Abu Dhabi, United Arab Emirates. STANDARD CONSTRUCTION SPECIFICATIONS (PART 2 - ROAD STRUCTURES, 2020) - page 11

 

 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 23-46 

C

HAPTER 

23:

 

S

TEEL 

S

TRUCTURES

 

 

First Edition -January 2018 

 

23.6.9 

Steel Structure Connections Using High-strength Bolts 

This section covers the assembly of structural joints using AASHTO M 164-05 (ASTM A325 - 10) or 
AASHTO M 253-05 (ASTM A490 

– 12) high-strength bolts or equivalent fasteners, installed so as to 

develop  the  minimum  required  bolt  tension  specified  in Table 23-10. The  bolts  are  used  in  holes 
conforming to the requirements of Section 23.5.5. 

The Contractor shall tighten (ASTM A325 

– 10) bolts in accordance with the procedures specified 

herein for turn-of-nut or direct-tension-indicator (DTI) tightening. 

When the Engineer approves (ASTM A307 

– 10) bolts for use in miscellaneous components, tighten 

them such that the plies of the joint are in firm contact. Use three to five impacts of an impact wrench 
or the full effort of a person using an ordinary spud wrench to obtain a snug connection. 

Lubricate and maintain consistency in lubrication of fastener assembly during Rotational Capacity 
(RC)  testing  and  installation.  Assemblies  that  exhibit  a  loss  of  lubrication,  as  determined  by  the 
Engineer, may be relubricated and retested before installation. 

Fasten  aluminum,  other  materials  or  assemblies  of  dissimilar  materials  in  accordance  with  the 
Contract documents. 

Install ordinary rough or machine bolts and nuts in accordance with the Contract documents. 

23.6.9.1 

Bolted Parts of Steel Structures 

All material within the grip of the bolt shall be steel; there shall be no compressible material such as 
gaskets  or  insulation  within  the grip.  Bolted steel  parts  shall fit  solidly  together  after the  bolts  are 
snugged and may be coated or uncoated. The slope of the surfaces of parts in contact with the bolt 
head or nut shall not exceed 1:20 with respect to a plane normal to the bolt axis. 

23.6.9.2 

Surface Conditions for High-strength Bolts 

At the time of assembly, all joint surfaces, including surfaces adjacent to the bolt head and nut, shall 
be free of scale, except tight mill scale, and shall be free of dirt or other foreign material. Burrs that 
would prevent solid seating of the connected parts in the snug condition shall be removed. 

Paint  is permitted on the faying surface including slip critical joints  when designed in accordance 
with Article 6.13.2, "Bolted Connections," of the 

AASHTO LRFD Bridge Design Specifications

Contacting  surfaces  of  slip-critical  connections  shall  meet  the  requirements  of  the  following 
paragraphs, as applicable: 

a.  In non-coated joints, paint, including any inadvertent overspray, shall be excluded from areas 

closer than one bolt diameter but not less than 25 mm from the edge of any hole and all areas 
within the bolt pattern. 

b.  Joints  specified  to  have  painted  faying  surfaces  shall  be  blast  cleaned  and  coated  with  a 

paint  which  has  been  qualified  in  accordance  with  requirements  of  Article  6.13.2.8,  "Slip 
Resistance," of the AASHTO LRFD Bridge Design Specifications. 

c.  Coated joints shall not be assembled before the coating has cured for the minimum time used 

in the qualifying test. 

Faying surfaces specified to be galvanized shall be hot-dip galvanized in accordance with AASHTO 
M  111M/M  111-11  (ASTM  A123  /  A123M  -  12).  The  Contractor  shall  provide  certification  to  the 
Engineer that galvanized faying surfaces meet or exceed a Class C slip critical classification, unless 
a  different  classification  is  required  elsewhere  in  the  Contract  documents.  The  Contractor  shall 
mechanically roughen the galvanized faying surfaces by means of hand wire brushing. Power wire 
brushing is not permitted. 

"Surface  conditions"  refers  to  Article  6.13.2,  "Bolted  Connections,"  and  Article  6.13.2.8,  "Slip 
Resistance," of the AASHTO LRFD Bridge Design Specifications. 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 23-47 

C

HAPTER 

23:

 

S

TEEL 

S

TRUCTURES

 

 

First Edition -January 2018 

 

23.6.9.3 

Reaming for High-strength Bolts 

The Contractor shall not over size bolt holes by reaming (or any other method) without the approval 
of the Engineer. 

23.6.9.4 

Drifting for High-strength Bolts 

The  Contractor  shall  not  over  size,  stretch,  or  otherwise  damage  bolt  holes  by  improper  and 
excessive drifting. 

23.6.9.5 

Filler Material for Splice Plate 

Unless  otherwise  specified  in  the  Contract  documents,  the  Contractor  shall  provide  filler  material 
edges within 3 mm of the adjacent splice material edge. 

23.6.9.6 

Installing High-strength Fasteners 

Fastener  components  shall  be  assigned  lot  numbers,  including  rotational-capacity  lot  numbers, 
before  shipping  and  components  shall  be  assembled  when  installed.  Such  components  shall  be 
protected from dirt and moisture at the job site. Only the number of anticipated components to be 
installed and tensioned during a work shift shall be removed from protective storage. Components 
not used shall be returned to protective storage at the end of the shift. Assemblies for slip-critical 
connections  which  accumulate  rust  or  dirt  resulting  from  job  site  conditions  shall  be  cleaned, 
relubricated,  and  tested  for  rotational  capacity  before  installation.  All  galvanized  nuts  shall  be 
lubricated with a lubricant containing a visible dye. Plain bolts must be oily to touch when delivered 
and installed. Lubricant on exposed surfaces shall be removed before painting. 

A  bolt-tension  measuring  device  (a  Skidmore-Wilhelm  Calibrator  or  other  equivalent  bolt-tension 
indicating device) shall be at all job sites wherever final connections are being made. The Contractor 
shall confirm the accuracy of the tension measuring device by having it calibrated by an approved 
testing agency once a year. The tension-measuring device shall be used to perform the rotational-
capacity test and to confirm: 

a.  The suitability to satisfy the requirements of Table 23-10 of the complete fastener assembly, 

including lubrication if required to be used in the work 

b.  calibration of the wrenches, and 
c.  the understanding and proper use by the bolting crew of the installation method. 

To perform the calibrated wrench verification test for short grip bolts, direct tension indicators (DTI) 
with solid plates may be used in lieu of a tension-measuring device. The DTI lot shall be first verified 
with a longer grip bolt in the Skidmore-Wilhelm Calibrator or an acceptable equivalent device. The 
frequency of confirmation testing, the number of tests to be performed, and the test procedure shall 
be as specified in this section, as applicable. The accuracy of the tension measuring device shall be 
confirmed by an approved testing agency at least annually. 

Bolts and nuts together with washers of size and quality specified in the Contract documents, located 
as required below, shall be installed in properly aligned holes and tensioned and inspected by any 
of the installation methods described in this section to at least the minimum tension specified in Table 
23-10.
 Tensioning may be done by turning the bolt while the nut is prevented from rotating. When it 
is impractical to turn the nut, impact wrenches, if used, shall be of adequate capacity and sufficiently 
supplied with air to apply the proper tension to each bolt in approximately ten seconds. 

Bolts shall be installed in all holes of the connection and the connection brought to a snug condition. 

Unless shown otherwise in the Erection Plan, the Contractor shall install the bolts of the connection 
by progressing systematically from the most rigid part of the connection to the free edges. Install 
bolts in all holes of the connection and bring them to a ‘snug tight’ condition. Following the sequence 
indicated in the Erection Plan, further tighten all the bolts in the connection until the full connection 
is in a snug condition. 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 23-48 

C

HAPTER 

23:

 

S

TEEL 

S

TRUCTURES

 

 

First Edition -January 2018 

 

For  connections  (such  as  large  main  load-carrying  members  or  truss  joints)  in  which  previously 
tightened high strength bolts become loose and require retightening upon the tensioning of others, 
install into a minimum of ten percent of the holes fully tensioned bolts before final tensioning of the 
permanent bolts. Distribute these first bolts randomly throughout the connection. If directed by the 
Engineer, remove the initial bolts and install permanent bolts at each location, otherwise retighten in 
accordance with this section.  

Table 23-10: Minimum required bolt tension 

Bolt size 

AASHTO M 164-05 

ASTM A325 - 10 

AASHTO M 253-05 

ASTM A490 

– 12 

13 mm 

53.5 kN 

66.7 kN 

16 mm 

84.5 Kn 

106.8 kN 

19 mm 

124.6 kN 

155.7 kN 

22 mm 

173.5 kN 

218.0 kN 

25 mm 

227.0 kN 

284.7 kN 

29 mm 

249.0 kN 

356.0 kN 

32 mm 

316.0 kN 

453.7 kN 

35 mm 

378.0 kN 

538.2 kN 

38 mm 

458.0 kN 

658.3 kN 

Minimum bolt tension shall be taken as seventy percent (70%) of specified minimum tensile strength 
of bolts (as specified in ASTM Specifications for tests of full-size A325 and A490 bolts with UNC 
threads  (

Metric  Screw  Threads:  M  Profile

,  ANSI  ASME  B1.13M-2005),  loaded  in  axial  tension) 

rounded to the nearest 1000 N. Table 23-11 shows necessary rotations. 

Table 23-11: Nut rotation from snug condition 

 

Geometry of outer faces of bolted parts 

Bolt  length  (from 
underside of head to 
end of bolt) 

Both  faces 
normal 

to 

bolt axis 

One face normal to bolt axis 
and  other  face  sloped  not 
more 

than 

1:20 

(Bevel 

washer not used) 

Both faces sloped not more 
than  1:20  from  normal  to 
bolt axis (Bevel washers not 
used) 

Up  to  and  including 
4 diametres   

1/3 turn 

1/2 turn 

2/3 turn 

Over  4  diametres, 
but  not  exceeding  8 
diametres   

1/2 turn 

2/3 turn 

5/6 turn 

Over  8  diametres, 
but  not  exceeding 
12 diametres 

2/3 turn 

5/6 turn 

1 turn 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 23-49 

C

HAPTER 

23:

 

S

TEEL 

S

TRUCTURES

 

 

First Edition -January 2018 

 

Rotation, as used in Table 23-11, shall be taken as relative to the bolt, regardless of the element 
(nut or bolt) being turned. The tolerances are minus 0, plus 30 degrees for bolts installed by a 1/2 
turn or less; for bolts installed by 2/3 turn or more, the tolerance are minus 0, plus 45 degrees. 

Values given in Table 23-11 shall be applicable only to connections in which all material within grip 
of the bolt is steel. 

For situations in which the bolt length measured from the underside of the head to the end of the 
bolt exceeds 12  diameters, the required rotation shall be determined by actual tests in a suitable 
tension device simulating the actual conditions. Submit procedures to the Engineer for review. 

a. 

Rotational Capacity Tests 

At the  location  of  and  before  installation  of permanent  high-strength fasteners  in main  or  primary 
load  carrying  member  connections,  the  Contractor  shall  perform  rotational  capacity  (RC)  tests  to 
ensure that the fasteners are capable of developing the specified strength and that the fasteners are 
properly lubricated. As a minimum, the Contractor shall test two assemblies per LOT designation. 
The bolt, nut and washer shall come from the same LOT and be packed in the same container (or 
group of containers assigned the same LOT), except in special cases where nuts and washers have 
only one production LOT number for each size. 

Assemblies specified as galvanized shall be tested after galvanising. Washers are required for RC 
tests even though they may not be required for jobsite installation. Where washers are not required 
for jobsite installation, LOT identification is not required. The washer coating shall be the same as 
that for the bolt and nut. The following shall apply: 

1.  Except as modified herein, the rotational-capacity test shall be performed in accordance with 

the requirements of AASHTO M 164-05 (ASTM A325 - 10). 

2.  Perform the RC test in a manner that replicates the anticipated fastener installation technique 

(that is, if a spud wrench is to be used as a part of the installation process, use the wrench 
similarly for the RC test). 

3.  If any of the required tests fails, the entire LOT will be rejected. 
4.  Each  combination  of  bolt  production  lot,  nut  lot,  and  washer  lot  shall  be  tested  as  an 

assembly.  

5.  A rotational-capacity lot number shall have been assigned to each combination of lots tested. 
6.  Minimum frequency of testing shall be two assemblies per rotational-capacity lot. 
7.  For  bolts  that  are  long  enough  to  fit  in  a  Skidmore-Wilhelm  Calibrator,  the  bolt,  nut,  and 

washer  assembly  shall be  assembled  in  a  Skidmore- Wilhelm  Calibrator  or  an  acceptable 
equivalent device. 

8.  Bolts that are too short to test in a Skidmore-Wilhelm Calibrator may be tested in a steel joint. 

The  tension  requirement,  in  the  section  below,  need  not  apply.  The  maximum  torque 
requirement, torque ≤ 0.250PD, shall be computed using a value of P equal to the turn test 
tension taken as 1.15 times the bolt tension in Table 23-7. 

9.  Tension reached at the rotation below, i.e., the turn-test tension, shall be equal to or greater 

than 1.15 times the required fastener tension, i.e., installation tension, shown in Table 23-10. 

10. In a tension-measuring device, the minimum rotation from an initial tension of ten percent of 

the minimum required tension shall be two times the required number of turns indicated in 
Table 23-11 without stripping or failure. 

After the required installation tension listed above has been exceeded, one reading of tension and 
torque shall be taken and recorded. The torque value shall conform to Equation 23-9. 

 

 

 

 

 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 23-50 

C

HAPTER 

23:

 

S

TEEL 

S

TRUCTURES

 

 

First Edition -January 2018 

 

Torque  ≤ 0.250 P D

 

Equation 23-9: Torque for rotational capacity testing 

Where: 

Torque 

measured torque, N.mm. 

P = 

 

measured  bolt  tension, 

N. 

D = 

 

bolt diametre, mm. 

b. 

Requirement for Washers for Installation with High-strength Fasteners 

The Contractor shall provide ASTM F436 - 11 hardened steel washers as follows: 

1.  For connections (and all associated testing) using (ASTM A490 

– 12) bolts, use a hardened 

washer under each element. 

2.  For  connections  using  (ASTM  A325 

–  10)  bolts,  use  hardened  washers  under  the  turned 

element.  

3.  Use hardened steel washers as part of the Rotational Capacity tests. 
4.  Where the outer face of the bolted parts has a slope of greater than 1:20 with respect to a 

plane normal to the bolt axis, use a hardened, beveled washer to compensate for the lack of 
parallelism.  

5.  Where bolts are to be installed in a oversized or slotted hole in an outer ply, provide a single 

washer satisfying ASTM F436 - 11, or continuous bar satisfying ASTM A709 / A709M 

– 11. 

For (ASTM A325 

– 10) bolts, provide a thickness of at least 8mm; and for (ASTM A490 – 12) 

bolts, provide a thickness of 10mm. Provide these washers or bars to completely cover the 
slot after installation. Provide a finish consistent with the bolt specified. 

6.  In non-Direct-Tension-Indicator (DTI) applications,  clip washers  on one side to a point not 

closer than 22mm of the bolt diametre from the center of the washer, if necessary. 

7.  Hardened bevelled washers for American Standard Beams and Channels shall be required 

and shall be square or rectangular, shall conform to the requirements of AASHTO M 293-10 
(ASTM F436 - 11), and shall taper in thickness. 

8.  Where necessary, washers may be clipped on one side to a point not closer than 0.875 times 

the bolt diametre from the center of the washer. 

c. 

Use of Washers with Direct-tension-indicators (DTIs) Devices 

When DTIs are used; the Contractor shall use ASTM F436 - 11 hardened washers as follows: 

1.  When the nut is turned and the DTI is located under the bolt head, a hardened washer is to 

be located under the nut. 

2.  When the  nut  is turned and the  DTI  is  located  under  the  nut,  a  hardened  washer  is to  be 

located between the nut and the DTI. 

3.  When the bolt head is turned and the DTI is located under the nut, a hardened washer is to 

be located under the bolt head. 

4.  When the bolt head is turned and the DTI is located under the bolt head, a hardened washer 

is to be located between the bolt head and the DTI. 

d. 

Hardened Washers for Installation with High-strength Fasteners 

Hardened washers are not required for connections using  AASHTO M 164-05 (ASTM A325 - 10) 
and AASHTO M 253-05 (ASTM A490 

– 12) bolts, except as follows: 

1.  Hardened  washers  shall  be  used  under  the  turned  element  when  tensioning  is  to  be 

performed by calibrated wrench method. 

2.  Irrespective of the tensioning method, hardened washers shall be used under both the head 

and the nut when AASHTO M 253-05 (ASTM A490 

– 12) bolts are to be installed in material 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 23-51 

C

HAPTER 

23:

 

S

TEEL 

S

TRUCTURES

 

 

First Edition -January 2018 

 

having a specified yield point less than 275 MPa. When DTIs are used, they may replace a 
hardened washer provided a standard sized hole is used. 

3.  Where AASHTO M 164-05 (ASTM A325 - 10) bolts of any diametre or AASHTO M 253-05 

(ASTM A490 

– 12) bolts equal to or less than 24 mm in diametre are to be installed in oversize 

or short-slotted holes in an outer ply, a hardened washer conforming to AASHTO M 293-10 
(ASTM F436 - 11) shall be used. 

4.  Where  AASHTO  M  253-05  (ASTM  A490 

–  12)  bolts  over  24  mm  in  diametre  are  to  be 

installed in an oversize or short-slotted hole in an outer ply, hardened washers conforming to 
AASHTO M 293-10 (ASTM F436 - 11), except with 8 mm minimum thickness, shall be used 
under both the head and the nut in lieu of standard thickness hardened washers. Multiple 
hardened  washers  with  combined  thickness  equal  to  or  greater  than  8  mm  shall  not  be 
considered as satisfying this requirement.  

5.  Where AASHTO M 164-05 (ASTM A325 - 10) bolts of any diametre or AASHTO M 253-05 

(ASTM A490 

– 12) bolts equal to or less than 24 mm in diametre are to be installed in a long 

slotted hole in an outer ply, a plate washer or continuous bar of at least 8 mm thickness with 
standard  holes  shall  be  provided.  These  washers  or  bars  shall  have  a  size  sufficient  to 
completely cover the slot after installation and shall be of structural grade material, but need 
not be hardened, except as follows. 

6.  Where AASHTO M 253-05 (ASTM A490 

– 12) bolts over 24 mm in diametre are to be used 

in long slotted holes in external plies, a single hardened washer conforming to AASHTO M 
293-10 (ASTM F436 - 11), but with 8 mm minimum thickness shall be used in lieu of washers 
or  bars  of  structural  grade  material.  Multiple  hardened  washers  with  combined  thickness 
equal to or greater than 8 mm shall not be considered as satisfying this requirement. 

e. 

Alternate High-strength Fasteners 

As an alternative, the Contractor may use high-strength fasteners that comply with the requirements 
outlined in Article 23.4.2.5. Such fasteners shall have a geometry that provides a bearing circle on 
the head or nut with a diametre equal to or greater than the diametre of hardened washers that meet 
the requirements of AASHTO M 293-10 (ASTM F436 - 11) and satisfy the requirements for washers 
outlined in this chapter. The Contractor may use such fasteners without washers. 

f. 

Turn-of Nut Installation Method for High-strength Fasteners 

When the turn-of-nut installation method is used, hardened washers are not required, except as may 
be specified in Article 23.6.9.6. 

For  each  work  shift,  the  Contractor  shall  perform  tests  utilizing  a  representative  sample  of  five 
fastener assemblies, from each LOT to  be installed that shift. Perform the tests using the tension 
measuring  device,  following the  same  procedure  to  be  used for  actual  installation  of the fastener 
assemblies,  to  a  snug-tight  tension  and  corresponding  torque,  which,  when  the  additional  turns 
required in Table 23-11, Nut Rotation from the Snug Condition are added, will result in at least 1.05 
times the minimum required fastener installation tension as shown in Table 23-10. Place a washer 
under the part turned in the tightening of the bolt. Consider the job inspection snug-tight torque as 
the  average  of three  test  values  determined  after rejecting the  high  and  low-test  values.  Periodic 
retesting shall be performed when ordered by the Engineer. 

After snugging, the applicable amount of rotation specified in Table 23-11 shall be achieved. During 
the tensioning operation there shall be no rotation of the part not turned by the wrench. Tensioning 
shall progress systematically from the most rigid part of the joint to its free edges. 

Snug-tight  Condition: 

In  the  turn-of-nut  method,  first  bring  all  the  fastener  assemblies  of  the 

connection to a ‘snug-tight’ condition to ensure that all parts of the connection are in firm contact with 
each other. For the purposes of this specification, “firm contact” shall mean the condition that exists 
on  a  faying  surface  when  the  plies  are  solidly  seated  against  each  other,  but  not  necessarily  in 
continuous contact. Regard snug-tight as the tightness required to produce the bolt tension, which 
following the final applied rotation, produces at least 1.05 times the minimum required bolt tension 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 23-52 

C

HAPTER 

23:

 

S

TEEL 

S

TRUCTURES

 

 

First Edition -January 2018 

 

in accordance with Table 20.8. In the presence of the Engineer, and on a daily basis, determine the 
job inspection snug-tight torque as specified herein. 

Final Tightening:

 After verification of the snug-tight condition in accordance with Article 23.6.9.6 by 

the  Engineer,  the  Contractor  shall  tighten  all  fastener  assemblies  in  the  joint  by  applying  the 
applicable amount of nut rotation specified in Table 23-11. Once snug-tight, bring all fasteners to the 
required tension within the same work shift. 

g. 

Calibrated Wrench Installation Method for High-strength Fasteners 

A calibrated wrench method may be used only when wrenches are calibrated on a daily basis and 
when  a  hardened  washer  is  used  under  the  turned  element.  Standard  torques  determined  from 
tables or from formulas which are assumed to relate torque to tension shall not be acceptable. 

When calibrated wrenches are used for installation, they shall be set to deliver a torque which has 
been calibrated to produce a tension not less than five percent in excess of the minimum tension 
specified in Table 23-10. The installation procedures shall be calibrated by verification testing at least 
once each working day for each fastener assembly that is being installed in the work that day. This 
verification testing shall be accomplished in a tension-measuring device capable of indicating actual 
bolt  tension  by  testing  three  typical  fastener  assemblies  from  each  lot.  Bolts,  nuts,  and  washers 
under  the  turned  element  shall  be  sampled  from  production  lots.  Wrenches  shall  be  recalibrated 
when a significant difference is noted in the surface condition of the bolts, threads, nuts, or washers. 
It shall be verified during actual installation in the assembled steel work that the wrench adjustment 
selected by the calibration does not produce a nut or bolt head rotation from snug condition greater 
than that permitted in Table 23-11. If manual torque wrenches are used, nuts shall be torqued in the 
tensioning direction when torque is measured.  

When  calibrated  wrenches  are  used  to  install  and  tension  bolts  in  a  connection,  bolts  shall  be 
installed with hardened washers under the turned element. Following snugging, the connection shall 
be tensioned using the calibrated wrench. Tensioning shall progress systematically from the most 
rigid part of the joint to its free edges. The wrench shall be returned to "touch up" previously tensioned 
bolts which may have been relaxed as a result of the subsequent tensioning of adjacent bolts until 
all bolts are tensioned to the prescribed amount. 

h. 

Alternative Design Bolt Installation Method for High-strength Fasteners 

When fasteners which incorporate a design feature intended to indirectly indicate that the applied 
torque develops the required bolt tension or to automatically develop the tension required by Table 
23-10 
and that have been qualified under Article 23.4.2.4 are to be installed, verification testing using 
a  representative  sample  of  not  less  than three fastener  assemblies  of  each  diametre,  length  and 
grade to be used in the work shall be performed at the job site in a device capable of indicating bolt 
tension. The test assembly shall include flat-hardened washers, if required in the actual connection, 
arranged as in the actual connections to be tensioned. The verification test shall demonstrate that 
each bolt develops a tension not less than five percent greater than the tension required by Table 
23-10.
  The  Manufacturer's  installation  procedure  shall  be  followed  for  installation  of  bolts  in  the 
calibration device and in all connections. Periodic retesting shall be performed when ordered by the 
Engineer. 

When  alternative  design  fasteners,  which  are  intended  to  control  or  indicate  bolt  tension  of  the 
fasteners  are  used,  bolts  shall  be  installed  in  all  holes  of  the  connection  and  initially  snugged 
sufficiently to bring all plies of the joint into firm contact, but without yielding or fracturing the control 
or  indicator  element  of  the  fasteners.  All  fasteners  shall  then  be  further  tensioned,  progressing 
systematically  from  the  most  rigid  part  of  the  connection  to  the  free  edges  in  a  manner  that  will 
minimize relaxation of previously tensioned bolts. In some cases, proper tensioning of the bolts may 
require more than a single cycle of systematic partial tensioning before final yielding or fracturing of 
the control or indicator element of individual fasteners. If yielding or fracture occurs before the final 
tensioning cycle, the individual fastener assembly shall be replaced with a new one. 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 23-53 

C

HAPTER 

23:

 

S

TEEL 

S

TRUCTURES

 

 

First Edition -January 2018 

 

i. 

Direct Tension Indicator Installation Method for High-strength Fasteners 

Every day, when installing direct tension indicator (DTI) devices that meet the requirements of Article 
23.4.2.5  in  accordance  with  the  method  specified  below,  the  Contractor  shall  perform  the  DTI 
verification tests described below at the location of installation.  

Unless otherwise approved by the Engineer, the DTIs shall be installed under the head of the bolt 
and the nut turned to tension the bolt. The  Manufacturer's recommendations shall be followed for 
the proper orientation of the DTI and additional washers, if any, required for the correct use of the 
DTI. Installation of a DTI under the turned element may be permitted if a washer is used to separate 
the turned element from the DTI. 

The  Contractor  shall  perform  DTI  verification  test  on  a  minimum  of  two  high-strength  fastener 
assemblies from each fastener assembly LOT and position of the DTI before production installation. 
If either assembly fails, test additional fastener assembly LOT/DTI combinations as requested by the 
Engineer to verify that the Requirements of the Contract documents have been satisfied. These two 
tests are in addition to the RC tests required in Article 23.6.9.6. If, after additional testing, the DTI 
fails to meet the requirements of these specifications, the LOT will be rejected by the Engineer. 

j. 

Verification of Direct Tension Indicator Installation 

Verification testing shall be performed in a calibrated bolt-tension measuring device. A special flat 
insert shall be used in place of the normal bolt head holding insert. Three verification tests shall be 
required for each combination of fastener assembly rotational-capacity lot, DTI lot, and DTI position 
relative to the turned element (bolt head or nut) to be used on the project. The fastener assembly 
shall be installed in the tension-measuring device with the DTI located in the same position as in the 
work. The element intended to be stationary (bolt or nut) shall be restrained from rotation. 

The  verification  tests  shall  be  conducted  in  two  stages.  The  bolt  nut  and  DTI  assembly  shall  be 
installed in a manner so that at least three and preferably not more than five threads are located 
between the bearing face of the nut and the bolt head. The bolt shall be tensioned first to the load 
equal to that listed in Table 23-10 under Verification Tension for the grade and diameter of the bolt. 
If an impact wrench is used, the tension developed using the impact wrench shall be no more than 
two-  thirds  of  the  required  tension.  Subsequently,  a  manual  wrench  shall  be  used  to  attain  the 
required tension. The number of refusals of the 0.125 mm tapered feeler gage in the spaces between 
the protrusions shall be recorded. The number of refusals for uncoated DTIs under the stationary or 
turned  element,  or  coated  DTIs  under the stationary  element, shall  not  exceed  the  number  listed 
under Maximum Verification Refusals in Table 23-12 for the grade and diameter of bolt used. The 
maximum  number  of  verification  refusals  for  coated  DTIs  (galvanized,  painted,  or  epoxy-coated), 
when used under the turned element, shall be no more than the number of spaces on the DTI less 
one. The DTI lot shall be rejected if the number of refusals exceeds the values in the table or, for 
coated DTIs if the gage is refused in all spaces. 

After the number of refusals is recorded at the verification load, the bolt shall be further tensioned 
until the 0.125 mm feeler gage is refused at all the spaces and a visible gap exists in at least one 
space. The load at this condition shall be recorded and the bolt removed from the tension-measuring 
device.  The  nut  shall  be  able  to  be  run  down  by  hand  for  the  complete  thread  length  of  the  bolt 
excluding thread run-out. If the nut cannot be run down for this thread length, the DTI lot shall be 
rejected  unless  the  load  recorded  is  less  than  95  percent  of  the  average  load  measured  in  the 
rotational capacity test of the fastener lot as specified in Article 23.6.9.6, "Rotational-Capacity Tests". 

If the bolt is too short to be tested in the calibration device, the DTI lot shall be verified on a long bolt 
in a calibrator to determine the number of refusals at the verification tension listed in Table 23-12. 
number of refusals shall not exceed the values listed under maximum verification refusals in Table 
23-12.
 Another DTI from the same lot shall then be verified with the short bolt in a convenient hole 
in the work. A bolt shall be tensioned until the 0.125 mm feeler gage is refused in all spaces and a 
visible gap exists in at least one space. A bolt shall then be removed from the tension-measuring 
device and the nut shall be able to be run down by hand for the complete thread length of the bolt 
excluding thread run-out. A DTI lot shall be rejected if the nut cannot be run down this thread length. 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 23-54 

C

HAPTER 

23:

 

S

TEEL 

S

TRUCTURES

 

 

First Edition -January 2018 

 

Table 23-12: Direct tension indicator requirements 

Bolt 
size 

Verification 
tension 

Maximum  verification 
refusals 

DTI spaces 

Minimum  installation 
refusals 

A325 

A490 

A325 

A490 

A325  A490  A325 

A490 

13 mm  57.8 kN  71.2 kN 

16 mm  89.0 kN 

111.2 
kN 

19 mm 

129.0 
kN 

164.6 
kN 

22 mm 

182.4 
kN 

227.0 
kN 

25 mm 

240.2 
kN 

298.0 
kN 

29 mm 

262.4 
kN 

373.7 
kN 

32 mm 

333.6 
kN 

476.0 
kN 

35 mm 

396.0 
kN 

564.0 
kN 

38 mm 

480.4 
kN 

689.5 
kN 

k. 

Installation of Fastener Assemblies with Direct Tension Indicator Devices 

Installation of fastener assemblies using DTI devices shall be performed in two stages. A stationary 
element shall be held against rotation during each stage of the installation.  A connection shall be 
first snugged with bolts installed in all the holes of the connection and tensioned sufficiently to bring 
all the plies of the connection into firm contact. A number of spaces in which a 0.125 mm feeler gage 
is  refused  in  the  DTI  after  snugging  shall  not  exceed  those  listed  under  Maximum  Verification 
Refusals in Table 23-12. If the number exceeds the values in the table, the fastener assembly shall 
be removed and another DTI installed and snugged. 

For  uncoated  DTIs  used  under  a  stationary  or  turned  element  and  for  coated  DTIs  used  under 
stationary element, the bolts shall be further tensioned until the number of refusals of the 0.125 mm 
feeler gage shall be equal to or greater than the number listed under Minimum Installation Refusals 
in Table 23-12. If the bolt is tensioned so that no visible gap in any space remains, the bolt and DTI 
shall be removed and replaced by a new properly tensioned bolt and DTI. 

When  coated  DTIs  (galvanized,  painted,  or  epoxy  coated)  are  used  under  a  turned  element,  the 
0.125 mm feeler gage shall be refused in all spaces. 

l. 

Reusing and Retightening High-strength Fasteners 

The Contractor shall not reuse (ASTM A490 

– 12) bolts or galvanized (ASTM A325 – 10) bolts. Black 

(ASTM  A325 

–  10)  bolts  with  free  spinning  nuts  may  be  reused  one  time  with  the  Engineer’s 

approval. Previously tightened bolts that may have been loosened by the tightening of adjacent bolts 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 23-55 

C

HAPTER 

23:

 

S

TEEL 

S

TRUCTURES

 

 

First Edition -January 2018 

 

can be further tightened from the original position.  The Contractor  shall ensure proper lubrication 
before retightening, discard and replace fractured or damaged bolts. 

m.  Installing Lock-pin and Collar Fasteners 

Installation  of  lock-pin  and  collar  fasteners  shall  be by  methods  and  procedures  approved  by  the 
Engineer. 

n. 

Inspecting Installation of High-strength Fasteners  

The Engineer shall determine that the following requirements of this Sub-article are met in the work. 
Before the installation of fasteners in the work, the Engineer shall: 

1.  check the marking, surface condition, and storage of bolts, nuts, washers, and DTIs, if used, 

and the faying surfaces of joints for compliance with the requirements of Sections 23.4.2 and 
23.6.9, and Article 23.6.9.6 and 

2.  observe calibration and/or testing procedures required in Article 23.6.9.6, as applicable, to 

confirm that the selected procedure is properly used and that, when so used with the fastener 
assemblies supplied, the tensions specified in Table 23-10 are developed. 

The  Engineer  shall  monitor  the  installation  of  fasteners  in  the  work  to  assure  that  the  selected 
installation method, as demonstrated in the initial testing to develop the specified tension, is routinely 
followed. 

o. 

Procedures to Inspect Installation of High-strength Fasteners 

Either the Engineer or the Contractor, in the presence of the Engineer at the Engineer's option, shall 
inspect the tensioned bolts using an inspection torque wrench, unless alternate fasteners or direct 
tension indicator devices are used, allowing verification by other methods. Inspection tests should 
be conducted before possible loss of lubrication or corrosion influence on tightening torque. 

Three  fastener  assembly  lots  in  the  same  condition  as  those  under  inspection  shall  be  placed 
individually in a device calibrated to measure bolt tension. This calibration operation shall be done 
at least once each inspection day. 

There shall be a washer under the turned element in tensioning each bolt if washers are used on the 
structure. If washers are not used on the structure, the material used in the tension-measuring device 
which abuts the part turned shall be of the same specification as that used on the structure. In the 
calibrated device, each bolt shall be tensioning by any convenient means to the specified tension. 
The inspecting wrench shall then be applied to the tensioned bolt to determine the torque required 
to turn the nut or head five degrees (25 mm at a 300 mm radius) in the tensioning direction. The 
average of the torque required for all three bolts shall be taken as the job-inspection torque. 

p. 

Turn-of-nut Tightening for High-strength Fasteners 

Turn-of-nut tightening for high-strength fasteners shall meet the following requirements. 

1.  Once the snug-tight condition is achieved for all of the fastener assemblies of the connection, 

within  24  hours  of  snugging  the  first  bolt  in  the  connection  and  in  the  presence  of  the 
Engineer,  the  Contractor  shall  verify  for  a  minimum  of  three  (3)  bolts  [two  (2)  for  two  bolt 
connections] or 10% of the fastener assemblies, that the job inspection snug-tight torque has 
been attained. These fasteners are to have a snug-tight torque equal to or exceeding that 
specified in 23.6.9.6. Perform this check using the same torque wrench used in 23.6.9.6. 

2.  If the tested fasteners do not obtain the job inspection snug-tight torque, test all remaining 

untested  fastener  assemblies  using  the  torque  wrench  in  the  connection  in  question. 
Following  testing  of all  assemblies,  bring  to  snug-tight  all  assemblies  and  retest  as  stated 
above. Resnug and retest as necessary using the calibrated torque wrench until the minimum 
testing stated above is performed favorably. 

3.  Following confirmation of the snug-tight condition as performed by the Contractor, and in the 

presence of the Engineer, match mark the fastener assemblies on the end of the bolt thread 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 23-56 

C

HAPTER 

23:

 

S

TEEL 

S

TRUCTURES

 

 

First Edition -January 2018 

 

and on the nut, and then tighten the nut the amount of rotation specified in Table 23-11. The 
Engineer will accept the connection as fully tightened when all of the following conditions are 
met: 

  Rotation specified in Table 23-11 has been achieved 

  There are no loose assemblies in the connection 

  All plies of the connection are in firm contact 

  There  are  no  indications  that  excessive  stretching  or  yielding  has  occurred  in  the 

fastener assembly 

  Bolt stick-through is consistent per lot 

q. 

Direct Tension Indicator Tightening for High-strength Fasteners 

Before bringing the connection to a snug-tight condition, the Contractor shall verify in the presence 
of the Engineer that the 

‘dimples’ of the DTI are not deformed or damaged. Bring the connection to 

a  snug-tight  condition  and  tighten  in  accordance  with  the  requirements  of  Article  23.6.9.6.  The 
Engineer will accept the connection as fully tightened when all of the following conditions are met: 

1.  the requirements of Article 23.6.9.6 have been achieved 
2.  there are no loose assemblies in the connection 
3.  all plies of the connection are in firm contact 
4.  there  are  no  indications  that  excessive  stretching  or  yielding  has  occurred  in  the  fastener 

assembly 

5.  Bolt stick-through is consistent per lot 

23.6.10 

Welding for Steel Structures 

Except  as  noted  in  the  Contract  documents,  shop  and  field  welding,  welder  qualifications, 
prequalification  of  weld  details,  and  inspection  of  welds  shall  conform  to  the  requirements  of  the 
current AASHTO/AWS D1.5M/D1.5:2010, 

Bridge Welding Code

Brackets, clips, shipping devices, or other material not required by the Contract documents shall not 
be welded or tacked to any member unless specified in the Contract documents and approved by 
the Engineer. 

Additional or alternate requirements for hollow steel structural sections and non-dynamically loaded 
members or components are listed below. 

Welding  shall  be  a  metal  arc  process  in  accordance  with  BS  EN  1011-2:2001  and  BS  EN  1011-
8:2004,  as  appropriate,  together  with  other  clauses  contained  in  this  section,  unless  otherwise 
specifically permitted by the Engineer. 

Welding consumables used shall be chosen to ensure that the mechanical properties of the weld 
metal are not less than those required for the parent metal. 

Joints  shall  be  prepared  in  accordance  with  BS  EN  1011-2:2001.  Precautions  shall  be  taken  to 
ensure cleanliness of the connection prior to welding. 

23.6.10.1  Welding on Non-dynamically Loaded Elements 

The  Contractor  shall  perform  welding  on  miscellaneous  components  and  other  statically  (non-
dynamically,  noncyclically,  etc.)  loaded  structural  elements  in  accordance  with  the  AWS  D1.1, 
Structural Welding  Code,  or  the  AASHTO/AWS  D1.5M/D1.5:2010, 

Bridge  Welding  Code

.  Unless 

otherwise specified in the  Contract documents or as approved by the  Engineer, follow the Bridge 
Welding Code for weld inspection and welder certifications. 

23.6.10.2  Electroslag Welding 

The  Contractor  shall  use  Narrow-Gap  Improved  Electroslag  Welding  (NGI-ESW)  for  joining  non-
fracture critical members or components up to 75mm thick. These members or components may be 
subjected to tension, compression or stress reversal. Inspect 100% of all NGI-ESW welds subject to 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 23-57 

C

HAPTER 

23:

 

S

TEEL 

S

TRUCTURES

 

 

First Edition -January 2018 

 

tension stresses or reversal of stress by both UT (ultrasonic examination as described in Section 6, 
Part  C  of  the  AASHTO/AWS  D1.5M/D1.5:2010, 

Bridge  Welding  Code

)  and  RT  (radiographic 

examination  as  described  in  Section  6,  Part  B  of  the  AASHTO/AWS  D1.5M/D1.5:2010, 

Bridge 

Welding Code

). 

Perform  NGI-ESW  welding  in  accordance  with  the  AASHTO/AWS  D1.5M/D1.5:2010, 

Bridge 

Welding Code

. Supplemented by the recommendations from the following references: 

  Report  No.  FHWA-SA-96-

053,  “Technical  Information  Guide  for  Narrow.Gap  Improved 

Electroslag Welding

”. 

  Report  No.  FHWA-SA-96-

052,  “Process  Operational  Guide  for  Narrow-Gap  Improved 

Electroslag Welding

”. 

23.6.10.3  Welding of Hollow Structural Steel Sections (Pipes and Tubes) 

Except as noted in the Contract documents, the Contractor shall perform all shop and field welding 
of Hollow Structural Shapes in accordance with the ANSI/AWS D1.1/D1.1M:2010, Structural Welding 
Code 

– Steel, as amended herein. 

a. 

Welding Highway Signs, Luminaires and Traffic Signals 

For structural steel sign structures, lighting poles, and traffic signal poles, the Contractor shall comply 
with the additional requirements of AASHTO 

Standard Specification for Structural Steel Supports for 

Highway  Signs,  Luminaires  and  Traffic  Signals

5

th

  Edition

,  Section  1.4.2,  Welding  of  Steel 

Structures. 

b. 

Welding Bridge Structures 

For  tubular  bridge  structures  including  pedestrian  bridges,  the  Contractor  shall  comply  with  the 
requirements of the ANSI/AWS D1.1/D1.1M:2010, 

Structural Welding Code 

– Steel, 

as amended by 

the following: 

1.  Qualify  all  welding  processes  in  accordance  with  the  AASHTO/AWS  D1.5M/D1.5:2010, 

Bridge Welding Code

. Comply with all qualification criteria including production thickness and 

position limitations. Use ASTM A709 / A709M - 11 Grade 50 for this test. 

2.  UT  NDE  technicians  performing  inspection  of  TKY  welds  are  to  be  qualified  to  the 

requirements and recommendations for operator qualification specified in API RP 2X:2004, 

Recommended  practice  for  ultrasonic  and  magnetic  examination  of  offshore  structural 
fabrication  and  guidelines  for  qualification  of  technicians,  4th  Edition

,  including  a  practical 

test with mockup tubular welds containing built-in flaws.  

3.  Perform nondestructive testing of all tubular complete joint penetration groove welds in main 

members  using  Ultrasonic  Testing  in  accordance  with  the  ANSI/AWS  D1.1/D1.1M:2010, 

Structural Welding Code 

– Steel

.  

Perform ultrasonic testing at the following frequency: 

  One hundred percent of each joint subject to tension or reversal of stress. 

  Twenty-five percent of each joint subject to compression or shear. 

If unacceptable discontinuities are found in the joint, the remainder of the joint shall be tested. 

Perform Magnetic Particle Testing on 300mm in every 3.0 metre on each fillet and partial penetration 
groove welds in main members but no less than 300mm on welds less than 3.0 metre. 

23.6.10.4  Non-destructive Testing of Welds 

a. 

Record of Testing 

The test results shall be recorded and be available for inspection by the Engineer. 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 23-58 

C

HAPTER 

23:

 

S

TEEL 

S

TRUCTURES

 

 

First Edition -January 2018 

 

b. 

Visual Inspection of Welds 

Visual inspection shall be made in accordance with guidance given in BS EN ISO 17637:2011 over 
the full length of the weld and before NDT inspection is performed. Any welds which will be rendered 
inaccessible by subsequent work shall be examined in prior to the loss of access. 

A suitably qualified person for visual inspection of welds may be a welding inspector or a welder who 
can provide evidence of having been trained and assessed for competence in visual inspection of 
the relevant types of welds. 

c. 

Surface Flaw Detection 

Where a closer examination of a weld surface is required, magnetic particle inspection (MPI) shall 
be used in accordance with the recommendations given in BS EN ISO 9934-1:2001. 

If magnetic particle inspection equipment is not available,  dye penetrant inspection (DPI) may be 
used in accordance with the recommendations given in BS EN ISO 3452-1:2013. 

Final surface flaw detection of a welded joint shall be carried out not less than 16 hours from the 
time of completion of the weld to be inspected, or  not less than 40 hours  in the case of welds to 
Design Grade 55 material. The Contractor shall note that where a welding procedure requires an 
inspection after initial weld runs before further welding is performed, such inspections may be carried 
out when the weld metal has cooled to ambient temperature.  

A suitably qualified person for surface flaw detection of welds may be a welding inspector or a welder 
who holds a current certificate of competence in surface flaw detection of the relevant types of work, 
from a recognised authority. 

d. 

Ultrasonic Examination 

Where  ultrasonic  examination  is  required,  it  shall  be  made  in  accordance  with  BS  EN  ISO 
17640:2010,  Level  2B.  Examination  shall  be  carried  out  not  less  than  16  hours  from  the  time  of 
completion of the weld to be inspected, or not less than 40 hours in the case of butt welds thicker 
than 40 mm or any welds to Design Grade 55 material. 

Operators  carrying  out  final  ultrasonic  examination  of  the  weld  shall  hold  a  current  certificate  of 
competence from a recognised authority. 

23.6.10.5  Field Welding 

The Contractor shall field weld only with the approval of the Engineer. Provide any additional field 
welding procedures as requested by the Engineer for review. 

23.6.10.6  Tack Welding 

The  Contractor  shall  not  weld  or  tack  any  fill  plates,  brackets,  clips,  shipping  devices,  or  other 
materials  not  required  by  the  Contract  documents  or  allowed  by  the  AASHTO/AWS 
D1.5M/D1.5:2010, 

Bridge Welding Code

1.  Tack welds shall be made using the same procedures as for the root runs of main welds. The 

length of the tack shall be the lesser of 4 times the thickness of the thicker part or 50 mm, 
unless demonstrated by a weld procedure qualification. 

2.  Tack welds which are not defective may be incorporated into main welds provided that the 

welder is qualified as in Article 23.4.11.3 of this chapter. However, where joints are welded 
using  an  automatic  or  mechanised  process,  the  suitability  of  the  tack  weld  used  for 
incorporation  into  automatic  processes  shall  be  demonstrated  in  the  weld  procedure 
qualification. 

3.  Where tack welds are made in circumstances other than those identified above, they must 

be removed. 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 23-59 

C

HAPTER 

23:

 

S

TEEL 

S

TRUCTURES

 

 

First Edition -January 2018 

 

23.7 

Erecting Steel Structures  

The Contractor shall provide all tools, machinery, and equipment necessary to erect the structure. 

Falsework and forms shall be in accordance with the requirements of Section 1.20.8 of Chapter 1, 
General Requirements. 

23.7.1 

Pre-erection Requirements 

The Contractor shall complete all of the requirements outlined in this section before erecting the steel 
structure for the Project. 

23.7.1.1 

Quality Control Plan for Erecting Steel Structures 

Develop an Erection Quality Control Plan for review and approval of the Engineer. 

23.7.1.2 

Submittals for Erecting Steel Structures 

The Contractor shall provide submittals to the Engineer for review in accordance with the Contract 
documents. 

23.7.1.3 

Plan for Erecting Steel Structures 

The  Contractor  shall  submit,  for  the  Engineer

’s  review,  an  Erection  Plan  locating  all  primary 

members,  lifting  equipment  and  temporary  supports  or  braces,  and  bolting  pattern  tightening 
procedures not considered routine. Ensure that the plan are signed and stamped by  Professional 
Engineer.  Include  supporting  calculations  indicating  that  the  design  unit  stresses  indicated  in  the 
Contract  documents  have  not  been  exceeded.  Provide  this  Plan  or  Plans  to  the  Engineer  three 
weeks before erecting the piece or pieces. 

The following information shall be included in the Erection Plan: 

a.  A plan of the work area showing all substructure units and foundations; surface roads and 

railroads; all streams, creeks and rivers; and all overhead and underground utilities. 

b.  The erection sequence for all primary load-carrying members and all primary load-carrying 

member bracing. Note any and all permanent or temporary support and/or bracing locations, 
including crane-holding positions. 

c.  The  center  of  gravity  locations,  pick  weight  and  delivery  orientation  for  all  primary  load-

carrying members and pick weight. 

d.  Identify any bolting requirements not considered routine. 
e.  Locate all pick crane work points. 
f.  Identify  all  temporary  works  and  staging  areas  such  as  barges,  mats  and  temporary 

excavation support. 

g.  Provide capacity charts on the drawings for each crane configuration and boom extension 

utilized. 

h.  Details of all temporary bracing, falsework, towers and shoring. 
i.  Provide any procedures requested by the Engineer and not contained in the Quality Control 

Plan. 

23.7.2 

Special Requirements to Resist Steel Weathering 

The Contractor shall not use marking materials (grease sticks, crayons) that leave behind a residual 
film  that  may  affect  the  weathering  process  of  the  steel.  Store  the  girders  as  required  for  non-
weathering steels. 

23.7.2.1 

Preparing Steel Against Weathering  

Before erection, the Contractor shall perform the following as appropriate: 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 23-60 

C

HAPTER 

23:

 

S

TEEL 

S

TRUCTURES

 

 

First Edition -January 2018 

 

Blast clean the exposed fascia of the exterior girders (both I and box) to meet criteria of SSPC-SP 
10/NACE  No.  2, 

Near-White  Blast  Cleaning

;  blast  clean  the  remaining  exposed  surfaces  of  steel 

trapezoidal girders, not required to be prepared otherwise, to meet criteria of SSPC-SP 6/NACE No. 
3, 

Commercial Blast Cleaning

; for steel I-girders, if a non-uniform mill scale finish has developed, as 

determined by the Engineer, blast clean all remaining exposed surfaces, not required to be prepared 
otherwise, to an SSPC-SP 6/NACE No. 3 criteria; coat the inside of box members including, but not 
limited  to,  all  bracing  members,  cross  frames  and  diaphragms  with  only  the  prime  coat.  For  the 
bottom or walking surface, certify that the applicable OSHA requirements on slip resistance will be 
obtained  after  applying  the  coating.  Reapply  the  coating  as  necessary  to  satisfy  the  OSHA 
requirements. Submit the composition of coating to the Engineer for review. 

23.7.2.2 

Preparing a Concrete Substructure Against Weathering  

Before erection of the girders, the Contractor shall wrap all exposed substructure concrete surfaces 
with polyethylene sheeting, or equal, as approved by the Engineer, to protect them against staining 
from  the  weathering  steel  components.  Leave  the  sheeting  in  place  and  keep  it  free  of  tears  or 
separations until just before the preparation for and application of the Class 5 Finish. In any case, 
do not remove the sheeting  before placement of the concrete deck. As directed by the  Engineer, 
clean all visible stains on concrete in areas not receiving a Class 5 Finish by sandblasting and follow-
on  cleaning  using  a  stain  remover  or  commercial  cleaner  after  completion  of  the  structure  in 
accordance  with  Chapter  4,  Concrete  Works,  of  these  standard  specifications,  and  Chapter  21, 
Concrete Structures. 

23.7.2.3 

Structure and Site Clean Up after Weather Protection 

Upon the completion of construction, the Contractor shall remove all oil, dirt, grease or other foreign 
material,  including  excessive  or  uneven  mill  scale  from  the  steel.  Remove  lubricants  from  the 
exposed  surfaces  of  installed  fastener  assemblies  and  other  surfaces  in  accordance  with  the 
Manufacturer

’s recommendations. Final surface finish is to be an even mill scale as approved by the 

Engineer. 

23.7.3 

Aligning Steel Structure with Substructure 

Before  the  erection  of  primary  load-carrying  members,  the  Contractor  shall  conduct  a  survey  to 
document the vertical, longitudinal and transverse position of all substructure units and anchor rod 
locations. Appropriately account for ambient temperature in the survey. 

Should  a  discrepancy  be  identified  with  the  Contract  documents,  the  Contractor  shall  submit  the 
necessary details to the Engineer for resolution. 

23.7.4 

Placing Anchor Rods for Erection of Steel Structure 

The  Contractor  shall  locate  and  place  anchor  rods  within  the  tolerance  shown  in  the  Contract 
documents or within 6mm of the theoretical location shown. If anchor rods cannot be located to the 
specified  tolerance,  place  only  with  the  approval  of  the  Engineer.  Unless  shown  otherwise  in  the 
Contract documents, provide galvanized anchor rods, nuts and washers as follows: 

1.  Set the anchor rods in preformed holes vertical to the plane of the bridge seat. 
2.  Provide 100mm diametre holes. 
3.  Provide non-shrink grout/mortar of a strength greater than or equal to that of the substructure 

concrete strength, or as shown elsewhere in the Contract documents. 

4.  Install the rods in accordance with the grout/mortar Manufacturer

’s recommendations. 

5.  Clean the threads of the anchor rods as necessary without damaging the coating. 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 23-61 

C

HAPTER 

23:

 

S

TEEL 

S

TRUCTURES

 

 

First Edition -January 2018 

 

23.7.5 

Preparing Bearing Areas and Setting Bearings for Erection of 
Steel Structure 

Before placing superstructure bearing units (including but not limited to neoprene pads and masonry 
plates),  the  Contractor  shall  prepare  the  top  of  concrete  pad  (bearing  area)  in  accordance  with 
Section  21.10.4  of  Chapters  21,  Concrete  Structures,  and  Chapter  25,  Bearing  Devices.  If  a 
discrepancy is identified, report it to the Engineer for resolution. 

For  expansion  bearings  with  slotted  holes  for  anchor  rods,  which  allow  movement  of  the 
superstructure with respect to the substructure, the Contractor shall vary the location of the slotted 
plate  in  relation  to  the  anchor  rods,  in  accordance  with  the  prevailing  temperature  at  the  time  of 
setting. For fixed bearings at multiple adjacent piers, if necessary, horizontally jack the substructure 
units to correctly set the centerline of bearing. Adequately account for temperature. 

Unless specified elsewhere in the  Contract documents, the Contractor shall locate the theoretical 
centerline  of  bearings to  within  1.5mm  transverse  to  longitudinal girder  lines;  and  in the  direction 
parallel to the longitudinal girder line locate the theoretical centerline of bearing within 6mm of the 
theoretical centerline of bearing. 

After setting the bearings and installing anchor rod nuts, washers and any other associated hardware 
specified in the Contract documents, the Contractor shall clean the protruding/ exposed surfaces of 
the assembly of all deleterious material. 

23.7.6 

Tightening Anchor Rod Nuts for Erection of Steel Structure 

when tightening anchor rod nuts during the erection of a steel structure, the Contractor shall comply 
with the specifications outlined in this section. 

23.7.6.1 

Tightening Fixed Bearings 

The  Contract

or  shall tighten  anchor  nuts  to  a  ‘snug tight’  condition  such  that the  different mating 

surfaces (such as the top of concrete, neoprene and steel) are in firm contact. The nut is to be tight 
enough to develop friction between surfaces to prevent sliding, but not over tightened that bulging 
or damage occurs in any of the mating materials. 

23.7.6.2 

Tightening Expansion Bearings 

The Contractor shall draw down the nut such that a total gap of 1.5 mm exists between the washer 
and nut and washer and bearing surface. Tighten a second nut of the same specification to a snug 
tight condition against the first nut maintaining the required gap. 

23.7.7 

Bearings for Erection of Steel Structures 

Bridge bearings shall be furnished and installed in conformance with Chapter 25, Bearing Devices. 

If the steel superstructure is to be placed on a substructure that was built under a separate Contract, 
the  Contractor  shall  verify  that the masonry  has been  constructed  in the right  location  and to  the 
correct lines and elevations before ordering materials. 

23.7.8 

Procedure to Erect a Steel Structure 

When erecting the steel structure for the Project, the Contractor shall comply with the requirements 
and specifications outlined in this section. 

23.7.8.1 

Conformance to Project Drawings during Erection 

The erection procedure shall conform to the erection drawings submitted in accordance with Section 
23.3.2. Any modifications to or deviations from this erection procedure shall require revised drawings 
and verification of stresses and geometry. 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 23-62 

C

HAPTER 

23:

 

S

TEEL 

S

TRUCTURES

 

 

First Edition -January 2018 

 

23.7.8.2 

Accounting for stresses during erection of Steel Structure 

Any erection stresses induced in the structure as a result of using a method of erection which differs 
from the Contract documents shall be accounted for by the Contractor. Erection design calculations 
for  such  changed  methods  shall  be  prepared  at  the  Contractor's  expense  and  submitted  to  the 
Engineer.  The  calculations  shall  indicate  any  change  in  stresses  or  change  in  behavior  for  the 
temporary  and  final  structures.  Additional  material  required  to  keep  both  the  temporary  and  final 
stresses within the allowable limits used in design shall be provided at the Contractor's expense. 

The  Contractor  shall  be  responsible  for  providing  temporary  bracing  or  stiffening  devices  to 
accommodate handling stresses in individual members or segments of the structure during erection. 
When the partial structure is deemed prone to suitability concerns, the Contractor shall provide the 
requisite calculations showing that the partial structure will remain stable until the complete continuity 
of the structure is reached. 

23.7.8.3 

Maintaining  an  Erected  Steel  Structures  Alignment  and 

Camber 

During erection, the Contractor shall be responsible for supporting segments of the structure in a 
manner that will produce the proper alignment and camber in the completed structure. Cross frames 
and diagonal bracing shall be installed as necessary during the erection process to provide stability 
and  assure  correct  geometry.  Temporary  bracing,  if  necessary  at  any  stage  of  erection,  shall  be 
provided by the Contractor. 

23.7.8.4 

Final Position of Girder Webs for a Steel Structure 

Unless shown elsewhere in the Contract documents, the Contractor shall detail the girders and cross 
frames as directed by the Engineer. The final condition is to be defined as with the deck and parapets 
cast, but without any future wearing surface. A web will be considered plumb if it is within a tolerance 
horizontally between the top and bottom of the web of 7.8mm per  metre of web depth compared 
against the theoretical position as required in the  Contract documents. Measure the out-of-plumb 
perpendicular to the face of the web. Erect trapezoidal girders to the geometry shown in the Contract 
documents to the same 7.8mm per metre of web depth tolerance. 

23.7.9 

Field Assembly for Erection of a Steel Structure 

Parts shall be accurately assembled as specified in the  Contract documents or erection drawings 
and any match-marks shall be followed. Material shall be carefully handled so that no parts will be 
bent, broken, or otherwise damaged. Hammering which will injure or distort the members shall not 
be  done.  Bearing  surfaces  and  surfaces  to  be  in  permanent  contact  shall  be  cleaned  before  the 
members are assembled. Splices and field connections shall have one-half of the holes filled with 
bolts  and  cylindrical  erection  pins  (half  bolts  and  half  pins)  before  installing  and  tightening  the 
balance  of  high-strength  bolts.  Splices  and  connections carrying traffic  during  erection  shall  have 
three-fourths of the holes so filled. 

Fitting-up bolts may be the same high-strength bolts used in the installation. If other fitting-up bolts 
are  used,  they  shall  be  of  the  same  nominal  diameter  as  the  high  strength  bolts  and  cylindrical 
erection pins shall be 0.8 mm larger. 

23.7.10 

Connection of Pins for an Erected Steel Structure 

Pilot and driving nuts shall be used in driving pins. They shall be furnished by the Contractor without 
charge. Pins shall be so driven that the members will take full bearing on them. Pin nuts shall be 
screwed up tight and the threads burred at the face of the nut with a pointed tool. 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 23-63 

C

HAPTER 

23:

 

S

TEEL 

S

TRUCTURES

 

 

First Edition -January 2018 

 

23.7.11 

Correcting Misfits in an Erected Steel Structure 

Correction of minor misfits involving minor amounts of reaming, cutting, grinding, and chipping shall 
be  considered  a  legitimate  part  of  the  erection.  However,  any  error  in  the  shop  fabrication  or 
deformation resulting from handling and transporting shall be cause for rejection. 

The Contractor shall be responsible for all misfits, errors, and damage and shall make the necessary 
corrections and replacements. 

23.8 

Expansion Joints for Steel Structures  

Expansion joints shall be fabricated and installed in accordance with the requirements of this section 
and the requirements of Chapter 26, Bridge Deck Joint Systems. 

Complete working drawings for fabrication and installation of expansion joints shall be submitted. 
The Contractor shall include the joint Manufacturer

‘s instructions for proper installation of the joint 

on the drawings. Joint opening dimension for an ambient temperature of thirty degree Celsius (30°C) 
and adjustments to that dimension due to temperature variations shall be shown. 

The Contractor shall fabricate expansion joints accurately to conform to the specified concrete floor 
section, matching cross slopes and break points. Expansion joints shall be assembled and checked 
for fit in the shop, then it shall be match marked for shipment. 

For sealed expansion joints, the steel receptors shall be fabricated to be continuous the full length 
of joint including 150 mm extensions. The number of splices in the steel receptor shall be minimized. 
To  splice,  a  partial  penetration  weld,  ground smooth  shall  be  used.  Welding  shall  not  be  done  in 
areas in contact with the neoprene.  

The Contractor shall provide and install a neoprene gland continuous the full length of joint including 
150 mm extensions. At locations where joints are shown to be for skew of thirty-five degree (35°) 
and greater, the neoprene shall be spliced by vulcanizing or other approved method that provides 
strength and durability equal to unspliced neoprene. Splices shall be permanently watertight. 

23.9 

Inspection and Final Acceptance for Steel Structures  

The Contractor shall perform Quality Control inspections of all phases of the work. The inspection 
frequency and depth shall be sufficient to ensure that all materials and workmanship incorporated 
into the work meet the requirements of the Contract documents and that the processes are controlled 
to ensure that the final finished product(s) conform to the physical characteristics and dimensions 
required  by  the  Contract  documents.  A  Quality  Control  Manager  shall  be  responsible  for  all 
inspection operations. An adequate number of Quality Control Inspectors shall be available to ensure 
review  of  all  materials  and  fabrication  processes  are  preformed  in  accordance  with  the  Quality 
Control Plan. Weekly meetings shall be held with the  Engineer to review inspection findings. The 
review of this information is to identify any refinements and/or improvements in the process being 
utilized in the work. The Engineer may alter the frequency of meetings. 

Material  (except  bearing  devices  and  painting)  for  steel  structures  will  be  evaluated  under  this 
section.  Production  certifications  shall  be  furnished  for  each  shipment  of  structural  steel,  steel 
forgings, and high-strength bolts, nuts, and washers. 

Construction  of  steel  structures  shall  be  evaluated  under  this  section.  Bearing  devices  shall  be 
evaluated  under  Chapter  25,  Bearing  Devices.  Painting  shall  be  evaluated  under  Chapter  24, 
Painting. 

The  Contractor  shall  ensure  the  final  alignment,  profile  and  fastening  of  the  erected  steel  is  in 
accordance with the Contract documents. 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 23-64 

C

HAPTER 

23:

 

S

TEEL 

S

TRUCTURES

 

 

First Edition -January 2018 

 

23.10 

Additional Provisions for Curved Steel Girders  

Provisions of this section apply to horizontally curved girders and shall be considered in addition to 
other provisions of these Specifications. However, when there is a conflict between these provisions 
for curved girders and other provisions of these Specifications, these provisions shall prevail. 

These provisions shall be used by the Contractor to create a construction plan as required herein. 

These  provisions  shall  apply  to  the  superstructure  including  fabrication,  shipping,  erection  of  the 
girders, cross-frames and other structural steel elements, and placement of the concrete deck. 

23.10.1 

Contract

or’s Construction Plan for Curved Girder Bridge 

The  Engineer

’s  construction  plan,  if  shown  in  the  Contract  documents,  shall  not  be  taken  as 

supplanting  or  implying  any  supplantation  of  the  Contract

or’s  responsibility  for  the  fabrication, 

erection, or construction of any part of the bridge. 

The Contractor shall provide a construction plan which details fabrication, procedures for erection, 
and  deck  placement,  and  which  shall  be  referred  to  herein  as  the  Contract

or’s construction plan. 

This plan may be based on the plan shown in the Contract documents, if one is provided, or may be 
developed entirely by the Contractor. In either event, it shall demonstrate the general stability of the 
structure and individual components during each stage of construction, including while supported on 
any  temporary  jacks.  The  Contract

or’s  construction  plan  shall  be  stamped  by  a  Professional 

Engineer and be accepted by the Owner or the Engineer. Where the Contract

or’s construction plan 

causes  a  difference  in  camber  of  the  girders  for  dead  load  from  that  presented  on  the  Contract 
documents, acceptance by the Owner or the Engineer shall be obtained before commencement of 
fabrication. The Contract

or’s construction plan shall include: 

a.  Fabrication procedures, including method of curving the girders 
b.  Shipping weights, lengths, widths, and heights, and means of shipping 
c.  Erection plan, including sequence of erection; crane capacities;  and the location, capacity 

and elevation of any temporary supports 

d.  Deck placement sequence, including the time between placements; and the magnitude and 

position of any temporary load required to prevent girder lift-off at bearings 

Computations which show that the factored construction stresses satisfy the requirements of Articles 
6.10.3  or  6.11.3,  “Constructability,”  of  the 

AASHTO  LRFD  Bridge  Design  Specifications

,  as 

applicable, shall be provided. 

23.10.2 

Fabricating Materials for Curved Girder Bridges  

The  Fabricator  shall  ensure  that  the  steel  can  be  fit  up  in  the  no-load  condition  unless  specified 
otherwise in the construction plan. 

23.10.2.1  Handling Materials for Curved Girder Bridges 

Rolled shapes and plates composing the flanges and webs shall be handled in such a manner as to 
prevent visible deformations or other incidental damage. 

23.10.2.2  Fabricating Curved Girders 

Fabrication  of  curved  girders  for  the  Owner  bridges  shall  comply  with  the  requirements  and 
specifications outlined in this section. 

a. 

Fabricating Rolled I-beams 

Horizontal curvature may be obtained by heat-curving. Heat-curving of beams shall be performed in 
accordance  with 

the  provisions  of  Article  6.7.7,  “Heat-Curved  Rolled  Beams  and  Welded  Plate 

Girders,”  of  the  AASHTO  LRFD  Bridge  Design  Specifications  and  Section  23.5.4  of  these 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 23-65 

C

HAPTER 

23:

 

S

TEEL 

S

TRUCTURES

 

 

First Edition -January 2018 

 

Specifications.  The  Engineer  shall  determine  the  necessity  of  providing  the  additional  camber 
specified in Article 6.7.7, “Camber,” of the AASHTO LRFD Bridge Design Specifications. 

b. 

Fabricating Welded I-girders 

In addition to heat-curving as specified in this section, welded girders may be fabricated from cut-
curved flanges. 

Vertical camber shall be obtained by cutting the web plate to the necessary contour. 

c. 

Fabricating Welded Box and Tub Girders 

Box flanges shall be cut-curved. Top flanges of tub girders may be curved according to the provisions 
of this section. 

23.10.2.3  Fabricating Web Attachments for Curved Girder Bridges 

Fabrication  of  web  attachments for  curved girder  bridges  shall  comply  with the  requirements  and 
specifications outlined in this section. 

a. 

Fabricating Transverse Stiffeners  

Transverse stiffeners shall be bolted to the web or welded to the web with continuous fillet welds on 
both sides of the stiffener. These welds shall be terminated between 4tw and the lesser of 6tw and 
100mm from the near edge of the adjacent flange or longitudinal web stiffener welds. If transverse 
stiffeners or transverse web elements serving as stiffeners are interrupted by a longitudinal stiffener, 
the transverse  stiffeners  shall  be  attached  to the  longitudinal  stiffener to develop  the flexural  and 
axial resistance of the transverse stiffener. If single-sided transverse stiffeners are used, the end of 
the stiffener should be attached to both flanges. Fillet welds on both sides of the stiffener may be 
used. 

When pairs of transverse stiffeners are used, they shall be fitted tightly to both flanges. 

b. 

Fabricating Connection Plates 

Connection  plates,  otherwise  identified  as  transverse  stiffeners  at  cross-frames  and  diaphragms, 
shall be attached to both flanges by either welding or bolting. If a bolted connection is shown on the 
Contract  documents,  a  welded  connection  may  not  be  substituted  without  permission  from  the 
Engineer. 

c. 

Fabricating Longitudinal Stiffeners 

Wherever  practical,  longitudinal  stiffeners  shall  extend  uninterrupted  over  their  specified  length 
unless otherwise permitted in the Contract documents. Longitudinal stiffeners shall be bolted to the 
web or welded to the web with continuous fillet welds on both sides of the stiffener. 

Where longitudinal stiffeners are interrupted, they should be fitted to, and attached to, the continuous 
element sufficiently to develop the required strength and stiffness of the longitudinal stiffener. 

d. 

Fabricating Cross-frames and Diaphragms 

Cross-frames and diaphragms shall be detailed to fit under the no-load condition unless otherwise 
specified. 

23.10.2.4  Fabricating Bolt Holes for Curved Girder Bridges 

Unless permitted otherwise in the Contract documents, bolt holes in girder splices and primary load-
carrying members shall be standard size. Exceptions shall be approved by the Engineer. 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 23-66 

C

HAPTER 

23:

 

S

TEEL 

S

TRUCTURES

 

 

First Edition -January 2018 

 

23.10.2.5  Tolerances in Curved Girder Bridges 

Materials for curved girder bridges shall comply with the requirements and specifications outlined in 
this section. 

a. 

Tolerance for Welded Web Flatness in Curved Girder Bridges 

Webs shall meet dimensional tolerances specified in the AASHTO/AWS D1.5M/D1.5:2010, 

Bridge 

Welding Code

. Flatness shall be measured with respect to a straightedge oriented perpendicular to 

the flanges. 

b. 

Tolerance for Camber in Curved Girder Bridges 

Cambers  provided  on  the  Contract  documents  shall  be  adhered  to  unless  steel  erection  or  deck 
placement is to be performed in a manner that will lead to deflections different from those used to 
determine the camber specified. If the Contractor or the Contract

or’s Fabricator/Detailer or Erector 

intends other procedures or outcomes, the approach shall be confirmed with the Engineer, and any 
documentation  required  for  approval  shall  be  provided  at  no  cost  to  the  Owner.  Any  required 
submissions should be made and approved before the submission of the shop drawings for approval. 

c. 

Tolerance for Sweep in Curved Girder Bridges 

Sweep  tolerance  shall  meet  the  requirements  of  the  AASHTO/AWS  D1.5M/D1.5:2010, 

Bridge 

Welding Code

. Sweep tolerance shall be measured radially from the theoretical curve of the girder. 

d. 

Tolerance for Lengths of Curved Girders 

Girder lengths shall be determined based on an ambient temperature of 30

o

 C. Girder length shall 

be measured along the arc. 

23.10.2.6  Fabricating Fit-up for Curved Girder Bridges 

Fit-up  of  girder  sections  shall  meet  the  provisions  of  Section  23.6.6

,  “Preassembly  of  Field 

Connections  for  Steel  Structures

,”  of  these  Specifications.  Unless  otherwise  specified  in  the 

Contract

or’s construction plan, fit-up shall be assumed to be performed under the no-load condition. 

When numerically controlled drilling is employed, trial fit-up of cross-frames or diaphragms between 
properly  positioned  girder  sections  shall  be  performed  as  specified  in  Article  23.6.1.4  of  these 
specifications. 

Shop fit-up of bolted connections in load-carrying connections of cross-frames and diaphragms to 
the girders may be required for structures with complex geometry or stiff elements. 

Girder Section Field Splices may be fit up in either the vertical or horizontal position. Girder splices 
may be fit up before heat-curving. 

23.10.3 

Transportation Plan for Curved Girders 

A Transportation Plan may be required by the Owner or the Engineer for complex or large structures. 
The  type  of  girder  supports  required  and  their  locations  shall  be  identified.  The  types,  size,  and 
locations of tie-downs shall be shown. A sufficient number of tie-downs shall be specified to provide 
adequate redundancy. 

Girder  stresses  due  to  selfweight  while  being  shipped  shall  be  computed  with  a  dynamic  load 
allowance of 100 percent. 

The computed girder stresses shall satisfy the provisions of Article 6.10.3.2 or Article 6.11.3.2 of the 

AASHTO LRFD Bridge Design Specifications

, as applicable. 

Fatigue  stresses  shall  not  exceed  the  constant  amplitude  fatigue  threshold  for  the  appropriate 
categories in Table 6.6.1.2.5-3 of the AASHTO LRFD Bridge Design Specifications. 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 23-67 

C

HAPTER 

23:

 

S

TEEL 

S

TRUCTURES

 

 

First Edition -January 2018 

 

Wherever practical, girder sections should be shipped in the same orientation as in the completed 
structure. Girders shall be supported in such a manner that their cross-section shape is maintained 
and through-thickness stresses are minimized. 

Supports should be such to ensure that dynamic lateral bending stresses are controlled. 

Temporary stiffening trusses or beams, if required to meet the requirements of this section, shall be 
specified in the Transportation Plan. 

23.10.4 

Erecting Steel for Curved Girder Bridges  

Erection shall be performed in accordance with the Contract

or’s construction plan as approved by 

the Engineer. 

Factored stresses due to selfweight of the steel and wind at each stage of erection shall not exceed 
those computed according to the provisions of Article 6.10.3 or Article 6.11.3, as applicable, of the 
AASHTO LRFD Bridge Design Specifications and Article 23.7.8.2

, “Accounting for stresses during 

erection of steel structures

”, of these Specifications. 

Reaming of bolt holes during erection shall be permitted only with the approval of the Engineer. 

Bolted girder splices shall be field assembled according to the provisions of Section 23.6.1 of these 
Specifications. 

23.10.4.1  Erecting Falsework for Curved Girder Bridges 

Falsework shall be designed to carry vertical and lateral loads that are specified in the construction 
plan. The elevation of falsework shall be such as to support the girders at  the cambered no-load 
elevation. Jacks used in conjunction with the falsework shall have a stroke adequate to permit full 
unloading. Unloading of temporary supports should be performed such that all temporary supports 
at each cross-section are unloaded uniformly. 

Where appropriate, cranes may be substituted for falsework. 

23.10.4.2  Erecting Bearings for Curved Girder Bridges 

Computed  bearing  rotation  during  construction  shall  not  exceed  the  rotational  capacity  of  the 
bearing. Bearings shall be installed such that, after dead load has been applied, sufficient rotation 
capacity  shall  be  available  to  accommodate  rotations  due  to  environmental  loads  and  live  load. 
Expansion bearings shall be installed so that they will be in the center of the permitted travel at the 
ambient temperature of 30° C unless otherwise specified by the Engineer. 

23.10.4.3  Erecting I-girders for Curved Girder Bridges 

The Contractor shall ensure that girders are stable throughout the erection process. The stage of 
completeness  of  the  bolted  connections  shall  be  considered  when  evaluating  the  strength  and 
stability of the steel during erection. 

23.10.4.4  Erecting  Closed  Box  and  Tub  Girders  for  Curved  Girder 

Bridges 

The Contractor shall ensure that the cross-section shape of each box is maintained during erection. 

Top lateral bracing should be installed in tub girders before shipping and erection of the field pieces. 

23.10.5 

Erecting Decks for Curved Girder Bridges 

When erecting decks for the curved girder bridge for the Project, the Contractor shall comply with 
the requirements and specifications outlined in this section. 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 23-68 

C

HAPTER 

23:

 

S

TEEL 

S

TRUCTURES

 

 

First Edition -January 2018 

 

23.10.5.1  Erecting Forms for Decks on Curved Girder Bridges 

Plywood, permanent metal forms, or concrete panels may be used as deck forms as approved by 
the Engineer. Proprietary forms shall be placed in accordance with the Manufacturer

’s specifications 

incorporating any modifications to those Specifications approved by the Engineer. Form work shall 
be supported by the superstructure. 

a. 

Erecting Overhangs for Decks on Curved Girder Bridges 

Overhang forms shall be removed after the deck has cured. Wherever practical, overhang brackets 
should  bear  near  the  bottom flange  and  be  attached  to the  top flange.  If overhang  brackets  bear 
against the web, the Contractor shall ensure that precautions have been taken to prevent permanent 
deformation of the web and excessive deflection of the wet slab and forms. The lateral force on the 
top flange due to overhang brackets shall be investigated to ensure that the flange is adequate as 
specified in Article 6.10.3.4, “Deck Placement,” of the AASHTO LRFD Bridge Design Specifications. 

Loads applied on the overhang brackets shall be considered in determining lateral flange bending 
stresses, cross-frame forces, and associated web and top flange deformations. If the loads or their 
application  are  to  be  different  than  those  provided  for  in  the  Contract  documents,  an  additional 
analysis shall be made by the Contractor and approved by the Engineer. 

b. 

Erecting Tub Girders for Decks on Curved Girder Bridges 

Deck  forms  shall  not  be  supported  at  locations  other  than  girder  flanges  unless  specifically 
considered in the design. 

23.10.5.2  Placing Concrete for Decks on Curved Girder Bridges 

Concrete placements shall be made in the sequence specified in the approved construction plan. 
Time  between  placements  shall  be  such  that  the  concrete  in  prior  pours  has  reached  an  age  or 
strength specified in the construction plan. Any accelerating or retarding agents to be used in the 
concrete mix shall be specified. 

Duration of each placement shall be specified in the construction plan. Placements that include both 
negative and positive dead load moment regions should be placed such that the positive moment 
region is poured first. 

23.10.6 

Reporting Modification to Construction Plan for Curved Girder 
Bridge 

Any modifications to the construction plan in the field from the original plan shall be documented with 
appropriate approvals noted. 

23.11 

Post-weld Treatment for Steel Structures  

Post-weld  treatments  for  steel  structures  shall  comply  with  the  requirements  and  specifications 
outlined in this section. 

Typical post-weld treatment includes ultrasonic impact treatment, heat treatment, grinding, weld toe 
remelting (GTAW dressing or plasma arc dressing), hammer peening, and shot peening. 

23.11.1 

Ultrasonic Impact Treatment for Steel Structures 

If required, the objective of  ultrasonic impact treatment (UIT) is to improve the fatigue strength of 
welded connections by plastically deforming the material at the weld toes and introducing residual 
compressive stresses substantially greater than the largest anticipated tensile stresses to a depth of 
no less than 0.5mm. This treatment is necessary only at the weld toe which is defined as the interface 
of the weld metal and base metal. Due to the finite size of the UIT needles and the recommended 
treatment procedure, some base metal adjacent to the weld toe will get treated. 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 23-69 

C

HAPTER 

23:

 

S

TEEL 

S

TRUCTURES

 

 

First Edition -January 2018 

 

23.11.1.1  Procedure  for  Ultrasonic  Impact  Treatment  for  Steel 

Structures 

UIT  shall  be  accomplished  in  accordance  with  the  equipment  Manufacturer

’s  recommendations, 

except as specifically described in the Contract documents. 

The use of UIT shall be limited to base metal with a specified minimum yield strength of 690 MPa or 
less. 

Before UIT, the weld toe to receive UIT shall be visually inspected and magnetic particle-tested for 
conformance to the quality standards specified in the Contract documents. The instrument shall be 
calibrated  against  the  maximum  flaw  size  allowed.  Discontinuities  greater  than  0.8mm  shall  be 
repaired satisfactorily before initiating the work. 

UIT shall be done along the toe of the weld in a manner that will cause the center of the resultant 
treatment groove to be at the weld toe, with equal treatment and smooth transition to the adjacent 
weld and base metal. 

UIT shall be performed so as to result in a uniform groove with a distinct and uniform bright metallic 
surface,  as  verified  by  visual  inspection  immediately  after  completion. When  viewed  under  a  10x 
magnifying glass, the groove shall be free from any visible indications of the untreated base metal 
or weld metal. If such untreated indications exist within the treated area, such area shall be retreated 
to obtain a uniform, bright metallic surface across the entire surface of the UIT groove. 

23.11.1.2  Other Weld Metal and Base Metal Treatments 

Because  the  benefits  of  UIT  are  primarily  derived  from  the  introduction  of  compressive  residual 
stresses, the Contractor shall avoid other processes, such as heat treatment, hot dipped galvanising, 
or overloading, that might relieve these stresses after performing the toe treatment.  

23.11.1.3  Dead Load Consideration 

If the structure is going to be subjected to a significant dead load when in use, it is advisable that 
this  be  taken  into  consideration  and  the  structure  be  loaded  before  treatment.  An  enhancement 
corresponding  to  the  lower  stress  ratio may  be obtained  in that  case,  depending  on  the  live  load 
stress ratio of the nominal stress cycles applied after the treatment. 

23.12 

Additional Requirements for Steel Structures 

In addition to the requirements of these specifications, the fabrication, transport and erection of steel 
structures shall also conform to the following additional requirements. 

a. 

Steel with Enhanced Through Thickness Properties 

Where  the  Contract  plans  indicate  a  requirement  for  steel  with  enhanced  through  thickness 
properties,  these  shall  be  in  accordance  with  BS  EN  10164:2004, 

Steel  products  with  improved 

deformation properties perpendicular to the surface of the product - Technical delivery conditions, 

or 

an equivalent specification approved by the Engineer. 

b. 

Laminar Defects in Plate Material 

The areas of plates presented in  

Table  23-13,  shall  not  have  laminations  exceeding  the  limits  specified  in  BS  EN  10160:1999, 

Ultrasonic testing of steel flat product of thickness equal or greater than 6 mm (reflection method)

  

Table 23-13 presents acceptance levels for internal imperfections in steel plate, strip and wide flats, 
based on Ultrasonic Testing. 

Table 23-13: Acceptance Levels for internal imperfections in steel plates 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 23-70 

C

HAPTER 

23:

 

S

TEEL 

S

TRUCTURES

 

 

First Edition -January 2018 

 

 

Acceptance 
Level 

For a band of flange or web plate of width 25 times the plate thickness on each 
side of a bearing diaphragm where attached by welding: 

B4 

For a band of web plate of width 25 times the plate thickness on each side of a 
single sided bearing stiffener where attached by welding : 

B4 

For edges of plates where corner welds will be made on to the surface of such 
plates: 

For welded cruciform joints transmitting primary tensile stresses through the plate 
thickness, on a band of width four times the thickness of the plate each side of 
the proposed attachment: 

B4 

c. 

Dimensions of Cope Holes 

The radius of cope holes and of re-entrant corners in plate material shall be the greater of 30mm or 
2 times the plate thickness unless specified otherwise in the Contract plans. 

d. 

Reference Temperature 

Dimensions of steel structures shown on the Contract plans shall be correct at the specified mean 
temperature. 

 

 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 23-71 

C

HAPTER 

23:

 

S

TEEL 

S

TRUCTURES

 

 

First Edition -January 2018 

 

 

I

NDEX

abutment, 23-4 
allowable temperature, 23-28, 23-29 
arc process, 23-58 
artificial cooling, 23-29 
bearing, 23-4, 23-21, 23-30, 23-31, 23-34, 23-

36,  23-38,  23-40,  23-45,  23-46,  23-47,  23-
53,  23-55,  23-62,  23-63,  23-64,  23-65,  23-
68, 23-71 

Bracing members, 23-4 
Bridge bearings, 23-63 
bridge structures, 23-59 
bulk materials, 23-14 
calibrated wrench, 23-49, 23-52, 23-53, 23-54 
camber,  23-15,  23-16,  23-17,  23-31,  23-37, 

23-45, 23-47, 23-63, 23-65, 23-66, 23-67 

Camber,  23-17,  23-31,  23-37,  23-38,  23-63, 

23-66, 23-67 

cold bending, 23-26 
collar fasteners, 23-21, 23-22, 23-56 
connection plates, 23-4, 23-30, 23-31, 23-33, 

23-35 

container, 23-14, 23-15, 23-51 
Cross frames, 23-4, 23-14, 23-63 
Cup and countersunk bolts, 23-22 
curvature, 23-27, 23-29, 23-30, 23-31, 23-41, 

23-42, 23-66 

curved beams, 23-4, 23-39 
dead load, 23-16, 23-17, 23-31, 23-38, 23-65, 

23-68, 23-69, 23-70 

Deck forms, 23-69 
Department of Transport, 23-4 
diaphragms, 23-4, 23-18, 23-43, 23-61, 23-66, 

23-67 

dimensional tolerances, 23-37, 23-38, 23-67 
direct tension indicator (DTI) devices, 23-54 
drilled holes, 23-33 
Electroslag Welding, 23-58 
equipment, 23-27, 23-34, 23-42, 23-43, 23-59, 

23-60, 23-70 

erection, 23-4, 23-14, 23-15, 23-16, 23-17, 23-

40,  23-41,  23-42,  23-43,  23-44,  23-45,  23-
46,  23-60,  23-61,  23-62,  23-63,  23-64,  23-
65, 23-67, 23-68, 23-70 

Erection design calculations, 23-63 
Erection Quality Control, 23-60 
Expansion joints, 23-64 
fabricated girders, 23-4 
Fabricator, 23-12, 23-13, 23-14, 23-15, 23-17, 

23-18,  23-26,  23-27,  23-28,  23-29,  23-30, 
23-31,  23-32,  23-33,  23-34,  23-35,  23-36, 
23-38, 23-43, 23-45, 23-65, 23-67 

Falsework, 23-4, 23-15, 23-16, 23-60, 23-68 

field connections, 23-34, 23-43, 23-64, 23-67 
field-welded connections, 23-47 
flame-cut, 23-40 
fracture  critical,  23-14,  23-18,  23-33,  23-35, 

23-58 

friction grip bolts, 23-46 
full-size tests, 23-42 
galvanising,  23-20,  23-21,  23-24,  23-37,  23-

51, 23-70 

girders, 23-4, 23-14, 23-16, 23-17, 23-18, 23-

29,  23-30,  23-31,  23-33,  23-34,  23-37,  23-
38,  23-39,  23-40,  23-45,  23-61,  23-63,  23-
65, 23-66, 23-67, 23-68 

harmful materials, 23-14 
Head markings, 23-20 
heat-curving bridge members, 23-29 
heating patterns, 23-28, 23-30, 23-32 
higher standards, 23-4 
horizontal radius, 23-30 
inspection frequency, 23-64 
jacks, 23-28, 23-32, 23-65 
large diametre holes, 23-36 
lateral bracing components, 23-33, 23-34 
lighting poles, 23-58 
load carrying capacity, 23-16 
Load-indicating devices, 23-22 
Lock nuts, 23-22 
lubricants, 23-37, 23-61 
Magnetic particle examination, 23-32 
Maximum deviation, 23-38, 23-41, 23-42 
moisture, 23-14, 23-15, 23-49 
non-destructive testing, 23-4, 23-32 
Non-Redundant Members, 23-18 
orthotropic-deck bridge, 23-41 
Overhang forms, 23-69 
permanent metal forms, 23-69 
pier, 23-4, 23-37 
pinholes, 23-38 
Post-weld treatments, 23-69 
preheat, 23-25 
Preload compressive stresses, 23-28 
primary  load,  23-4,  23-14,  23-18,  23-32,  23-

35, 23-51, 23-61, 23-62, 23-67 

Radiographic examination, 23-32 
reaming,  23-34,  23-35,  23-36,  23-45,  23-46, 

23-47, 23-48, 23-64 

Rib members, 23-4 
rolled  beams,  23-4,  23-14,  23-18,  23-30,  23-

31 

shear studs, 23-14 
sign structures, 23-58 
slip-critical connections, 23-48, 23-49 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 23-72 

C

HAPTER 

23:

 

S

TEEL 

S

TRUCTURES

 

 

First Edition -January 2018 

 

slotted hole geometry, 23-35 
splice plates, 23-14, 23-18, 23-26 
stainless steel, 23-19, 23-41 
standard hole, 23-33 
steel arches, 23-4 
Steel castings, 23-23 
Steel forgings, 23-23 
Steel surfaces, 23-39 
structural members, 23-14, 23-42 
Stud shear connectors, 23-22 
supplier, 23-14, 23-20 
Surface finishes, 23-36 
Tack welds, 23-60 
Tensile properties, 23-22, 23-23 
Threads, 23-5, 23-40, 23-47, 23-50 
torches, 23-28, 23-40 
traffic signal poles, 23-58 
truss chords, 23-38, 23-43 
truss members, 23-4, 23-43 
turn-of-nut, 23-47, 23-53 
Ultrasonic, 23-10, 23-11, 23-32, 23-59, 23-60, 

23-69, 23-70 

ultrasonic examination, 23-26, 23-58, 23-60 
Visual inspection, 23-26, 23-32, 23-59 
V-type heating, 23-29 
Washers,  23-7,  23-15,  23-20,  23-21,  23-22, 

23-51, 23-52 

Welder qualification, 23-25 
welder qualifications, 23-58 
welding, 23-9, 23-11, 23-16, 23-18, 23-19, 23-

22,  23-24,  23-25,  23-26,  23-30,  23-31,  23-
33,  23-40,  23-41,  23-58,  23-59,  23-60,  23-
66, 23-71 

 

 

 

 

 

 

 

STANDARD CONSTRUCTION SPECIFICATIONS 

PART 2 

ROAD STRUCTURES 

 

CHAPTER 24 - PAINTING 

 

 

 

 

 

 

 

DOCUMENT NO: TR- 

FIRST EDITION 

JANUARY 2018

 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page i 

C

HAPTER 

24:

 

P

AINTING

 

 

First Edition -January 2018 

 

Chapter 24: Painting 

T

ABLE OF 

C

ONTENTS

 

Table of Contents............................................................................................................................. i

 

List of Tables .................................................................................................................................. iii

 

24

 

Painting ........................................................................................................................... 24-1

 

24.1

 

General ........................................................................................................................ 24-1

 

24.1.1

 

Protection of Public, Property, and Workers .......................................................... 24-1

 

24.1.2

 

Existing Paint Removal ......................................................................................... 24-1

 

24.1.3

 

Protection of Work ................................................................................................ 24-2

 

24.1.4

 

Qualification Samples and Tests ........................................................................... 24-2

 

24.1.5

 

General Requirements for Surface Preparation .................................................... 24-3

 

24.1.6

 

General Requirements for Paint Application ......................................................... 24-3

 

24.2

 

Reference Standards and Codes ................................................................................. 24-4

 

24.3

 

Painting Structural Iron and Steel Surfaces .................................................................. 24-9

 

24.3.1

 

General ................................................................................................................. 24-9

 

24.3.1.1

 

Compatibility ................................................................................................ 24-10

 

24.3.1.2

 

Toxicity ........................................................................................................ 24-10

 

24.3.1.3

 

Volatile Organics.......................................................................................... 24-10

 

24.3.1.4

 

Color ............................................................................................................ 24-10

 

24.3.1.5

 

Performance Requirements ......................................................................... 24-10

 

24.3.2

 

Paint  Systems for  New External  Visible  Surfaces  or  Surfaces  with  All  Existing  Paint 

Removed .......................................................................................................................... 24-12

 

24.3.2.1

 

Paint System No. 1 - Inorganic Zinc Silicate System .................................... 24-13

 

24.3.2.2

 

Paint System No. 2 

– Zinc Rich Epoxy System ............................................ 24-14

 

24.3.2.3

 

Paint System No. 3 

– Moisture Cured Polyurethane System ....................... 24-14

 

24.3.2.4

 

Paint System No. 4 

– Acrylic Latex System ................................................. 24-16

 

24.3.2.5

 

Paint System No. 5 

– Low VOC Alkyd System ............................................. 24-16

 

24.3.3

 

Paint Systems for Surfaces with Existing Sound Paint ........................................ 24-17

 

24.3.3.1

 

Paint System No. 6 

– Moisture Cured Polyurethane System ....................... 24-18

 

24.3.3.2

 

Paint System No. 7 

– Low VOC Alkyd System ............................................. 24-18

 

24.3.3.3

 

Paint System No. 8 

– Low Viscosity Epoxy System ..................................... 24-18

 

24.3.4

 

Paint System No. 9 for New Internal Invisible Surfaces....................................... 24-18

 

24.3.5

 

Surface Preparation of Iron and Steel Surfaces .................................................. 24-18

 

24.3.5.1

 

New surfaces or Surfaces with all Existing Paint Removed .......................... 24-18

 

24.3.5.2

 

Surfaces with Existing Sound Paint.............................................................. 24-19

 

24.3.5.3

 

Cleaning Methods of Iron and Steel Surfaces .............................................. 24-19

 

24.3.6

 

Sampling and Testing ......................................................................................... 24-22

 

24.3.7

 

Time of Application ............................................................................................. 24-22

 

24.3.8

 

Storage of Paint and Thinner .............................................................................. 24-23

 

24.3.9

 

Mixing and Thinning ............................................................................................ 24-23

 

24.3.10

 

Application of Paint ............................................................................................. 24-24

 

24.3.10.1

 

General ........................................................................................................ 24-24

 

24.3.10.2

 

Brush Application ......................................................................................... 24-25

 

24.3.10.3

 

Spray Application of Paint ............................................................................ 24-25

 

24.3.10.4

 

Shop Painting .............................................................................................. 24-26

 

24.3.10.5

 

Field Painting ............................................................................................... 24-26

 

24.3.10.6

 

Drying of Painted Iron and Steel .................................................................. 24-27

 

24.3.10.7

 

Handling of Painted Iron and Steel .............................................................. 24-27

 

24.3.10.8

 

Measurement of Dry Film Thickness (DFT) of Paints ................................... 24-27

 

24.4

 

Painting Galvanized Surfaces .................................................................................... 24-29

 

24.4.1

 

Paint System No. 10 

– Polyamide Cured Rust Inhibitive Epoxy System ............. 24-30

 

24.4.2

 

Paint System No. 11 

– Vinyl Wash System ......................................................... 24-30

 

24.5

 

Painting Steel Sheet, H, Pipe Pilings, and other Surfaces .......................................... 24-31

 

24.5.1

 

Surface Preparation ............................................................................................ 24-31

 

24.5.2

 

Application Requirements ................................................................................... 24-31

 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page ii 

C

HAPTER 

24:

 

P

AINTING

 

 

First Edition -January 2018 

 

24.6

 

Painting Aluminium Surfaces ..................................................................................... 24-32

 

24.6.1

 

Surface Preparation ............................................................................................ 24-32

 

24.6.2

 

Paint Systems for Aluminium Surfaces ............................................................... 24-32

 

24.6.2.1

 

Paint System No. 11 - Polyvinylidene Difluoride Coating ............................. 24-33

 

24.6.2.2

 

Paint System No. 12 - Epoxy ....................................................................... 24-33

 

24.6.3

 

Aluminium in Contact with Dissimilar Metals ....................................................... 24-33

 

24.7

 

Painting Exposed Surfaces of Concrete Structures .................................................... 24-33

 

24.7.1

 

General Requirements for Concrete Painting ...................................................... 24-34

 

24.7.2

 

Paint Test Areas for the Engineer’s Approval ...................................................... 24-35

 

24.7.3

 

Project and Weather Conditions ......................................................................... 24-35

 

24.7.4

 

Surface Preparation and Application ................................................................... 24-36

 

24.7.5

 

Paint Materials .................................................................................................... 24-37

 

24.7.5.1

 

Exposed Concrete Surfaces ........................................................................ 24-37

 

24.7.5.2

 

Concrete Surfaces in Splash Zones ............................................................. 24-39

 

Index   ...................................................................................................................................... 24-40

 

 

 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page iii 

C

HAPTER 

24:

 

P

AINTING

 

 

First Edition -January 2018 

 

L

IST OF 

T

ABLES

 

Table 24-1: Designations and titles for AASHTO and ASTM standards that apply to painting works
 .................................................................................................................................................. 24-6

 

Table 24-2:  Designations and titles for  BS, and BS EN, and DIN standards that apply to painting 
works ......................................................................................................................................... 24-9

 

Table 24-3: Performance requirements of coatings .................................................................. 24-11

 

Table 24-4: Structural iron and steel coating systems for new surfaces and surfaces with all existing 
paint removed .......................................................................................................................... 24-12

 

Table 24-5: Acceptance levels for salt fog ................................................................................ 24-16

 

Table 24-6: Acceptance levels for cyclic exposure ................................................................... 24-16

 

Table 24-7: Structural iron and steel coating systems for surfaces with existing sound paint ... 24-17

 

Table 24-8: Methods of testing Paint properties ....................................................................... 24-22

 

Table 24-9: Galvanized surface coating systems ..................................................................... 24-30

 

Table 24-10: Characteristics of coal tar epoxy coating ............................................................. 24-31

 

Table 24-11: Polyvinylidene difluoride (PVDF) requirements.................................................... 24-33

 

Table 24-12: Pigmented elastomeric aliphatic acrylic coating for exposed concrete surfaces .. 24-37

 

Table 24-13:  Silane/Siloxane primer for exposed concrete surfaces ....................................... 24-38

 

S

TANDARD 

C

ONSTRUCTION SPECIFICATIONS

 

 

PART 

2

 

 

R

OAD 

S

TRUCTURES

 

 

 

Page 24-1 

C

HAPTER 

24:

 

P

AINTING

 

 

First Edition -January 2018 

 

24 

PAINTING 

24.1 

General 

This specification sets out the minimum requirements and the standards for surface treatment and 
painting  of  structural  iron  and  steel,  galvanized,  aluminium,  and  concrete  surfaces  to  control 
corrosion and deterioration.  

The Contractor shall comply with the specifications in this chapter and the Contract documents when 
performing  painting  services  for  the  Project.  Painting  services  shall  include  at  least  the  following 
activities: 

  Preparing surfaces 

  Applying paint (painting surfaces)  

  Curing paint 

  Protecting works under construction, existing facilities, vehicles, and the public from damage 

caused by painting 

  Furnishing of all labour, equipment, and materials needed to perform painting services 

  The  applicator/painter  shall  demonstrate    to  the  Engineer  his  proficiency  in  applying  the 

manufacturer’s  recommendations 

24.1.1 

Protection of Public, Property, and Workers 

The  Contractor  shall comply  with  the  Steel  Structures  Painting  Council's  (SSPC) Guide  to  Safety 
and  Health  Requirements  (SSPC-PA  Guide  10),  and  OSHA  requirements.  All  applicable 
environmental  protection  and  occupational  safety  and  health  standards,  rules,  regulations,  and 
orders  shall  be  observed  by  the  Contractor.  Failure  to  comply  with  these  standards,  rules, 
regulations, and orders shall be sufficient cause for suspension or disqualification. 

All reasonable precautions shall be taken to contain waste materials, including used blasting material 
and old paint, classified as hazardous. Disposal of hazardous waste material shall be performed in 
accordance with all applicable laws. 

Protective  devices,  such  as  tarps,  screens,  or  covers,  shall  be  provided  by  the  Contractor,  as 
necessary, to prevent damage to the work and to other properties, or persons from all cleaning and 
painting operations. All damage caused by the painting works to vehicles, persons, or property shall 
be the responsibility of the Contractor. 

Paint or paint stains that result in an unsightly appearance on surfaces not designated to be painted 
shall be removed or obliterated by the Contractor at its expense. 

24.1.2 

Existing Paint Removal 

If the paint being removed is a hazardous material containing lead or chromium, the Contractor shall 
comply with all the following: 

  SSPC  Guide  6I(CON)  -  Guide  for  Containing  Debris  Generated  During  Paint  Removal 

Operations; 

  SSPC  Guide  7I(DIS)  -  Guide  for  the  Disposal  of  Lead-Contaminated  Surface  Preparation 

Debris; 

  40 CFR Parts 260 - 268 - Code of Federal Regulations; 

  29 CFR 1926.62 - OSHA Construction Industry Standards for Lead; 

  40  CFR  50.6  -  EPA  National  Primary  and  Secondary  Ambient  Air  Quality  Standards  for 

Particulate Matter; and 

  40  CFR  50.12  -  EPA  National  Primary  and  Secondary  Ambient  Air  Quality  Standards  for 

Lead. 

 

 

 

 

 

 

 