|
|
Procedure for AZSPU Driving Safety Standard
Page 3 of 28
Refuelling
17
Winter Driving
18
BP Driving Assessments, Trainings & Permitting
18
Defensive Driving Assessments
18
Defensive Driver Trainings
19
BP Driver Permitting
19
PURPOSE
19
AUTHORISATION
19
ISSUING
20
Validity
20
Identification
21
PERFORMANCE MEASURES
23
QUERIES
23
8
BP DRIVER TRAINING PROCESS
23
DRIVER CORE DEFENSIVE DRIVING SKILLS
23
OFF ROAD DRIVING SKILLS
24
Defensive Driver Training Program
24
Off-Road Driver Training Program
25
Fatigue and Tiredness Management Training
26
Skid correction training
26
APPENDIXES (PLEASE CLICK THE LINKS TO VIEW THE CONTENT)
26
Appendix A - BP Driver‟s Permit program Across Azerbaijan, Georgia & Turkey
Appendix B - Vehicle Inspection Documents
Daily Light Vehicle Checklist for Driver
Pre-Trip Vehicle Inspection Guidance
Appendix C - Vehicle Periodic Maintenance Inspection Sheets
Appendix D - Use of communication equipment procedure
Appendix E - Incident Investigation and Reporting Procedure
Appendix F - Specimen questions for LGV & PCV drivers
Appendix G - Driver Training Format and Matrix
Appendix H - Driver Medical Screening Program
Appendix I
- Safe Vehicle Standard & Specifications
Appendix J - Vehicle Seat & Seatbelt Policy
Appendix K - Vehicle Loading Policy & Guidelines on “Load restrain & transportation”
Appendix L - Headlights use guideline
Appendix M - Contracts minimum expectation
Appendix N - Winter Driving Tips
Appendix O - Maximum Speed Limits
Appendix P - BP Vehicle Use Policy
Appendix Q - BP Vehicle Disposal Policy
Appendix R - Vehicle Operation Best Practises / Guidelines
Appendix S - BP Driver Disciplinary Code Guidelines
Appendix T - Did you know?
Control Tier:
<<2>>
Revision Date: <<20 April 2010>>
3
Document Number: << AZSPU-HSSE-DOC-00121-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING.
THE CONTROLLED VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
Procedure for AZSPU Driving Safety Standard
Page 4 of 28
1
PURPOSE /SCOPE
Purpose
The purpose of this procedure is to assist all who operate transportation as a scope of work for BP, to
prepare for and execute road transport operations safely. This procedure includes clear regulations
that must be complied with, and other useful information for guidance.
This procedure is not simply a set of regulations about how to drive well, it is also a guide to the
conduct, which will lead to the safer use of vehicles both on the job and away from the workplace.
It deals with drivers‟ and passengers‟ behaviours, vehicle operation and maintenance standards.
This procedure provides a recommended way of managing risks of driving for the workforce and
vehicles on BP business.
The procedure includes the overall aim of reducing the number of driving related incidents
The Safe Driver‟s and Safe Passenger‟s Codes, which follow, summarise the essential behaviour,
which is expected of all those who drive for BP as a scope of work and their passengers.
Scope
The contents of this procedure are applicable to all BP owned or managed project, operation, sites,
structure and other asset in Azerbaijan SPU. Contractors operating transport on or to and from BP
owned or managed project, operation, sites, structure and other asset of Azerbaijan SPU also
responsible for alignment with this procedure.
This document does not replace the procedures prepared and adopted by specialist contractors.
Neither does it supersede any national and local regulatory requirements.
This procedure contributes to compliance with the OMS Part 2 - Elements of Operating Including
Group essentials, 3 - OMS Performance Improvement Cycle and 4 - Governance and Implementation.
The procedure supports delivery of the following OMS Group Essentials.
Sub-element
Group Essentials
2.2 People and Competence
2.2.3, 2.2.5
3.2 Personal Safety
3.2.1
3.4 Health and Industrial Hygiene
3.4.4, 3.4.5
3.7 Transportation
3.7.1, 3.7.2, 3.7.3, 3.7.4,
3.7.5, 3.7.6
5.3 Asset Operation
5.3.1
5.4 Inspection and Maintenance
5.4.2, 5.4.3, 5.4.4
All guidelines contained in this procedure shall be regarded as the minimum requirements for BP
owned or managed project, operation, sites, structure and other asset in Azerbaijan SPU.
Legislation & Standards
The aim of the Procedure for AZSPU Driving Safety Standard is to achieve “no accidents”, “no harm
to people” and “no damage to the environment”. To achieve this aim, this procedure complies with
National Legislation, the terms of the Production Sharing Agreement
(PSA) and BP Group
Recommended Practice GRP 3.7-0002 Driving Safety issued on 16th December of 2009.
Control Tier:
<<2>>
Revision Date: <<20 April 2010>>
4
Document Number: << AZSPU-HSSE-DOC-00121-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING.
THE CONTROLLED VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
Procedure for AZSPU Driving Safety Standard
Page 5 of 28
The best International Oil Industry practice and relevant goal setting legislation have been adopted to
reduce the level of risk to as low as reasonably practicable and therefore well below that mandated by
applicable statutory laws and regulations.
In the absence of local regulations, appropriate UK and US regulations and industry best practice will
apply as required. In addition, BP Group Recommended Practice GRP 3.7-0002 Driving Safety has
been considered in setting suitable goals and targets.
2
DEFINITIONS
TRA
Task Risk Assessment
DCTA
Driving Compliance Technical Authority
JMP
Journey Management Plan
ALARP
As Low as Reasonably Practicable
LV
Any motorized vehicle for transporting passengers or goods
and with Gross Maximum Vehicle Mass equal or less that 3500
kg as per local legislation
HGV
Any motorized vehicle for transporting personnel or goods with
Gross Maximum Vehicle Mass more that 3500 kg as per local
legislation
ERV
Emergency Response Vehicle
ETD
Estimated Time of Departure
ETA
Estimated Time of Arrival
JMC
Journey Management Controller
IMS
Incident Management System
Individual
A seat belt designed for one person only
seat belt
CS (CAM)
Contract Specialist (Contract Accountable Manager)
3
GENERAL REQUIREMENTS
Company Requirements
It
is a company requirement that all driving operations are subject to an assessment
of
risk to
demonstrate that risks have been reduced to as low a level as reasonably practicable (ALARP). This
can be achieved by complying with the Company‟s existing standards. Where compliance with
Company standards can not be reasonably achieved, a formal level 2 Risk Assessment will be
undertaken to identify any additional controls to ensure that risks remain as low as reasonably
practicable. Procedure of AzSPU Driving Safety Standard is non-negotiable.
Stopping Unsafe Work
To stop the continuation of potentially unsafe driving at the earliest possible stage, this Driving safety
Standard Procedure make it very clear that all drivers and passengers are obliged and have the
authority to “STOP” driving that they consider to be unsafe.
Control Tier:
<<2>>
Revision Date: <<20 April 2010>>
5
Document Number: << AZSPU-HSSE-DOC-00121-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING.
THE CONTROLLED VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
Procedure for AZSPU Driving Safety Standard
Page 6 of 28
Deviations
This procedure contains general regulations for the operation of road transportation, which must be
fully complied with by all who operate such transportation, as a scope of work for BP. Requirements
and endorsement from BP AzSPU Driving Compliance Technical Authority (BP DCTA) must be
obtained before any deviations from these regulations may be authorised. In emergency situations
where approval is either unavailable or impractical, BP Senior line management are authorised to
make deviations, provided that an adequate risk assessment has been conducted and firm control is
implemented. All such deviations must however, be reported to BP RSA within 24 hours.
Any form of deviation from this procedure, including but not limited to local rules, shall be requested
and authorised in accordance with SSOW, Deviations from Regulations and Procedures procedure
(Doc. No: AZSPU-HSSE-DOC-00011-2).
Document Review
This document will be reviewed on an annual basis when users from the project, operation, sites,
structure and other asset in Azerbaijan SPU will have an opportunity to propose changes to the
existing processes and procedures. The Driving Compliance Technical Authority will be responsible
for coordinating this review.
Audit, Compliance and Assurance
Performance Units (PU) are accountable for implementing the Standard and for providing auditable
evidence of compliance.
Monitoring compliance to this Standard by BP employees and in respect of BP and contractors‟
vehicles, and reporting on progress of implementation must be included as part of the annual HSSE
assurance process for each PU.
Compliance with Standards is mandatory for all BP driving workforce operating vehicles on BP
business. Verification of compliance is the responsibility of relevant PU. PUs must be able to
demonstrate compliance with the Standard and must have an action plan to address any gaps.
AzSPU Specific Cross References & Related Procedures
This procedure shall, where appropriate, be used in conjunction with this suite of AzSPU Procedures
referenced below.
Document Number
Title of Procedure
AZSPU-HSSE-DOC-00011-2
Deviations from Regulations and Procedures
AZSPU-HSSE-DOC-00060-2
Permit To Work
AZSPU-HSSE-DOC-00054-2
Incident Investigation & Reporting
AZSPU-HSSE-DOC-00063-2
Task Risk Assessment
Language Facilitation
Due to the various languages spoken at project, operation, sites, structure and other asset in
Azerbaijan SPU, there is a necessity to assist all with “an ease of understanding”. Therefore, the
development and use of information tools are available.
4
KEY RESPONSIBILITIES
Within this procedure the following responsibilities are assigned:
Control Tier:
<<2>>
Revision Date: <<20 April 2010>>
6
Document Number: << AZSPU-HSSE-DOC-00121-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING.
THE CONTROLLED VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
Procedure for AZSPU Driving Safety Standard
Page 7 of 28
Site Manager
¾ Ensure overall operation of the AzSPU Driving Safety Standard procedure on their site and
ensuring that the elements described in this document are consistently followed.
¾ Ensuring that the Driving Safety process is subject to regular monitoring and auditing, acting
upon the results of these audits to maintain the integrity of the system and proposing any
recommendations for system improvement.
¾ Ensuring that the training and competency standards, as defined in this document, are
followed
¾ Ensuring that drivers incentive and disciplinary programs are in place and followed
¾ Approves deviation raised and ensures that the deviation process followed.
¾ Approval of all Level 2 Risk Assessments (Normal), Operational Risk Assessments (ORA) ,
Stand Alone Risk Assessments (SARA) and Isolation Risk Assessments (IRA).
¾ Approval of lessons learned and audits.
Transport Manager
The Transport Manager is responsible for:
¾
Ensuring adequate resources and funding (equipment, personnel, training, etc.) are allocated
for the implementation and operation of this procedure.
¾
Organizing and conducting regular safety briefings in conjunction with HSE: and making
arrangements for all drivers to attend.
¾
Preparing a schedule of monthly driver safety meetings that permits every driver to attend at
least one meeting per month.
¾
Maintaining and auditing quarterly and monthly safety meeting attendance records.
¾
Ensuring that discrepancies in the vehicle inventory or vehicle condition are reported and
corrective actions taken.
¾
Implementation of the Transport Safety Management Procedure.
¾
Ensuring the vehicle inspections are conducted on all BP and Contractor owned vehicles and
contract vehicles operating on BP own or leased project, operation, sites, structure and other
asset in Azerbaijan SPU and ensuring that results of the inspection are verified by the
appointed workshop mechanic.
¾
Ensuring and verify that workforce drivers have valid Driving License and BP Driver Permit.
¾
Ensuring and verify that workforce drivers conducting pre-use vehicle checks on acceptable
level as per procedure.
¾
Appointing a qualified mechanic who shall be designed as a Vehicle Safety Inspector.
¾
Ensuring that the Vehicle Safety Inspector implements and monitors the effectiveness of this
procedure by carrying out audits and inspections.
¾
In collaboration with the BP Land Transportation Departments, ensuring that Defensive and
other Driver Trainings and Assessment courses are scheduled, conducted and the all training
and assessment records up to date.
¾
Investigation of all vehicle accidents and communicate lessons learned to the workforce
¾
Ensuring effective disciplinary action is taken against drivers who do not observe the rules set
forth in this procedure.
¾
Passengers
Passengers play a significant role in road safety issues and are not only customers, but also
supporters of the driver. Passenger behaviour can positively or negatively influence the Driver‟s
performance.
Control Tier:
<<2>>
Revision Date: <<20 April 2010>>
7
Document Number: << AZSPU-HSSE-DOC-00121-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING.
THE CONTROLLED VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
Procedure for AZSPU Driving Safety Standard
Page 8 of 28
Passengers must report unsafe driving practices, defective safety equipment, and unsafe vehicle or
road conditions, to the Transportation Department. Passengers should also recognize good driving
practices and safe driving performance.
Vehicle passengers are to be fully briefed during the company induction, regarding the safe code of
practice and their expected behaviour.
Vehicle occupants must be encouraged to warn report or stop other occupants, who blatantly deviate
from the established rules and regulations (SOC, Stop-cards, etc.)
Safe Passenger Code
Proudly adhering to this code will bring the benefits of fewer accidents, less stress, and a more
responsible approach to passenger safety. This can be summarized by the following:
1. Always wear your seatbelt. Be certain that it operates correctly and that it is in good condition
2. Make sure your cargo is secured by placing all heavy items within the cargo space. Laptop is a
load, which ideally should be placed in cargo space. No objects should be in front of airbags
3. Be on time and never attempt to rush the Driver, he will not comply
4. If you are in doubt of the vehicle‟s roadworthiness, then consult the vehicle‟s checklist and
request a confirmatory check
5. Assist the driver while manoeuvring, if required
6. Do not smoke inside the vehicle
7. Advise the Driver if he fails to comply with the Safe Driver‟s Code
8. Confirm, that your Driver has filed a Journey Management Plan (more than 100 km round trip)
9. Always ensure that your headrest is properly adjusted
10. Do not eat or drink while vehicle is in motion - please avoid any hot-drinks while travelling
11. If you are feeling tired suggest a
5-minute break. Remember, if you sleep, you cannot
effectively support the Driver, relying entirely on his professionalism and that of other
passengers! It is recommended that at least one passenger remains awake while the vehicle is
in motion
Remember!
Road safety is a matter of mutual responsibility of both the driver and his passengers.
Responsible Passenger
The “Responsible Passenger” is defined as the front seat passenger or the most senior employee
seated in the vehicle. The senior passenger and the driver are equally responsible for ensuring
compliance with this AzSPU Driving Safety Standard and ensuring the vehicle is operated in a safe
and courteous manner.
The Responsible Passenger is responsible for:
¾ Ensuring that the motor vehicle observes the correct speed limits.
¾ Ensuring that the vehicle is driven in safe manner with due regards to the prevailing road and
weather conditions.
¾ Reporting to Transport Manager any unsafe driving acts, conditions and incidents of speeding
observed.
Vehicle Passengers
Vehicle passengers shall:
¾ Wear seatbelts whenever the vehicle is in motion.
¾ Ensure that the vehicle driver obeys the Traffic Law and BP Standard.
¾ Observe the requests of the driver with regard to passenger safety requirements.
Control Tier:
<<2>>
Revision Date: <<20 April 2010>>
8
Document Number: << AZSPU-HSSE-DOC-00121-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING.
THE CONTROLLED VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
Procedure for AZSPU Driving Safety Standard
Page 9 of 28
Drivers
General
No matter how excellent the vehicle is, or how good the road, the majority of road traffic accidents
happen because drivers are not observing, planning or adequately responding to the hazards, which
can often be predicted or avoided.
By definition
„an accident’ is an unexpected event resulting in loss of control. Therefore, ALL
DRIVERS CAN AVOID ACCIDENTS by staying firmly in control of all aspects of their journey by
planning it, driving safely, and recovering from any unforeseen problems encountered.
BP and Contractor Drivers
BP Drivers and Contractor Drivers are responsible for:
¾ Ensuring that their vehicle is fit for purpose and maintained to be in a safe road worthy
condition.
¾ Possession of a valid Driving License and BP Driver Permit.
¾ Ensuring that their vehicle is driven in a safe and courteous manner and obeying all safe-
driving requirements contained in this procedure.
¾ Immediately reporting all accidents and incidents to the Transport Manager
¾ Attendance at safety meetings in accordance with the published schedule.
Ensuring that all passengers are wearing seat belts prior to moving the vehicle
The Safe Driver‟s Code
All those who drive for BP as a scope of work, on duty, and even off duty, must demonstrate a good
standard of personal behaviour. People who see us can measure this behaviour. It is a code of
behaviour embodying SAFETY, COURTESY AND DISCIPLINE.
Proudly adhering to this code will bring the benefits of fewer accidents, less stress, and a more
professional approach to the essential task of driving safely. This can be summarized by the following:
1. Completing daily vehicle checks and report defects immediately
2. Planning the journey by use of a map (if required) and informing Base of the journey plan
3. Before setting out on any trip, you must be fit, alert and have the following documents in your
vehicle:
¾ Your driving license
¾ The vehicle‟s technical passport
¾ The insurance certificate
¾ The company‟s authorisation letter
¾ BP Driver‟s Permit
4. Driving the vehicle:
¾ Only after everyone's seat belt is fastened (See Appendix J - Vehicle Seat & Seatbelt
Policy)
¾ Any unsafe passenger behaviour must be corrected immediately and reported
¾ Unauthorised passengers are not to be carried
5. Rest breaks:
¾ Half an hour after each 3 hrs of continues driving
¾ A minimum of 12 hrs after a full 12 hrs shift.
¾ If you feel tired at any time, always take a break
6. Being Seen and Heard:
Control Tier:
<<2>>
Revision Date: <<20 April 2010>>
9
Document Number: << AZSPU-HSSE-DOC-00121-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING.
THE CONTROLLED VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
Procedure for AZSPU Driving Safety Standard
Page 10 of 28
¾ Headlights on at least 30 min before sunset (dusk) and 30 min after sunrise (dawn) also
during poor daytime visibility. (See Appendix L - Headlights use guideline)
¾ Use your horn to warn, not to annoy
7. Communication:
¾ Use your phone and radio only if parked in safe place
¾ Keep your radio / phone use to a minimum
¾ Never initiate or answer calls whilst driving (see Appendix D - Use of communication
equipment procedure)
8. Speed:
¾ Always drive at a safe speed!
¾ Comply with BP maximum speed limits of 90 km/h (70 km/h for vehicles in excess of 3.5
tonnes) on the highways and 60 km/h within the city limit, unless road and weather
conditions dictate a lower speed, particularly whilst driving on wet or icy road. A maximum
speed limit for driving off-road is 40 km/h. (Please see Appendix O - Maximum Speed
Limits)
¾ Follow the law 100% - BP will not pay fines!
9. Distance:
¾ Keep your distance from other road users
¾ Show consideration for your passengers and all other road users
10. Accidents:
¾ Report all collisions and vehicle faults promptly (Please see Appendix E - Incident
Investigation and Reporting Procedure)
11. You must not eat or drink whilst driving. Smoking is always prohibited inside the vehicle.
Remember!
Drive each day as though you were on a mission, the goal of which is not to be involved in or cause
an accident.
Management Support
All supervisors and managers who administer transportation as a scope of work for BP must
demonstrate:
¾ Compliance with all BP Road Safety regulations and guidelines
Active support for the BP Road Safety Program, by personal commitment and leading by example
5
PROSEDURE AND PROCESS
Driving Competence
All Drivers must continue to develop their driving skills up to and beyond the BP minimum acceptable
standard and familiarise themselves with local hazards. Only Drivers who hold BP Driver‟s Permits
and who believe in and follow the Safe Driver's Code are allowed to drive vehicles as a scope of work
for BP.
Driver Core Skills Assessment
BP driving instructors are to conduct core skills assessments prior to Driver recruitment and during
scheduled assessments in accordance with the BP Driver‟s Permitting program. (See Appendix A)
Driver Supporting Skills
In addition to core skills, Drivers must also be able to:
Control Tier:
<<2>>
Revision Date: <<20 April 2010>>
10
Document Number: << AZSPU-HSSE-DOC-00121-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING.
THE CONTROLLED VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
Procedure for AZSPU Driving Safety Standard
Page 11 of 28
¾ Demonstrate their knowledge of BP Road Driving Safety procedures
¾ Effectively use the BP Journey Management system
¾ Deal with simple mechanical faults, and be able to change a wheel
¾ Know the National and Local traffic rules and regulations
¾ Complete vehicle daily checks and understand the vehicle maintenance program
¾ Use communications equipment safely and in accordance with BP policy
¾ Understand the basics of how the vehicle works
¾ Understand how to report accidents in accordance with BP procedures
¾ Administer basic first aid and fight minor fires
¾ Demonstrate skills in off-road driving inclusive vehicle winch operation and basic recovery
¾ Understand and conduct „Road Risk Assessments‟
Driver Special Qualifications
Heavy Goods, Passenger Carrying and Articulated Vehicles
For vehicles, which carry more than eight passengers, weigh more than 3.5 tonnes or pull trailers in
excess of 0.75 tonnes, Drivers must attend related training and hold the relevant license categories.
¾
Driver Fitness, Welfare and Hours of Work
Fitness
A medical fitness program for all drivers must be in place - (Please see Appendix H)
All drivers are to be subjected to a pre-employment medical fitness examination, which is
conducted by a BP assessed medical organisation
Bi-annual medical check-ups are to be scheduled for all personnel who drive for BP as a
scope of work
A system must be in place, which prevents drivers from operating vehicles when they are
medically unfit or ill
A system must be in place, which regularly checks the medical fitness of drivers. (On a daily
basis)
A system must be in place, which requires drivers to report when they are taking a course of
physician prescribed drugs
Drivers must routinely be checked for fitness following road traffic accidents.
A system must be in place to regularly and randomly check drivers for alcohol / drug abuse.
(Bi-annually and at high risk times such as days following; holidays, time off, celebrations etc -
Please see Appendix - H)
The BP Driver medical screening programme as a minimum is comprised of:
¾ A health questionnaire
¾ A visual and audio examination
¾ Alcohol abuse check
¾ Prolonged use of prescribed or other medication
¾ Other clinical examinations as established by BP HSE Department (Please see Appendix - H)
Welfare
Drivers must be able to:
¾ Lodge in adequate accommodation, which has been approved by BP, if they are required to
stay overnight. If tired, Drivers shall never be ordered to drive or continue driving
Control Tier:
<<2>>
Revision Date: <<20 April 2010>>
11
Document Number: << AZSPU-HSSE-DOC-00121-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING.
THE CONTROLLED VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
Procedure for AZSPU Driving Safety Standard
Page 12 of 28
¾ Receive adequate meals - or have expenses to purchase such meals
¾ Provision for frequent communications with family
¾ Time off work in the case of family bereavement or other emergency
¾ Find out their duty in reasonable time in order to make necessary preparations
The company should cover all reasonable welfare expenses
Driver Hours of Work
The following hours of work comply with the BP Group HSE standards. It is recognised however, that
it may be impractical to strictly follow these standards in all cases and as such deviations may be
authorised. Drivers who operate in excess of their maximum daily hours are only to do so to complete
essential work and these occurrences are to be kept to an extreme minimum. All deviations must be
reported to BP DCTA and Drivers carefully monitored and controlled. Working hour‟s requirement
shall comply with local legislation. Driving / working in emergency situations shall meet labour code
requirements, definitions and conditions.
Requirements
Rules
Maximum working hours within a rolling 24 hour
12 hours total
period
Rest after full 12 hours shift
Minimum 12 hours unbroken
Maximum working hours
60 hours over continues 7-day period or 120
hours over 14 days (no more than 80 hours
over 7 days with an average of 60 hours a
week over an extended period)
Maximum driving time within a rolling 24 hour
10 hours total (not including the time spent
period
driving to and from work)
Minimum unbroken rest during 24 hours period
6 hours
Work breaks (including meals) during a working
Minimum of 30 min break after every 5 hrs
shift
Maximum continuous driving time
3 hours, with minimum 30 min break after.
Additional breaks should be taken as felt
necessary
Maximum continues driving time at the wheel on
2 hours, with minimum 30 min break after
night time or for off-road driving
Off-duty period for every continuous 7 days
Minimum of a continuous 24 hour break
Off duty period for every continuous 14-day
At least one continuous 48-hour break
period
Off duty rest must not be taken in the cab of a vehicle, unless the vehicle is fitted with a proper cab
bunk.
When driving in severe weather or over difficult terrain, the working hours should be shortened.
Night-work will always cause more fatigue than day-work due to the poor quality of sleep during the
day and the feeling of social isolation. Night shifts must therefore be followed by a rest period - never
another working shift.
1. Drivers‟ working hours are to be strictly controlled and comply with local legislation and BP
requirements. Working hours must be closely monitored and recorded, which should include time
off work, rest breaks and any occasions of deviation from BP requirements. Documents should be
made available for auditing purposes.
Control Tier:
<<2>>
Revision Date: <<20 April 2010>>
12
Document Number: << AZSPU-HSSE-DOC-00121-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING.
THE CONTROLLED VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
Procedure for AZSPU Driving Safety Standard
Page 13 of 28
2. A system must be in place, which reduces the chance of drivers falling asleep at the wheel,
through driver education, regular communication, control of the vehicle internal environment and
support from passengers. The system should also include:
Dispatchers / Transportation qualified personnel who must control daily drivers work-hours,
particularly for long journeys and those conducted during the hours of darkness
Passengers responsibilities which play a significant role in driver fatigue management; see
„Safe Passenger Code‟
Journey Management Procedures
6
VEHICLE OPERATION PROCEDURE PROCESS
General
Vehicle operations must never compromise the Safe Driver‟s or Safe Passenger‟s Codes.
Passengers should never set out on journeys, which place the Driver in the impossible position of
breaking the Safe Driver‟s Code. Good journey planning must prevail. All Employees are entitled to
make use of the Company's vehicles when required to travel on approved official Company
business. Vehicles should be requisitioned in advance from the Company's vehicle pool (see BP
vehicle use policy - Appendix P). Using Company vehicles or equipment for personal use or non-job
related purposes as well as transporting of non-business related passengers or load in company
vehicles is forbidden.
The most important behaviour is to keep to safe speed limits, follow all warning signs and be
courteous to all other road users (cyclists, pedestrians, buses, etc.).
Where BP activities may cause disturbance to other road users, supervisors should control traffic by
using flagmen or other clear warning signs.
Vehicle Standards
The following vehicle standards are accepted by BP AzSPU and will apply to all newly purchased
vehicles. These standards are also to be observed on the existing Company fleets - any exceptions
proposed shall be followed through “Deviation Process”. Contractor shall follow minimum required
standards. All vehicles‟ related equipment is to be maintained in a state that is safe and suitable for
the intended usage. Requests for deviations to these standards must be forwarded to BP as a
Road safety authority via DCTA for consideration and final approval.
(Please see Appendix I - Safe Vehicle Standard & Specifications)
Maintenance
The primary object of the maintenance system is to maintain vehicle roadworthiness - that is, the
integrity of all the vehicle systems to enable it to be driven without the vehicle contributing to any form
of crash.
A comprehensive vehicle service and maintenance system to be in place.
All vehicles before using are to be checked to ensure that they are fit for purpose, regularly
inspected and confirmed that vehicle‟s system are mechanically sound, in serviceable
condition and in safe working order by full-scale inspection conducted at pre-start and as
guided by a Safety Inspection Intervals at or at least every 6 months (See example of
minimum required check, guidance and safety inspection intervals guide - Appendix B)
Assurance must be confirmed that all vehicles are being serviced and maintained strictly in
accordance with the vehicle manufacturers‟ standards and recommendations.
Control Tier:
<<2>>
Revision Date: <<20 April 2010>>
13
Document Number: << AZSPU-HSSE-DOC-00121-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING.
THE CONTROLLED VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
Procedure for AZSPU Driving Safety Standard
Page 14 of 28
Assurance must be confirmed that only genuine spare parts are installed, which are specific to
the vehicle and in accordance with the vehicle manufacturers‟ recommendations.
All vehicles are to be serviced and maintained by fully qualified and competent mechanics.
All vehicle servicing and maintenance work to be recorded and tracked (See example
document Appendix C)
A register must be maintained of all service manuals for equipment in use or being maintained
on a regular basis.
Quality assurance of completed vehicle maintenance must be established by means of an
effective handover and acceptance system from and to the maintenance workshop
Maintenance is a shared task between the Driver, the maintenance workshop and the manager of the
team of drivers. The Driver, however, is always the first line of “defence”.
Maintenance System
There are four main participants in the BP vehicle maintenance system as follows:
¾ Drivers
¾ In-house maintenance Expert / Mechanic
¾ Contracted service shop(s)
¾ Transportation managers and supervisors
Their tasks are described as follows:
Driver Responsibilities:
o Check the vehicle at the start of the shift, as defined in Appendix B
o Report defects immediately
Maintenance Expert / Mechanic Responsibilities:
o Periodic safety inspections of all vehicles
o Scheduling / authorising maintenance service trips for each fleet vehicle
o Confirming and authorising defect repair
o Co-ordinating with the contracted service shop(s) for ensuring safe, cost-effective, timely and
professional maintenance service of the Company fleet
o Keeping records of all maintenance work carried out
Contracted Service or In House Shop Responsibilities:
o Carry out maintenance service as per the BP issued Service Order and in accordance with the
manufacturer‟s specifications by qualified mechanics only
o Carry out general inspection of the vehicle every time when the vehicle is in service and advise
of any necessary spare part replacement/service that will be required in the near future
o Provide safe, high-quality, professional service ensuring roadworthiness of each Company
vehicle
o See Maintenance Inspection Sheet to be used by the Service Shop(s) in Appendix C
Transportation Manager / Supervisor Responsibilities:
o Developing fleet maintenance program
o Carry out daily/weekly random checks on any fleet vehicle, using either the Driver's pre-use
check or periodic safety inspection report as a guide
Control Tier:
<<2>>
Revision Date: <<20 April 2010>>
14
Document Number: << AZSPU-HSSE-DOC-00121-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING.
THE CONTROLLED VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
Procedure for AZSPU Driving Safety Standard
Page 15 of 28
o Check contracted service workshop(s) and vehicle records for inspections, defect reporting and
servicing
Emergency Response Vehicles (ERV)
BP emergency response vehicles are to operate on a 24-hour basis for addressing immediate
transportation requirements during emergencies. At night a specially trained crew of emergency
Drivers and a Dispatcher are to be made available to handle all emergency transportation
requirements.
The fact that these vehicles could be required to attend the scene of an accident or disaster, all ERV
must always be in a good operational condition, with full fuel tanks and equipped with all necessary
safety equipment. The safety and telecommunications equipment carried within ERV requires careful
consideration by the Transportation Department and its customers.
Journey Management Procedures
1. All journeys‟ risks, in areas identified as high risk for vehicle accident, shall be assessed and
journey risk management plan shall be in place to mitigate those risks.
2. A journey management system must be in place
3. All drivers and passengers must understand and comply with the Procedure and Journey Risk
Management Plan.
4. All journeys are to be recorded and tracked appropriately using electronic software or other
suitable methods.
Any journey that is to take place outside of 50 km radius (100 km round trip) of the major cities
boundaries or outside of normal routine activities area / permanent location requires an approved
Journey Management Plan (JMP) and must be controlled by Journey Management procedures.
Taking into consideration geography of Baku city as an exception JMP required for trips greater than
100-kilometres radius from the centre of Baku, or 50 kilometers from Baku boundaries (southward
Alyat, northward H.Z. Tagiyev settlement). Journey Management procedures must include the
following details:
¾ Driver‟s name
¾ Vehicle registration number
¾ Vehicle fleet unit number
¾ Names of passengers
¾ Start time (ETD) and arrival time (ETA)
¾ Cargo details (if any)
¾ Route details and planned rest stops
¾ Planned calls in to Journey Management Centre
Identified personnel who are responsible for vehicle Journey Management are to ensure that all
vehicle movements which fall under JMP are properly administered.
“Man Lost” Procedure
The aim is to locate and rescue a Driver who has failed to reach his destination by the estimated time
of arrival. The basic principles are:
Control Tier:
<<2>>
Revision Date: <<20 April 2010>>
15
Document Number: << AZSPU-HSSE-DOC-00121-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING.
THE CONTROLLED VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
Procedure for AZSPU Driving Safety Standard
Page 16 of 28
¾ After no contact has been made for more than 2 hours, the Journey Management Controller
(JMC) will make initial investigations as to the possible whereabouts of the vehicle
¾ A full-scale search will commence if no contact has been made with the Driver for more than 3
hours
¾ Assumptions are not to be made, debates neither started nor blame for over-reaction given. The
system must “default” to over-reaction, rather than under-reaction
¾ Activate the BP Incident Management System (IMS)
¾ The search may require all available means of rescue, including helicopters and local
emergency services, which are to be controlled by the Incident Commander
¾ The Senior management present at both the departure and arrival sites will jointly investigate
the Journey Management Plan and provide recommendations as necessary and communicate
actions to the Operations Section Chief
¾ A “man lost” incident will be considered as a near miss and an investigation will always be
carried out
¾ If lost, you must always stay with your vehicle until rescued
Driving Off-Road or on Construction Zones
Off-road definition: Any track or ground travelled which is not paved, is not marked by road
traffic signs or patrolled by traffic police is classified as off-road and detailed as such in any
police report.
Construction zone definition: Any zone that has construction / activities regardless marked or
unmarked with heavy machinery / plant and heavy good vehicle intensive movement shall be
considered as “Construction Zone”
¾
Only Drivers who have passed a BP AzSPU competency test in off-road driving skills are
authorised to drive off-road for BP as a scope of work
¾
A maximum speed limit for driving off-road is 40 km/h unless road, zone, site and weather
conditions dictate a lower speed, particularly whilst driving on wet or icy road.
¾
Always strictly adhere to the submitted Journey Management Plan, particularly with regards to
the agreed route
¾
Notify the JMC immediately of any proposed deviations
¾
Steep ascents and descents must be carefully assessed before being driven
¾
Avoid traversing slopes whenever possible, if traversing is unavoidable then they must be
carefully assessed before being driven
¾
Travel restrictions - be fully aware of all restricted and potentially dangerous areas such as:
o Vertical Incline - 35%
o Sidling Incline - 15%
o BTC / WREP / AZTRANSGAZ execution zones
o Military installations / zones
o Security and other out-of-bounds areas
o Rivers and steep gradients
¾
Use dipped headlights at all times, day or night
¾
Avoid reversing where possible if necessary must be carefully assessed before being driven
¾
Use cones of flagman if required while reversing
¾
Where reversing on BP-controlled premises cannot be avoided in areas that contain operational
equipment or if the maneuver could put personnel in danger, reversing shall only be undertaken
with the assistance of a Banksman.
¾
If lost, you must stay with your vehicle
Driving During the Hours of Darkness
No night driving!
All night driving is forbidden, apart from the following authorised exceptions:
Control Tier:
<<2>>
Revision Date: <<20 April 2010>>
16
Document Number: << AZSPU-HSSE-DOC-00121-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING.
THE CONTROLLED VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
Procedure for AZSPU Driving Safety Standard
Page 17 of 28
¾ Drivers who are tasked for „Meet & Assist‟ purposes
¾ Scheduled shift changes
¾ Responding to an Emergency as directed by the Incident Commander
¾ Between the work-site and BP or Contractor camps within the same locality
All other instances must receive prior authorisation from BP Senior line management, in accordance
with the Deviation Procedure and requirements stated in clause 1.6 of this document. All deviations
from the „No Night Driving‟ policy are to be properly risk-assessed, approved by BP Senior
management, recorded and tracked. All night driving shall be done only by specially trained on “Night
Driving” personnel.
Vehicle Loading
Loads and cargo shall be secured and shall not exceed manufacturer‟s specifications and legal limits
for class of vehicle. Specific “Loading and load restraint” procedures for all types of vehicles being
used shall be developed, communicated and followed. All drivers shall understand and comply with
these procedures.
¾ Vehicle loads must not exceed the weight limitations indicated on the vehicle registration
document
¾ Vehicle loads must not extend over the sides of the vehicle
¾ Any load, which extends beyond the rear of the vehicle, must be marked with a red flag and at
night, a red light
¾ Vehicle loads must be properly secured. Loose items, tools or equipment must not be carried
inside the passenger compartment, but placed behind a protective screen or lashed down
¾ Jerry-cans, of approved metal construction, must be carried outside the vehicle passenger
compartment and must be secured in external holders
¾ The following colour coding must be used for marking jerry-cans:
o Petrol
=
Red
o Diesel
=
Yellow
o Water
=
White
o Lubricating Oils
=
Green
See Appendix K - Vehicle Loading Policy & Guidelines on “Load restrain & transportation”.
Convoy Driving
BP or Contractor vehicle convoy movements must be properly organised. The Convoy Commander
must ensure that:
¾ A pre-journey risk assessment is conducted
¾ Onsite vehicle maintenance and safety checks are completed
¾ Journey Management Plan is prepared and supervised by himself
¾ All vehicles move with dipped headlights day or night
¾ An adequate and uniform distance is maintained between vehicles
¾ Vehicles within the convoy do not overtake each other
¾ No vehicle Driver makes any unauthorised stops
¾ The convoy travels at the speed of the slowest vehicle
¾ Communications are maintained between vehicles
Refuelling
During refuelling operations, the Driver of the vehicle being refuelled must ensure that:
Control Tier:
<<2>>
Revision Date: <<20 April 2010>>
17
Document Number: << AZSPU-HSSE-DOC-00121-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING.
THE CONTROLLED VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
Procedure for AZSPU Driving Safety Standard
Page 18 of 28
¾ The engine is switched off before the fuel transfer begins
¾ The windows are closed
¾ Neither he nor his passengers operate communications equipment
¾ All mobile telephones are to remain in the vehicle during self - service
¾ No smoking or open flames are to be used on the station premises, unless in a area
designated by the station staff and which is considered to be safe by the Driver
Winter Driving
Before you start a journey, ask yourself:
¾ Is your journey necessary?
¾ Are you fit for driving?
¾ What‟s the weather forecast?
¾ Is the vehicle roadworthy?
Other things to consider:
¾ In the daytime when light levels are low or during heavy rain, use your headlights, reduce your
speed and remain alert
¾ Pedestrians and animals are more difficult to see due to poor daylight quality and longer nights
¾ Other vehicle movements are difficult to predict, due to poor daylight quality and incorrect use
of lights
¾ On wet or icy roads extend your stopping distance
Please see Appendix - N on “Winter Driving Tips”
7. DRIVERS TRAINNING PROCEDURE
BP Driving Assessments, Trainings & Permitting
BP Land Transportation Departments are to maintain records of all Drivers training courses and
driving assessments. BP authorised Driving Instructors are to conduct driving competency training ,
assessments, theory tests and corrective driver training as may be necessary. Additional driver
trainings, as defined by matrix, shall be conducted by BP AzSPU recognized trainers. (See Appendix
G)
1. All personnel who drive as a scope of work for BP must hold a BP authorised driver permit in
accordance with BP Driver Permitting Procedure (Please see Appendix A)
2. Contractors must ensure that all their drivers are assessed in accordance with the BP driving
assessment program (Please see Appendix A)
3. Contractors‟ should either have their own or contracted BP approved Driving Instructor group
and shall request for provision of required driver trainings / assessments conducted by this
training provider.
Defensive Driving Assessments
Defensive driving assessments are to be conducted to evaluate a Driver‟s knowledge and practical
skills to meet BP minimum driving standards for all those who drive for BP as a scope of work.
Control Tier:
<<2>>
Revision Date: <<20 April 2010>>
18
Document Number: << AZSPU-HSSE-DOC-00121-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING.
THE CONTROLLED VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
Procedure for AZSPU Driving Safety Standard
Page 19 of 28
Defensive driving assessments are to be conducted at least once annually, in order to re-assess core
driving skills of all those who drive for BP as a scope of work. These assessments are conducted to
ensure that all Drivers remain in full compliance with current BP defensive driving standards and
procedures.
All BP Instructors are authorised to pass or fail any Driver who fails to achieve the BP minimum
standard and are to assist in the development of driver training courses.
Drivers who fail to achieve BP minimum driving standards must not drive vehicles as a scope of work
for BP.
Defensive Driver Trainings
The following groups only, are to conduct defensive driver training on behalf of BP:
¾ BP authorised driver-training providers
¾ BP Driving Instructors (as may be necessary)
Driving training Experts could be utilised to conduct continuation-training courses for all BP personnel
as required.
The instructors providing trainings and assessments shall
Complete instructor training prior to providing training
Approved to provide such as trainings and assessments by AzSPU
Re-assessed by external provider for competency at least every two years
BP Driver Permitting
All personnel who drive motor vehicles as a scope of work for BP must carry a valid and authorised
BP Driver‟s Permit, shall be able to revalidate trainings and assessments at least annually.
For further details, relating to BP Driver Permitting, Driving assessments and training, (see Appendix
A).
BP Driver‟s Permit
Purpose
The fundamental purpose for the introduction of the BP driver‟s permit system is to assert greater
control over all those personnel who drive vehicles as a scope of work for BP, and to ensure that
those drivers‟ are properly trained and assessed. Drivers‟, who cannot demonstrate adequate driving
competence, are of significant risk to themselves and all other road users.
All personnel who drive a motor vehicle as a scope of work for BP must carry a valid BP Drivers
Permit. All drivers must produce their BP Driver‟s Permit on the request of senior management or any
other authorized person.
Authorisation
The following personnel only, are to authorise BP driver‟s permits.
a.
BP Azerbaijan Land Transportation Manager or nominated representative.
b.
BP Georgia Transportation Team Leader or nominated representative.
Control Tier:
<<2>>
Revision Date: <<20 April 2010>>
19
Document Number: << AZSPU-HSSE-DOC-00121-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING.
THE CONTROLLED VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
Procedure for AZSPU Driving Safety Standard
Page 20 of 28
c.
BP AzSPU Turkey Transport Coordinator
All authorised permits must show an official date stamp and be signed in ink by an authorising person
or his nominated representative. An electronic record of all authorised permits is to be maintained and
made available for review on the BP intranet. Each permits identification code is to follow in sequence
the first issue being 0001
The permit date stamp is to reflect the actual date that the permit is authorized.
Issuing
BP Driver‟s permits in each country are produced and supplied by the BP Land Transportation
Department. Following their initial issue, all additional requests for permits are to be co-ordinated
through the suitable Land Transportation Department.
Photocopies of BP driver‟s permits are not to be used as an alternative to the officially issued
document.
Permits will only be issued to BP and Contractor drivers‟ who have successfully completed an
authorised BP driving assessment.
Only BP authorised Instructors are allowed to make entries in the permit‟s record of driving trainings
and assessments.
Only BP authorised Instructors are to conduct BP driving trainings and assessments. All BP driving
trainings and assessments are to strictly comply with the protocol for conducting such driving
assessments.
Validity
BP driver‟s permits will remain valid unless:
a.
They have become defaced or mutilated.
b.
Lost or stolen.
c.
Unofficially altered.
d.
The relevant driving training and (or) assessment dates have been exceeded by more than 30
days.
Permits that have been defaced or mutilated must be destroyed, and a replacement permit issued.
Permits that have been lost or stolen must be cancelled and the BP Transportation Department in
each country must be informed immediately. A replacement permit should be issued, which reflects all
the details from the lost permit, obtainable from the Transportation Department‟s electronic records.
The old identification code number or next available identification code number could be used for the
replacement permit. Electronic records are to be updated to reflect the old permit as being lost and
invalid, but must not be deleted from the database. The permit is an accountable document and as
such, an investigation is to be made into the circumstances surrounding the loss or theft, and any
disciplinary action taken if appropriate.
Permits, which have been altered unofficially, must be destroyed and a replacement permit issued as
above. An investigation is to be made into the circumstances surrounding the alteration, and any
disciplinary action taken if appropriate.
Control Tier:
<<2>>
Revision Date: <<20 April 2010>>
20
Document Number: << AZSPU-HSSE-DOC-00121-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING.
THE CONTROLLED VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
Procedure for AZSPU Driving Safety Standard
Page 21 of 28
In exceptional circumstances, the date of expiry of a driving assessment may be extended for up to 30
additional days. The driver‟s supervisor must make a written request to the BP Land Transportation
Department, for such extensions.
The Driver‟s supervisor within each country is responsible to communicate a list of all those drivers,
whose trainings and (or) assessments period will expire in less than 30 days.
BP Driver‟s supervisor is responsible for keeping all trainings and assessments dates valid.
Permits remain authentic, only when supported by a valid national driver‟s licence or Police certificate,
which contains the appropriate details and vehicle categories.
Identification
Till May 2009 in Azerbaijan and till July 2008 Georgia the permits were supplied in Green and Red
formats for identification purposes only, and which are issued under the following conditions:
a.
Green
(BP Employees)
b.
Red
(BP Contractors)
From May 2008 the permits in Azerbaijan for are supplied only in Green format with records of
obtaining trainings and assessments validity. In April 2008 as per S&OI Audit Recommendation a new
BP Permit format was implemented for BP Driving workforce.
The permit identification code is a BP AzSPU generated code consisting of a two-letter prefix followed
by four digits. The prefix will either be AZ for permits issued in Azerbaijan or GE for those issued in
Georgia. The four-digit entry will follow a sequential format that is centrally controlled by the BP
Transportation Departments.
Procedure for obtaining a BP Driver‟s Permit
1.
All personnel who drive vehicles as a scope of work for BP must successfully complete the
relevant driving trainings and assessments and be issued with a BP driver‟s permit.
2.
Drivers‟, who have successfully completed a previous BP driving trainings and assessment,
which is still in date, can be issued with a BP drivers permit without having to complete a
further driving assessment. These permits must however, reflect both the current assessments
start and expiry dates. Permits are not to be issued to these drivers however, until they have
attended the defensive driving training and successfully completed a BP driver‟s matrix test
and practical assessment, if validity date expired.
3.
The validity of driving assessments is 12, or 6 calendar months, as recommended within
individual driving assessment reports. No other validity periods are to be used without the prior
approval of BP AzSPU Driving Compliance Technical Authority (DCTA).
4.
Driving trainings and assessments for BP employees‟ are to be co-ordinated directly through
their respective Transportation Departments.
5.
Driving assessments for contractor‟s employees‟ are to be co-ordinated directly through the
relevant BP Technical Specialist former Contract Accountable Manager
(CAM) and
Transportation Department. The BP Technical Specialist former Contract Accountable
Manager (CAM) is to liaise closely with the contractor, and BP relevant HSE department, to
clearly determine which contractor drivers are required to attend BP driving assessments.
6.
Minimum driving Trainings and Assessments are to consist of the following:
a.
Defensive Driving Training
Control Tier:
<<2>>
Revision Date: <<20 April 2010>>
21
Document Number: << AZSPU-HSSE-DOC-00121-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING.
THE CONTROLLED VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
Procedure for AZSPU Driving Safety Standard
Page 22 of 28
i. Defensive Driving Presentation
ii. Matrix Test
iii.
A vehicle safety inspection
iv. Practical driving training
v. Practical assessment ( as required)
vi. Corrective driver training ( if required
b.
Off Road Training
i. Off road Driving presentation
ii. Practical off-road driving training
iii.
Practical off-road assessment
c.
Fatigue and Tiredness management Training
d.
First Aid- Level1
(as per AzSPU Training Matrix)- conducted by external service
provider- Driver‟s supervisor is responsible for training arrangements and keeping
training dates valid
7.
After the successful completion of all driving trainings and assessments, the driver will be
issued with a BP temporary pass certificate or a BP driver‟s permit. A BP driver‟s permit will
always be issued within 7 days of the driving trainings and assessments completion. The
permit is to be authorised in accordance with these instructions and the driving instructor is to
enter the training and assessment details in the permit‟s record of driving trainings and
assessments.
8.
All BP qualified instructors are to keep up to date electronic reports of all completed driving
trainings and assessments and maintain a consolidated electronic „drivers permits, trainings
and assessments file‟ for each country. These files must be made accessible and protected as
„read-only‟ on the BP intranet.
9.
All drivers who are required to attend a further refresher driving trainings and assessments in
12 months or less are to ensure that they improve their core driving skills to meet the BP
standard. Drivers, who fail to improve their core driving skills between driving assessments,
will be required to attend a course of driving instruction, which is conducted by a qualified
driver training provider. The cost of such instruction will be met either by BP for BP employees
or the contractor for contractor employees.
10.
BP Land Transportation reserves the right to revoke any driver‟s BP permit, where the driver
consistently demonstrates weak driving skills or a poor attitude to road safety issues.
Termination of Employment
Following the termination of any driver‟s employment, it is the responsibility of all BP and Contractor
Human Resource or Personnel Departments to ensure that all BP Drivers Permits are returned to
their issuing authority,
BP Drivers Permits, which are returned to the issuing authority, are to be retained until all the
recorded driving assessment validity dates have been exceeded. Permits, which do not contain any
valid driving assessments are to be destroyed, after recording the details within the consolidated
„drivers permits and assessments‟ file.
BP Drivers Permits, which have been returned and still held by the issuing authority, may be re-issued
to a driver on his re-employment provided that:
a.
The driving assessments contained within the permit are in date.
b.
The driver was not dismissed due to poor driving issues.
Control Tier:
<<2>>
Revision Date: <<20 April 2010>>
22
Document Number: << AZSPU-HSSE-DOC-00121-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING.
THE CONTROLLED VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
Procedure for AZSPU Driving Safety Standard
Page 23 of 28
Performance Measures
1.
The BP driver‟s permit system was implemented on 12th April 2001.
2.
All existing BP and Contractor drivers will be issued with BP Driver Permits as required.
3.
A review of the driver‟s permitting system will be conducted by BP AzSPU Driving Compliance
Technical Authority ( DCTA) each year.
4.
All drivers will be continually retrained and reassessed in accordance with these instructions.
Queries
1.
All queries concerning BP driver‟s permits must be made through the respective permit-
authorising persons in Azerbaijan, Georgia or Turkey.
2.
Modifications to the BP driver‟s permit system must be sought through the BP AzSPU Driving
Compliance Technical Authority (DCTA).
8
BP DRIVER TRAINING PROCESS
Every member of Driving Workforce who drives any vehicle (light vehicle, heavy vehicle, motorcycle,
mobile plant, forklift, or off-road vehicle) in the conduct of BP business shall be trained and qualified to
operate that class of vehicle. All drivers shall successfully complete on-road driving assessment, as
part of their recruitment / selection process.
The established defensive driver training program operating within BP is designed to increase the
driving expertise within the Company. All Drivers of Company vehicles should be encouraged to
actively pursue development of their skills through theoretical and practical trainings, assessments,
and testing.
1. Management must demonstrate commitment towards training
2. A designated training department or provider must be available to ensure high quality training for
all drivers
3. All drivers must be appropriately trained to perform their expected duties safely and competently,
which should include a sound understanding of and assessment in:
Driver core defensive driving skills
Defensive driver training must be provided and include each vehicle category that the driver is
expected to drive
The following disciplines are required to be taught as a minimum:
Vehicle Daily check including ancillary equipment
Practical defensive driving within the city.
Practical defensive driving on highways.
Practical defensive driving within construction zone.
Railway crossing.
Bridge/Tunnel crossing.
Towing procedures.
Vehicle loading and load restraint.
Convoy driving procedure.
Control Tier:
<<2>>
Revision Date: <<20 April 2010>>
23
Document Number: << AZSPU-HSSE-DOC-00121-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING.
THE CONTROLLED VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
Procedure for AZSPU Driving Safety Standard
Page 24 of 28
Refuelling procedure.
Snow chains fitting.
Skid correction (Theory presentation as a minimum)
Silent direction (reversing with help from a third party)
Off road driving skills
Off-road driver training must be provided and include each vehicle category that the driver is expected
to drive
The following disciplines are required to be taught as a minimum:
Practical off road driving techniques (Vehicles, Drivers, Passengers)
Steep ascent and descent procedures
Failed ascent procedure
Vehicle recovery from mud / sand stuck.
River crossing
Winch operation (if required)
Changing a wheel using Jack base plate
Off-road driver training must be provided and include each vehicle category that the driver is expected
to drive
4. A program must be in place to assure and develop drivers‟ skills, which should include:
a) Regular driving training and assessments (At least once annually - Appendix G)
b) Continuation training program (defensive driving, first aid, skid-correction etc - please see
Appendix G)
c) Program of assurance to encompass all driver expectations
5. A system is to be in place to speedily correct identified driving errors and should include:
a) External training providers
b) Training facilities are to be adequate and, which effectively meet the requirements for the
training being performed
c) Specific training courses must be available for defensive driving
d) Specific training courses must be available for off-road driving
e) Training and assessment records for all driver personnel are to be maintained in a central
location on a computer database or within other suitable filing systems
Defensive Driver Training Program
BP‟s current defensive driver training program is a comprehensive package consisting of all
fundamental defensive driving skills, accompanied by sound reasoning and attitude development. All
BP trained Drivers are required to achieve the minimum standards listed below. All Drivers who
complete a course in Defensive Driving techniques are required to demonstrate the following
minimum elements and standards of achievement:
Driver shall display a mature attitude to driving, showing enthusiasm
Relevant local road and driving statistic
Causes of collision
Control Tier:
<<2>>
Revision Date: <<20 April 2010>>
24
Document Number: << AZSPU-HSSE-DOC-00121-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING.
THE CONTROLLED VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
Procedure for AZSPU Driving Safety Standard
Page 25 of 28
Effective decision making
AzSPU Driving Safety Standard 10 Elements
Perform daily maintenance checks of a vehicle and ancillary equipment in accordance with the
established Daily Vehicle Check Booklet
Mount the vehicle correctly and before starting the engine, ensure that all safety checks are
carried out including braking system, tyres, wheels, nuts securing, hand brake, gear, seating
position, headrests, mirrors, seat belts and etc.
Knowable of Defensive Driving Technique called Five Seeing Habits
Knowledge of Journey Management Plan and current JMP procedure
Safely and effectively start the engine by use of the clutch and accelerator
Move away from the roadside correctly by use of the handbrake, clutch, accelerator, indicators
and mirrors
Steer the vehicle correctly using the push-pull method of steering
Keep correct speed and distance under varying road and weather conditions
Maintain lane discipline and use indicators and mirrors intelligently
Negotiate all types of hazards by sound forward planning and use of the system of car control
Take appropriate action with regards to road signs, markings and all orders given by Police
Officers
Anticipate the actions of other road users
Stop at the roadside safely by the correct use of mirrors, indicators, steering, brakes and gears
Change a wheel that has been deflated by use of the vehicle‟s jack
Switch between 2 and 4 wheel drive, using high and low ratios and operate a differential lock
Reverse the vehicle competently, using sound observations, signals, good control and accuracy
Reverse parking procedure
Risk Assessment on road
Changing a wheel on/off the road
Accident procedure (actions in case of emergency)
Start a vehicles engine by using an auxiliary battery
Operation of communications equipment
Fatigue and tiredness management
Night Time driving (if duty requires)
Anti-skid/Collision avoidance/Vehicle rollover prevention
Winter driving and winter driving preparation
Driving in severe weather condition where vision is limited
Load securing and transportation
Off-Road Driver Training Program
Off-road driver training is currently taught to off-road Drivers but does not form part of the basic
defensive driver program. It is essential for all drivers of Company vehicles in an off-road environment
to attend suitable training. Off-road driving requires a high level of skill combined with a mature and
positive attitude. Drivers who are not properly trained are a liability to the Company. All Drivers that
have undergone the off-road driver training are required to achieve the minimum standards listed
below.
Considerations:
a) Engage 4WD
b) Secure cargo and passengers
c) Adjust tyre pressures
d) Fold wing mirrors
e) Retract antenna
Control Tier:
<<2>>
Revision Date: <<20 April 2010>>
25
Document Number: << AZSPU-HSSE-DOC-00121-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING.
THE CONTROLLED VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
Procedure for AZSPU Driving Safety Standard
Page 26 of 28
Safely Negotiate:
a) Rocks
b) Slopes
c) River crossing
d) Sand
e) Mud
f) Ditches
g) Winch recovery techniques
Driving Patterns:
a) Show vehicle sympathy
b) Route selection
c) Mature attitude
Fatigue and Tiredness Management Training
BP‟s current Fatigue and Tiredness Management training program consist of four hours theoretical
class. All categories 1, 2 and 3 drivers shall pass F&TM training as a part of recruitment and
refreshment trainings as part of Defensive Driving package to be followed annually.
Skid correction training
A significant factor, which has contributed to the severity of many road traffic accidents in AzSPU is
that many drivers are unable to control their vehicles during a skid situation. Skid is defined as - “The
involuntary movement of a vehicle due to the grip of the tyres on the road surface becoming less than
a force or forces acting on the vehicle”.
In order to rectify this training deficiency, BP Transportation Department has acquired a
technologically advanced skid correction system, which now allows BP drivers to gain practical skills
in skid correction, collision avoidance and vehicle‟s rollover prevention techniques. The objectives of
this training are:
To understand the three causes and relevant factors which contribute to loss of vehicle
control.
To obtain the practical skills necessary to correct a loss of control situation.
The system allows the driver to safely experience real-life skid situations and to react to them
instinctively. Skid correction training is mandatory training for BP category 1 & 2 drivers and shall be
refreshed annually. Skid correction training shall also be arranged for category 3 drivers upon
availability with minimum follow up every 3 years.
Appendixes (please click the links to view the content)
Appendix A - BP Driver‟s Permit program Across Azerbaijan, Georgia & Turkey
Appendix B - Vehicle Inspection Documents
Appendix C - Vehicle Maintenance Inspection Sheet for Contracted Garages
Appendix D - Use of communication equipment procedure
Appendix E - Incident Investigation and Reporting Procedure
Appendix F - Specimen questions for LGV & PCV drivers
Appendix G - Driver Training Format and Matrix
Appendix H - Driver Medical Screening Program
Appendix I
- Safe Vehicle Standard & Specifications
Appendix J - Vehicle Seat & Seatbelt Policy
Control Tier:
<<2>>
Revision Date: <<20 April 2010>>
26
Document Number: << AZSPU-HSSE-DOC-00121-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING.
THE CONTROLLED VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
Procedure for AZSPU Driving Safety Standard
Page 27 of 28
Appendix K - Vehicle Loading Policy & Guidelines on “Load restrain & transportation”
Appendix L - Headlights use guideline
Appendix M - Contracts minimum expectation
Appendix N - Winter Driving Tips
Appendix O - Maximum Speed Limits
Appendix P - BP Vehicle Use Policy
Appendix Q - BP Vehicle Disposal Policy
Appendix R - Vehicle Operation Best Practises
Appendix S - BP Driver Disciplinary Code Guidelines
Appendix T - Did you know?
Revision/Review Log
Revision Date
Authority
Custodian
Revision Details
04 Feb 2008
Alan McNulty
CHSSE Team
On Page 10 of the main document:
CHSSE Manager
Teymuraz
The referred procedure has been changed
Babayev
page 9-10 of the document
(CHSSE Driving
Driver Fitness
Compliance
Addendum Appendix H
Technical
Medical check up for drivers
Authority )
Teymuraz
General:
Babayev
Throughout the procedure the document for
30 April 2008
Alan McNulty
(CHSSE Driving
referred procedure has been changed.
(CHSSE Manager)
Compliance
Addendum. Appendix P:
Technical
BP Vehicle Use policy.
Authority )
Dispatcher points details
Transportation service provision
Staff Commuting
Shuttle bus service
23 November,
Alan McNulty
Teymuraz
General
2008
(CHSSE
Babayev
Throughout the procedure the document for
MANAGER)
(CHSSE Driving
referred procedure has been changed in
Compliance
conformity with ALT Training matrix for 2008,
Technical
Vehicle Maintenance Sheet and Contract
Authority )
Minimum Expectation.
Addendum Appendix G
Driver Training format and Matrix
Addendum Appendix C
Vehicle Maintenance Sheet for Contracted
Garage or In House Workshop
Addendum Appendix M
Medical check up for drivers
Refresh Training for Driver
Speed limit for vehicle
Control Tier:
<<2>>
Revision Date: <<20 April 2010>>
27
Document Number: << AZSPU-HSSE-DOC-00121-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING.
THE CONTROLLED VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
Procedure for AZSPU Driving Safety Standard
Page 28 of 28
05 December,
Yuliy Zaytsev
Teymuraz
2008
(AzSPU Safety &
Babayev
Authority position/name has changed to reflect
Compliance
(CHSSE Driving
org changes in HSE&TD as of December 1st
Systems Manager)
Compliance
2008
Technical
Authority )
28 April, 2010
Yuliy Zaytsev
Teymuraz
General
(AzSPU Safety &
Babayev
Throughout the procedures the document for
Compliance
(AzSPU Driving
referred BP Group Recommended Practice
Systems Manager)
Compliance
Driving Safety 3.7-0002 and OMS wording has
Technical
been changed
Authority )
Document has been changed to comply with
Standardized Document Control Procedure
Template AZSPU -HSSE-DOC-000026-2
On page 15 of the main document
Journey Management Procedure in conformity
with Baku city boundaries.
On pages 18-26 of the main document
BP Driver‟s Permit in conformity with BP Driver
Permit program
BP Driver Training in conformity with current
procedure.
General
Throughout the procedure the document for
referred procedure has been changed
Appendix A - BP Driver‟s Permit Program
Appendix Vehicle Inspection Documents -
added Pre- Trip Vehicle Inspection Manual
Appendix G- BP AzSPU Defensive Driving
Training for Drivers
Control Tier:
<<2>>
Revision Date: <<20 April 2010>>
28
Document Number: << AZSPU-HSSE-DOC-00121-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING.
THE CONTROLLED VERSION OF THIS DOCUMENT CAN BE FOUND AT http://docs.bpweb.bp.com/dkazspu/component/hssesms
Procedure for Energy Isolation - Electrical
Page 1 of 24
Procedure for Energy Isolation - Electrical
AZSPU-HSSE-DOC-00048-2
This number supersedes UNIF-HSE-PRO-106-C2
Authority:
Chris Houghton / AZSPU
Custodian:
Yvonne Hepburn /AZSPU
ENGINEERING AUTHORITY
ELECTRICAL TECHENICAL
AUTHORITY
Scope:
AzSPU
Document
Administrator:
AzSPU HSSE Document Coordinator
Issue Date:
24 Aug 2004
Issuing Dept:
HSE&TD, Safety & Compliance
Revision Date:
19 January 2010
Control Tier:
2 - SPU
Next Review
19 January 2011
Date:
Control Tier:
<<2>>
Revision Date: <<19 January 2010>>
Document Number: << AZSPU-HSSE-DOC-00048-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT
Procedure for Energy Isolation - Electrical
Page 2 of 24
TABLE OF CONTENTS
1 PURPOSE / SCOPE
4
2 DEFINITIONS
4
3 GENERAL REQUIREMENTS
5
3.1 Legislation & Standards
5
3.2 BP Requirements
5
3.3 Stopping Unsafe Work
6
3.4 Requirements for Work Activities Involving Energy Isolation
6
4 ROLES AND RESPONSIBILITIES
6
4.1 Electrical Functional Work Group
6
4.2 Site Controller (SC)
6
4.3 Area Authority (AA)
7
4.4 Isolating Authorities (IAE & IAC)
7
4.4.1 Isolating Authority (IA)
7
4.4.2 Electrical Isolators (IAE)
7
4.4.3 Senior Authorized Electrical Personnel (SAEP)
7
4.4.4 Authorized Electrical Personnel (AEP)
8
4.4.5 Competent Isolator (CI)
8
4.4.6 Control Isolators (IAC)
8
4.4.7 Authorized Instrument Personnel (AIP)
9
4.4.8 Competent Isolator (CI)
9
4.5 Performing Authority (PA)
9
4.6 Responsible Electrical Person (REP)
9
4.7 Electrical Technical Authority (ETA)
10
4.8 Competent Person (CP)
10
5 ENERGY ISOLATION PROCESS
10
5.1 Self-regulation and Audit
10
5.2 Isolating Authorities (IAE & IAC) - Training, Competency and Authorisation
10
5.3 Modification and New Facilities
11
5.4 Isolation and Planning
11
5.4.1 Isolation
11
5.4.2 Isolation Planning
12
5.4.3 Switching Programmes
12
5.4.4 Isolation Methods
13
5.4.5 Isolation Standards
14
5.4.6 Risk Assessment of Non-compliant Isolations
15
5.4.7 Live Working
15
5.5 Isolation Implementation and Control
16
5.5.1
Security
16
5.5.2
Isolation Labelling
16
5.5.3 Positive Identification of Equipment
17
5.5.4 Control of Isolations
17
5.5.5 Operational Locks
17
Control Tier:
<<2>>
Revision Date: <<19 January 2010>>
Document Number: << AZSPU-HSSE-DOC-00048-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT
Procedure for Energy Isolation - Electrical
Page 3 of 24
5.5.6 Boundary Isolations
18
5.5.7 Long-Term Isolations
18
5.5.8 Personal Isolations
19
5.5.9 Testing Isolation Integrity - Proving Dead
19
5.5.10 Monitoring Isolation Integrity
20
5.6 De-isolation of Plant
20
6 KEY DOCUMENTS / TOOLS / REFERENCES
20
Flow Sheet Electrical Isolations
21
Appendix A: Applicability
22
Appendix B: Adjacent Working Assessment
22
Appendix C: Switching Programme
22
Appendix D: Operational Locking System
22
Appendix E: Control of Electrical Work
22
Appendix F: Labels
22
Control Tier:
<<2>>
Revision Date: <<19 January 2010>>
Document Number: << AZSPU-HSSE-DOC-00048-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT
Procedure for Energy Isolation - Electrical
Page 4 of 24
1 PURPOSE / SCOPE
The purpose of this document is to define the Azerbaijan Performance Unit (AzSPU) functional
standard for the safe isolation of electrical plant or equipment from sources of electrical energy.
All Process Isolation requirements are covered by Energy Isolation - Process Document.
The contents of this Safe System of Work are applicable to all BP owned and managed
sites/installations in Azerbaijan and Georgia. Contractors working on BP owned or managed
sites/installations are also responsible for alignment with this SSOW.
Any specific procedure developed by specialist contractors should align with requirements of
this procedure. Neither does it supersede any national and local regulatory requirements.
All guidelines contained shall be regarded as the minimum requirements for BP owned or
managed sites in Azerbaijan and Georgia.
This document applies to the electrical isolation of equipment for work. It shall be followed at all
AzSPU operated sites / installations and is applicable to both onshore and offshore.
This procedure is written in sufficient detail that it should be able to be applied consistently at all
sites / installations. There may still be the requirement for some local rules covering site /
installation specific logistical / administrative arrangements and local variations in responsibilities
to reflect differences in organisational arrangements. These local rules should not deviate from
the core processes within this document. Any form of deviation from this procedure, including
but not limited to local rules, shall be requested and authorised in accordance with the SSOW
Deviations from Regulations and Procedures (Doc. No: AZSPU-HSSE-DOC-00011-2)
2 DEFINITIONS
Refer to document AzSPU-HSSE-DOC-00021-2 HSE Definitions for definitions common to this
procedure. Definitions specific to this Procedure are included below.
AA
Area Authority
AAA
Affected Area Authority
AEP
Authorized Electrical Person
AIP
Authorized Instrument Person
SPUL
Strategic Performance Unit Leader
CI
Competent isolator
CMAS
Competence Management Assurance System
D
Main phase and neutral conductors disconnected
E
Earth the isolated conductor
ELV
“extra low voltage” Voltage which does not exceed
50V ac rms between conductors or between any
conductor and earth, in a circuit isolated from the
supply be means such as a safety isolating
transformer or converter with separate windings.
A voltage which does not exceed 50V dc between
conductors or any conductor and earth in a circuit
isolated from Higher voltage circuits
Control Tier:
<<2>>
Revision Date: <<19 January 2010>>
Document Number: << AZSPU-HSSE-DOC-00048-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT
Procedure for Energy Isolation - Electrical
Page 5 of 24
HV
“High Voltage” voltages that exceed
1000Vac or
1500Vdc between conductors or 600Vac or 900Vdc
between conductors and earth
IA
Isolating Authority
IAC
Isolating authority Control
IAE
Isolating authority Electrical
ICC
Isolation Control Certificate
IP
Ingress protection
Is
Isolation of the main phase conductors
ISSOW
Integrated Safe System of Work
LL
Lock and Label
LTI
Long-term isolations
LV
“Low Voltage” is a voltage normally exceeding extra
low voltage by not exceeding 1000V ac or 1500 Vdc
between conductors or 600Vac or 900Vdc between
conductors and earth
OIM
Offshore Installation Manager
P
Prove dead with proprietary voltage tester
PA
Performing Authority
REP
Responsible Electrical Person
SAEP
Senior Authorized Electrical Person
SC
Site Controller
SM
Site Manager
SP
Authorized Switching Programme
SSOW
Safe System Of Work
TA
Technical Authority
WCC
Work Control Certificate
3 GENERAL REQUIREMENTS
3.1 Legislation & Standards
This procedure complies with applicable national law. Applicable national law is national law as
amended by project specific agreements, e.g. the ACG Production Sharing Agreement (PSA),
and relevant International Conventions, if any, in force in Azerbaijan or Georgia, as applicable.
In the absence of national legislation, or where national legislation is inconsistent with the
requirements of project specific agreements, BP Group Standards or applicable requirements
from UK or US legislation will be complied with.
Where requirements conflict, legal advice has been obtained and a defendable compliance
position adopted.
The standards and practices contained in this procedure are consistent with those internationally
recognized within the petroleum industry.
3.2 BP Requirements
It is a company requirement that all tasks are subjected to an assessment of risk to demonstrate
that risks have been reduced to as low a level as reasonably practicable (ALARP). This can be
achieved by complying with the Company‟s existing standards. Where compliance with
Control Tier:
<<2>>
Revision Date: <<19 January 2010>>
Document Number: << AZSPU-HSSE-DOC-00048-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT
Procedure for Energy Isolation - Electrical
Page 6 of 24
Company standards cannot reasonably be achieved, a formal level 2 Risk Assessment will be
undertaken to identify any additional controls and demonstrate that risks remain as low as
reasonably practicable. Whether by compliance with Company Standards or through level 2
Risk Assessment, the Company‟s Golden Rules of Safety must be complied with. Golden Rules
are non-negotiable.
3.3 Stopping Unsafe Work
To stop the continuation of potentially unsafe work at the earliest possible stage the Control of
Work (CoW) Policy and this Energy Isolation - Electrical procedure make it very clear that all
personnel are obliged and have the authority to “STOP” the work that they consider to be
unsafe.
3.4 Requirements for Work Activities Involving Energy Isolation
The controls associated with the Golden Rules of Safety directly associated with Control of Work
are listed below and shall be applied whenever the work activity is carried.
Any isolation of energy systems; mechanical, electrical, process, hydraulic and others, shall not
proceed unless:
the method of isolation and discharge of stored energy are agreed and executed by a
competent person(s)
any stored energy is discharged
a system of locks and tags is utilized at isolation points
a test is conducted to ensure the isolation is effective
isolation effectiveness is periodically monitored
4 ROLES AND RESPONSIBILITIES
4.1 Electrical Functional Work Group
The Electrical Functional Work Group (EFWG) has produced this document to support the safe
system of work. The Document Technical Authority will issue any new revisions of the
document for approval.
4.2 Site Controller (SC)
This is the site manager (SM) or the offshore installation manage (OIM) and is a gate keeper
role with authorisation of all categories of WCC‟s . The principle ISSOW related responsibilities
of the SC are to:
Take overall charge of the Installation/ site and responsibility for the effective operation of
ISSOW
Control Tier:
<<2>>
Revision Date: <<19 January 2010>>
Document Number: << AZSPU-HSSE-DOC-00048-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT
Procedure for Energy Isolation - Electrical
Page 7 of 24
Ensure that regular auditing of the process occurs and that all corrective actions resulting
from the audit are carried out
Ensure persons appointed to roles with ISSOW have undergone and the required training
and have been assessed as competent for the roles they fill and that these details are
recorded in accordance with the existing competency management process.
Responsible for authorizing any deviations from the isolation standard through the risk
assessment process. In doing so, he/she may choose to defer or not to carry out the activity
and seek further technical guidance if the residual risk is perceived to be excessive.
4.3 Area Authority (AA)
The Area Authority is responsible for approving the isolation design, providing assurance that
the design achieves the highest quality of isolation reasonably practicable. He/she can delegate
the detailed isolation design to an appropriately competent or authorized person. The Area
Authority is then responsible for authorizing the work to proceed under appropriate controls.
This includes approval of any preparatory work and, on completion of the task, the work required
to complete reinstatement.
4.4 Isolating Authorities (IAE & IAC)
Within the ISSOW system there are two identifiers used for persons authorised for electrical
isolation IAE and IAC
4.4.1 Isolating Authority (IA)
Note: the IA category in ISSOW will not be used as the specific authorisation approval levels
IAP, IAE IAC will be used.
4.4.2 Electrical Isolators (IAE)
Electrical Isolators are responsible for design of an electrical isolation when requested by the
Area Authority. He/she is then responsible for safely isolating a specific section of plant or items
of equipment to the highest quality and security of isolation, which is reasonably practicable. The
Isolating Authority is also responsible for demonstrating the integrity of the isolation to the
Performing Authority. The Isolating Authority will be authorized to the maximum voltage level
required for the isolation
4.4.3 Senior Authorized Electrical Personnel (SAEP)
Electrical personnel who have been formally assessed by the TA or delegate as identified in the
table below and authorized by the Site Controller, to switch, isolate and test electrical equipment
greater than
1000v the upper level of authorization will be detailed on the Electrical
Authorization Certificate, can act as an isolating authority under the Safe Systems of Work for
electrical systems with voltage levels up to and greater than 1000V. As described in AZSPU-
HSSE-DOC-00048-2 Procedure for: Energy Isolation - Electrical.
Level
Scope
Assessed by
SAEP L1
Isolation of HV motors for mechanical work
ETA or REP
SAEP L2
Isolation of HV motors for electrical work
ETA or
delegate
SAEP L3
Isolation of HV distribution
ETA or
delegate
Control Tier:
<<2>>
Revision Date: <<19 January 2010>>
Document Number: << AZSPU-HSSE-DOC-00048-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT
Procedure for Energy Isolation - Electrical
Page 8 of 24
Note : any restrictions limitations will be identified on the authorisation certificate
Note: Where switching or isolation interfaces with an external organization the
authorization may also include an assessment by the external organization or the State
Energy Control
4.4.4 Authorized Electrical Personnel (AEP)
Electrical personnel who have been formally assessed as identified in the table below, and
authorized by the Offshore Installation Manager / Site Manager / Site Controller, to switch,
isolate and test electrical equipment with voltage levels less than one thousand volts (1000V)
and act as an isolating authority under the Safe Systems of Work for electrical systems with
voltage levels less than 1000V. As described in AZSPU-HSSE-DOC-00048-2 Procedure for:
Energy Isolation - Electrical
Level
Scope
Assessed by
AEP L1
Single circuit 240VAC MCB
REP
AEP L2
Single circuit LV MCB
REP
AEP L3
Single circuit LV Switchgear
REP
AEP L4
Isolation of LV distribution and generation
REP
Note : any restrictions limitations will be identified on the authorisation certificate
4.4.5 Competent Isolator (CI)
In special circumstances individuals can be assessed as competent isolators and authorized
and recognised as IAE by the Site Controller for specific items of equipment providing that they
have completed the formal training and have been assessed as competent, as described in
AZSPU-HSSE-DOC-00048-2 for: Energy Isolation - Electrical
Level
Scope
Assessed by
CI L2
LV specific task
REP
CI L3
HV specific task
ETA or
delegate
Note : any restrictions limitations will be identified on the authorisation certificate
4.4.6 Control Isolators (IAC)
Control / Instrument / Telecoms Isolators are responsible for design of a Control / Instrument /
Telecoms isolations when requested by the Area Authority. He/she is then responsible for
safely isolating a specific section of plant or items of equipment to the highest quality and
security of isolation, which is reasonably practicable. The Isolating Authority is also responsible
for demonstrating the integrity of the isolation to the Performing Authority. The Isolating Authority
will be authorized to the maximum voltage level required for the isolation
Control Tier:
<<2>>
Revision Date: <<19 January 2010>>
Document Number: << AZSPU-HSSE-DOC-00048-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT
Procedure for Energy Isolation - Electrical
Page 9 of 24
4.4.7 Authorized Instrument Personnel (AIP)
Instrument /Telecoms/ Control personnel who have been formally assessed by the site REP,
and authorized by the Site Controller to switch, isolate and test control, instrument and telecom
equipment with voltage levels less than 240 volts, can act as an isolating authority under the
Safe Systems of Work for control, instrument and telecom systems with voltage levels less than
240V phase to earth. As described in AZSPU-HSSE-DOC-00048-2 Procedure for: Energy
Isolation - Electrical
Level
Scope
Assessed by
AIP L1
ELV circuits with voltage less than 50V
REP
AIP L2
Single circuit 240V MCB
REP
Note : any restrictions limitations will be identified on the authorisation certificate
4.4.8 Competent Isolator (CI)
In special circumstances individuals can be assessed as competent isolators by the site REP
and authorized and recognised as IAC by the Site Controller for specific items of equipment
providing that they have completed the formal training and have been assessed as competent,
as described in AZSPU-HSSE-DOC-00048-2 for: Energy Isolation - Electrical
Level
Scope
Assessed by
CI L1
ELV specific task
REP
Note : any restrictions limitations will be identified on the authorisation certificate
4.5 Performing Authority (PA)
The Performing Authority is the person charged with the responsibility of carrying out the work
and has the right to request demonstration of the integrity of any isolation. The Performing
Authority will ensure that they have witnessed, at the point of work, that the conductors are
dead. The Performing Authority may complete this task themselves if suitably authorized.
4.6 Responsible Electrical Person (REP)
This is a role under the „safe system of work‟ to clearly identify which authorized person has the
responsibility for the electrical system, the REP is nominated by the SC from those persons
having the highest level of authorization required for that site / installation and is technically
assessed by site Electrical Technical Authority or delegate for the role of REP.
The REP will:
Approve any switching programs
Countersign WCC with electrical content where the Area Authority isn‟t electrically
competent, ensuring that the isolation has been correctly designed and the Isolating
Control Tier:
<<2>>
Revision Date: <<19 January 2010>>
Document Number: << AZSPU-HSSE-DOC-00048-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT
Procedure for Energy Isolation - Electrical
Page 10 of 24
Authority has the appropriate authorization level for the work (Note: REP will have Area
Authority training and assessment in support of this)
Assess and recommend site personnel for authorization for inclusion in the ISSOW
At any one time there can be only one REP responsible for the electrical system. The REP may
also be the isolating authority as recognised by ISSOW.
Level
Scope
Assessed by
REP
As defined
ETA or
delegate
4.7 Electrical Technical Authority (ETA)
The Electrical Technical Authority is an Electrical Engineer who is recognized by management
as the site technical authority. The technical authority or their delegate assesses and
recommends site personnel for authorization to SAEP and will assess and recommend
personnel for the role of REP.
4.8 Competent Person (CP)
An essential requirement for persons undertaking electrical work is that they are competent,
established by virtue of training and or experience. A competent person is capable of
recognising danger and knows when to seek guidance when the work falls outside their area of
competence.
The employing company will certify competency of the employee and will supply BP with copies
of their competence assessment as required. The AzSPU certifies the competence of its own
employees using CMAS and or trade qualifications.
5 ENERGY ISOLATION PROCESS
5.1 Self-regulation and Audit
Performance Units shall periodically review isolation related activities, including review of
individual isolations and review of overall isolation processes. Such reviews may also include:
General compliance with this document and any local procedures
The assessment of non-compliant isolations and the extent of any approved deviations
Registers of competent and authorized persons
5.2 Isolating Authorities (IAE & IAC) - Training, Competency and Authorisation
The Isolating Authority will be authorized by SC based on the following criteria.
The Isolating Authority will be:
Familiar with the site / installation
Control Tier:
<<2>>
Revision Date: <<19 January 2010>>
Document Number: << AZSPU-HSSE-DOC-00048-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT
Procedure for Energy Isolation - Electrical
Page 11 of 24
Have Electrical First Aid Training (level 1 plus AED/ CPR and treatment of burns or level
2 training)
Will be EX certified, when working on Hydrocarbon Plants
Where appropriate, will have HV operational training
Will have been formally and practically assessed for electrical isolations and recognised
as authorized at a specific voltage level for the work site
The Authorisation levels on site will be as follows:
Level
Scope
Assessed by
REP
As defined
ETA or
delegate
SAEP L1
Isolation of HV motors for mechanical work
REP or ETA
SAEP L2
Isolation of HV motors for electrical work
ETA or
delegate
SAEP L3
Isolation of HV distribution
ETA or
delegate
AEP L1
Single circuit 240VAC MCB
REP
AEP L2
Single circuit LV MCB
REP
AEP L3
Single circuit LV Switchgear
REP
AEP L4
Isolation of LV distribution and generation
REP
AIP L1
ELV circuits with voltage less than 50V
REP
AIP L2
Single circuit 240V MCB
REP
CI L1
ELV specific task
REP
CI L2
LV specific task
REP
CI L3
HV specific task
ETA or
delegate
In special circumstances individuals can be assessed as Competent Isolators (CI) for specific
items of equipment providing that they have completed the formal training and have been
assessed as competent on the specific tasks. Site management is responsible for ensuring that
this is recorded so that it is clear which tasks these individuals are competent to undertake.
5.3 Modification and New Facilities
In relation to existing Installations and sites:
The design of all modification and new facilities shall include a review of the provision of
means of isolation for maintenance to ensure compliance with this document
Such reviews shall address both isolations within the modified/new facilities and any
opportunities to upgrade existing isolation facilities where these are inadequate
New isolators supplied as part of a modification or as a replacement shall be provided with
a facility to be locked off.
5.4 Isolation and Planning
5.4.1 Isolation
The highest quality and security of isolations, which is reasonably practicable in the prevailing
circumstances, shall always be used. This document sets out the minimum recommended
isolation standard to be used in the Azerbaijan Strategic performance Unit.
Control Tier:
<<2>>
Revision Date: <<19 January 2010>>
Document Number: << AZSPU-HSSE-DOC-00048-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT
Procedure for Energy Isolation - Electrical
Page 12 of 24
Any isolation, which does not meet the Minimum Recommended Isolation Standard as defined
in section 7.5, including the application of the Mandatory Safeguards, must be assessed using
the Level 2 Risk Assessment Process before the isolation is approved. Should any non-
compliant isolation have to be repeatedly justified by risk assessment, consideration shall be
given to a permanently engineered solution.
All key participants in the implementation of the BP Isolations Policy shall be trained and
assessed as competent to the appropriate level in the Electrical Isolation Standard.
An audit programme shall be established by the SC at each site to ensure that regular checks
are made on isolations to provide assurance that the isolations policy and standards are being
applied and that lessons learned are communicated effectively.
5.4.2 Isolation Planning
Isolation of any piece of equipment shall be planned to minimize risk to personnel, property and
production. To achieve this, the following information will be required:
A clear description of the work, ensuring that if the activity includes electrical work that this
is clearly identified
A clear description of the equipment which needs to be isolated, this will include the Plant
Tag Number and the Plant Tag Description
A drawing identifying the isolation, earth and disconnection points where this is not
obvious
Tag references of all the switching and isolation points
Locks and Labels for securing the isolation points
Test equipment for proving effectiveness of the isolation
Switching program detailing the sequence of switching required to achieve the isolation where
the equipment is fed from more than one source or main distribution is to be switched or at the
REP‟s discretion
5.4.3 Switching Programmes
Where main distribution equipment is to be switched it is essential that the equipment be
switched in the correct sequence. To achieve this, a switching programme will be required,
detailing the switching sequence. This will be accompanied by a marked up single line drawing.
An HV switching programme will be prepared by an SAEP and checked by the REP. Where the
REP is alone on site, the site electrical engineer will check the switching program. Technical
advice will be sought as required.
While switching two persons will be involved one who will read out loud the instruction and the
other who will confirm the instruction out loud and on confirmation that this is correct will perform
the operation.
See Appendix C for a blank Switching Programme.
The Switching Programme does not replace an ICC.
Control Tier:
<<2>>
Revision Date: <<19 January 2010>>
Document Number: << AZSPU-HSSE-DOC-00048-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT
Procedure for Energy Isolation - Electrical
Page 13 of 24
5.4.4 Isolation Methods
The highest quality of isolation, which is reasonably practicable, shall be applied to every
individual isolation point. The methods of isolation normally available are detailed below; listed
in descending order of security and effectiveness. The key to all of these isolations is the
positive identification of the equipment to be isolated, to this end all equipment and isolation
points on a site will be uniquely identified and clearly labelled, a secondary check could use the
cable numbers which connect the isolator to the equipment. If there is any doubt about the
correct identification of the equipment to be isolated and the isolation point then the work should
be suspended and clarification sought.
(a)
Isolate Circuit, Prove Dead, Disconnect, Lock, Label and Earth
This is a positive isolation of the main phase conductors with an isolator and disconnection of
the main phase and neutral conductors by removal of fuses, links or withdrawal of a circuit
breaker or some other means of disconnection. The circuit is proven dead to ensure that the
circuit is discharged and is earthed to prevent recharging. Locks and labels are applied to all
points of isolation and earthing
Note: When the isolation requires switching of main distribution equipment, a Switching
Program is also required.
(b)
Isolate Circuit, Prove Dead, Disconnect, Lock and Label
This is a positive isolation of the main phase conductors with an isolator and disconnection of
the main phase and neutral conductors by removal of fuses, links or withdrawal of a circuit
breaker or some other means of disconnection. The circuit is proven dead to ensure that the
circuit is discharged. Locks and labels are applied to all points of isolation.
Note: Where the isolation switch meets the minimum standard for disconnection, as defined in
IEC 60947, and it includes all phases and neutral then no further disconnection is necessary if
the risk of physical disconnection outweighs the advantage. However, this is a minimum
standard and it is expected that if fuses or links are part of the circuit that they will be removed.
(c)
Isolate, Lock and Label (not suitable for electrical work)
This is a positive isolation of the main phase conductors with an isolator; the isolator type will be
of such construction that it breaks the main phase conductors when open. Locks and labels are
applied to all points of isolation.
Note: Isolation by auxiliary control circuits only is not acceptable for isolation purposes.
(d)
Prove Dead, Disconnect, Label
This is a positive isolation typically used for isolating instruments where there is no lockable
isolator. It is required that the circuit cable cores are disconnected from the terminal rail and
terminated into a temporary terminal block with isolation labelling at the disconnected cores.
General Note:
When completing the isolation confirmation certificate (ICC) for reasons of clarity the following
guidelines are given for isolation points where locks and labels will be applied
Isolate ( Open/closed)
When the isolation point is a an isolator or a MCB
or a MCCB with an OPEN / CLOSE POSITION
Fuse (Removed / Replaced)
When at the isolation point Fuses or Links have
been removed
Control Tier:
<<2>>
Revision Date: <<19 January 2010>>
Document Number: << AZSPU-HSSE-DOC-00048-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT
Procedure for Energy Isolation - Electrical
Page 14 of 24
Disconnect/ Reconnect
When at the isolation point a cable is removed ( the
isolation point tag reference will be the termination
point of the cable and the cable number)
Earths ( Applied / Removed)
When any earth is applied
( the isolation point tag
reference will be the earth application point where
the lock and the a green earth label will be applied)
Circuit Breaker ( Rack out /
When the isolation point is a circuit breaker (note at
rack in )
this point identify where the lock & label is to be
applied (ie 1S ESW81001 AB racking mechanism))
Bus Bar shutters ( locked /
When the isolation point is a bus bar shutter, note if
unlocked)
there are live conductors behind the shutter then a
danger notice should be used
Circuit shutters ( locked /
When the isolation point is a circuit shutter, note if
unlocked)
there are live conductors behind the shutter then a
danger notice should be used
Proved Dead
When a point in the circuit has been positively
proven dead it is to be identified on the WCC.
This should be identified as mitigation for
electrical work. The performing authority is
required to prove dead at the point of work or
have this demonstrated by a competent person.
5.4.5 Isolation Standards
Operating Voltages
Isolation requirements for:
<50V
>50V < 1000V
>1000V
Non-electrical work only
N/A
Is+LL
Is+LL
Electrical work on single
circuit
Is+P+D+Label
Is+P+D+LL
Is+P+D+LL+E
Electrical work on distribution
SP+Is+P+D+L
SP+Is+P+D+LL
system
N/A
L
+E
Note 1:If any work requires Proving Dead in a Hazardous Area, a gas monitor will
be required with a Hot Work 2 (Spark Potential) WCC.
Note 2:If any work is done adjacent to live conductors then this must be considered
when providing the isolation and an Electrical Adjacent Work Assessment is to be
completed.
Note 3:All conductors to be proven dead at the point of work
Is - Isolation of the main phase conductors
LL - Lock and labelled
D - Main phase and neutral disconnected
P - Prove dead with an approved voltage tester which is proved before and after
testing
E - Earth the isolated conductors
SP - Authorized Switching Programme
>50V <
Precautions
<50V
250V
>250V < 1000V
>1000V
SAEP or
AIP,
AIP,
AEP under
Authorisation level required to
AEP,
AEP,
direct
perform the isolation
SAEP
SAEP
AEP, SAEP
supervision
Control Tier:
<<2>>
Revision Date: <<19 January 2010>>
Document Number: << AZSPU-HSSE-DOC-00048-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT
Procedure for Energy Isolation - Electrical
Page 15 of 24
of SAEP
SAEP or
AEP under
Accompanied for proving
AEP,
SAEP
direct
dead, distribution switching,
based on Risk
supervision
testing, fault finding
No
No
assessment
of SAEP
Communications link
Yes
Yes
Yes
Yes
Nomex gloves or leather
gauntlets
No
Yes
Yes
Yes
Note 4:If work is to be accompanied there must be a clear understanding between
the Isolating Authority and the accompanying person identifying what the
accompanying person will do in the event of an emergency.
Note 5:Competent Isolator perform isolations for the specific equipment and voltage
that they have been authorised for
Table 1: Minimum Recommended Isolations Standard
5.4.6 Risk Assessment of Non-compliant Isolations
In the event that the Minimum Recommended Isolation Standard cannot be achieved, a Risk
Assessment shall be carried out in accordance with SSOW guidelines
The assessment team, including the REP shall specify appropriate safeguards, which may
replace or be in addition to those listed in Table 1. The team shall be satisfied that these
safeguards shall reduce the risks to an acceptable level before the task requiring isolation is
permitted to proceed.
The site controller must authorize all level 2 risk assessments prior to any work proceeding.
5.4.7 Live Working
Live working is defined as work on or in close proximity to live conductors; this includes testing.
All conductors will be assumed live unless proven dead. (See section 8.9)
Live work will not be a normal activity and will not be carried out unless there is no other
reasonably practicable method available. Where it is not possible to avoid live work, an
appropriate level of risk assessment shall be carried out before work commences.
Is the live working justified? Consider:
If the work could be done when equipment is isolated (an example of work which must be
done live would be work on battery systems)
If isolating the equipment introduces other greater safety risks
When identifying the risks consider:
Voltage level
Fault level of the equipment and the arc energy if a fault develops while working
Working environment (wet, dusty, noisy, vibration, at height etc)
Control Tier:
<<2>>
Revision Date: <<19 January 2010>>
Document Number: << AZSPU-HSSE-DOC-00048-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT
Procedure for Energy Isolation - Electrical
Page 16 of 24
What exposed voltage levels will be adjacent to the worksite
What could go wrong
Can adequate precautions be taken to reduce risk to an acceptable level? Some precautions,
which should be considered:
Competent people with training and experience
Insulated tools and test equipment
Accompanied work - Accompanying person to be First Aid Trained and it should be clear
what is expected of the accompanying person to ensure that they are competent to
accomplish this expectation
Insulated barriers, mats, grab hooks
Work site control (e.g. cordoning off area, limiting access)
Additional and / or specialist personal protective equipment
Reference to any specific safety rules or guidance
See Appendix E for a flowchart covering the Control of Electrical Work.
Isolations for Work Near Live Conductor
Frequently, work inside of complex control equipment means that although the circuit to be
worked on is isolated, there may be other circuits that are still energised. It is a requirement that
the risk from these adjacent conductors is assessed and appropriate precautions taken to
reduce the risk.
See Appendix B for an adjacent working assessment form.
5.5 Isolation Implementation and Control
5.5.1 Security
Any isolation must effectively disconnect the worksite from all sources of energy. Locks must be
used to prevent unauthorized de-isolation; to this end unique locking devices must be used.
Keys to any locks used for isolation purposes must be effectively controlled via the Area
Authority and the WCC to Work - Isolation Confirmation Certificate (ICC). Only when the ICC
allows should the Area Authority make the key available to remove a lock.
The locks should be a high security type, which are tamper proof. See appendix D.
5.5.2 Isolation Labelling
All isolation points shall be clearly identified, tagged and recorded on the ICC. Where not
obvious, a drawing should be attached to the ICC showing the location of each isolation and
earth point (where applied).
At the isolation point there should be an ISSOW or Yellow Isolation Label with the following
clearly identified:
ICC number
The Tag number of the isolation point
Control Tier:
<<2>>
Revision Date: <<19 January 2010>>
Document Number: << AZSPU-HSSE-DOC-00048-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT
Procedure for Energy Isolation - Electrical
Page 17 of 24
Reason for isolation
Isolation Authority name and signature
Date
At the Earth point there should be a Green Earth Label attached in addition to the ISSOW
isolation label
Adjacent live circuits will be identified with a Red Danger notice, e.g. live bus bar shutters when
work is to be carried on the circuit.
See Appendix G for labels
5.5.3 Positive Identification of Equipment
To allow effective isolation, equipment must be clearly labelled with unique tag numbers. If
equipment is not tagged then another method of positive identification of equipment must be
used, e.g. use of the cable number and cable schedule and interconnection drawings. These
provide a unique number, which should be located at each end of the cable. If there is any
doubt about the correct identification of the equipment to be isolated and the isolation point, then
the work should be suspended and clarification sought.
5.5.4 Control of Isolations
The ICC, cross-referenced to the work control certificate, shall be the principal means of control
once isolations are in place. The ICC performs the following functions:
Identifies the plant concerned and the reasons for isolations
Authorises isolation by disciplines
Records the complete list of isolation points
Records „prove dead‟ operations
Records the position of any earths applied
Records locking points and lock numbers
Records where isolation labels have been applied
Confirms that the isolation has been effected
Authorises any temporary de-isolations and isolations necessary for testing (sanction for
test)
Authorises and records de-isolations on completion of the task
The Area Authority must effectively control all keys for locks used for isolation.
5.5.5 Operational Locks
Operational Locks will be used as required on switchgear to ensure that normal operating
standards are maintained. These locks will be kept in the switch rooms in lock cabinets where
only appropriately authorised competent personnel will have access.
An example of this would be manual close buttons on switchgear, which will normally be locked
for operational purposes and unlocked for maintenance or for transformer offload tap changers.
Appendix: D shows an example of an operational locking system, which could be used for the
control of locks.
Control Tier:
<<2>>
Revision Date: <<19 January 2010>>
Document Number: << AZSPU-HSSE-DOC-00048-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT
Procedure for Energy Isolation - Electrical
Page 18 of 24
5.5.6 Boundary Isolations
Where an area of plant is isolated such that several activities (typically construction work) can
safely take place within this common set of strategically placed isolation points then this can be
termed as a „Boundary Isolation‟. It must be clearly identified that the isolation is appropriate for
all the individual tasks to be carried out within the Boundary Isolation and all individual Work
Permits are cross-referenced to this Boundary Isolation.
If any of the proposed tasks require a level of isolation or implementation of control measures
greater than that covered by the Boundary then a separate Isolation Confirmation Certificate
should be raised for this task.
Thorough planning and preparation is essential when planning Boundary Isolation. A team
including the Area Authority and Isolating Authority and any additional technical support required
should be set up away from the work place to properly review and agree the scope of the
Boundary Isolation and the tasks to be carried out.
Once work is in progress and subsequent Work Permits are applied for within the recognised
framework of the Boundary Isolation, they can be added providing it is clearly established that
the existing isolation is appropriate to the task. However, this should be avoided if possible and
it is preferable to identify all activities when the Boundary isolation is being planned.
Boundary Isolations shall not be removed until all applicable Work Permits have been cancelled.
If, for any reason, work on a particular piece of plant within the Boundary needs to be
suspended (e.g. whilst awaiting spares) then a separate isolation shall be implemented and an
ICC raised before the Boundary Isolation can be cancelled and confirmation that the installation
can be energised safely.
Where the de-isolation of the Boundary Isolation is proposed, the Area Authority shall ensure
that all associated Work Permits have been cancelled. He/she should also ensure that
equipment within the boundary is in safe condition.
5.5.7 Long-Term Isolations
Long-term Isolations (LTI) are defined as those that no longer have work performed against
them. Each site should maintain a detailed register of long-term isolations with a reason why
they are in place.
Long-term isolations shall be subject to two levels of review:
A weekly review of the register to check the status of the isolations in place
A quarterly review to physically check all the isolation points to confirm their security and
integrity and that the keys to all locks are being adequately controlled
If the LTI is in place for more than 1 year, review the requirement for LTI. Consider if
something else could be done (i.e. decommission circuit)
Before any work is performed against a long-term isolation a full integrity check of all isolation
points is required and the point of work must be proven dead.
Before an electrical LTI is removed a physical check of the equipment to be energized will be
made to ensure that the equipment is safe to energize.
Control Tier:
<<2>>
Revision Date: <<19 January 2010>>
Document Number: << AZSPU-HSSE-DOC-00048-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT
Procedure for Energy Isolation - Electrical
Page 19 of 24
5.5.8 Personal Isolations
Personal isolations are intended for short-duration tasks of relatively low risk. For example,
when work is required on a single motor feeder circuit or other such tasks where the completion
of an ICC is considered to add no significant value in terms of risk reduction. The use of
personnel isolation may only be authorized by the Area Authority and should be recorded on the
work control certificate. The rules for approval of a personal isolation are as follows:
One person within one shift performs the task and isolation; the person may receive
assistance from others but he/she shall be present at all times when work is in progress
Before approval, the Area Authority must be satisfied with the competence of the
Performing Authority and check that they have sufficient authorisation to both carry out the
isolation and execute the work. Personal isolations shall only be carried out by those
deemed to be a competent Isolating Authority
The same isolating standards apply to personal isolations other than the completion of the
ICC
The isolation points shall be labelled with an isolation label (which includes the date, the
name of the person isolating and the task information) and locked (the Performing
Authority must keep effective control of keys to isolation locks)
If the worksite is left unattended, the plant shall be left safe, with all covers or barriers in
place
The personal isolation is authorised on the work permit
An ICC shall be raised if any of these conditions cannot be met or conditions change during the
work activity.
Personal isolations are not allowed on the following:
High Voltage
Safety systems e.g. Fire and Gas or Emergency Shutdown (ESD) panels or sections
thereof
Equipment fed from more than one source
5.5.9 Testing Isolation Integrity - Proving Dead
All electrical conductors shall be considered to be live until positively proven dead using an
approved live line tester suitable for the voltage to be tested; this tester will be proved both
before and after use. The conductor will be proven dead between circuit and earth. Where
there is a neutral or the system is unearthed the conductors will also be proven dead between
all of the circuit conductors. It is a requirement under the BP Golden Rule of Energy Isolation
that energy has been discharged and that testing has proved the isolation.
The Performing Authority will be required to witness this test or prove dead themselves before
commencing work on any conductor.
It is essential that after testing with an applied voltage, a conductor be adequately discharged to
earth using approved discharging equipment. Once discharged, the conductor is again proven
dead.
Proving Dead is considered to be live working and therefore each location must assess the risks
of this activity based on sited conditions and produce a standalone risk assessment, which
Control Tier:
<<2>>
Revision Date: <<19 January 2010>>
Document Number: << AZSPU-HSSE-DOC-00048-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT
Procedure for Energy Isolation - Electrical
Page 20 of 24
covers this activity. The understanding of these precautions will form part of the authorisation
process for the site.
5.5.10 Monitoring Isolation Integrity
Locks and effective control of their keys maintain the integrity of electrical isolation. An isolation
lock may not be removed unless written permission is given on its ICC. A lock may not be
removed by any other means than the key. If for any reason the key is not available, the Area
Authority, Responsible Electrical Person, Isolation Authority and Performing Authority must
apply in writing to the Site Controller for permission to remove the lock.
Where possible, a multi-hasp device will be used to allow for more that one padlock at each
isolation point.
If the integrity of the isolation requires the use of barriers or shields then their condition will be
checked before the start of any work activity.
5.6 De-isolation of Plant
Before plant is de-isolated the Area Authority shall ensure that all work is complete, all permits
are cancelled, all covers and safety barriers have been replaced, the plant has been tested and
inspected and any relevant certification is completed. When the Area Authority is satisfied and
has checked that there are no other permits cross referenced to the isolation, he will instruct the
Isolation Authority to de-isolate the plant.
In a Hazardous Areas before de-isolation, the plant must be inspected to ensure that the
equipment meets the requirements to prevent danger in the hazardous area, commonly know as
an EX inspection.
6 KEY DOCUMENTS / TOOLS / REFERENCES
This procedure shall, where appropriate, be used in conjunction with this suite of AzSPU
Procedures referenced below.
Document No
Title of Procedure
AZSPU-HSSE-DOC-00012-2
AzSPU Procedure for Authorisation
AZSPU-HSSE-DOC-00011-2
AzSPU Procedure for Deviation
AZSPU-HSSE-DOC-00048-A2
AzSPU Electrical Safety Guidelines
AZSPU-HSSE-DOC-00063-2
AzSPU SSOW Procedure for Task Risk Assessment
AZSPU-HSSE-DOC-00049-2
AzSPU Procedure for Energy Isolation - Process
AZSPU-HSSE-DOC-00060-2
AzSPU Procedure for Permit To Work
AZSPU-HSSE-DOC- 00002-2
AzSPU Procedure for Control of Work
Control Tier:
<<2>>
Revision Date: <<19 January 2010>>
Document Number: << AZSPU-HSSE-DOC-00048-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT
Procedure for Energy Isolation - Electrical
Page 21 of 24
FLOW SHEET ELECTRICAL ISOLATIONS
AA REQUESTS
ISOLATION
ELECTRICAL/ INSTRUMENT
NON-ELECTRICAL WORK
WORK
WHAT TYPE
OF ISOLATION?
POSITEVELY IDENTIFY
EQUIPMENT, PREPARE
>1000V
<50V
WHAT VOLTAGE
ICC, ISOLATE CIRCUIT
LEVEL?
NO
LOW ENERGY?
>50 & <1000
LOCK AND LABEL
COMPLETE ICC,
NO
SINGLE
YES
RECORD ISOLATION IN
CIRCUIT
SWITCHROOM LOGBOOK
ISOLATION?
POSITEVELY IDENTIFY
EQUIPMENT, PREPARE
PREPARE
ICC, ISOLATE CIRCUIT
AND
YES
NO
SINGLE
APPROVE
CIRCUIT
SWITCHING
ISOLATION?
PROGRAMME
PROVE DEAD
PREPARE
AND
APPROVE
SWITCHING
POSITEVELY IDENTIFY
PROGRAMME
LOCK OR DISCONNECTOR
EQUIPMENT, PREPARE
CONTUCTORS AND TERMINATE IN
ICC, ISOLATE CIRCUIT
TO CHOC BLOC AND LABEL
POSITEVELY IDENTIFY
PROVE DEAD WITH
COMPLETE ICC
EQUIPMENT, PREPARE
APPROVED TEST UNIT
ICC, ISOLATE CIRCUIT
PROVE DEAD AT
DISCONNECT BY
POINT OF WORK
REMOVING FUSES AND
LINKS (INCL. NEUTRAL)
Motor contactor
NO
or auto circuit
earth
LOCK AND LABEL
PROVE DEAD WITH
YES
APPROVED TEST UNIT
COMPLETE ICC,
RECORD ISOLATION IN
SWITCHROOM LOGBOOK
EARTH CIRCUIT
LOCK AND LABEL
PROVE DEAD AT
ALL ISOLAION POINTS
POINT OF WORK
COMPLETE ICC,
RECORD ISOLATION IN
SWITCHROOM LOGBOOK
Control Tier:
<<2>>
PROVE DEAD AT
Revision Date: <<19 January 2010>>
Document Number: << AZSPU-HPOINT OF WORK0048-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT
Procedure for Energy Isolation - Electrical
Page 22 of 24
APPENDIX A: APPLICABILITY
This document applies to the following job functions:
Area Authority
Authorized Electrical Personnel
Authorized Instrument Personnel
Electrical Technical Authority
Isolating Authority
Site Manager / Site Controller / Offshore Installation Manager
Operations Engineer
Performing Authority
Responsible Electrical Person
Senior Authorized Electrical Personnel
APPENDIX B: ADJACENT WORKING ASSESSMENT
00048-A3
APPENDIX C: SWITCHING PROGRAMME
00048-A4
APPENDIX D: OPERATIONAL LOCKING SYSTEM
00048-A5
APPENDIX E: CONTROL OF ELECTRICAL WORK
00048-A6
APPENDIX F: LABELS
00048-A7
Control Tier:
<<2>>
Revision Date: <<19 January 2010>>
Document Number: << AZSPU-HSSE-DOC-00048-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT
Procedure for Energy Isolation - Electrical
Page 23 of 24
Revision/Review Log
Revision Date
Authority
Custodian
Revision Details
24 Aug 2004
Central
EI (electrical)
Initial issue as controlled document
Engineering
Technical
Senior Authority
Authority
18 June 2007
Steve Grittner
Yvonne Hepburn
Table of Contents changed as follows:
(Central
EI (electrical)
Sub-sections included into the Table of Contents.
Engineering
Technical
General:
Senior
Authority
Throughout the procedure the document
Authority)
numbering for referred procedures has been
changed.
Section 1. Introduction:
1.1 is now Scope. 1.2 is now General
Requirements. 1.3 is now Stopping Unsafe Work.
1.4 is now Deviations. 1.5 is now Document
Review. 1.6 is now BP Golden Rules of Safety.
1.7 is now SSOW Specific Cross References. 1.8
is now Language Facilitation. 1.9 is now
Procedure Summary. 1.10 is now Document
review.
Section 2. Roles and Responsibilities:
2.6 Responsible Electrical Person: Added on to
end of paragraph, “and assessed by site Electrical
Technical Authority or delegate”. 2.11Competent
Isolator: Added into the paragraph after REP is
“with the agreement of the ETA”.
Section 6. Isolation & Planning:
6.4 Isolation Methods: New sub-section added
titled “(d) Prove Dead, Disconnect, Label”. 6.5
Isolation Standards: Note 4 added to the standard
stating “Competent Isolator perform isolations for
the specific equipment and voltage that they have
been authorized for”.
Section 7. Isolation Implementation and
Control:
7.5 Operational Locks; Added into
the second paragraph after maintenance is “or for
transformer offload tap chargers”.
Appendices.
2 additional appendices included to the document
as follows:
Procedure Summary
Procedure Feedback & Improvement
Suggestions
19 January
Chris Houghton
Yvonne Hepburn
Formatting aligned to the new HSE standard
2010
AZSPU
AzSPU
Changes made to align the document with the
Engineering
Electrical
ISSOW system Changes to the authorization
Aurthority
Technical
levels.
Authotity
The paragraph where specific Golden Rules
Energy Isolation requirements were stated now is
substituted for appropriate requirements as stated
in Group Defined Practice for CoW.
Control Tier:
<<2>>
Revision Date: <<19 January 2010>>
Document Number: << AZSPU-HSSE-DOC-00048-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT
Procedure for Energy Isolation - Electrical
Page 24 of 24
Control Tier:
<<2>>
Revision Date: <<19 January 2010>>
Document Number: << AZSPU-HSSE-DOC-00048-2>>
Print Date: 2/1/2011
PAPER COPIES ARE UNCONTROLLED. THIS COPY VALID ONLY AT THE TIME OF PRINTING. THE CONTROLLED
VERSION OF THIS DOCUMENT CAN BE FOUND AT
|
||
|
|
|