5. Perform final operational test to verify faults have been corrected.
6. Complete The Army Maintenance Management System (TAMMS) forms, as required.
Evaluation Preparation:
WARNING
The following safety precautions must be adhered to when performing
the tasks listed in this manual: Do not remove a radiator cap or surge
tank cap unless the engine is cool. While working on electrical
systems, remove all rings, watches, and jewelry. Before working on
the exhaust system, make sure it is cool. Disconnect the negative
battery cable prior to performing any electrical system maintenance or
when performing repairs in the locality of electrical components.
When working around engines that are operating, wear hearing
protection. When removing components over 75 pounds, two
personnel are required.
20 May 2010
3-307
STP 9-91A14-SM-TG
Performance Measures
GO NO-GO
1. Performed administrative action.
——
——
a. Selected and used applicable TM's.
b. Selected and used applicable tools and TMDE.
c. Practiced shop safety and maintenance discipline.
2. Diagnosed ready ammo door and determined maintenance action to be performed.
——
——
3. Replaced faulty component, as necessary.
——
——
4. Ensured all safety precautions and procedures were followed.
——
——
5. Performed final operational test to verify faults were corrected.
——
——
6. Completed The Army Maintenance Management System (TAMMS) forms, as
——
——
required.
Evaluation Guidance: Score the Soldier GO if all performance measures are passed. Score the Soldier
NO-GO if any performance measure is failed. If the Soldier fails any performance measure, show what was
done wrong and how to do it correctly.
References
Required
Related
DA PAM 750-8
LO 9-2350-264-13
TM 9-2350-264-10-1
TM 9-2350-264-20-2-1
TM 9-2350-264-20-2-2
TM 9-2350-264-20-2-3
TM 9-2350-264-20-2-4
TM 9-2350-264-24-2
TM 9-243
3-308
20 May 2010
STP 9-91A14-SM-TG
Perform Diagnostic Procedures on the External Auxiliary Power Unit of the M1 Series Track Vehicle
091-91A-3047
Conditions: In a contemporary operational environment (COE) given an applicable vehicle; repair parts;
tool kit, multi-capable; DA Form 5988-E (Equipment Inspection Maintenance Worksheet) stating "Perform
Diagnostic Procedures on the External Auxiliary Power Unit of the M1 Series Track Vehicle"; test,
measurement, and diagnostic equipment (TMDE); and equipment as indicated in technical manuals (TMs);
applicable technical publications; and supervision/assistance.
Standards: Perform diagnostic procedures on the external auxiliary power unit, in accordance with
applicable technical publications. When this task is completed, the vehicle or equipment is fully
mission-capable or maintenance actions required to be performed by other than military occupational
specialty (MOS) 91A personnel are identified.
Performance Steps
1. Perform administrative action.
a. Select and use applicable TMs.
b. Select and use applicable tools and TMDE.
c. Practice shop safety and maintenance discipline.
2. Diagnose the external auxiliary power unit and determine maintenance action to be performed.
3. Replace faulty component, as necessary.
4. Ensure all safety precautions and procedures are followed.
5. Perform final operational test to verify faults have been corrected.
6. Complete The Army Maintenance Management System (TAMMS) forms, as required.
Evaluation Preparation:
WARNING
The following safety precautions must be adhered to when performing
the tasks listed in this manual: Do not remove a radiator cap or surge
tank cap unless the engine is cool. While working on electrical
systems, remove all rings, watches, and jewelry. Before working on
the exhaust system, make sure it is cool. Disconnect the negative
battery cable prior to performing any electrical system maintenance or
when performing repairs in the locality of electrical components.
When working around engines that are operating, wear hearing
protection. When removing components over 75 pounds, two
personnel are required.
20 May 2010
3-309
STP 9-91A14-SM-TG
Performance Measures
GO NO-GO
1. Performed administrative action.
——
——
a. Selected and used applicable TMs.
b. Selected and used applicable tools and TMDE.
c. Practiced shop safety and maintenance discipline.
2. Diagnosed the external auxiliary power unit and determine maintenance action
——
——
performed.
3. Replaced faulty component, as necessary.
——
——
4. Ensured all safety precautions and procedures were followed.
——
——
5. Performed final operational test to verify faults were corrected.
——
——
6. Completed The Army Maintenance Management System (TAMMS) forms, as
——
——
required.
Evaluation Guidance: Score the Soldier GO if all performance measures are passed. Score the Soldier
NO-GO if any performance measure is failed. If the Soldier fails any performance measure, show what was
done wrong and how to do it correctly.
References
Required
Related
DA Form 5988-E
DA PAM 750-8
TM 9-2350-264-10-1
TM 9-2350-264-20-2-1
TM 9-2350-264-20-2-2
TM 9-2350-264-20-2-3
TM 9-2350-264-20-2-4
3-310
20 May 2010
STP 9-91A14-SM-TG
Perform Diagnostic Procedures on the Fire Suppression System of the M1 Series Track Vehicle
091-91A-3048
Conditions: In a contemporary operational environment (COE) given an applicable vehicle; repair parts;
tool kit, multi-capable; DA Form 5988-E (Equipment Inspection Maintenance Worksheet) stating "Perform
Diagnostic Procedures on the Fire Suppression System of the M1 Series Track Vehicle"; test,
measurement, and diagnostic equipment (TMDE); and equipment as indicated in technical manuals (TMs);
applicable technical publications; and supervision/assistance.
Standards: Perform diagnostic procedures of fire suppression system, in accordance with applicable
technical publications. When this task is completed, the vehicle or equipment is fully mission-capable or
maintenance actions required to be performed by other than military occupation specialty (MOS) 91A
personnel are identified.
Performance Steps
1. Perform administrative actions.
a. Select and use applicable technical manuals.
b. Select and use applicable tools and test measurement, and diagnostic equipment (TMDE).
c. Practice shop safety and maintenance discipline.
2. Diagnose fire suppression system faults and determine maintenance action to be performed.
a. Perform System Test.
b. Verify fire extinguishers are serviceable.
3. Ensure all safety precautions and procedures are followed.
4. Replace defective components, as necessary.
5. Perform final operational test to verify the faults have been corrected.
6. Complete The Army Maintenance Management System (TAMMS) forms, as required.
Evaluation Preparation:
WARNING
The following safety precautions must be adhered to when performing
the tasks listed in this manual: Do not remove a radiator cap or surge
tank cap unless the engine is cool. While working on electrical
systems, remove all rings, watches, and jewelry. Before working on
the exhaust system, make sure it is cool. Disconnect the negative
battery cable prior to performing any electrical system maintenance or
when performing repairs in the locality of electrical components.
When working around engines that are operating, wear hearing
protection. When removing components over 75 pounds, two
personnel are required.
20 May 2010
3-311
STP 9-91A14-SM-TG
Performance Measures
GO NO-GO
1. Performed administrative actions.
——
——
a. Selected and used applicable technical manuals.
b. Selected and used applicable tools and test measurement, and diagnostic
equipment (TMDE).
c. Practiced shop safety and maintenance discipline.
2. Diagnosed fire suppression system faults and determine maintenance action to be
——
——
performed.
a. Performed System Test.
b. Verified fire extinguishers were serviceable.
3. Ensured all safety precautions and procedures were followed.
——
——
4. Replaced defective components, as necessary.
——
——
5. Performed final operational test to verify the faults were corrected.
——
——
6. Completed The Army Maintenance Management System (TAMMS) forms, as
——
——
required.
Evaluation Guidance: Score the Soldier GO if all performance measures are passed. Score the Soldier
NO-GO if any performance measure is failed. If the Soldier fails any performance measure, show what was
done wrong and how to do it correctly.
References
Required
Related
DA Form 5988-E
DA PAM 750-8
TM 11-6625-3052-14
TM 9-2350-264-10-1
TM 9-2350-264-20-2-1
TM 9-2350-264-20-2-2
TM 9-2350-264-20-2-3
TM 9-2350-264-20-2-4
TM 9-2350-264-24P-2
3-312
20 May 2010
STP 9-91A14-SM-TG
Perform Diagnostic Procedures on the Chemical Biological Radiological Nuclear Systems of the
M1 Series Track Vehicle
091-91A-3049
Conditions: In a contemporary operational environment (COE) given an applicable vehicle; repair parts;
tool kit, multi-capable; DA Form 5988-E (Equipment Inspection Maintenance Worksheet) stating "Perform
Diagnostic Procedures on the Chemical Biological Radiological Nuclear Systems of the M1 Series Track
Vehicle"; required tools and test equipment; and with minimum supervision.
Standards: Maintain the chemical biological radiological nuclear system and repair or replace its
components in accordance with the applicable technical publication procedures and specifications.
(See
Maintenance Allocation Chart for exact procedures authorized for each military occupational specialty
(MOS) and skill level (SL).) When this task is completed, the vehicle or equipment is fully mission-capable
or maintenance actions required to be performed by other than MOS 91A personnel are identified.
Performance Steps
1. Perform administrative actions.
a. Select and use applicable technical manuals.
b. Select and use applicable tools and test measurement, and diagnostic equipment (TMDE).
c. Practice shop safety and maintenance discipline.
2. Diagnose the chemical biological radiological and nuclear system faults and determine maintenance
action to be performed.
3. Ensure all safety precautions and procedures are followed.
4. Replace defective components, as necessary.
5. Perform final operational test to verify the faults have been corrected.
6. Complete The Army Maintenance Management System (TAMMS) forms, as required.
Evaluation Preparation:
WARNING
The following safety precautions must be adhered to when performing
the tasks listed in this manual: Do not remove a radiator cap or surge
tank cap unless the engine is cool. While working on electrical
systems, remove all rings, watches, and jewelry. Before working on
the exhaust system, make sure it is cool. Disconnect the negative
battery cable prior to performing any electrical system maintenance or
when performing repairs in the locality of electrical components.
When working around engines that are operating, wear hearing
protection. When removing components over 75 pounds, two
personnel are required.
20 May 2010
3-313
STP 9-91A14-SM-TG
Performance Measures
GO NO-GO
1. Performed administrative actions.
——
——
a. Selected and used applicable technical manuals.
b. Selected and used applicable tools and test measurement, and diagnostic
equipment (TMDE).
c. Practiced shop safety and maintenance discipline.
2. Diagnosed the chemical biological radiological and nuclear system faults and
——
——
determined the maintenance action to be performed.
3. Ensured all safety precautions and procedures were followed.
——
——
4. Replaced defective components, as necessary.
——
——
5. Performed final operational test to verify the faults were corrected.
——
——
6. Completed The Army Maintenance Management System (TAMMS) forms, as
——
——
required.
Evaluation Guidance: Score the Soldier GO if all performance measures are passed. Score the Soldier
NO-GO if any performance measure is failed. If the Soldier fails any performance measure, show what was
done wrong and how to do it correctly.
References
Required
Related
DA PAM 750-8
TM 9-2350-264-10-1
TM 9-2350-264-20-1-1
TM 9-2350-264-20-1-2
TM 9-2350-264-20-1-3
TM 9-2350-264-20-1-4
TM 9-2350-264-20-1-5
3-314
20 May 2010
STP 9-91A14-SM-TG
Perform Diagnostic Procedures on the Commander's Weapon Station of the M1 Track Vehicle
091-91A-3050
Conditions: In a contemporary operational environment (COE) given an applicable vehicle; repair parts;
tool kit, multi-capable; DA Form 5988-E (Equipment Inspection Maintenance Worksheet) stating "Perform
Diagnostic Procedures on the Commander's Weapon Station of the M1 Track Vehicle"; required tools and
test equipment; and with minimum supervision.
Standards: Maintain the cupola/commander's weapon station/hatch assembly and replace or repair its
components in accordance with the applicable technical publication procedures and specifications.
(See
Maintenance Allocation Chart for exact procedures authorized for each military occupational specialty
(MOS) and skill level (SL).) When this task is completed, the vehicle or equipment is fully mission-capable
or maintenance actions required to be performed by other than MOS 91A personnel are identified.
Performance Steps
1. Review work request.
2. Perform initial inspection.
3. Determine maintenance action to be performed.
4. Ensure task was within shop capability/authorization.
5. Ensure proper tools were available.
6. Identify and requisition repair parts, if required.
a. Azimuth drive system.
b. Firing circuit.
7. Ensure TAMMS procedures are followed.
8. Determine maintenance action to be performed.
9. Ensure applicable publications are available.
10. Assign personnel to perform task.
11. Ensure all safety precautions are followed.
12. Provide assistance, if necessary.
13. Ensure task is performed to acceptable standards.
14. Conduct an in-process inspection.
15. Perform a final inspection.
16. Critique personnel on performance of task.
17. Ensure tools and equipment are properly maintained.
20 May 2010
3-315
STP 9-91A14-SM-TG
Evaluation Preparation:
WARNING
The following safety precautions must be adhered to when performing
the tasks listed in this manual: Do not remove a radiator cap or surge
tank cap unless the engine is cool. While working on electrical
systems, remove all rings, watches, and jewelry. Before working on
the exhaust system, make sure it is cool. Disconnect the negative
battery cable prior to performing any electrical system maintenance or
when performing repairs in the locality of electrical components.
When working around engines that are operating, wear hearing
protection. When removing components over 75 pounds, two
personnel are required.
Performance Measures
GO
NO-GO
1. Reviewed work request.
——
——
2. Performed initial inspection.
——
——
3. Determined maintenance action to be performed.
——
——
4. Ensured task was within shop capability/authorization.
——
——
5. Ensured proper tools were available.
——
——
6. Identified and requisition repair parts, if required.
——
——
a. Azimuth drive system.
b. Firing circuit.
7. Ensured TAMMS procedures are followed.
——
——
8. Determined maintenance action to be performed.
——
——
9. Ensured applicable publications are available.
——
——
10. Assigned personnel to perform task.
——
——
11. Ensured all safety precautions are followed.
——
——
12. Provided assistance, if necessary.
——
——
13. Ensured task is performed to acceptable standards.
——
——
14. Conducted an in-process inspection.
——
——
15. Performed a final inspection.
——
——
16. Critiqued personnel on performance of task.
——
——
17. Ensured tools and equipment are properly maintained.
——
——
Evaluation Guidance: Score the Soldier GO if all performance measures are passed. Score the Soldier
NO-GO if any performance measure is failed. If the Soldier fails any performance measure, show what was
done wrong and how to do it correctly.
3-316
20 May 2010
STP 9-91A14-SM-TG
References
Required
Related
DA PAM 750-8
TM 9-2350-264-20-2-1
TM 9-2350-264-20-2-2
TM 9-2350-264-20-2-3
TM 9-2350-264-20-2-4
TM 9-2350-264-24-2
TM 9-243
20 May 2010
3-317
STP 9-91A14-SM-TG
Perform Diagnostic Procedures on the Fire Control System of the M1 Series Track Vehicle
091-91A-3052
Conditions: In a contemporary operational environment (COE) given an applicable vehicle; repair parts;
tool kit, multi-capable; DA Form 5988-E (Equipment Inspection Maintenance Worksheet) stating "Perform
Diagnostic Procedures on the Fire Control System of the M1 Series Track Vehicle"; required tools and test
equipment; and with minimum supervision.
Standards: Maintain the sighting and fire control system and replace or repair its components in
accordance with the applicable technical publication procedures and specifications.
(See Maintenance
Allocation Chart for exact procedures authorized for each military occupational specialty (MOS) and skill
level SL).) When this task is completed, the vehicle or equipment is fully mission-capable or maintenance
actions required to be performed by other than MOS 91A personnel are identified.
Performance Steps
1. Perform administrative action.
a. Select and use applicable technical manuals.
b. Select and use applicable tools and TMDE.
c. Practice shop safety and maintenance discipline.
2. Perform diagnostic procedures on Fire Control System.
a. Computer subsystem.
b. Ammunition select subsystem.
c. Muzzle reference sensor.
3. Monitor Fault light.
a. Computer subsystem.
b. Ammunition select subsystem.
c. Muzzle reference sensor.
4. Perform computer manual self test.
a. Perform firing circuit test on main gun.
b. Perform firing circuit test on machine guns.
5. Ensure task is performed to acceptable standards.
a. Perform a final inspection.
b. Critique personnel on performance of task.
c. Ensure tools and equipment are properly maintained.
Evaluation Preparation:
WARNING
The following safety precautions must be adhered to when performing
the tasks listed in this manual: Do not remove a radiator cap or surge
tank cap unless the engine is cool. While working on electrical
systems, remove all rings, watches, and jewelry. Before working on
the exhaust system, make sure it is cool. Disconnect the negative
battery cable prior to performing any electrical system maintenance or
when performing repairs in the locality of electrical components.
When working around engines that are operating, wear hearing
protection. When removing components over 75 pounds, two
personnel are required.
3-318
20 May 2010
STP 9-91A14-SM-TG
Performance Measures
GO NO-GO
1. Performed administrative action.
——
——
a. Selected and used applicable technical manuals.
b. Selected and used applicable tools and TMDE.
c. Practiced shop safety and maintenance discipline.
2. Performed diagnostic procedures on Fire Control System.
——
——
a. Computer subsystem.
b. Ammunition select subsystem.
c. Muzzle reference sensor.
3. Monitored Fault light.
——
——
a. Computer subsystem.
b. Ammunition select subsystem.
c. Muzzle reference sensor.
4. Performed computer manual self test.
——
——
a. Performed computer manual self test.
b. Performed firing circuit test on machine guns.
5. Ensured task is performed to acceptable standards.
——
——
a. Performed a final inspection.
b. Critiqued personnel on performance of task.
c. Ensured tools and equipment are properly maintained.
Evaluation Guidance: Score the Soldier GO if all performance measures are passed. Score the Soldier
NO-GO if any performance measure is failed. If the Soldier fails any performance measure, show what was
done wrong and how to do it correctly.
References
Required
Related
TM 9-2350-264-10-1
TM 9-2350-264-20-2-1
TM 9-2350-264-20-2-2
TM 9-2350-264-20-2-3
TM 9-2350-264-20-2-4
TM 9-2350-264-24-2
TM 9-243
20 May 2010
3-319
STP 9-91A14-SM-TG
Perform Diagnostic Procedures on the Sighting Systems of the M1 Series Track Vehicle
091-91A-3053
Conditions: In a contemporary operational environment (COE) given a DA Form 5988-E (Equipment
Inspection Maintenance Worksheet) stating "Perform Diagnostic Procedures on the Sighting Systems of
the M1 Series Track Vehicle", required tools and test equipment, and with minimum supervision.
Standards: Perform diagnostic procedures on the Sighting Systems of the M1 Series Track Vehicle and
replace or repair its components in accordance with the applicable technical publication procedures and
specifications.
(See Maintenance Allocation Chart for exact procedures authorized for each military
occupational specialty (MOS) and skill level (SL).) When this task is completed, the vehicle or equipment
is fully mission-capable, or maintenance actions required to be performed by other than MOS 91A
personnel are identified.
Performance Steps
1. Perform administrative action.
a. Select and use applicable technical manuals.
b. Select and use applicable tools and TMDE.
c. Practice shop safety and maintenance discipline.
2. Perform diagnostic procedures on Sighting System.
a. Perform computer manual self test.
b. Check for loose electrical connectors and obvious damage to harnesses.
c. Isolate the fault.
3. Perform alternate troubleshooting procedures for fault.
a. Identify defective component.
b. Replace defective component.
4. Perform final operational test to verify the faults have been corrected.
a. Perform computer manual self test.
b. Ensure task is performed to acceptable standards.
c. Ensure tools and equipment are properly maintained.
Evaluation Preparation:
WARNING
The following safety precautions must be adhered to when performing
the tasks listed in this manual: Do not remove a radiator cap or surge
tank cap unless the engine is cool. While working on electrical
systems, remove all rings, watches, and jewelry. Before working on
the exhaust system, make sure it is cool. Disconnect the negative
battery cable prior to performing any electrical system maintenance or
when performing repairs in the locality of electrical components.
When working around engines that are operating, wear hearing
protection. When removing components over 75 pounds, two
personnel are required.
3-320
20 May 2010
STP 9-91A14-SM-TG
Performance Measures
GO NO-GO
1. Performed administrative action.
——
——
a. Selected and used applicable technical manuals.
b. Selected and used applicable tools and TMDE.
c. Practiced shop safety and maintenance discipline.
2. Performed diagnostic procedures on Sighting System.
——
——
a. Performed computer manual self test
b. Checked for loose electrical connectors and obvious damage to harnesses.
c. Isolated the fault.
3. Performed alternate troubleshooting procedures for fault.
——
——
a. Identified defective component.
b. Replaced defective component.
4. Performed final operational test to verify the faults have been corrected.
——
——
a. Performed computer manual self test.
b. Ensured task is performed to acceptable standards.
c. Ensured tools and equipment are properly maintained.
Evaluation Guidance: Score the Soldier GO if all performance measures are passed. Score the Soldier
NO-GO if any performance measure is failed. If the Soldier fails any performance measure, show what was
done wrong and how to do it correctly.
References
Required
Related
DA PAM 750-8
TM 9-2350-264-10-1
TM 9-2350-264-20-2-1
TM 9-2350-264-20-2-2
TM 9-2350-264-20-2-3
TM 9-2350-264-20-2-4
TM 9-2350-264-24-2
TM 9-243
20 May 2010
3-321
STP 9-91A14-SM-TG
Perform Diagnostic Procedures on the Thermal Imaging System of the M1 Series Track Vehicle
091-91A-3054
Conditions: In a contemporary operational environment (COE) given an applicable vehicle; repair parts;
tool kit, multi-capable; DA Form 5988-E (Equipment Inspection Maintenance Worksheet) stating "Perform
Diagnostic Procedures on the Thermal Imaging System of the M1 Series Track Vehicle"; test,
measurement, and diagnostic equipment (TMDE); and equipment as indicated in technical manuals (TMs);
applicable technical publications; and supervision/assistance.
Standards: Perform diagnostic procedures on the Thermal Imaging System of the M1 Series Track Vehicle
in accordance with applicable technical publications. When this task is completed, the vehicle or equipment
is fully mission-capable or maintenance actions required to be performed by other than military
occupational specialty (MOS) 91A personnel are identified.
Performance Steps
1. Review work request.
2. Perform initial inspection.
a. Ensure applicable publications are available.
b. Ensure all safety precautions are followed.
3. Determine maintenance action to be performed.
4. Ensure task was within shop capability/authorization.
5. Ensure proper tools are available.
6. Identify and requisitioned repair parts, if required.
a. Computer subsystem.
b. Thermal Imaging System.
7. Perform a final inspection.
a. Ensure task is performed to acceptable standards.
b. Ensure tools and equipment are properly maintained.
Evaluation Preparation:
WARNING
The following safety precautions must be adhered to when performing
the tasks listed in this manual: Do not remove a radiator cap or surge
tank cap unless the engine is cool. While working on electrical
systems, remove all rings, watches, and jewelry. Before working on
the exhaust system, make sure it is cool. Disconnect the negative
battery cable prior to performing any electrical system maintenance or
when performing repairs in the locality of electrical components.
When working around engines that are operating, wear hearing
protection. When removing components over 75 pounds, two
personnel are required.
3-322
20 May 2010
STP 9-91A14-SM-TG
Performance Measures
GO NO-GO
1. Reviewed work request.
——
——
2. Performed initial inspection.
——
——
a. Ensured applicable publications are available.
b. Ensured all safety precautions are followed.
3. Determined maintenance action to be performed.
——
——
4. Ensured task was within shop capability/authorization.
——
——
5. Ensured proper tools are available.
——
——
6. Identified and requisitioned repair parts, if required.
——
——
a. Computer subsystem.
b. Thermal Imaging System.
7. Performed a final inspection.
——
——
a. Ensured task is performed to acceptable standards.
b. Ensured tools and equipment are properly maintained.
Evaluation Guidance: Score the Soldier GO if all performance measures are passed. Score the Soldier
NO-GO if any performance measure is failed. If the Soldier fails any performance measure, show what was
done wrong and how to do it correctly.
References
Required
Related
DA Form 5988-E
DA PAM 750-8
TM 11-6625-3052-14
TM 9-2350-264-10-1
TM 9-2350-264-20-2-1
TM 9-2350-264-20-2-2
TM 9-2350-264-20-2-3
TM 9-2350-264-20-2-4
TM 9-2350-264-24-2
TM 9-2350-264-24P-2
TM 9-4910-751-14&P
20 May 2010
3-323
STP 9-91A14-SM-TG
Perform Diagnostic Procedures of the Turret Drive System of the M1 Series Track Vehicle
091-91A-3055
Conditions: In a contemporary operational environment (COE) given an applicable vehicle; repair parts;
tool kit, multi-capable; DA Form 5988-E (Equipment Inspection Maintenance Worksheet) stating "Perform
Diagnostic Procedures of the Turret Drive System of the M1 Series Track Vehicle"; test, measurement, and
diagnostic equipment (TMDE); and equipment as indicated in technical manuals (TMs); applicable
technical publications; and supervision/assistance.
Standards: Perform diagnostic procedures of the turret drive system in accordance with applicable
technical publications. When this task is completed, the vehicle or equipment is fully mission-capable or
maintenance actions required to be performed by other than military occupational specialty (MOS) 91A
personnel are identified.
Performance Steps
1. Perform administrative actions.
a. Select and use applicable technical manuals.
b. Select and use applicable tools and test measurement, and diagnostic equipment (TMDE).
c. Practice shop safety and maintenance discipline.
2. Perform diagnostic procedures of Turret Drive System.
a. Inspect cables for damage.
b. Connect test equipment.
c. Follow test procedures.
3. Determine maintenance action required.
a. Ensure hydraulic pressure is zero.
b. Replace faulty component.
4. Perform a final inspection.
a. Ensure task was performed to acceptable standards.
b. Ensure maintenance forms are completed, as required.
c. Ensure tools and equipment are properly maintained.
Evaluation Preparation:
WARNING
The following safety precautions must be adhered to when performing
the tasks listed in this manual: Do not remove a radiator cap or surge
tank cap unless the engine is cool. While working on electrical
systems, remove all rings, watches, and jewelry. Before working on
the exhaust system, make sure it is cool. Disconnect the negative
battery cable prior to performing any electrical system maintenance or
when performing repairs in the locality of electrical components.
When working around engines that are operating, wear hearing
protection. When removing components over 75 pounds, two
personnel are required.
3-324
20 May 2010
STP 9-91A14-SM-TG
Performance Measures
GO NO-GO
1. Performed administrative actions.
——
——
a. Selected and used applicable technical manuals.
b. Selected and used applicable tools and test measurement, and diagnostic
equipment (TMDE).
c. Practiced shop safety and maintenance discipline.
2. Performed diagnostic procedures of Turret Drive System.
——
——
a. Inspected cables for damage.
b. Connected test equipment.
c. Followed test procedures.
3. Determined maintenance action required.
——
——
a. Ensured hydraulic pressure is zero.
b. Replaced faulty component.
4. Performed a final inspection.
——
——
a. Ensured task was performed to acceptable standards.
b. Ensured maintenance forms are completed, as required.
c. Ensured tools and equipment are properly maintained.
Evaluation Guidance: Score the Soldier GO if all performance measures are passed. Score the Soldier
NO-GO if any performance measure is failed. If the Soldier fails any performance measure, show what was
done wrong and how to do it correctly.
References
Required
Related
DA Form 5988-E
DA PAM 750-8
TM 9-2350-264-10-1
TM 9-2350-264-20-2-1
TM 9-2350-264-20-2-2
TM 9-2350-264-20-2-3
TM 9-2350-264-20-2-4
TM 9-2350-264-34-2-1
TM 9-2350-264-34-2-2
20 May 2010
3-325
STP 9-91A14-SM-TG
Performed Diagnostic Procedures of the Elevation System of the M1 Series Track Vehicle
091-91A-3056
Conditions: In a contemporary operational environment (COE) given an M1A1 tank with basic issue items
(BII); repair parts; tool kit, multi-capable; safety equipment; additional tools, DA Form 5988-E (Equipment
Inspection Maintenance Worksheet) stating "Performed Diagnostic Procedures of the Elevation System of
the M1 Series Track Vehicle"; test, measurement, and diagnostic equipment (TMDE); and equipment as
indicated in technical manuals (TMs); applicable technical publications; and supervision/assistance.
Standards: Performed diagnostic procedures of the Elevation System of the M1 Series Track Vehicle in
accordance with applicable technical publications. When this task is completed, the vehicle or equipment
is fully mission-capable or maintenance actions required to be performed by other than military
occupational specialty (MOS) 91A personnel are identified.
Performance Steps
1. Perform administrative action.
a. Select and use applicable technical manuals.
b. Select and use applicable tools and TMDE.
c. Practice shop safety and maintenance discipline.
2. Set tank controls for standard initial test conditions.
a. Gun turret drive switch in power position.
b. Fire control switch in normal or emergency.
c. MRS level in the IN position.
3. Perform diagnostic procedures on Elevation System.
a. Check for loose electrical connectors, obvious damage to harnesses and leaks.
b. Ensure hydraulic pressure is at 1,500 psi and auxiliary hydraulic switch on.
c. Perform computer manual self test.
4. Elevate and depress main gun with gunner's control handles.
a. Elevate ad depress main gun with commander's control handles.
b. Manually elevate and depress main gun.
c. Lock main gun in travel lock.
5. Ensure task is performed to acceptable standards.
a. Inspect hydraulic hoses and hydraulic components for leaks.
b. Ensure tools and equipment are properly maintained.
Evaluation Preparation:
WARNING
The following safety precautions must be adhered to when performing
the tasks listed in this manual: Do not remove a radiator cap or surge
tank cap unless the engine is cool. While working on electrical
systems, remove all rings, watches, and jewelry. Before working on
the exhaust system, make sure it is cool. Disconnect the negative
battery cable prior to performing any electrical system maintenance or
when performing repairs in the locality of electrical components.
When working around engines that are operating, wear hearing
protection. When removing components over 75 pounds, two
personnel are required.
3-326
20 May 2010
STP 9-91A14-SM-TG
Performance Measures
GO NO-GO
1. Performed administrative action.
——
——
a. Selected and used applicable technical manuals.
b. Selected and used applicable tools and TMDE.
c. Practiced shop safety and maintenance discipline.
2. Set tank controls for standard initial test conditions.
——
——
a. Gun turret drive switch in power position.
b. Fire control switch in normal or emergency.
c. MRS level in the IN position.
3. Performed diagnostic procedures on Elevation System.
——
——
a. Checked for loose electrical connectors, obvious damage to harnesses and
leaks.
b. Ensured hydraulic pressure is at 1,500 psi and auxiliary hydraulic switch on.
c. Performed computer manual self test.
4. Elevated and depressed main gun with gunner's control handles.
——
——
a. Elevated ad depressed main gun with commander's control handles.
b. Manually elevated and depressed main gun.
c. Locked main gun in travel lock.
5. Ensured task is performed to acceptable standards.
——
——
a. Inspected hydraulic hoses and hydraulic components for leaks.
b. Ensured tools and equipment are properly maintained.
Evaluation Guidance: Score the Soldier GO if all performance measures are passed. Score the Soldier
NO-GO if any performance measure is failed. If the Soldier fails any performance measure, show what was
done wrong and how to do it correctly.
References
Required
Related
DA PAM 750-8
LO 9-2350-264-13
TM 9-1000-202-14
TM 9-2350-264-10-1
TM 9-2350-264-20-2-1
TM 9-2350-264-20-2-2
TM 9-2350-264-20-2-3
TM 9-2350-264-20-2-4
TM 9-2350-264-24-2
20 May 2010
3-327
STP 9-91A14-SM-TG
Perform Diagnostic Procedures of the Main Weapon System of the M1 Series Track Vehicle
091-91A-3058
Conditions: In a contemporary operational environment (COE) given an applicable vehicle; repair parts;
tool kit, multi-capable; DA Form 5988-E (Equipment Inspection Maintenance Worksheet) stating "Perform
Diagnostic Procedures of the Main Weapon System of the M1 Series Track Vehicle"; test, measurement,
and diagnostic equipment (TMDE); and equipment as indicated in technical manuals (TMs); applicable
technical publications; and supervision/assistance.
Standards: Perform diagnostic procedures of the main weapon system in accordance with applicable
technical publications. When this task is completed, the vehicle or equipment is fully mission-capable or
maintenance actions required to be performed by other than military occupational specialty (MOS) 91A
personnel are identified.
Performance Steps
1. Perform administrative action.
a. Select and use applicable technical manuals.
b. Select and use applicable tools and TMDE
c. Practice shop safety and maintenance discipline.
2. Perform diagnostic procedures on main weapon systems.
a. Perform computer manual self test.
b. Check main gun firing pin.
3. Set tank controls for standard initial test conditions.
a. Select ammo type.
b. Fire control switch in normal mode.
c. Move main gun safety switch to armed position.
4. Perform main gun firing circuit test.
a. Fire main gun from commander's control handle.
b. Fire main gun from gunner's control handle.
c. Fire main gun from elevation hand pump.
d. Fire main gun from blasting machine.
5. Ensure task is performed to acceptable standards.
a. Ensure main gun safety switch in safe position.
b. Ensure tools and equipment are properly maintained.
Evaluation Preparation:
WARNING
The following safety precautions must be adhered to when performing
the tasks listed in this manual: Do not remove a radiator cap or surge
tank cap unless the engine is cool. While working on electrical
systems, remove all rings, watches, and jewelry. Before working on
the exhaust system, make sure it is cool. Disconnect the negative
battery cable prior to performing any electrical system maintenance or
when performing repairs in the locality of electrical components.
When working around engines that are operating, wear hearing
protection. When removing components over 75 pounds, two
personnel are required.
3-328
20 May 2010
STP 9-91A14-SM-TG
Performance Measures
GO NO-GO
1. Performed administrative action.
——
——
a. Selected and used applicable technical manuals.
b. Selected and used applicable tools and TMDE.
c. Practiced shop safety and maintenance discipline.
2. Performed diagnostic procedures on main weapon systems.
——
——
a. Performed computer manual self test.
b. Checked main gun firing pin.
3. Set tank controls for standard initial test conditions.
——
——
a. Selected ammo type.
b. Fired control switch in normal mode.
c. Moved main gun safety switch to armed position.
4. Performed main gun firing circuit test.
——
——
a. Fired main gun from commander's control handle.
b. Fired main gun from gunner's control handle.
c. Fired main gun from elevation hand pump.
d. Fired main gun from blasting machine.
5. Ensured task is performed to acceptable standards.
——
——
a. Ensured main gun safety switch in safe position.
b. Ensured tools and equipment are properly maintained.
Evaluation Guidance: Score the Soldier GO if all performance measures are passed. Score the Soldier
NO-GO if any performance measure is failed. If the Soldier fails any performance measure, show what was
done wrong and how to do it correctly.
References
Required
Related
DA Form 5988-E
DA PAM 750-8
TM 11-6625-3052-14
TM 9-2350-264-10-1
TM 9-2350-264-20-2-1
TM 9-2350-264-20-2-2
TM 9-2350-264-20-2-3
TM 9-2350-264-20-2-4
TM 9-2350-264-24-2
TM 9-2350-264-24P-2
TM 9-4910-751-14&P
20 May 2010
3-329
STP 9-91A14-SM-TG
Perform Diagnostic Procedures of the Turret Electrical of the M1 Series Track Vehicle
091-91A-3059
Conditions: In a contemporary operational environment (COE) given an applicable vehicle; repair parts;
tool kit, multi-capable; DA Form 5988-E (Equipment Inspection Maintenance Worksheet) stating "Perform
Diagnostic Procedures of the Turret Electrical of the M1 Series Track Vehicle"; test, measurement, and
diagnostic equipment (TMDE); and equipment as indicated in technical manuals (TMs); applicable
technical publications; and supervision/assistance.
Standards: Perform diagnostic procedures of turret electrical systems in accordance with applicable TMs.
When this task is completed, the vehicle or equipment is fully mission-capable or maintenance actions
required to be performed by other than military occupational specialty (MOS) 91A personnel are identified.
Performance Steps
1. Perform administrative action.
a. Select and use applicable technical publications.
b. Select and use applicable tools and TMDE.
c. Practice shop safety and maintenance discipline.
2. Perform diagnostic procedures of Turret Electrical System.
a. Check for loose electrical connectors and obvious damage to harnesses.
b. Perform panel lights test.
c. Perform computer manual self test.
3. Set tank controls for standard initial test conditions.
4. Check turret circuit breakers on Turret Network Box.
5. Ensure task is performed to acceptable standards.
6. Ensure tools and equipment are properly maintained.
Evaluation Preparation:
WARNING
The following safety precautions must be adhered to when performing
the tasks listed in this manual: Do not remove a radiator cap or surge
tank cap unless the engine is cool. While working on electrical
systems, remove all rings, watches, and jewelry. Before working on
the exhaust system, make sure it is cool. Disconnect the negative
battery cable prior to performing any electrical system maintenance or
when performing repairs in the locality of electrical components.
When working around engines that are operating, wear hearing
protection. When removing components over 75 pounds, two
personnel are required.
Performance Measures
GO NO-GO
1. Performed administrative action.
——
——
a. Selected and used applicable technical publications.
b. Selected and used applicable tools and TMDE.
c. Practiced shop safety and maintenance discipline.
3-330
20 May 2010
STP 9-91A14-SM-TG
Performance Measures
GO NO-GO
2. Performed diagnostic procedures of Turret Electrical System.
——
——
a. Checked for loose electrical connectors and obvious damage to harnesses.
b. Performed panel lights test.
c. Performed computer manual self test.
3. Set tank controls for standard initial test conditions.
——
——
4. Checked turret circuit breakers on Turret Network Box.
——
——
5. Ensured task is performed to acceptable standards.
——
——
6. Ensured tools and equipment are properly maintained.
——
——
Evaluation Guidance: Score the Soldier GO if all performance measures are passed. Score the Soldier
NO-GO if any performance measure is failed. If the Soldier fails any performance measure, show what was
done wrong and how to do it correctly.
References
Required
Related
DA PAM 750-8
LO 9-2350-264-13
TM 9-2350-264-10-1
TM 9-2350-264-20-2-1
TM 9-2350-264-20-2-2
TM 9-2350-264-20-2-3
TM 9-2350-264-20-2-4
TM 9-2350-264-24-2
TM 9-243
20 May 2010
3-331
STP 9-91A14-SM-TG
Perform Diagnostic Procedures of the Turret Hydraulics of the M1 Series Track Vehicle
091-91A-3060
Conditions: In a contemporary operational environment (COE) given an applicable vehicle; repair parts;
tool kit, multi-capable; DA Form 5988-E (Equipment Inspection Maintenance Worksheet) stating "Perform
Diagnostic Procedures of the Turret Hydraulics of the M1 Series Track Vehicle"; test, measurement, and
diagnostic equipment (TMDE); and equipment as indicated in technical manuals (TMs); applicable
technical publications; and supervision/assistance.
Standards: Perform diagnostic procedures of the turret hydraulic systems in accordance with applicable
TMs. When this task is completed, the vehicle or equipment is fully mission-capable or maintenance
actions required to be performed by other than military occupational specialty (MOS) 91A personnel are
identified.
Performance Steps
1. Perform administrative action.
a. Select and use applicable technical publications.
b. Select and use applicable tools and TMDE.
c. Practice shop safety and maintenance discipline.
2. Inspect hydraulic system components.
a. Bleed air from hydraulic system.
b. Prime the manual elevation hand pump assembly.
c. Bleed air from the manual elevation hand pump.
3. Replace elevation servomechanism fluid filter.
4. Replace and charge main hydraulic accumulator.
5. Perform a final operational test to verify hydraulic system malfunction is corrected to specification.
a. Annotate corrective actions taken on DA Form 5988-E.
b. Maintain tools and equipment.
Evaluation Preparation:
WARNING
The following safety precautions must be adhered to when performing
the tasks listed in this manual: Do not remove a radiator cap or surge
tank cap unless the engine is cool. While working on electrical
systems, remove all rings, watches, and jewelry. Before working on
the exhaust system, make sure it is cool. Disconnect the negative
battery cable prior to performing any electrical system maintenance or
when performing repairs in the locality of electrical components.
When working around engines that are operating, wear hearing
protection. When removing components over 75 pounds, two
personnel are required.
3-332
20 May 2010
STP 9-91A14-SM-TG
Performance Measures
GO NO-GO
1. Performed administrative action.
——
——
a. Selected and used applicable technical publications.
b. Selected and used applicable tools and TMDE.
c. Practiced shop safety and maintenance discipline.
2. Inspected hydraulic system components.
——
——
a. Bleed air from hydraulic system.
b. Primed the manual elevation hand pump assembly.
c. Bleed air from the manual elevation hand pump.
3. Replaced elevation servomechanism fluid filter.
——
——
4. Replaced and charge main hydraulic accumulator.
——
——
5. Performed a final operational test to verify hydraulic system malfunction is
——
——
corrected to specification.
a. Annotated corrective actions taken on DA Form 5988-E.
b. Maintained tools and equipment.
Evaluation Guidance: Score the Soldier GO if all performance measures are passed. Score the Soldier
NO-GO if any performance measure is failed. If the Soldier fails any performance measure, show what was
done wrong and how to do it correctly.
References
Required
Related
DA PAM 750-8
LO 9-2350-264-13
TM 9-2350-264-10-1
TM 9-2350-264-20-2-1
TM 9-2350-264-20-2-2
TM 9-2350-264-20-2-3
TM 9-2350-264-20-2-4
TM 9-2350-264-24-2
TM 9-243
20 May 2010
3-333
STP 9-91A14-SM-TG
Perform Diagnostic Procedures of the Hull Hydraulic System of the M1 Series Track Vehicle
091-91A-3061
Conditions: In a contemporary operational environment (COE) given an applicable vehicle; repair parts;
tool kit, multi-capable; DA Form 5988-E (Equipment Inspection Maintenance Worksheet) stating "Perform
Diagnostic Procedures of the Hull Hydraulic System of the M1 Series Track Vehicle"; test, measurement,
and diagnostic equipment (TMDE); and equipment as indicated in technical manuals (TMs); applicable
technical publications; and supervision/assistance.
Standards: Perform diagnostic procedures of the Hull Hydraulic System of the M1 Series Track Vehicle,
replace all applicable components in accordance with the applicable technical publication procedures and
specifications.
(See Maintenance Allocation Chart for exact procedures authorized for each military
occupational specialty (MOS) and skill level (SL).) When this task is completed, the vehicle or equipment
is fully mission-capable or maintenance actions required to be performed by other than MOS 91A personnel
are identified.
Performance Steps
1. Perform administrative action.
a. Select and use applicable technical publications.
b. Select and use applicable tools and TMDE.
c. Practice shop safety and maintenance discipline.
2. Inspect hull hydraulic system components.
a. Check quick disconnect on pump.
b. Check hydraulic break accumulator.
3. Perform diagnostic procedures of Hull Hydraulic System.
a. Check for loose electrical connectors, obvious damage to harnesses and leaks.
b. Check hydraulic system warning light.
c. Check hydraulic pressure read between 1,500 to 1,700 psi.
4. Check hydraulic reservoir fluid level.
5. Operate bilge pump.
6. Ensure task is performed to acceptable standards.
a. Inspect hydraulic hoses and hydraulic components for leaks.
b. Ensure tools and equipment are properly maintained.
Evaluation Preparation:
WARNING
The following safety precautions must be adhered to when performing
the tasks listed in this manual: Do not remove a radiator cap or surge
tank cap unless the engine is cool. While working on electrical
systems, remove all rings, watches, and jewelry. Before working on
the exhaust system, make sure it is cool. Disconnect the negative
battery cable prior to performing any electrical system maintenance or
when performing repairs in the locality of electrical components.
When working around engines that are operating, wear hearing
protection. When removing components over 75 pounds, two
personnel are required.
3-334
20 May 2010
STP 9-91A14-SM-TG
Performance Measures
GO NO-GO
1. Performed administrative action.
——
——
a. Selected and used applicable technical publications.
b. Selected and used applicable tools and TMDE.
c. Practiced shop safety and maintenance discipline.
2. Inspected hull hydraulic system components.
——
——
a. Checked quick disconnect on pump.
b. Checked hydraulic break accumulator.
3. Performed diagnostic procedures of Hull Hydraulic System.
——
——
a. Checked for loose electrical connectors, obvious damage to harnesses and
leaks.
b. Checked hydraulic system warning light.
c. Checked hydraulic pressure read between 1,500 to 1,700 psi.
4. Checked hydraulic reservoir fluid level.
——
——
5. Operated bilge pump.
——
——
6. Ensured task is performed to acceptable standards.
——
——
a. Inspected hydraulic hoses and hydraulic components for leaks.
b. Ensured tools and equipment are properly maintained.
Evaluation Guidance: Score the Soldier GO if all performance measures are passed. Score the Soldier
NO-GO if any performance measure is failed. If the Soldier fails any performance measure, show what was
done wrong and how to do it correctly.
References
Required
Related
DA Form 5988-E
DA PAM 750-8
TM 9-2350-264-10-1
TM 9-2350-264-20-2-1
TM 9-2350-264-20-2-2
TM 9-2350-264-20-2-3
TM 9-2350-264-20-2-4
20 May 2010
3-335
STP 9-91A14-SM-TG
Perform Battlefield Damage Assessment and Repair of the M1 Series Track Vehicle
091-91A-3066
Conditions: In a field or garrison environment (COE) given an applicable vehicle; repair parts; tool kit,
multi-capable; additional tools, DA Form 5988-E (Equipment Inspection Maintenance Worksheet) stating
"Perform Battlefield Damage Assessment and Repair of the M1 Series Track Vehicle"; test, measurement,
and diagnostic equipment (TMDE); and equipment as indicated in technical manuals (TMs); applicable
technical publications; and supervision/assistance.
Standards: Perform battlefield damage assessment and repair (BDAR) of track vehicle
armament/automotive systems. Document required maintenance actions. Supervise and assist personnel
assigned to perform BDAR to ensure repair is performed to acceptable standards, with equipment being
capable of functioning in a battlefield environment. When this task is completed, the vehicle or equipment
is fully mission-capable or maintenance actions required to be performed by other than military
occupational specialty (MOS) 91A personnel are identified.
Performance Steps
1. Review work request/commander's directive.
2. Ensure applicable technical publications are available.
3. Inspect vehicle to diagnose damages.
4. Determine necessary BDAR repairs.
5. Ensure proper tools are available to perform BDAR for track vehicle armament/automotive systems.
6. Assign personnel to assist in BDAR.
7. Ensure all safety precautions and procedures are followed.
8. Ensure task is performed in accordance with appropriate TMs and references.
9. Conduct an in-process inspection.
10. Perform a final inspection to ensure the vehicle armament/automotive systems are capable of
functioning in a battlefield environment.
11. Critique personnel on performance of the task.
12. Ensure maintenance forms are completed, as required.
13. Ensure tools and equipment are properly maintained.
3-336
20 May 2010
STP 9-91A14-SM-TG
Evaluation Preparation:
WARNING
The following safety precautions must be adhered to when performing
the tasks listed in this manual: Do not remove a radiator cap or surge
tank cap unless the engine is cool. While working on electrical
systems, remove all rings, watches, and jewelry. Before working on
the exhaust system, make sure it is cool. Disconnect the negative
battery cable prior to performing any electrical system maintenance or
when performing repairs in the locality of electrical components.
When working around engines that are operating, wear hearing
protection. When removing components over 75 pounds, two
personnel are required.
Performance Measures
GO NO-GO
1. Reviewed work request/commander's directive.
——
——
2. Ensured applicable technical publications were available.
——
——
3. Inspected vehicle to diagnose damages.
——
——
4. Determined necessary BDAR repairs.
——
——
5. Ensured proper tools are available to perform BDAR for track vehicle
——
——
armament/automotive systems.
6. Assigned personnel to assist in BDAR.
——
——
7. Ensured all safety precautions and procedures are followed.
——
——
8. Ensured task is performed in accordance with appropriate TMs and references.
——
——
9. Conducted an in-process inspection.
——
——
10. Performed a final inspection to ensure the vehicle armament/automotive systems
——
——
are capable of functioning in a battlefield environment.
11. Critiqued personnel on performance of the task.
——
——
12. Ensured maintenance forms are completed, as required.
——
——
13. Ensured tools and equipment are properly maintained.
——
——
Evaluation Guidance: Score the Soldier GO if all performance measures are passed. Score the Soldier
NO-GO if any performance measure is failed. If the Soldier fails any performance measure, show what was
done wrong and how to do it correctly.
References
Required
Related
DA PAM 750-8
LO 9-2350-256-12
LO 9-2350-264-13
TM 9-2350-256-10
TM 9-2350-256-20-1
20 May 2010
3-337
STP 9-91A14-SM-TG
References
Required
Related
TM 9-2350-256-20-2
TM 9-2350-264-10-1
TM 9-2350-264-20-1-1
TM 9-2350-264-20-1-2
TM 9-2350-264-20-1-3
TM 9-2350-264-20-1-4
TM 9-2350-264-20-1-5
TM 9-243
3-338
20 May 2010
STP 9-91A14-SM-TG
Maintain the Turret Drive Angle Unit on a M1 Series Track Vehicle
091-91A-3068
Conditions: In a contemporary operational environment (COE) given an applicable vehicle; repair parts;
tool kit, multi-capable; DA Form 5988-E (Equipment Inspection Maintenance Worksheet) stating "Maintain
the Turret Drive Angle Unit on a M1 Series Track Vehicle"; test, measurement, and diagnostic equipment
(TMDE); and equipment as indicated in technical manuals (TMs); applicable technical publications; and
supervision/assistance.
Standards: Perform diagnostic procedures of the turret drive unit angle, in accordance with applicable
technical publications. When this task is completed, the vehicle or equipment is fully mission-capable or
maintenance actions required to be performed by other than military occupational specialty (MOS) 91A
personnel are identified.
Performance Steps
1. Perform administrative actions.
a. Select and use applicable technical manuals.
b. Select and use applicable tools and test measurement, and diagnostic equipment (TMDE).
c. Practice shop safety and maintenance discipline.
2. Inspect Turret Drive Angle Unit.
a. Inspect hydraulic system components for leaks.
b. Inspect electrical connectors and obvious damage to harnesses.
c. Inspect hydraulic manifolds.
3. Replace hydraulic filters.
a. Replace elevation and traverse servo filters.
b. Replace hydraulic reservoir filters.
4. Ensure task is performed to acceptable standards.
5. Ensure tools and equipment are properly maintained.
Evaluation Preparation:
WARNING
The following safety precautions must be adhered to when performing
the tasks listed in this manual: Do not remove a radiator cap or surge
tank cap unless the engine is cool. While working on electrical
systems, remove all rings, watches, and jewelry. Before working on
the exhaust system, make sure it is cool. Disconnect the negative
battery cable prior to performing any electrical system maintenance or
when performing repairs in the locality of electrical components.
When working around engines that are operating, wear hearing
protection. When removing components over 75 pounds, two
personnel are required.
20 May 2010
3-339
STP 9-91A14-SM-TG
Performance Measures
GO NO-GO
1. Performed administrative actions.
——
——
a. Selected and used applicable technical manuals.
b. Selected and used applicable tools and test measurement, and diagnostic
equipment (TMDE).
c. Practiced shop safety and maintenance discipline.
2. Inspected Turret Drive Angle Unit.
——
——
a. Inspected hydraulic system components for leaks.
b. Inspected electrical connectors and obvious damage to harnesses.
c. Inspected hydraulic manifolds.
3. Replaced hydraulic filters.
——
——
a. Replaced elevation and traverse servo filters.
b. Replaced hydraulic reservoir filters.
4. Ensured task is performed to acceptable standards.
——
——
5. Ensured tools and equipment are properly maintained.
——
——
Evaluation Guidance: Score the Soldier GO if all performance measures are passed. Score the Soldier
NO-GO if any performance measure is failed. If the Soldier fails any performance measure, show what was
done wrong and how to do it correctly.
References
Required
Related
DA Form 5988-E
DA PAM 750-8
TM 9-2350-264-10-1
TM 9-2350-264-20-2-1
TM 9-2350-264-20-2-2
TM 9-2350-264-20-2-3
TM 9-2350-264-20-2-4
3-340
20 May 2010
STP 9-91A14-SM-TG
Repair the Turret Race Ring Assembly on the M1 Series Track Vehicle
091-91A-3073
Conditions: In a contemporary operational environment (COE) given an applicable vehicle; repair parts;
tool kit, multi-capable; DA Form 5988-E (Equipment Inspection Maintenance Worksheet) stating "Repair
the Turret Race Ring Assembly on the M1 Series Track Vehicle "; test, measurement, and diagnostic
equipment (TMDE); and equipment as indicated in technical manuals (TMs); applicable technical
publications; and supervision/assistance.
Standards: Perform diagnostic procedures of turret ring assembly, in accordance with applicable technical
publications. When this task is completed, the vehicle or equipment is fully mission-capable or maintenance
actions required to be performed by other than military occupational specialty (MOS) 91A personnel are
identified.
Performance Steps
1. Perform administrative actions.
a. Select and use applicable technical manuals.
b. Select and use applicable tools and test measurement, and diagnostic equipment (TMDE).
c. Practice shop safety and maintenance discipline.
2. Diagnose the turret race ring assembly and determine maintenance action to be performed.
3. Ensure all safety precautions and procedures are followed.
4. Replace defective components, as necessary.
5. Perform a final operational test to verify that the cannon assembly malfunction is corrected to
specification.
6. Complete The Army Maintenance Management System (TAMMS) forms, as required.
Evaluation Preparation:
WARNING
The following safety precautions must be adhered to when performing
the tasks listed in this manual: Do not remove a radiator cap or surge
tank cap unless the engine is cool. While working on electrical
systems, remove all rings, watches, and jewelry. Before working on
the exhaust system, make sure it is cool. Disconnect the negative
battery cable prior to performing any electrical system maintenance or
when performing repairs in the locality of electrical components.
When working around engines that are operating, wear hearing
protection. When removing components over 75 pounds, two
personnel are required.
Performance Measures
GO NO-GO
1. Performed administrative actions.
——
——
a. Selected and used applicable technical manuals.
b. Selected and used applicable tools and test measurement, and diagnostic
equipment (TMDE).
c. Practiced shop safety and maintenance discipline.
20 May 2010
3-341
STP 9-91A14-SM-TG
Performance Measures
GO NO-GO
2. Diagnosed the turret race ring assembly and determined maintenance action to be
——
——
performed.
3. Ensured all safety precautions and procedures were followed.
——
——
4. Replaced defective components, as necessary.
——
——
5. Performed a final operational test to verify that the cannon assembly malfunction(s)
——
——
were corrected to specification.
6. Completed The Army Maintenance Management System (TAMMS) forms, as
——
——
required.
Evaluation Guidance: Score the Soldier GO if all performance measures are passed. Score the Soldier
NO-GO if any performance measure is failed. If the Soldier fails any performance measure, show what was
done wrong and how to do it correctly.
References
Required
Related
DA Form 5988-E
DA PAM 750-8
TM 9-2350-264-10-1
TM 9-2350-264-20-2-1
TM 9-2350-264-20-2-2
TM 9-2350-264-20-2-3
TM 9-2350-264-20-2-4
3-342
20 May 2010
STP 9-91A14-SM-TG
Repair Elevating Mechanism Assembly on the M1 Series Track Vehicle
091-91A-3082
Conditions: In a contemporary operational environment (COE) given an applicable vehicle; repair parts;
tool kit, multi-capable; DA Form 5988-E (Equipment Inspection Maintenance Worksheet) stating "Repair
Elevating Mechanism Assembly on the M1 Series Track Vehicle"; test, measurement, and diagnostic
equipment (TMDE); and equipment as indicated in technical manuals (TMs); applicable technical
publications; and supervision/assistance.
Standards: Perform diagnostic procedures of elevating systems in accordance with applicable technical
publications. When this task is completed, the vehicle or equipment is fully mission-capable or
maintenance actions required to be performed by other than military occupational specialty (MOS) 91A
personnel are identified.
Performance Steps
1. Perform administrative actions.
a. Select and use applicable technical manuals.
b. Select and use applicable tools and TMDE.
c. Practice shop safety and maintenance discipline.
2. Inspect the elevating system component(s).
3. Replace hydraulic turret valve.
a. Torque turret valve to specification.
b. Ensure all four electrical connectors are locked in place.
c. Tighten all hydraulic hoses and tubes a half turn past the point of firm resistance.
4. Replace elevation servo mechanism fluid filter.
5. Bleed air from hydraulic system.
6. Prime the manual elevation hand pump assembly.
7. Bleed air from the manual elevation hand pump assembly.
8. Adjust the zero degree elevation switch.
9. Perform troubleshooting malfunction of gun elevation subsystem.
10. Replace and charge main hydraulic accumulator.
11. Replace and charge manual hydraulic accumulator.
12. Perform a final operational test to verify that the elevating system malfunction(s) is corrected to
specification.
13. Complete The Army Maintenance Management System (TAMMS) forms, as required.
20 May 2010
3-343
STP 9-91A14-SM-TG
Evaluation Preparation:
WARNING
The following safety precautions must be adhered to when performing
the tasks listed in this manual: Do not remove a radiator cap or surge
tank cap unless the engine is cool. While working on electrical
systems, remove all rings, watches, and jewelry. Before working on
the exhaust system, make sure it is cool. Disconnect the negative
battery cable prior to performing any electrical system maintenance or
when performing repairs in the locality of electrical components.
When working around engines that are operating, wear hearing
protection. When removing components over 75 pounds, two
personnel are required.
Performance Measures
GO
NO-GO
1. Performed administrative actions.
——
——
a. Selected and used applicable technical publications.
b. Selected and used applicable tools and TMDE.
c. Practiced shop safety and maintenance discipline.
2. Inspected the elevating system component(s).
——
——
3. Replaced hydraulic turret valve.
——
——
a. Torqued turret valve to specification.
b. Ensured all four electrical connectors were locked in place.
c. Tightened all hydraulic hoses and tubes a half turn past the point of firm
resistance.
4. Replaced elevation servo mechanism fluid filter.
——
——
5. Bleed air from hydraulic system.
——
——
6. Primed the manual elevation hand pump assembly.
——
——
7. Bleed air from the manual elevation hand pump assembly.
——
——
8. Adjusted the zero degree elevation switch.
——
——
9. Performed troubleshooting malfunction of gun elevation subsystem.
——
——
10. Replaced and charged main hydraulic accumulator.
——
——
11. Replaced and charged manual hydraulic accumulator.
——
——
12. Performed a final operational test to verify that the elevating system malfunction(s)
——
——
were corrected to specification.
13. Completed The Army Maintenance Management System (TAMMS) forms, as
——
——
required.
Evaluation Guidance: Score the Soldier GO if all performance measures are passed. Score the Soldier
NO-GO if any performance measure is failed. If the Soldier fails any performance measure, show what was
done wrong and how to do it correctly.
3-344
20 May 2010
STP 9-91A14-SM-TG
References
Required
Related
DA PAM 750-8
LO 9-2350-264-13
TM 9-1000-202-14
TM 9-2350-264-10-1
TM 9-2350-264-20-2-1
TM 9-2350-264-20-2-2
TM 9-2350-264-20-2-3
TM 9-2350-264-20-2-4
TM 9-2350-264-24-2
TM 9-243
20 May 2010
3-345
STP 9-91A14-SM-TG
Replace Rod End Bearing, Plain on the M1 Series Track Vehicle
091-91A-3083
Conditions: In a contemporary operational environment (COE) given an applicable vehicle; repair parts;
tool kit, multi-capable; DA Form 5988-E (Equipment Inspection Maintenance Worksheet) stating "Replace
Rod End Bearing, Plain on the M1 Series Track Vehicle "; test, measurement, and diagnostic equipment
(TMDE); and equipment as indicated in technical manuals (TMs); applicable technical publications; and
supervision/assistance.
Standards: Perform diagnostic procedures of cannon assemblies in accordance with applicable technical
publications. When this task is completed, the vehicle or equipment is fully mission-capable or maintenance
actions required to be performed by other than military occupational specialty (MOS) 91A personnel are
identified.
Performance Steps
1. Perform administrative actions.
a. Select and use applicable technical manuals.
b. Select and use applicable tools and test measurement, and diagnostic equipment (TMDE).
c. Practice shop safety and maintenance discipline.
2. Diagnose the plain rod end bearing and determine maintenance action to be performed.
a. Remove safety wire and hose clamp from rod end.
b. Push dust and moisture seal boot back to uncover wrench flats.
c. Loosen nut, hold piston, pull away key washer and remove rod end.
3. Ensure all safety precautions and procedures are followed.
4. Replace defective components, as necessary.
5. Perform rod end bearing adjustment.
a. Measure distance must be 12.75 in (32.39 cm).
b. Install required two clamps and replace old screws and lock washers.
c. Torque screws between 250 to 300 lb-ft.
d. Do not install safety wire screws until operation of elevation mechanism is tested in manual
mode.
e. Verify proper operation of elevation mechanism and Install boot and safety wire bolts.
6. Perform a final operational test to verify that the rod end bearing malfunction is corrected to
specification.
7. Complete The Army Maintenance Management System (TAMMS) forms, as required.
Evaluation Preparation:
WARNING
The following safety precautions must be adhered to when performing
the tasks listed in this manual: Do not remove a radiator cap or surge
tank cap unless the engine is cool. While working on electrical
systems, remove all rings, watches, and jewelry. Before working on
the exhaust system, make sure it is cool. Disconnect the negative
battery cable prior to performing any electrical system maintenance or
when performing repairs in the locality of electrical components.
When working around engines that are operating, wear hearing
protection. When removing components over 75 pounds, two
personnel are required.
3-346
20 May 2010
STP 9-91A14-SM-TG
Performance Measures
GO
NO-GO
1. Performed administrative actions.
——
——
a. Selected and used applicable technical manuals.
b. Selected and used applicable tools and test measurement, and diagnostic
equipment (TMDE).
c. Practiced shop safety and maintenance discipline.
2. Diagnosed the plain rod end bearing and determined maintenance action to be
——
——
performed.
a. Removed safety wire and hose clamp from rod end.
b. Pushed dust and moisture seal boot back to uncover wrench flats.
c. Correctly removed rod end.
3. Ensured all safety precautions and procedures were followed.
——
——
4. Replaced defective components, as necessary.
——
——
5. Performed rod end bearing adjustment.
——
——
a. Measured distance between rod end and cylinder rod (12.75 in /32.39 cm).
b. Installed required two clamps and replaced old screws and lock washers.
c. Torqued screws between 250 to 300 lb-ft.
d. Did not install safety wire screws until operation of elevation mechanism was
tested in manual mode.
e. Verified proper operation of elevation mechanism and Installed boot and
safety wire bolts.
6. Performed a final operational test to verify that the cannon assembly malfunction(s)
——
——
were corrected to specification.
7. Completed The Army Maintenance Management System (TAMMS) forms, as
——
——
required.
Evaluation Guidance: Score the Soldier GO if all performance measures are passed. Score the Soldier
NO-GO if any performance measure is failed. If the Soldier fails any performance measure, show what was
done wrong and how to do it correctly.
References
Required
Related
TM 9-2350-264-10-1
TM 9-2350-264-10-2
TM 9-2350-264-20-2-1
TM 9-2350-264-20-2-2
TM 9-2350-264-20-2-3
TM 9-2350-264-20-2-4
TM 9-2350-264-34-2-1
TM 9-2350-264-34-2-2
20 May 2010
3-347
STP 9-91A14-SM-TG
Repair Gun Mount Assembly on the M1 Series Track Vehicle
091-91A-3085
Conditions: In a contemporary operational environment (COE) given an applicable vehicle; repair parts;
tool kit, multi-capable; DA Form 5988-E (Equipment Inspection Maintenance Worksheet) stating "Repair
Gun Mount Assembly on the M1 Series Track Vehicle"; test, measurement, and diagnostic equipment
(TMDE); and equipment as indicated in technical manuals (TMs); applicable technical publications; and
supervision/assistance.
Standards: Perform diagnostic procedures of cannon assemblies in accordance with applicable technical
publications. When this task is completed, the vehicle or equipment is fully mission-capable or maintenance
actions required to be performed by other than military occupational specialty (MOS) 91A personnel are
identified.
Performance Steps
1. Perform administrative actions.
a. Select and use applicable technical manuals.
b. Select and use applicable tools and test measurement, and diagnostic equipment (TMDE).
c. Practice shop safety and maintenance discipline.
2. Diagnose the gun mount assembly and determine maintenance action to be performed.
3. Ensure all safety precautions and procedures are followed.
4. Replace defective components, as necessary.
5. Perform a final operational test to verify that the cannon assembly malfunction is corrected to
specification.
6. Complete The Army Maintenance Management System (TAMMS) forms, as required.
Evaluation Preparation:
WARNING
The following safety precautions must be adhered to when performing
the tasks listed in this manual: Do not remove a radiator cap or surge
tank cap unless the engine is cool. While working on electrical
systems, remove all rings, watches, and jewelry. Before working on
the exhaust system, make sure it is cool. Disconnect the negative
battery cable prior to performing any electrical system maintenance or
when performing repairs in the locality of electrical components.
When working around engines that are operating, wear hearing
protection. When removing components over 75 pounds, two
personnel are required.
3-348
20 May 2010
STP 9-91A14-SM-TG
Performance Measures
GO NO-GO
1. Performed administrative actions.
——
——
a. Selected and used applicable technical manuals.
b. Selected and used applicable tools and test measurement, and diagnostic
equipment (TMDE).
c. Practiced shop safety and maintenance discipline.
2. Diagnosed the gun mount assembly and determined maintenance action to be
——
——
performed.
3. Ensured all safety precautions and procedures were followed.
——
——
4. Replaced defective components, as necessary.
——
——
5. Performed a final operational test to verify that the cannon assembly malfunction is
——
——
corrected to specification.
6. Completed The Army Maintenance Management System (TAMMS) forms, as
——
——
required.
Evaluation Guidance: Score the Soldier GO if all performance measures are passed. Score the Soldier
NO-GO if any performance measure is failed. If the Soldier fails any performance measure, show what was
done wrong and how to do it correctly.
References
Required
Related
TM 9-2350-264-10-1
TM 9-2350-264-10-2
TM 9-2350-264-20-2-1
TM 9-2350-264-20-2-2
TM 9-2350-264-20-2-3
TM 9-2350-264-20-2-4
TM 9-2350-264-34-2-1
TM 9-2350-264-34-2-2
20 May 2010
3-349
STP 9-91A14-SM-TG
Repair Door Assembly, Ammunition on the M1 Series Track Vehicle
091-91A-3088
Conditions: In a contemporary operational environment (COE) given an applicable vehicle; repair parts;
tool kit, multi-capable; DA Form 5988-E (Equipment Inspection Maintenance Worksheet) stating "Repair
Door Assembly, Ammunition on the M1 Series Track Vehicle"; test, measurement, and diagnostic
equipment (TMDE); and equipment as indicated in technical manuals (TMs); applicable technical
publications; and supervision/assistance.
Standards: Perform diagnostic procedures of ammunition door assembly in accordance with applicable
technical publications. When this task is completed, the vehicle or equipment is fully mission-capable or
maintenance actions required to be performed by other than military occupational specialty (MOS) 91A
personnel are identified.
Performance Steps
1. Perform administrative actions.
a. Select and use applicable technical manuals.
b. Select and use applicable tools and test measurement, and diagnostic equipment (TMDE).
c. Practice shop safety and maintenance discipline.
2. Diagnose the ammunition door assembly and determine maintenance action to be performed.
a. Troubleshoot Door Electrical System.
b. Troubleshoot Door Hydraulic System.
3. Ensure all safety precautions and procedures are followed.
4. Replace defective components, as necessary.
5. Perform a final operational test to verify that the cannon assembly malfunction is corrected to
specification.
6. Complete The Army Maintenance Management System (TAMMS) forms, as required.
Evaluation Preparation: All operations will be performed to protect and preserve Army personnel and
property against accidental loss. Procedures will provide for public safety incidental to Army operations
and activities and safe and healthful workplaces, procedures, and equipment. Observe all safety and/or
environment precautions regarding electricity, fuel, lubricants, and high pressures. Provide ventilation for
exhaust fumes during equipment operation and use hearing protection when required in accordance with
AR 385-10, the Clean Air Act (CAA), and the CAA amendments, and the OSHA Hazard Communication
standard.
Performance Measures
GO NO-GO
1. Performed administrative actions.
——
——
a. Selected and used applicable technical manuals.
b. Selected and used applicable tools and test measurement, and diagnostic
equipment (TMDE).
c. Practiced shop safety and maintenance discipline.
2. Diagnosed the ammunition door assembly and determined maintenance action to
——
——
be performed.
a. Diagnosed Door Electrical System.
b. Diagnosed Door Hydraulic System.
3. Ensured all safety precautions and procedures were followed.
——
——
4. Replaced defective components, as necessary.
——
——
3-350
20 May 2010
STP 9-91A14-SM-TG
Performance Measures
GO NO-GO
5. Performed a final operational test to verify that the cannon assembly malfunction
——
——
was corrected to specification.
6. Completed The Army Maintenance Management System (TAMMS) forms, as
——
——
required.
Evaluation Guidance: Score the Soldier GO if all performance measures are passed. Score the Soldier
NO-GO if any performance measure is failed. If the Soldier fails any performance measure, show what was
done wrong and how to do it correctly.
References
Required
Related
TM 9-2350-264-10-1
TM 9-2350-264-10-2
TM 9-2350-264-20-2-1
TM 9-2350-264-20-2-2
TM 9-2350-264-20-2-3
TM 9-2350-264-20-2-4
TM 9-2350-264-34-1-1
TM 9-2350-264-34-1-2
20 May 2010
3-351
STP 9-91A14-SM-TG
Maintain the 120MM Gun Cannon on the M1 Series Track Vehicle
091-91A-3090
Conditions: In a contemporary operational environment (COE) given an applicable vehicle; repair parts;
tool kit, multi-capable; DA Form 5988-E (Equipment Inspection Maintenance Worksheet) stating "Maintain
the 120MM Gun Cannon on the M1 Series Track Vehicle"; test, measurement, and diagnostic equipment
(TMDE); and equipment as indicated in technical manuals (TMs); applicable technical publications; and
supervision/assistance.
Standards: Perform diagnostic procedures of cannon assemblies in accordance with applicable technical
publications. When this task is completed, the vehicle or equipment is fully mission-capable or maintenance
actions required to be performed by other than military occupational specialty (MOS) 91A personnel are
identified.
Performance Steps
1. Perform administrative actions.
a. Select and use applicable technical manuals.
b. Select and use applicable tools and test measurement, and diagnostic equipment (TMDE).
c. Practice shop safety and maintenance discipline.
2. Diagnose the 120MM gun cannon and determine maintenance action to be performed.
a. Replace operating shafts and bearings.
b. Repair breechblock.
c. Repair closing piston assembly.
d. Perform breechblock function check.
3. Ensure all safety precautions and procedures are followed.
4. Replace defective components, as necessary.
5. Perform a final operational test to verify that the cannon assembly malfunction is corrected to
specification.
6. Complete The Army Maintenance Management System (TAMMS) forms, as required.
Evaluation Preparation:
WARNING
The following safety precautions must be adhered to when performing
the tasks listed in this manual: Do not remove a radiator cap or surge
tank cap unless the engine is cool. While working on electrical
systems, remove all rings, watches, and jewelry. Before working on
the exhaust system, make sure it is cool. Disconnect the negative
battery cable prior to performing any electrical system maintenance or
when performing repairs in the locality of electrical components.
When working around engines that are operating, wear hearing
protection. When removing components over 75 pounds, two
personnel are required.
3-352
20 May 2010
STP 9-91A14-SM-TG
Performance Measures
GO NO-GO
1. Performed administrative actions.
——
——
a. Selected and used applicable technical manuals.
b. Selected and used applicable tools and test measurement, and diagnostic
equipment (TMDE).
c. Practiced shop safety and maintenance discipline.
2. Diagnosed the 120MM gun cannon and determine maintenance action to be
——
——
performed.
a. Replaced operating shafts and bearings.
b. Repaired breechblock.
c. Repaired closing piston assembly.
d. Performed breechblock function check.
3. Ensured all safety precautions and procedures are followed.
——
——
4. Replaced defective components, as necessary.
——
——
5. Performed a final operational test to verify that the cannon assembly malfunction is
——
——
corrected to specification.
6. Completed The Army Maintenance Management System (TAMMS) forms, as
——
——
required.
Evaluation Guidance: Score the Soldier GO if all performance measures are passed. Score the Soldier
NO-GO if any performance measure is failed. If the Soldier fails any performance measure, show what was
done wrong and how to do it correctly.
References
Required
Related
DA PAM 750-8
LO 9-2350-264-13
TM 9-1000-202-14
TM 9-2350-264-10-1
TM 9-2350-264-20-2-1
TM 9-2350-264-20-2-2
TM 9-2350-264-20-2-3
TM 9-2350-264-20-2-4
TM 9-2350-264-24-2
20 May 2010
3-353
STP 9-91A14-SM-TG
Replace the Turret on the M1 Series Track Vehicle
091-91A-3092
Conditions: In a contemporary operational environment (COE) given an applicable vehicle; repair parts;
tool kit, multi-capable; DA Form 5988-E (Equipment Inspection Maintenance Worksheet) stating "Replace
the Turret on the M1 Series Track Vehicle"; test, measurement, and diagnostic equipment (TMDE); and
equipment as indicated in technical manuals (TMs); applicable technical publications; and
supervision/assistance.
Standards: Replace the turret on the M1 Series Track Vehicle, and all applicable components in
accordance with the applicable technical publication procedures and specifications.
(See Maintenance
Allocation Chart for exact procedures authorized for each military occupational specialty (MOS) and skill
level (SL).) When this task is completed, the vehicle or equipment is fully mission-capable or maintenance
actions required to be performed by other than MOS 91A personnel are identified.
Performance Steps
1. Perform administrative actions.
a. Select and use applicable technical manuals.
b. Select and use applicable tools and test measurement, and diagnostic equipment (TMDE).
c. Practice shop safety and maintenance discipline.
2. Diagnose turret and determine maintenance action to be performed.
a. Prepare turret for removal.
(1) Disconnect hydraulic lines.
(2) Remove traverse gear box.
(3) Remove required electrical components and cables.
(4) Unbolt turret form vehicle hull.
b. Inventory applicable special tools required.
(1) Over head lift/crane.
(2) Turret sling.
(3) Turret stand.
3. Ensure all safety precautions and procedures are followed.
4. Replace defective components, as necessary.
5. Perform final operational test to verify the faults have been corrected.
6. Complete The Army Maintenance Management System (TAMMS) forms, as required.
Evaluation Preparation:
WARNING
The following safety precautions must be adhered to when performing
the tasks listed in this manual: Do not remove a radiator cap or surge
tank cap unless the engine is cool. While working on electrical
systems, remove all rings, watches, and jewelry. Before working on
the exhaust system, make sure it is cool. Disconnect the negative
battery cable prior to performing any electrical system maintenance or
when performing repairs in the locality of electrical components.
When working around engines that are operating, wear hearing
protection. When removing components over 75 pounds, two
personnel are required.
3-354
20 May 2010
STP 9-91A14-SM-TG
Performance Measures
GO NO-GO
1. Performed administrative actions.
——
——
a. Selected and used applicable technical manuals.
b. Selected and used applicable tools and test measurement, and diagnostic
equipment (TMDE).
c. Practiced shop safety and maintenance discipline.
2. Diagnosed turret and determined maintenance action to be performed.
——
——
a. Prepared turret for removal.
(1) Disconnected hydraulic lines.
(2) Removed traverse gear box.
(3) Removed required electrical components and cables.
(4) Unbolted turret form vehicle hull.
b. Inventoried applicable special tools required.
(1) Over head lift/crane.
(2) Turret sling.
(3) Turret stand.
3. Ensured all safety precautions and procedures were followed.
——
——
4. Replaced defective components, as necessary.
——
——
5. Performed final operational test to verify the faults have been corrected.
——
——
6. Completed The Army Maintenance Management System (TAMMS) forms, as
——
——
required.
Evaluation Guidance: Score the Soldier GO if all performance measures are passed. Score the Soldier
NO-GO if any performance measure is failed. If the Soldier fails any performance measure, show what was
done wrong and how to do it correctly.
References
Required
Related
DA Form 5988-E
DA PAM 750-8
TM 9-2350-264-10-1
TM 9-2350-264-20-2-1
TM 9-2350-264-20-2-2
TM 9-2350-264-20-2-3
TM 9-2350-264-20-2-4
TM 9-2350-264-34-2-1
TM 9-2350-264-34-2-2
20 May 2010
3-355
STP 9-91A14-SM-TG
Replace the Main Gun Tube on the M1 Series Track Vehicle
091-91A-3094
Conditions: In a contemporary operational environment (COE) given an applicable vehicle; repair parts;
tool kit, multi-capable; DA Form 5988-E (Equipment Inspection Maintenance Worksheet) stating "Replace
the Main Gun Tube on the M1 Series Track Vehicle"; test, measurement, and diagnostic equipment
(TMDE); and equipment as indicated in technical manuals (TMs); applicable technical publications; and
supervision/assistance.
Standards: Replace the Main Gun Tube on the M1 Series Track Vehicle; replace all applicable
components in accordance with the applicable technical publication procedures and specifications.
(See
Maintenance Allocation Chart for exact procedures authorized for each military occupational specialty
(MOS) and skill level (SL).) When this task is completed, the vehicle or equipment is fully mission-capable
or maintenance actions required to be performed by other than MOS 91A personnel are identified.
Performance Steps
1. Perform administrative actions.
a. Select and use applicable technical manuals.
b. Select and use applicable tools and test measurement, and diagnostic equipment (TMDE).
c. Practice shop safety and maintenance discipline.
2. Diagnose main gun tub and determine maintenance action to be performed.
a. Prepare gun tube for removal.
(1) Remove all applicable sub-components.
(2) Remove thermal shrouds.
(3) Unbolt gun mount.
b. Inventory applicable special tools.
(1) Spanner wrench.
(2) Lifting slings.
3. Ensure all safety precautions and procedures are followed.
4. Replace defective components, as necessary.
5. Perform final operational test to verify the faults have been corrected.
6. Complete The Army Maintenance Management System (TAMMS) forms, as required.
Evaluation Preparation:
WARNING
The following safety precautions must be adhered to when performing
the tasks listed in this manual: Do not remove a radiator cap or surge
tank cap unless the engine is cool. While working on electrical
systems, remove all rings, watches, and jewelry. Before working on
the exhaust system, make sure it is cool. Disconnect the negative
battery cable prior to performing any electrical system maintenance or
when performing repairs in the locality of electrical components.
When working around engines that are operating, wear hearing
protection. When removing components over 75 pounds, two
personnel are required.
3-356
20 May 2010
STP 9-91A14-SM-TG
Performance Measures
GO NO-GO
1. Performed administrative actions.
——
——
a. Selected and used applicable technical manuals.
b. Selected and used applicable tools and test measurement, and diagnostic
equipment (TMDE).
c. Practiced shop safety and maintenance discipline.
2. Diagnosed main gun tub and determined maintenance action to be performed.
——
——
a. Prepared gun tube for removal.
(1) Removed all applicable sub-components.
(2) Removed thermal shrouds.
(3) Unbolted gun mount.
b. Inventoried applicable special tools.
(1) Spanner wrench.
(2) Lifting slings.
3. Ensured all safety precautions and procedures were followed.
——
——
4. Replaced defective components, as necessary.
——
——
5. Performed final operational test to verify the faults was corrected.
——
——
6. Completed The Army Maintenance Management System (TAMMS) forms, as
——
——
required.
Evaluation Guidance: Score the Soldier GO if all performance measures are passed. Score the Soldier
NO-GO if any performance measure is failed. If the Soldier fails any performance measure, show what was
done wrong and how to do it correctly.
References
Required
Related
TM 9-2350-264-34-2-1
TM 9-2350-264-34-2-2
20 May 2010
3-357
STP 9-91A14-SM-TG
Skill Level 4
Subject Area 9: COMMON LOGISTIC MANAGEMENT TASKS (SKILL LEVEL 4)
Perform Senior Rater Responsibilities for a Maintenance Section
091-CLT-4001
Conditions: In a contemporary operational environment (COE) given a noncommissioned officer
evaluation report (NCOER) with the rater's portion completed, accompanying counseling statements, and
Army regulation (AR) 623-3.
Standards: Perform senior rater's responsibilities in accordance with applicable references.
Performance Steps
1. Ensure all materials and references were available.
2. Review quarterly counseling that supported the NCOER.
3. Review the administrative data and rater's portions of the NCOER for accuracy and content.
4. Prepare the senior rater's portion of the NCOER.
5. Submit the NCOER for review and further processing.
Performance Measures
GO NO-GO
1. Ensured all materials and references were available.
——
——
2. Reviewed quarterly counseling that supported the NCOER.
——
——
3. Reviewed the administrative data and rater's portions of the NCOER for accuracy
——
——
and content.
4. Prepared the senior rater's portion of the NCOER.
——
——
5. Submitted the NCOER for review and further processing.
——
——
Evaluation Guidance: Score the Soldier GO if all performance measures are passed. Score the Soldier
NO-GO if any performance measure is failed. If the Soldier fails any performance measure, show what was
done wrong and how to do it correctly.
References
Required
Related
AR 623-3
3-358
20 May 2010
STP 9-91A14-SM-TG
Supervise Platoon/Section Administrative Procedures
091-CLT-4002
Conditions: In a contemporary operational environment (COE) given Army regulation (AR) 25-400-2,
AR 600-8-2, AR 614-200, AR 635-200, situation(s) requiring platoon/section administrative procedures
supervision and applicable forms, records, and publications.
Standards: Supervise platoon or section administrative procedures in accordance with applicable
references.
Performance Steps
1. Establish files using the Army Records Information Management System (ARIMS).
a. Prepare file folders and guides
b. Arrange file folders and guides.
c. Prepare file drawer labels.
d. Prepare a list of file numbers
2. Process a recommendation for award.
3. Process and update a flag on records.
4. Verify the accuracy of Suspension of Favorable Action Report.
5. Process and update a bar to reenlistment.
6. Process a chapter action.
a. Select appropriate type of chapter action and identify separation guidelines.
b. Initiate and follow up on the chapter action.
7. Process a recommendation for advancement/promotion.
8. Verify accuracy of Enlisted Promotion Report (AAC-C01).
9. Assist a subordinate noncommissioned officer (NCO) who had received notice of selection to be
released under the Qualitative Management Program (QMP).
Performance Measures
GO NO-GO
1. Established files using ARIMS.
——
——
a. Prepared file folders and guides.
b. Arranged file folders and guides.
c. Prepared file drawer labels.
d. Prepared a list of file numbers.
2. Processed a recommendation for award.
——
——
3. Processed and updated a flag on records.
——
——
4. Verified the accuracy of Suspension of Favorable Action Report.
——
——
5. Processed and updated a bar to reenlistment.
——
——
6. Processed a chapter action.
——
——
a. Selected appropriate type of chapter action and identified separation
guidelines.
b. Initiated and followed up on the chapter action.
7. Processed a recommendation for advancement/promotion.
——
——
20 May 2010
3-359
STP 9-91A14-SM-TG
Performance Measures
GO NO-GO
8. Verified accuracy of Enlisted Promotion Report (AAC-C01).
——
——
9. Assisted a subordinate noncommissioned officer (NCO) who had received notice of
——
——
selection to be released under the Qualitative Management Program (QMP).
Evaluation Guidance: Score the Soldier GO if all performance measures are passed. Score the Soldier
NO-GO if any performance measure is failed. If the Soldier fails any performance measure, show what was
done wrong and how to do it correctly.
References
Required
Related
AR 25-400-2
AR 600-8-2
AR 614-200
AR 635-200
3-360
20 May 2010
STP 9-91A14-SM-TG
Manage Combat Stress
091-CLT-4003
Conditions: In a contemporary operational environment (COE) given a situation requiring stress
management and Field Manual (FM) 6-22.5.
Standards: Manage combat stress in accordance with applicable reference.
Performance Steps
1. Identify sources of combat stress.
2. Identify the signs and classifications of battle fatigue.
3. Identify signs of stress in self, others, and the unit.
4. Take appropriate steps to reduce and/or prevent stress.
Performance Measures
GO NO-GO
1. Identified sources of combat stress.
——
——
2. Identified the signs and classifications of battle fatigue.
——
——
3. Identified signs of stress in self, others, and the unit.
——
——
4. Took appropriate steps to reduce and/or prevent stress.
——
——
Evaluation Guidance: Score the Soldier GO if all performance measures are passed. Score the Soldier
NO-GO if any performance measure is failed. If the Soldier fails any performance measure, show what was
done wrong and how to do it correctly.
References
Required
Related
FM 6-22.5
20 May 2010
3-361
STP 9-91A14-SM-TG
Coordinate Support for the Maintenance Platoon/Section
091-CLT-4006
Conditions: In a contemporary operational environment (COE) given Field Manual (FM) 4-30.3, an
operation order (OPORD)/maintenance situation, a maintenance platoon or section with personnel and
equipment, standing operating procedure (SOP), and applicable references.
Standards: Coordinate support for the maintenance platoon or section in accordance with SOP and
applicable references.
Performance Steps
1. Evaluate the tactical situation and OPORD requirements.
2. Determine support needed at each location.
3. Notify parent and support units of support requirements.
4. Follow up to ensure support had been coordinated and was being provided.
a. Notify appropriate parent and support units to resolve any problems.
b. Address problems in After Action Review (AAR).
Performance Measures
GO NO-GO
1. Evaluated the tactical situation and OPORD requirements.
——
——
2. Determined support needed at each location.
——
——
3. Notified parent and supported units of support requirements.
——
——
4. Followed up to ensure support had been coordinated and was being provided.
——
——
a. Notified appropriate parent and supported units to resolve any problems.
b. Addressed problems in After Action Review (AAR).
Evaluation Guidance: Score the Soldier GO if all performance measures are passed. Score the Soldier
NO-GO if any performance measure is failed. If the Soldier fails any performance measure, show what was
done wrong and how to do it correctly.
References
Required
Related
FM 4-30.3
3-362
20 May 2010
STP 9-91A14-SM-TG
Integrate Automated Logistics Support Systems
091-CLT-4010
Conditions: In a contemporary operational environment (COE) given a Unit Level Logistics
System-Ground (ULLS-G) computer system with software and equipment data base in a unit-level
maintenance shop, a Standard Army Maintenance System-1 (SAMS-1) computer system with software and
database in a direct support (DS)-level maintenance shop, a Standard Army Maintenance System-2
(SAMS-2) computer system with software and data base in a support operations section, Automated
Information Systems Manual (AISM)-25-L21-AHN-ZZZ-EM, AISM-25-L26-AHO-ZZZ-EM, Army Regulation
(AR) 710-2, Department of the Army (DA) Pamphlet 710-2-1, DA Pamphlet 750-8, and applicable
publications.
Standards: Integrate automated logistics support systems in a maintenance shop in accordance with
applicable references.
Performance Steps
1. Identify the architecture and interface of Army automated logistics systems.
2. Supervise ULLS-G functions in a unit level maintenance shop.
3. Supervise SAMS-1 functions in a DS level maintenance shop.
4. Supervise SAMS-2 functions in a support operations section.
5. Interface with Standard Army Retail Supply System-Objective (SARSS-O) for supply functions.
Performance Measures
GO NO-GO
1. Identified the architecture and interface of Army automated logistics systems.
——
——
2. Supervised ULLS-G functions in a unit level maintenance shop.
——
——
3. Supervised SAMS-1 functions in a DS level maintenance shop.
——
——
4. Supervised SAMS-2 functions in a support operations section.
——
——
5. Interfaced with Standard Army Retail Supply System-Objective (SARSS-O) for
——
——
supply functions.
Evaluation Guidance: Score the Soldier GO if all performance measures are passed. Score the Soldier
NO-GO if any performance measure is failed. If the Soldier fails any performance measure, show what was
done wrong and how to do it correctly.
References
Required
Related
AISM-25-L21-AHN-ZZZ-EM
AISM-25-L26-AHO-ZZZ-EM
AR 710-2
DA PAM 710-2-1
DA PAM 750-8
20 May 2010
3-363
STP 9-91A14-SM-TG
Plan Logistics Support for Maintenance Operations
091-CLT-4011
Conditions: In a contemporary operational environment (COE) given Field Manual (FM) 4-30.3, an
operation order (OPORD)/maintenance situation, maintenance personnel and equipment, and applicable
references.
Standards: Plan logistics support for maintenance operations in accordance with applicable references.
Performance Steps
1. Assess the combat situation.
2. Determine support needed.
a. People (skills and numbers).
b. Equipment (transportation, tools, test, measurement, and diagnostic equipment [TMDE], and
communications).
c. Supplies (components, assemblies, and repair parts).
3. Organize resources to provide needed support.
4. Follow these planning considerations:
a. Number and type of units supported.
b. Stock levels for repair parts.
c. Forward displacement of maintenance support teams and maintenance collection points.
d. Channels and procedures for recovery, collection, evacuation, and disposition of captured or
abandoned materiel.
Performance Measures
GO NO-GO
1. Assessed the combat situation.
——
——
2. Determined support needed.
——
——
a. People (skills and numbers).
b. Equipment (transportation, tools, test, measurement, and diagnostic
equipment [TMDE], and communications).
c. Supplies (components, assemblies, and repair parts).
3. Organized resources to provide needed support.
——
——
4. Followed these planning considerations:
——
——
a. Number and type of units supported.
b. Stock levels for repair parts.
c. Forward displacement of maintenance support teams and maintenance
collection points.
d. Channels and procedures for recovery, collection, evacuation, and disposition
of captured or abandoned materiel.
Evaluation Guidance: Score the Soldier GO if all performance measures are passed. Score the Soldier
NO-GO if any performance measure is failed. If the Soldier fails any performance measure, show what was
done wrong and how to do it correctly.
References
Required
Related
FM 4-30.3
3-364
20 May 2010
STP 9-91A14-SM-TG
Prepare Standing Operating Procedures for Maintenance Operations
091-CLT-4021
Conditions: In a contemporary operational environment (COE) given Field Manual (FM) 4-30.3, higher
headquarters standing operating procedure (SOP), and commander's guidance.
Standards: Prepare a maintenance shop internal or external SOP for the commander's review, comment,
and approval in accordance with cited references.
Performance Steps
1. Ensure applicable publication was available.
2. Prepare a maintenance shop internal or external SOP.
3. Ensure unit policies and commander's guidance were followed.
4. Ensure shop operation policies were adequately addressed.
5. Update the shop SOP, as required.
Performance Measures
GO NO-GO
1. Ensured applicable publication was available.
——
——
2. Prepared a maintenance shop internal or external SOP.
——
——
3. Ensured unit policies and commander's guidance were followed.
——
——
4. Ensured shop operation policies were adequately addressed.
——
——
5. Updated the shop SOP, as required.
——
——
Evaluation Guidance: Score the Soldier GO if all performance measures are passed. Score the Soldier
NO-GO if any performance measure is failed. If the Soldier fails any performance measure, show what was
done wrong and how to do it correctly.
References
Required
Related
FM 4-30.3
20 May 2010
3-365
STP 9-91A14-SM-TG
Supervise the Deployment of Company Maintenance Team/Recovery Support Team/Maintenance
Support Team
091-CLT-4022
Conditions: In a contemporary operational environment (COE) given Field Manual (FM) 1-02,
FM 3-34.170, FM 4-30.3, a request for maintenance support/maintenance situation, map, operational
overlay, grid coordinates of destination, vehicle(s), equipment, maintenance personnel, and applicable
references.
Standards: Supervise the deployment of company maintenance team and recovery support teams in
accordance with the maintenance situation or request for maintenance support and cited reference.
Performance Steps
1. Review the request for maintenance support or maintenance situation.
2. Ensure personnel and equipment were available to perform the mission.
3. Ensure resources for the company maintenance team, recovery support team, and/or maintenance
support team, including personnel with applicable MOS, vehicles, tools, test equipment, publications,
repair parts, time, and facilities were appropriately identified.
4. Ensure requirements for defending the teams had been properly determined and arranged.
5. Ensure team leaders were briefed on the mission.
a. Review the operational overlay.
b. Conduct a map reconnaissance of the route and destination.
6. Ensure the company maintenance team, recovery support team, and/or maintenance support team
was deployed.
Performance Measures
GO NO-GO
1. Reviewed the request for maintenance support or maintenance situation.
——
——
2. Ensured personnel and equipment were available to perform the mission.
——
——
3. Ensured resources for the company maintenance team, recovery support team,
——
——
and/or maintenance support team, including personnel with applicable MOS,
vehicles, tools, test equipment, publications, repair parts, time, and facilities were
appropriately identified.
4. Ensured requirements for defending the teams had been properly determined and
——
——
arranged.
5. Ensured team leaders were briefed on the mission.
——
——
a. Reviewed the operational overlay.
b. Conducted a map reconnaissance of the route and destination.
6. Ensured the company maintenance team, recovery support team, and/or
——
——
maintenance support team were deployed.
Evaluation Guidance: Score the Soldier GO if all performance measures are passed. Score the Soldier
NO-GO if any performance measure is failed. If the Soldier fails any performance measure, show what was
done wrong and how to do it correctly.
References
Required
Related
FM 1-02
FM 3-34.170
FM 4-30.3
3-366
20 May 2010
STP 9-91A14-SM-TG
Conduct a Route Reconnaissance for a Maintenance Mission
091-CLT-4023
Conditions: In a contemporary operational environment (COE) given Field Manual (FM) 3-34.170,
FM 4-30.3, a maintenance situation/operation order (OPORD), operational overlay, grid coordinates for a
proposed route, map, vehicle with personnel, and applicable references.
Standards: Conduct a route reconnaissance for a given route identifying distances/times, problem areas
along the route, possible bypasses or alternate routes, and prepared strip maps in accordance with the
maintenance situation/OPORD and applicable references.
Performance Steps
1. Ensure necessary equipment and publications were available.
2. Determine the route to be used for the maintenance mission.
3. Perform a map reconnaissance of the route.
4. Contact units along the route and coordinated passage.
5. Select personnel to conduct the reconnaissance.
6. Conduct a reconnaissance of the route by identifying the following key features.
a. Potential problem areas (that is, possible enemy contact, trafficability, and so forth).
b. Possible bypasses and alternate routes.
7. Record information on a strip map for use by the maintenance team.
8. Advise the commander or staff officer on use of the route for maintenance missions.
Performance Measures
GO
NO-GO
1. Ensured necessary equipment and publications were available.
——
——
2. Determined the route to be used for the maintenance mission.
——
——
3. Performed a map reconnaissance of the route.
——
——
4. Contacted units along the route and coordinated passage.
——
——
5. Selected personnel to conduct the reconnaissance.
——
——
6. Conducted a reconnaissance of the route by identifying the following key features.
——
——
a. Potential problem areas (that is, possible enemy contact, trafficability, and so
forth).
b. Possible bypasses and alternate routes.
7. Recorded information on a strip map for use by the maintenance team.
——
——
8. Advised the commander or staff officer on use of the route for maintenance
——
——
missions.
Evaluation Guidance: Score the Soldier GO if all performance measures are passed. Score the Soldier
NO-GO if any performance measure is failed. If the Soldier fails any performance measure, show what was
done wrong and how to do it correctly.
References
Required
Related
FM 3-34.170
FM 4-30.3
20 May 2010
3-367
STP 9-91A14-SM-TG
Conduct an Area Reconnaissance for a Maintenance Mission
091-CLT-4024
Conditions: In a contemporary operational environment (COE) given Field Manual (FM) 3-34.170,
FM 4-30.3, a maintenance situation/operation order (OPORD), operational overlay, grid coordinates for a
proposed occupation area, map, vehicle with personnel, and applicable references.
Standards: Perform an area reconnaissance, selecting the most appropriate location to establish a
maintenance site in accordance with the maintenance situation or OPORD and cited reference.
Performance Steps
1. Ensure necessary equipment and publications were available.
2. Perform a map reconnaissance of the area.
3. Select personnel to conduct the reconnaissance.
4. Conduct a reconnaissance of the area to determine suitability for maintenance operations,
accessibility in and out of the site, defendable, and actions required for the safety of personnel and
equipment.
5. Advise the commander or staff officer on occupying the area of operations based upon the
reconnaissance.
Performance Measures
GO NO-GO
1. Ensured necessary equipment and publications were available.
——
——
2. Performed a map reconnaissance of the area.
——
——
3. Selected personnel to conduct the reconnaissance.
——
——
4. Conducted a reconnaissance of the area to determine suitability for maintenance
——
——
operations, accessibility in and out of the site, defendable, and actions required for
the safety of personnel and equipment.
5. Advised the commander or staff officer on occupying the area of operations based
——
——
upon the reconnaissance.
Evaluation Guidance: Score the Soldier GO if all performance measures are passed. Score the Soldier
NO-GO if any performance measure is failed. If the Soldier fails any performance measure, show what was
done wrong and how to do it correctly.
References
Required
Related
FM 3-34.170
FM 4-30.3
3-368
20 May 2010
STP 9-91A14-SM-TG
Manage Battlefield Maintenance Support
091-CLT-4025
Conditions: In a contemporary operational environment (COE) given Field Manual (FM) 4-30.3, an
operation order (OPORD)/maintenance situation, maintenance personnel, equipment, and applicable
references.
Standards: Manage battlefield maintenance support in accordance with cited reference.
Performance Steps
1. Assess the combat situation and organized and prioritized support based on the type of operation.
a. Offensive operation.
b. Defensive operation.
2. Plan for and execute appropriate maintenance support.
a. Identify requirements.
b. Identify available resources.
(1) Personnel and skills.
(2) Publications.
(3) Time.
(4) Facilities.
(5) Test, measurement, and diagnostic equipment (TMDE) and tools.
(6) Parts.
c. Manage resources for maximum return, with priority on the following:
(1) Maintenance support forward.
(2) Commander's guidance.
(3) Battle damage repair.
(4) Controlled exchange.
(5) Cannibalization.
(6) Evacuation.
(7) Recovery.
3. Follow priorities for repair of battle damaged systems.
a. Most essential for completion of the immediate mission.
b. Least amount of time to repair.
c. Reparable, but not in time to continue the immediate mission.
Performance Measures
GO
NO-GO
1. Assessed the combat situation and organized and prioritized support based on the
——
——
type of operation.
a. Offensive operation.
b. Defensive operation.
2. Planned for and executed appropriate maintenance support.
——
——
a. Identified requirements.
b. Identified available resources.
(1) Personnel and skills.
(2) Publications.
(3) Time.
(4) Facilities.
(5) Test, measurement, and diagnostic equipment (TMDE) and tools.
(6) Parts.
c. Managed resources for maximum return, with priority on the following:
(1) Maintenance support forward.
(2) Commander's guidance.
20 May 2010
3-369
STP 9-91A14-SM-TG
Performance Measures
GO NO-GO
(3) Battle damage repair.
(4) Controlled exchange.
(5) Cannibalization.
(6) Evacuation.
(7) Recovery.
3. Followed priorities for repair of battle damaged systems.
——
——
a. Most essential for completion of the immediate mission.
b. Least amount of time to repair.
c. Reparable, but not in time to continue the immediate mission.
d. Damaged beyond repair candidate for cannibalization.
Evaluation Guidance: Score the Soldier GO if all performance measures are passed. Score the Soldier
NO-GO if any performance measure is failed. If the Soldier fails any performance measure, show what was
done wrong and how to do it correctly.
References
Required
Related
FM 4-30.3
3-370
20 May 2010
STP 9-91A14-SM-TG
Perform Support Operations NCO Duties
091-CLT-4026
Conditions: In a contemporary operational environment (COE) given Field Manual (FM) 4-30.3,
FM 100-16, a position as a support operations maintenance noncommissioned officer (NCO) and
applicable references.
Standards: Perform the duties of a support operations maintenance NCO, ensuring that the direct support
(DS) maintenance mission is effectively coordinated and integrated within the battalion or support group.
Performance Steps
1. Provide guidance on maintenance priorities within the unit.
2. Set objectives for maintenance shop production.
3. Monitor maintenance shop workflow and status of repair part
4. Supervise, control, and direct the operation of battalion units for the below.
a. DS maintenance.
b. Evacuation.
c. Repair parts supply.
d. Reparable exchange (RX).
e. Technical assistance.
Performance Measures
GO
NO-GO
1. Provided guidance on maintenance priorities within the unit.
——
——
2. Set objectives for maintenance shop production.
——
——
3. Monitored maintenance shop workflow and status of repair part requisitions.
——
——
4. Supervised, controlled, and directed the operation of battalion units for the below.
——
——
a. DS maintenance.
b. Evacuation.
c. Repair parts supply.
d. Reparable exchange (RX).
e. Technical assistance.
Evaluation Guidance: Score the Soldier GO if all performance measures are passed. Score the Soldier
NO-GO if any performance measure is failed. If the Soldier fails any performance measure, show what was
done wrong and how to do it correctly.
References
Required
Related
FM 100-16
FM 4-30.3
20 May 2010
3-371
STP 9-91A14-SM-TG
Manage Maintenance Operations at a Maintenance Collection Point
091-CLT-4027
Conditions: In a contemporary operational environment (COE) given Field Manual (FM) 4-30.3, an
operation order (OPORD)/maintenance situation, a maintenance collection point (MCP) site, maintenance
personnel and equipment, and applicable references.
Standards: Manage maintenance operations at an MCP in accordance with the OPORD and cited
references.
Performance Steps
1. Set up the MCP.
2. Manage flow of equipment for repair.
a. Focus efforts toward repairing systems for current battle or start of next battle.
b. Fix 4 to 6 hour jobs at unit maintenance collection point (UMCP).
c. Evacuate other equipment to brigade MCP or farther rear location.
d. Maximize battlefield damage assessment repair (BDAR), cannibalization, and controlled
exchange at central MCP.
3. Manage company maintenance teams, recovery support teams, and maintenance support teams held
at MCP.
4. Manage Prescribed Load List (PLL) assets for forward combat units.
5. Relocate forward (as necessary) to continue fix-forward support.
Performance Measures
GO NO-GO
1. Set up the MCP.
——
——
2. Managed flow of equipment for repair.
——
——
a. Focused efforts toward repairing systems for current battle or start of next
battle.
b. Fixed 4 to 6 hour jobs at unit maintenance collection point (UMCP).
c. Evacuated other equipment to brigade MCP or farther rear location.
d. Maximized battlefield damage assessment repair (BDAR), cannibalization,
and controlled exchange at central MCP.
3. Managed company maintenance teams, recovery support teams, and
——
——
maintenance support teams held at MCP.
4. Managed Prescribed Load List (PLL) assets for forward combat units.
——
——
5. Relocated forward (as necessary) to continue fix-forward support.
——
——
Evaluation Guidance: Score the Soldier GO if all performance measures are passed. Score the Soldier
NO-GO if any performance measure is failed. If the Soldier fails any performance measure, show what was
done wrong and how to do it correctly.
References
Required
Related
FM 4-30.3
3-372
20 May 2010
STP 9-91A14-SM-TG
Provide Maintenance Support During Tactical Operations
091-CLT-4028
Conditions: In a contemporary operational environment (COE) given Field Manual (FM) 4-30.3, an
operation order (OPORD)/maintenance situation, maintenance personnel and equipment, and applicable
references.
Standards: Provide maintenance support during tactical operations in accordance with the OPORD and
cited reference.
Performance Steps
1. Provide maintenance support during offensive
2. Provide maintenance support during defensive
3. Provide maintenance support during retrograde operations.
4. Provide maintenance support during reconstitution operations.
5. Provide maintenance support during night operations.
6. Provide maintenance support in a chemical, biological, radiological, nuclear (CBRN) environment.
7. Provide maintenance support during stability and support operations (SASO).
a. Peace operations.
b. Humanitarian operations.
c. Disaster relief operations.
8. Provide maintenance support in adverse conditions.
a. Desert operations.
b. Cold weather operations.
c. Jungle operations.
d. Mountain operations.
e. Urban terrain operations.
Performance Measures
GO
NO-GO
1. Provided maintenance support during offensive operations.
——
——
2. Provided maintenance support during defensive operations.
——
——
3. Provided maintenance support during retrograde operations.
——
——
4. Provided maintenance support during reconstitution operations.
——
——
5. Provided maintenance support during night operations.
——
——
6. Provided maintenance support in a CBRN environment.
——
——
7. Provided maintenance support during SASO.
——
——
a. Peace operations.
b. Humanitarian operations.
c. Disaster relief operations.
8. Provided maintenance support in adverse conditions.
——
——
a. Desert operations.
b. Cold weather operations.
c. Jungle operations.
20 May 2010
3-373
STP 9-91A14-SM-TG
Performance Measures
GO NO-GO
d. Mountain operations.
e. Urban terrain operations.
Evaluation Guidance: Score the Soldier GO if all performance measures are passed. Score the Soldier
NO-GO if any performance measure is failed. If the Soldier fails any performance measure, show what was
done wrong and how to do it correctly.
References
Required
Related
FM 4-30.3
3-374
20 May 2010
STP 9-91A14-SM-TG
Appendix A
HANDS-ON EVALUATION (DA FORM 5164-R)
INSTRUCTIONS
(Excerpted from STP 21-24-SMCT, Appendix C)
DA Form 5164-R (Hands-On Evaluation) allows the trainer to keep a record of the performance measures a
soldier passes or fails on each task.
Before evaluation:
1. Obtain a blank copy of DA Form 5164-R, which you may locally reproduce on 8 ½“ x 11“ paper.
2. Enter the task title and 10-digit number from the STP task summary.
3. In Column a, enter the performance measure numbers from the task summary.
4. In Column b, enter the performance measure corresponding to the number in Column a (you may
abbreviate this information if necessary).
5. Locally reproduce the partially completed form when evaluating more than one soldier on the task
or when evaluating the same soldier more than once.
During evaluation:
1. Enter the date just before evaluating the soldier's task performance.
2. Enter the evaluator's name, the soldier's name, and the unit.
3. For each performance measure in Column b, enter a check in Column c (PASS) or Column d
(FAIL), as appropriate.
4. Compare the number of performance measures the soldier passes (and, if applicable, which ones)
against the task standards specified in the task summary. If the standards are met or exceeded,
check the GO block under STATUS; otherwise, check the NO-GO block.
20 May 2010
A-1
STP 9-91A14-SM-TG
Figure A-1. Sample of a Completed DA Form 5164-R
A-2
20 May 2010
STP 9-91A14-SM-TG
Appendix B
FIELD EXPEDIENT SQUAD BOOK (DA FORM 5165-R)
INSTRUCTIONS
DA Form 5165-R (Field Expedient Squad Book) allows the trainer to keep a record of task proficiency for a
group of Soldiers.
Before evaluation:
1. Obtain a blank copy of DA Form 5165-R, which you may locally reproduce on 8 1/2 x 11 paper.
2. Locally reproduce the partially completed form if you are evaluating more than nine Soldiers.
During evaluation:
1. Enter the names of the Soldiers you are evaluating, one name per column, at the top of the form.
2. Under STATUS, record (in pencil) the date in the GO block if the Soldier demonstrated task
proficiency to Soldier’s manual standards. Keep this information current by always recording the
most recent date on which the Soldier demonstrated task proficiency. Record the date in the
NO-GO block if the Soldier failed to demonstrate task proficiency to Soldier’s manual standards.
Soldiers who failed to perform the task should be retrained and reevaluated until they can meet
the standards. When the standards are met, enter the date in the appropriate GO block and erase
the previous entry from the NO-GO block.
After evaluation:
1. Read down each column (GO/NO-GO) to determine the training status of an individual. This will
give you a quick indication of which tasks a Soldier needs training on.
2. Read across the rows for each task to determine the training status of all Soldiers. You can readily
see which tasks to focus training on.
3. Line through the STATUS column of any Soldier who leaves the unit.
20 May 2010
B-1
STP 9-91A14-SM-TG
Figure B-1. Sample of a Completed DA Form 5165-R
B-2
20 May 2010
STP 9-91A14-SM-TG
Glossary
SECTION I - ACRONYMS AND ABBREVIATIONS
AAR
after-action review; after-action report
AC
Active Component
AHU
air handling unit
AIM (1)
analog input module
AISM
automated information systems manual
AIT
Advanced Individual Training
SLC
Advanced Noncommissioned Officer Course
AOAP
Army Oil Analysis Program
APC
armored personnel carrier
app
appendix
APU
Auxiliary Power Unit
AR
Army regulation
aux
auxiliary
AZ
azimuth
BA
biannually
BDAR
battle damage assessment and repair
BICU
biocular image control unit
BII
basic issue items
BIT
built-in test
BL
low battery
ALC
Basic Noncommissioned Officer Course
BOB
Break-Out Box
BPS (1)
battery power source
BTY
battery
BW
biweekly
BX
box
CB(1)
Circuit Breaker
CCHA
commander's control handle assembly
CD (2)
compact disk
CDA (1)
controller diagnostic aid
CD-ROM
Compact Disk-Read Only Memory
CDU
control display unit
CDU (1)
commander's display unit
CEU
computer electronics unit
chap
chapter
CID (1)
commander's integrated display
CITV
commander's independent thermal viewer
CITV-EU
commander's independent thermal viewer-electronic unit
20 May 2010
Glossary-1
STP 9-91A14-SM-TG
CKT
circuit
CLR
clear
CLT (1)
common logistic task
CMDR
commander
COAX
coaxial
COEI
components of end item
cont
continued; continuous
CTS
contact test set
cw (2)
clockwise
CWS
commander's weapon station
CWS-PCU
commander's weapon station power control unit
CWSS
commander's weapon station sight
D
Drive
DA
Department of the Army
DA Form
Department of the Army form
DA PAM
Department of the Army pamphlet
DACU
digital azimuth control unit
DB
data base
DID (1)
driver's integrated display
DMM
digital multimeter
DPO
removable disk pack
DPY
display
DS
direct support
DSPL
display (control)
DTS (1)
diagnostic test set
DVRS
Digital Voice Recorder System
e.g.
for example
Ea
each
ea (1)
each
ECU
electronic control unit
EDF
Equipment Data File
EIC
equipment identification code
EIC (1)
End Item Code
EL (1)
elevation
ETM
extension training material
ETM (1)
electronic technical manual
FCEU
fire control electronic unit
FIT
Fault Isolation Test
FLIR
forward looking infrared
FM (1)
field manual
FMC
fully mission capable
Glossary-2
20 May 2010
STP 9-91A14-SM-TG
FOV
Field Of View
GCDP
gunner's control display panel
GPS
global positioning system
GTD
gun turret drive
HMPU
hull mission processor unit
HNB
hull networks box
HPDU
hull power distribution unit
HTEU
hull/turret electronics unit
IEEE
Institute of Electrical & Electronics Engineers
IETM
interactive electronic technical manual
IVIS
Vehicular Information System
LAN
Local Area Network
LCD
liquid crystal display
LOS (1)
line of sight
MACOM
major Army command
MARKS
Modern Army Record Keeping System
MCP
maintenance collection point
MCSR
Materiel Condition Status Report
MD
military deception
MMU (1)
mass memory unit
MOS
military occupational specialty
MOSC
military occupational specialty code
MSDS
Material Safety Data Sheet
NA
not applicable
NBC
nuclear, biological, and chemical
NCO
noncommissioned officer
NCOER
Noncommissioned Officer Evaluation Report
NMC
non-mission capable
OPORD
operations order
ORD
operational requirements document
pam
pamphlet
para
paragraph
PC (1)
Personnel Computer
PLL
Prescribed Load List
PMCS
preventive maintenance checks and services
POL
petroleum, oils, and lubricants
POS/NAV
position/navigation system
QA
quality assurance
QC
quality control
QMP
Qualitative Management Program
QT
quarterly
20 May 2010
Glossary-3
STP 9-91A14-SM-TG
RDL
Reimer Digital Library
RIU
radio interface unit
RSM
remote switching module
RX
reparable exchange
SA (1)
semiannual
SAMS
Standard Army Maintenance System
SAMS-1
Standard Army Maintenance System-Level 1
SAMS-2
Standard Army Maintenance System-Level 2
SARSS-O
Standard Army Retail Supply System-Objective
SASO
stability and support operations
SC
supply catalog
SGCEU
second generation common electronics unit
SGSEU
second generation servo electronics unit
SGTRU
second generation thermal receiver unit
SKO
sets, kits and outfits
SL
skill level
SM
Soldier's Manual
SME
subject matter expert
SMI (1)
soldier machine interface
SOP
standing operating procedure
SPORT
Soldier's Portable On-system Repair Tool
STP
Soldier training publication
Suppl
supplement
TAMMS
The Army Maintenance Management System
TB
technical bulletin
TC (1)
training circular
TIS (1)
thermal imaging system
TM
technical manual
TMDE
test, measurement, and diagnostic equipment
TMPU
turret mission processor unit
TMS
thermal management system
TNB
turret networks box
TRADOC
Training and Doctrine Command
ULLS
Unit Level Logistics System
ULLS-G
Unit Level Logistics System-Ground
UMCP
unit maintenance collection point
USAMC
United States Army Materiel Command
UUAPU
under armor auxiliary power unit
VCSU
vapor compression system unit
VGA
Video Graphics Array
Glossary-4
20 May 2010
STP 9-91A14-SM-TG
SECTION II - TERMS
Class III
(supply) POL
MOS Training Plan (MTP)
The MTP addresses all skill levels (SL) of an MOS and all duty positions, to include additional skill
identifiers (ASI), special qualifications identifiers (SQI), and language identifier codes (LIC),
associated with each SL which has unique critical task training requirements. The MTP lists all
MOS-specific and shared critical tasks for which the MOS is responsible.
20 May 2010
Glossary-5
This page intentionally left blank.
STP 9-91A14-SM-TG
References
Required Publications
Required publications are sources that users must read in order to understand or to comply with this
publication.
Army Regulations
AR 190-13, The Army Physical Security Program, 30 September 1993.
AR 190-51, Security of Unclassified Army Property (Sensitive and Nonsensitive), 30 September 1993.
AR 220-1, Army Unit Status Reporting and Force Registration - Consolidated Policies, 15 April 2010.
AR 25-1, Army Knowledge Management and Information Technology, 4 December 2008.
AR 25-400-2, The Army Records Information Management System (ARIMS), 2 October 2007.
AR 385-10, The Army Safety Program, 23 August 2007.
AR 600-55, The Army Driver and Operator Standardization Program (Selection, Training, Testing, and
Licensing), 18 June 2007.
AR 600-8-2, Suspension of Favorable Personnel Actions (Flags), 23 December 2004.
AR 614-200, Enlisted Assignments and Utilization Management, 26 February 2009.
AR 623-3, Evaluation Reporting System, 10 August 2007.
AR 635-200, Active Duty Enlisted Administrative Separations, 6 June 2005.
AR 700-138, Army Logistics Readiness and Sustainability, 26 February 2004.
AR 700-4, Logistics Assistance, 14 December 2007.
AR 710-2, Supply Policy Below the National Level, 28 March 2008.
AR 725-50, Requisition, Receipt, and Issue System, 15 November 1995.
AR 735-5, Policies and Procedures for Property Accountability, 28 February 2005.
AR 750-1, Army Materiel Maintenance Policy, 20 September 2007.
AR 750-10, Army Modification Program, 24 February 2006.
AR 750-43, Army Test, Measurement, and Diagnostic Equipment, 3 November 2006.
Department of Army Pamphlets
DA PAM 25-30, Consolidated Index of Army Publications and Blank Forms, 14 July 2009.
DA PAM 25-33, User's Guide for Army Publications and Forms, 15 September 1996.
DA PAM 25-40, Army Publishing: Action Officers Guide, 7 November 2006.
DA PAM 710-2-1, Using Unit Supply System (Manual Procedures), 31 December 1997.
DA PAM 710-2-2, Supply Support Activity Supply System: Manual Procedures, 30 September 1998.
DA PAM 738-751, Functional Users Manual for the Army Maintenance Management System-Aviation
(TAMMS-A), 15 March 1999.
DA PAM 750-1, Commanders' Maintenance Handbook, 2 February 2007.
DA PAM 750-3, Soldiers' Guide for Field Maintenance Operations, 28 September 2006.
DA PAM 750-8, The Army Maintenance Management System (TAMMS) Users Manual, 22 August 2005.
Field Manuals
FM 1-02, Operational Terms and Graphics, 21 September 2004.
FM 3-25.26, Map Reading and Land Navigation, 18 January 2005.
FM 3-34.170, Engineer Reconnaissance, 25 March 2008.
FM 4-30.3, Maintenance Operations and Procedures, 28 July 2004.
20 May 2010
References-1
STP 9-91A14-SM-TG
FM 5-125, Rigging Techniques, Procedures, and Applications, 3 October 1995.
FM 6-22.5, Combat and Operational Stress Control Manual for Leaders and Soldiers, 18 March 2009.
FM 7-0 (FM 25-4, FM 25-5, FM 25-100), Training for Full Spectrum Operations, 12 December 2008.
Lubrication Orders
LO 9-2350-256-12, Recovery Vehicle, Full-Tracked, Medium, M88A1 (NSN 2350-01-122-6826),
28 February 1986.
LO 9-2350-264-13, Tank, Combat, Full-Tracked: 120-mm Gun, M1A1 (NSN 2350-01-087-1095) General
Abrams, 1 November 2008.
LO 9-2350-284-12, Fighting Vehicle Infantry M2A2 and M2A2 ODS; Fighting Vehicle Cavalry M3A2 and
M3A2 ODS, 15 February 1997.
Other Product Types
AISM-25-L21-AHN-ZZZ-EM, Standard Army Maintenance System Level 1 (SAMS-1) L211000 End User
AISM-25-L26-AHO-ZZZ-EM, Standard Army Maintenance, System Level 2 (SAMS-2E) End User Manual,
14 March 2009, (available from www.us.army.mil/portal/portal_home.jhtml ).
EM 0266, TM 9-2350-292-14&P, Interactive Electronic Technical Manual for Recovery Vehicle, Heavy,
M88A2 (Hercules) (Contains Data Sets 20, 24P, and 34), 15 June 2007.
STP 21-1-SMCT, Soldier’s Manual of Common Tasks Skill Level 1, 18 June 2009.
STP 21-24-SMCT, Soldier’s Manual of Common Tasks (SMCT) Warrior Leader Skill Level 2, 3, and 4,
9 September 2008.
Technical Bulletins
TB 43-0142, Safety Inspection and Testing of Lifting Devices, 28 February 1997.
TB 43-180, Calibration and Repair Requirements for the Maintenance of Army Materiel, 1 June 2010.
Technical Manuals
TM 11-5820-890-10-3, Operator's Manual for SINCGARS Ground Combat Net Radio, Non-ICOM Manpack
Radio AN/PRC-119 (NSN 5820-01-151-9915) (EIC: L2A) Short Range Vehicular Radio AN/VRC-87
(5820-01-151-9916) (EIC: L2T) Short Range Vehicular Radio (with Single Radio Mount), AN/VRC-87D
(5820-01-351-5259) (EIC: TBD), Short Range Vehicular Radio With Dismount AN/VRC 91
(5820-01-151-9920) (EIC: L2X), Long Range/Long Range Vehicular Radio AN/VRC-92
(5820-01-151-9921) (EIC: L2Y), 1 September 1992.
TM 11-6625-3052-14, Operator's, Unit, Direct Support and General Support Maintenance Manual for
Digital Multimeter AN/PSM-45 (NSN 6625-01-139-2512), 10 January 1984TM 5-5420-232-10,
Operator's Manual Operator Controls, PMCS, Operation under Usual Conditions, Unusual
Conditions, Troubleshooting and Maintenance, Bridge Launching Carrier M104 Wolverine (NSN
5420-01-430-5403), 1 March 2001.
TM 9-1000-202-14, Evaluation of Cannon Tubes, 1 February 1999.
TM 9-2320-279-10-1, Operators Manual for M977 Series 8X8 Heavy Expanded Mobility Tactical Trucks
(HEMTT), Truck, Cargo, With Winch, M977 (NSN 2320-01-097-0260); Truck, Cargo, With Winch,
M977A2 (2320-01-493-3774); Truck, Cargo, With Winch, M977A2R1 (2320-01-493-3782); Truck,
Cargo, Without Winch, M977; Truck, Cargo, Without Winch M977A2R1 (2320-01-493-3789),
Truck, Cargo With Winch, M985E1 (2320-01-194-7032); Truck, Cargo, With Winch, M985E1A2
(2320-01-493-3790); Truck, Cargo, With Winch M985EA1A2R1 (2320-01-493-3792),
21 November 1986.
TM 9-2320-279-10-2, Operator's Manual for M977 Series, 8X8 Heavy Expanded Mobility Tactical Trucks
(HEMTT) Truck, Cargo, With Winch M977 (2320-01-097-0260); Truck, Cargo, With Winch,
M977A2 (2320-01-493-3774); Truck, Cargo, With Winch, M977A2R1 (2320-01-493-3782); Truck,
Cargo, Without Winch, M977 (2320-01-099-6426); Truck, Cargo, Without Winch, M985A2R1
(2320-01-493-3789); Truck, Cargo, With Winch, M985E1 (2320-01-194-7032); Truck, Cargo, With
References-2
20 May 2010
STP 9-91A14-SM-TG
Winch, M985E1A2 (2320-01-493-3790); Truck, Cargo, With Winch, M985E1A2R1
(2320-01-493-3792), 15 June 1987.
TM 9-2320-279-20-1, Maintenance Instructions for Organizational Maintenance M977 Series, 8X8 Heavy
Expanded Mobility Tactical Trucks (HEMTT) Truck, Cargo, With Winch M977 (NSN
2320-01-097-0260); Truck, Cargo, Without Winch M977 (2320-01-099-6426); Truck, Tank, Fuel,
With Winch M978 (2320-01-097-0249); Truck, Tank, Fuel, Without Winch M978
(2320-01-194-7032); Truck, Cargo, With Winch M985E1 (2320-01-194-7032); Truck, Cargo,
Without Winch M985E1 (2320-01-194-7031), 7 April 1987.
TM 9-2320-279-20-2, Maintenance Instructions for Organizational Maintenance for M977 Series, 8X8
Heavy Expanded Mobility Tactical Trucks (HEMTT) Truck, Cargo, With Winch M977 (NSN
2320-01-097-0260); Truck, Cargo, With Winch, M977A2 (2320-01-493-3774); Truck, Cargo, With
Winch, M977A2R1 (2320-01-493-3782); Truck, Cargo, With Winch, M985E1A2
(2320-01-493-3790); Truck, Cargo, With Winch, M985E1A2R1 (2320-01-493-3792), 7 April 1987.
TM 9-2320-279-20-3, Maintenance Instructions Organizational Maintenance M977 Series, 8x8 Heavy
Expanded Mobility Tactical (HEMTT) Truck, Cargo With Winch M977 (NSN 2320-01-097-0260);
Truck, Cargo, Without Winch M977 (2320-01-099-6426); Truck, Tank, Fuel, With Winch M978
(2320-01-097-0249); Truck, Tank, Fuel, Without Winch M978 (2320-01-194-7032); Truck, Cargo,
Without Winch M985E1 (2320-01-194-7031); 8 April 1987.
TM 9-2350-256-10, Operator's Manual for Recovery Vehicle, Full Tracked, Medium, M88A1 (NSN
2350-00-122-6826), 31 March 1998.
TM 9-2350-256-20-1, Unit Maintenance Manual for Recovery Vehicle, Full Tracked: Medium, M88A1
(NSN: 2350-00-122-6826) (EIC: AQA) Volume 1, 27 November 2005.
TM 9-2350-256-20-2, Unit Maintenance Manual for Recovery Vehicle, Full Tracked: Medium, MM88A1
(NSN: 2350-00-122-6826) (EIC: AQA) Volume 2, 27 June 2005.
TM 9-2350-256-24P-1, Unit, Direct Support and General Support Maintenance Repair Parts and Special
Tools List (Including Depot Maintenance Repair Parts and Special Tools) for Recovery Vehicle, Full
Tracked; Medium M88A1 (NSN 2350-00-122-6826), 29 May 1992.
TM 9-2350-256-24P-2, Unit, Direct Support and General Support Maintenance Repair Parts and Special
Tools List (Including Depot Maintenance Repair Parts and Special Tools) for Recovery Vehicle, Full
Tracked; Medium, M88A1 (NSN 2350-00-122-6826), 8 May 1992.
TM 9-2350-264-10-1, Operator Controls, PMCS, and Operations Under Usual Conditions Volume 1 of 2
Tank, Combat, Full-Tracked: 120-MM Gun, M1A1 (NSN 2350-01-087-1095) General Abrams
(TM 08953A-10/1-1), 5 March 2003.
TM 9-2350-264-10-2, Operator's Manual for Unusual Conditions, Troubleshooting, and Maintenance
Volume 2 of 2 Tank, Combat, Full-Tracked: 120-MM Gun, M1A1 (NSN 2350-01-087-1095) General
Abrams (TM 08953-10/1-2), 5 March 2003.
TM 9-2350-264-20-1-1, Unit Maintenance Manual VOL 1 of 5 for Tank, Combat, Full-Tracked: 120-MM
Gun, M1A1 (NSN 2350-01-087-1095) (EIC: AAB) General Abrams, Hull (TM 08953A-20/2-1),
5 March 2003.
TM 9-2350-264-20-1-2, Unit Maintenance Manual VOL 2 of 5 for Tank, Combat, Full-Tracked: 120-MM
Gun, M1A1 (NSN 2350-01-087-1095) (EIC: AAB) General Abrams, Hull (TM 08953A-20/2-2),
5 March 2003.
TM 9-2350-264-20-1-3, Unit Maintenance Manual VOL 3 of 5 for Tank, Combat, Full-Tracked: 120-MM
Gun, M1A1 (NSN 2350-01-087-1095) (EIC: AAB) General Abrams, Hull (TM 08953A-20/2-3),
5 March 2003.
TM 9-2350-264-20-1-4, Unit Maintenance Manual VOL 4 of 5 for Tank, Combat, Full-Tracked: 120-MM
Gun, M1A1 (NSN 2350-01-087-1095) (EIC: AAB) General Abrams, Hull (TM 08953A-20/2-4),
5 March 2003.
TM 9-2350-264-20-1-5, Unit Maintenance Manual VOL 5 of 5 for Tank, Combat, Full-Tracked: 120-MM
Gun, M1A1 (NSN 2350-01-087-1095) (EIC: AAB) General Abrams, Hull (TM 08953A-20/2-5),
5 March 2003.
20 May 2010
References-3
STP 9-91A14-SM-TG
TM 9-2350-264-20-2-1, Unit Maintenance Manual VOL 1 of 4 for Tank, Combat, Full-Tracked: 120-MM
Gun, M1A1 (NSN 2350-01-087-1095) (EIC: AAB) General Abrams, Turret (TM 08953A-20/3-1),
1 April 2003.
TM 9-2350-264-20-2-2, Unit Maintenance Manual VOL 2 of 4 for Tank, Combat, Full-Tracked: 120-MM
Gun, M1A1 (NSN 2350-01-087-1095) (EIC: AAB) General Abrams, Turret (TM 08953A-20/3-2),
1 April 2003.
TM 9-2350-264-20-2-3, Unit Maintenance Manual VOL 3 of 4 for Tank, Combat, Full-Tracked: 120-MM
Gun, M1A1 (NSN 2350-01-087-1095) (EIC: AAB) General Abrams, Turret (TM 08953A-20/3-3),
1 April 2003.
TM 9-2350-264-20-2-4, Unit Maintenance Manual VOL 4 of 4 for Tank, Combat, Full-Tracked: 120-MM
Gun, M1A1 (NSN 2350-01-087-1095) (EIC: AAB) General Abrams, Turret (TM 08953A-20/3-4),
1 April 2003.
TM 9-2350-264-24-1, Unit, Direct Support and General Support Maintenance Manual Systems Schematics
Tank, Combat, Full-Tracked: 120-MM Gun, M1A1 (NSN: 2350-01-087-1099) (EIC: AAB), General
Abrams Hull, 7 September 2009.
TM 9-2350-264-24-2, Unit Intermediate Direct Support and General Support Maintenance Manual for
System Schematic, Tank, Combat, Full-Tracked: 120-MM Gun, M1A1, (NSN 2350-01-087-1095)
(EIC:AAB) General Abrams Turret, 30 October 2007.
TM 9-2350-264-24P-2, Unit, Direct Support and General Support Maintenance Repair Parts and Special
Tools List (Including Depot Maintenance Repair Parts) for Tank, Combat, Full-Tracked, 120-MM
Gun, M1A1(NSN 2350-01-087-1095) (EIC: AAB) General Abrams Turret, 23 April 1999.
TM 9-2350-264-34-1-1, Direct Support and General Support Maintenance Manual for Tank, Combat,
Full-Tracked: 120-MM, M1A1 (NSN 2350-01-087-1095) General Abrams Hull VOL 1 of 2 (TM
08953A-34/5-1), 5 March 2003.
TM 9-2350-264-34-1-2, Direct Support and General Support Maintenance Manual VOL 2 of 2 for Tank,
Combat, Full-Tracked: 120-MM, M1A1 (NSN 2350-01-087-1095) General Abrams Hull
(TM 08953A-34/5-2), 5 March 2003.
TM 9-2350-264-34-2-1, Direct Support and General Support Maintenance Manual Volume 1 of 2 for Tank
Combat, Full-Tracked: 120-MM Gun, M1A1 (NSN 2350-01-087-1095) (EIC: AAB) General Abrams
Turret (TM 08953A-34P/6-1), 1 April 2003.
TM 9-2350-264-34-2-2, Direct Support and General Support Maintenance Manual for Volume 2 of 2 Tank
Combat, Full-Tracked: 120-MM Gun, M1A1 (NSN 2350-01-087-1095) (EIC: AAB) General Abrams
Turret [TM 08953A-34/6-1], 2 February 2003.
TM 9-2350-284-20-2-1, Unit Maintenance for Fighting Vehicle, Infantry M2A2 (NSN 2350-01-248-7619)
(EIC: ALG); Fighting Vehicle, Infantry, M2A2 Operation Desert Storm (2350-01-405-9886) (EIC:
APE); Fighting Vehicle, M2A2 W/ODS for Engineers (2350-01-494-9960); Fighting Vehicle,
Cavalry, M3A2 (2350-01-248-7620) (EIC: ALH); Fighting Vehicle, Cavalry, M3A2 Operation Desert
Storm (2350-01-405-9887) (EIC: APF) Turret, 19 July 2002.
TM 9-2350-284-20-2-2, Unit Maintenance for Fighting Vehicle, Infantry M2A2 (NSN 2350-01-248-7619)
(EIC: ALG); Fighting Vehicle, Infantry, M2A2 Operation Desert Storm (2350-01-405-9886) (EIC:
APE); Fighting Vehicle, M2A2 W/ODS for Engineers (2350-01-494-9960); Fighting Vehicle,
Cavalry, M3A2 (2350-01-248-7620) (EIC: ALH); Fighting Vehicle, Cavalry, M3A2 Operation Desert
Storm (2350-01-405-9887) (EIC: APF) Turret, 19 July 2002.
TM 9-2350-284-20-2-3, Unit Maintenance for Fighting Vehicle, Infantry M2A2 (NSN 2350-01-248-7619)
(EIC: ALG); Fighting Vehicle, Infantry, M2A2 Operation Desert Storm (2350-01-405-9886) (EIC:
APE); Fighting Vehicle, M2A2 W/ODS for Engineers (2350-01-494-9960); Fighting Vehicle,
Cavalry, M3A2 (2350-01-248-7620) (EIC: ALH); Fighting Vehicle, Cavalry, M3A2 Operation Desert
Storm (2350-01-405-9887) (EIC: APF) Turret, 19 July 2002.
TM 9-2350-284-20-1-1, Unit Maintenance for Fighting Vehicle, Infantry M2A2 (NSN 2350-01-248-7619)
(EIC: ALG); Fighting Vehicle, Infantry, Operation Desert Storm M2A2 ODS (2350-01-405-9886)
(EIC: APE); Fighting Vehicle, M2A2 W/ODS for Engineers (2350-01-494-9960) and Fighting
References-4
20 May 2010
STP 9-91A14-SM-TG
Vehicle, Cavalry M3A2 (2350-01-248-7620) (EIC: ALH); Fighting Vehicle, Cavalry, Operation
Desert Storm M3A2 ODS (2350-01-405-9887) (EIC: APF) Hull, 31 May 1989.
TM 9-2350-284-20-1-2, Unit Maintenance for Fighting Vehicle, Infantry M2A2 (NSN 2350-01-248-7619)
(EIC: ALG); Fighting Vehicle, Infantry, Operation Desert Storm M2A2 ODS (2350-01-405-9886)
(EIC: APE); Fighting Vehicle, M2A2 W/ODS for Engineers (2350-01-494-9960) and Fighting
Vehicle, Cavalry M3A2 (2350-01-248-7620) (EIC: ALH); Fighting Vehicle, Cavalry, Operation
Desert Storm M3A2 ODS (2350-01-405-9887) (EIC: APF) Hull, 31 May 1989.
TM 9-2350-284-20-1-3, Unit Maintenance Manual for Fighting Vehicle, Infantry M2A2 (NSN
2350-01-248-7619) (EIC: ALG); Fighting Vehicle, Infantry, Operation Desert Storm M2A2
(2350-01-405-9886) (EIC: ALG) and Fighting Vehicle, Cavalry M3A2 (2350-01-248-7620) (EIC:
ALH); Fighting Vehicle, Cavalry, Operation Desert Storm M2A2 ODS (2350-01-405-9887) (EIC:
ALH), 13 August 1980.
TM 9-2350-284-20-1-4, Unit Maintenance for Fighting Vehicle, Infantry M2A2 (NSN 2350-01-248-7619)
(EIC: ALG); Fighting Vehicle, Infantry, Operation Desert Storm M2A2 ODS (2350-01-405-9886)
(EIC: APE) and Fighting Vehicle, Cavalry M3A2 (2350-01-248-7620) (EIC: ALH); Fighting Vehicle,
Cavalry, Operation Desert Storm M3A2 ODS (2350-01-405-9887) (EIC: APF) Hull, 31 May 1989.
TM 9-2350-284-20-1-5, Unit Maintenance for Fighting Vehicle, Infantry M2A2 (NSN 2350-01-248-7619)
(EIC: ALG); Fighting Vehicle, Infantry Operation Desert Storm M2A2 ODS (2350-01-405-9886)
(EIC: APE) and Fighting Vehicle, Cavalry M3A2 (2350-01-248-7620) (EIC: ALH); Fighting Vehicle,
Operation Desert Storm M3A2 ODS (2350-01-405-9887) (EIC: APF) Hull, 15 February 1997.
TM 9-2350-284-10-1, Operator's Manual for High Survivability Fighting Vehicle, Infantry M2A2 (NSN
2350-01-248-7619) (EIC: ALG) and Fighting Vehicle, Cavalry M3A2 (2350-01-248-7620) (EIC:
ALH) Hull, 24 May 2003.
TM 9-2350-284-10-2, Operator's Manual for Fighting Vehicle, Infantry M2A2 (NSN 2350-01-248-7619)
(EIC: ALG) and Fighting Vehicle, Cavalry M3A2 (2350-01-248-7620) (EIC: ALH) Turret,
30 November 2009.
TM 9-2350-288-10-1, Operator's Manual Volume 1 of 2 Tank, Combat, Full-Tracked: 120-MM Gun, M1A2
(NSN 2350-01-328-5964) General Abrams, 13 July 1995.
TM 9-2350-288-10-2, Operator's Manual Volume 2 of 2 Tank, Combat, Full-Tracked: 120-MM Gun, M1A2
(NSN 2350-01-328-5964) General Abrams, 13 July 1995.
TM 9-2350-288-20-1-1, Unit Maintenance Manual for Volume 1 of 5, Tank, Combat, Full-Tracked: 120-MM
Gun, M1A2 (NSN 2350-01-328-5964) (EIC: AAF) General Abrams Hull, 2 August 1995.
TM 9-2350-288-20-1-2, Unit Maintenance Manual for Volume 2 of 5, Tank, Combat, Full-Tracked: 120-MM
Gun, M1A2 (NSN 2350-01-328-5964) (EIC: AAF) General Abrams Hull, 2 August 1995.
TM 9-2350-288-20-1-3, Unit Maintenance Manual for Volume 3 of 5, Tank, Combat, Full-Tracked: 120-MM
Gun, M1A2 (NSN 2350-01-328-5964) (EIC: AAF) General Abrams Hull, 2 August 1995.
TM 9-2350-288-20-1-4, Unit Maintenance Manual for Volume 4 of 5, Tank, Combat, Full-Tracked: 120-MM
Gun, M1A2 (NSN 2350-01-328-5964) (EIC: AAF) General Abrams Hull, 2 August 1995.
TM 9-2350-288-20-1-5 Unit Maintenance Manual for Volume 5 of 5, Tank, Combat, Full-Tracked: 120-MM
Gun, M1A2 (NSN 2350-01-328-5964) (EIC: AAF) General Abrams Hull, 2 August 1995.
TM 9-2350-288-20-2-1, Unit Maintenance Manual, VOL 1 of 4, Tank, Combat, Full-Tracked: 120-MM Gun,
M1A2 (NSN 2350-01-328-5964) (EIC: AAF) General Abrams Turret, 22 August 1995.
TM 9-2350-288-20-2-2, Unit Maintenance Manual, VOL 2 of 4, Tank, Combat, Full-Tracked: 120-MM Gun,
M1A2 (NSN 2350-01-328-5964) (EIC: AAF) General Abrams Turret, 22 August 1995.
TM 9-2350-288-20-2-3, Unit Maintenance Manual, VOL 3 of 4, Tank, Combat, Full-Tracked: 120-MM Gun,
M1A2 (NSN 2350-01-328-5964) General Abrams Turret, 22 August 1995.
TM 9-2350-288-20-2-4, Unit Maintenance Manual, VOL 4 of 4, Tank, Combat, Full-Tracked: 120-MM Gun,
M1A2 (NSN 2350-01-328-5964) (EIC: AAF) General Abrams Turret, 22 August 1995.
TM 9-2350-288-24-1, Unit, Direct Support, and General Support Maintenance Manual, System Schematics
Tank, Combat, Full-Tracked: 120-MM Gun, M1A2 (NSN 2350-01-328-5964) (EIC: AAF) General
Abrams Hull, 1 August 2005.
20 May 2010
References-5
STP 9-91A14-SM-TG
TM 9-2350-288-24-2, Unit, Direct Support, and General Support Maintenance Manual System Schematics
Tank, Combat, Full-Tracked: 120-MM Gun, M1A2 (NSN 2350-01-328-5964) (EIC: AAF) General
Abrams, 16 July 2005.
TM 9-2350-288-24P-1, Unit, Direct Support, and General Support Maintenance Repair Parts and Special
Tools List (Including Depot Maintenance Repair Parts) for Tank, Combat, Full Tracked: 120-MM
Gun, M1A2 (NSN 2350-01-328-5964) (EIC: AAF) General Abrams Hull, 31 July 2001.
TM 9-2350-288-24P-2, Unit, Direct Support, and General Support Maintenance Repair Parts and Special
Tools List (Including Depot Maintenance Repair Parts) for Tank, Combat, Full Tracked: 120-MM
Gun, M1A2 (NSN 2350-01-328-5964) (EIC: AAF) General Abrams Turret, 10 October 2000.
TM 9-2350-292-10, Operator's Manual for Recovery Vehicle, Heavy, Full-Tracked: M88A2 (NSN
2350-01-390-4683) (EIC: ACQ), 1 November 2005.
TM 9-2350-292-14&P, Interactive Electronic Technical Manual (IETM) for Recovery Vehicle, Heavy,
M88A2 (HERCULES), 15 June 2007.
TM 9-2350-314-10, Operator's Manual for Howitzer, Medium, Self-Propelled: 155MM, M109A6 (NSN
2350-01-305-0028) (EIC: 3FC), 8 February 1999.
TM 9-2350-388-10-1, Operator's Manual for Tank, Combat, Full-Tracked: 120-MM Gun, M1A2 System
Enhancement Package (SEP) (NSN 2350-01-328-5964) (EIC: AAF) General Abrams Volume 1 of
3, 6 February 2009.
TM 9-2350-388-10-2, Operator's Manual for Tank, Combat, Full-Tracked: 120-MM Gun, M1A2 System
Enhancement Package (SEP) (NSN 2350-01-328-5964) (EIC: AAF) General Abrams Volume 2 of
3, 6 February 2009.
TM 9-243, Use and Care of Hand Tools and Measuring Tools {TO 32-1-101; M6290-AJ-MAN-010;
TM-10209-10/1}, 1 December 2004.
TM 9-2835-255-34, Direct Support and General Support Maintenance Manual for Turbine Engine, Field
Service, Model AGT 1500 (M1/1PM1) (P/N 12287428) and Turbine Engine, Field Service Model
AGT 1500 (M1A1) (P/N 12324029), and Container (NSN 8145-01-112-6574), Turbine Engine With
Container Model AGT1500 (m1/1PM1/M1A1) (P/N 5705196); (2835-01-216-8639), and Turbine
Engine With Container Model AGT1500 With Battle Field Override and Pulse Jet (M1A1/M1A2)
(P/N 57K2919) (2835-01-408-7048), 28 October 1987.
TM 9-4910-751-14&P, Operator, Unit, Direct Support Maintenance Manual for Test Set, STE-M1/FVS
(NSN 6625-01-135-4389) (4910-01-135-4379) (4910-01-142-2640), 28 May 1991.
TM 9-6115-542-24&P, Unit, Direct Support and General Support Maintenance Manual Including Repair
Parts and Special Tools List (RPSTL) for External Auxiliary Power Unit (EAPU) (NSN
6115-01-369-7465) (12387361) [TM 9-6115-24&P/1], 17 May 1999.
TM 9-6625-2301-14&P, Interactive Electronic Technical Manual (IETM) for Operating Instructions,
Organization/Direct Support/General Support Maintenance, and Repair Parts List for Test Set,
Electronic Systems, AN/PSM-95 (NSN 6625-01-445-0085), Part No. 13580703, and Maintenance
Support Device (MSD), 1 April 2009.
TM 5-5420-232-20-1, Unit Maintenance Manual Volume 1 of 5 Bridge Launching Carrier M104 Wolverine
(NSN 5420-01-430-5403), 1 March 2001.
TM 5-5420-232-20-2, Unit Maintenance Manual Volume 2 of 5 Bridge Launching Carrier M104 Wolverine
(NSN 5420-01-430-5403), 1 March 2001.
TM 5-5420-232-20-3, Unit Maintenance Manual Volume 3 of 5 Bridge Launching Carrier M104 Wolverine
(NSN 5420-01-430-5403), 1 March 2001.
TM 5-5420-232-20-4, Unit Maintenance Manual Volume 4 of 5 Bridge Launching Carrier M104 Wolverine
(NSN 5420-01-430-5403), 1 March 2001.
TM 5-5420-232-20-5 Unit Maintenance Manual Volume 5 of 5 Bridge Launching Carrier M104 Wolverine
(NSN 5420-01-430-5403), 1 March 2001.
TM 9-8000, Principles of Automotive Vehicles, 25 October 1985.
References-6
20 May 2010
STP 9-91A14-SM-TG
Training Circulars
TC 43-35, Recovery Training, 3 October 1995.
TC 9-237, Operator's Circular Welding Theory and Application, 7 May 1993.
Related Publications
Related publications are sources of additional information. They are not required in order to understand
this publication.
Technical Manuals
TM 11-5820-401-10-1, Operator's Manual for Radio Sets AN/VRC-12(NSN 5820-00-223-7412),
AN/VRC-43 (5820-00-223-7415), AN/VRC-44 (5820-00-223-7417), AN/VRC-45
(5820-00-223-7418), AN/VRC-46 (5820-00-223-7433), AN/VRC-47 (5820-00-223-7434),
AN/VRC-48 (5820-00-223-7435), and AN/VRC-49 (5820-00-223-7437) (Used Without Intercom
Systems), {EE150-JA-OP1-101-E154; TO 31R2-2VRC-191}, 15 January 1986.
TM 11-5820-401-10-2, Operator's Manual for Radio Sets, AN/VRC-12 (5820-00-223-7412) (EIC: GCC),
AN/VRC-43 (5820-00-223-7415) (EIC: GCD), AN/VRC-44 (5820-00-223-7417) (EIC: GCE),
AN/VRC-45 (5820-00-223-7418) (EIC: GCF), AN/VRC-46 (5820-00-223-7433), AN/VRC-47
(5820-00-223-7434) (EIC: GCH), AN/VRC-48 (5820-00-223-7435) (EIC: GCH), AM/VRC-49
(5820-00-223-7437) (EIC: GCK) (Used With an Intercom System), 23 November 1982.
TM 11-5820-401-10-4, Operator's Quick Checks for Receiver-Transmitter, RT-246( )/VRC (NSN
5820-00-892-0623) and RT-524( )/VRC (5820-00-892-0622), 16 October 1980.
TM 11-5830-340-12, Operator's and Unit Organizational Maintenance Manual for Intercommunication Set,
AN/VIC-1(V) (NSN 5830-00-856-3273) and Control, Intercommunication Set, C-10456/VRC
(5830-01-082-0804), 15 January 1986.
TM 9-2320-366-10-1, Operator's Instructions Manual For M1083 Series, 5-Ton, 6X6, Medium Tactical
Vehicles (MTV) Volume No. 1 of 2 Truck, Car., MTV, M1083 W/WN (NSN 2320-01-360-1895) (EIC:
BT3), W/O WN (2320-01-354-3386) (EIC: BR2); Truck, Car., MTV, W/Material Handling Equipment
(MHE) M1084 (2320-01-354-3387) (EIC: BR3); Truck, Car., Air Drop, M1094 W/WN
(2320-01-360-1894) (EIC: BT2); W/O WN (2320-01-355-3062) (EIC: BTK); Truck, Chassis, MTV,
LWB, M1096 (2320-01-354-4527) (EIC: BR6), 15 September 1998.
TM 9-2320-366-10-2, Operator's Instructions Manual for M1083 Series, 5-Ton, 6X6, Medium Tactical
Vehicles (MTV) Volume No. 2 of 2 Truck, Car., MTV, M1083 W/WN (2320-01-360-1895) (EIC:
BT3), W/O WN (2320-01-354-3386) (EIC: BR2); Truck, Car., MTV, W/Material Handling Equipment
(MHE) M1084 (2320-01-354-3387) (EIC: BR3); Truck, Car., (2320-01-360-1894) (EIC: BT2); W/O
WN (2320-01-355-3062) (EIC: BTK); Truck, Chassis, MTV, LWB, M1096 (2320-354-4527) (EIC:
BR6), 15 September 1998.
TM 9-2320-272-10, Operator's Manual for Truck, 5-Ton, 6X6, M939, M939A1, and M939A2 Series Trucks
(Diesel), Truck, Cargo: 5-Ton, 6X6 Dropside, M923 (2320-01-050-2084) (EIC: BRY); M923A1
(2320-01-206-4087) (EIC: BSS); M923A2 (2320-01-230-0307) (EIC: BS7); M925
(2320-01-047-8769) (EIC: BRT); M925A1 (2320-01-206-4088) (EIC: BST); M925A2
(2320-01-230-0308); 6X6, M936 (2320-01-047-8754) (EIC: BTF); M936A1 (2320-01-206-4078)
(EIC: BS6); M936A2 (2320-01-230-304) (EIC: BTT), 15 August 1996.
TM 9-2835-255-34P, Direct Support and General Support Maintenance Repair Parts and Special Tools List
(Including Depot Maintenance Repair Parts and Special Tools List) for Turbine Engine, Field
Service, Model AGT 1500 (M1/IPM1) (Part No. 12287428) and Turbine Engine, Field Service
Model AGT 1500 (M1A1) (Part No. 12324029) and Turbine Engine, Field Service Model AGT 1500
(M1A1/M1A2) (P/N 12347472) and Container (NSN 8145-01-112-6574), 31 March 1992.
TM 9-2350-264-24P-1, Unit, Direct Support and General Support Maintenance Repair Parts and Special
Tools List (Including Depot Maintenance Repair Parts) for Tank, Combat, Full-Tracked: 120-MM
Gun, M1A1 (NSN 2350-01-087-1095) (EIC: AAB) General Abrams Hull, 5 March 2003.
20 May 2010
References-7
STP 9-91A14-SM-TG
TM 9-2350-388-23-1-1, Field Maintenance Manual for Tank, Combat, Full-Tracked: 120-MM Gun, M1A2
System Enhancement Package (SEP) (NSN: 2350-01-328-5964) (EIC: AAF), General Abrams
Hull, Volume 1 of 7, 6 February 2009.
TM 9-2350-388-23-1-2, Field Maintenance Manual for Tank, Combat, Full-Tracked: 120-MM Gun, M1A2
System Enhancement Package (SEP) (NSN: 2350-01-328-5964) (EIC: AAF), General Abrams
Hull, Volume 2 of 7, 6 February 2009.
TM 9-2350-388-23-1-3, Field Maintenance Manual for Tank, Combat, Full-Tracked: 120-MM Gun, M1A2
System Enhancement Package (SEP) (NSN: 2350-01-328-5964) (EIC: AAF), General Abrams
Hull, Volume 3 of 7, 6 February 2009.
TM 9-2350-388-23-1-4, Field Maintenance Manual for Tank, Combat, Full-Tracked: 120-MM Gun, M1A2
System Enhancement Package (SEP) (NSN: 2350-01-328-5964) (EIC: AAF), General Abrams
Hull, Volume 4 of 7, 6 February 2009.
TM 9-2350-388-23-1-5, Field Maintenance Manual for Tank, Combat, Full-Tracked: 120-MM Gun, M1A2
System Enhancement Package (SEP) (NSN: 2350-01-328-5964) (EIC: AAF), General Abrams
Hull, Volume 5 of 7, 6 February 2009.
TM 9-2350-388-23-1-6, Field Maintenance Manual for Tank, Combat, Full-Tracked: 120-MM Gun, M1A2
System Enhancement Package (SEP) (NSN: 2350-01-328-5964) (EIC: AAF), General Abrams
Hull, Volume 6 of 7, 6 February 2009.
TM 9-2350-388-23-1-7, Field Maintenance Manual for Tank, Combat, Full-Tracked: 120-MM Gun, M1A2
System Enhancement Package (SEP) (NSN: 2350-01-328-5964) (EIC: AAF), General Abrams
Hull, Volume 7 of 7, 6 February 2009.
Prescribed Forms
NONE.
Referenced Forms
DA Forms are available on the APD website (www.apd.army.mil ).
DA Form 17, Requisition for Publications and Blank Forms.
DA Form 17-1, Requisition for Publications and Blank Forms (Continuation Sheet).
DA Form 2028, Recommended Changes to Publications and Blank Forms.
DA Form 2062, Hand Receipt/Annex Number.
DA Form 2404, Equipment Inspection and Maintenance Worksheet.
DA Form 2407, Maintenance Request.
DA Form 4569-1-R, Security Assistance Publication Requisition Code Sheet (LRA).
DA Form 5164-R, Hands-On Evaluation (LRA).
DA Form 5165-R, Field Expedient Squad Book (LRA).
DA Form 5988-E, Equipment Inspection Maintenance Worksheet.
References-8
20 May 2010

 

 

 

 

 

 

 

Content      ..     2      3      4