/lux

Visibility of the road markings is reduced in wet conditions. 

e.  Drying Time

Thermoplastic material shall set to bear traffic in not more than 10 minutes when the air temperature 
is 32 ± 2º C and when the application temperature is within the range of the melting temperature of 
the road marking compound and up to +5

0

 C. The manufacturer

’s recommendations shall be applied 

as approved by the Engineer. when the application temperature is within the range  

Setting / hardening time is 10 minutes at a surface temperature of 20

0

 C and a light breeze. 

f.  Material Sampling and Testing for Acceptance

Sampling and testing shall be performed per AASHTO T 250 or EN 1871 or any other equivalent 
standard approved by the Engineer or the Owner. Minimum size batch of thermoplastic traffic striping 
material sampled and tested shall not be less than 1080 kg unless the total order is less than this 
amount.  Acceptance  shall  be  evaluated  per  the  criteria  established  in  AASHTO  M  249  or  any 
equivalent standard for:  

1.  Binder content

2.  Glass bead content

3.  Glass bead content, grading & roundness

4.  Reflectance & yellowness index

5.  Colour & luminance

6.  Titanium dioxide

7.  Lead chromate

8.  Flowability (percent residue)

9.  Low temperature stress resistance

10. Bond strength

11. Impact resistance

12. Softening point

13. Specific gravity

14. Heat Stability

15. Ultraviolet light and condensate exposure

16. Hardness

17. Flash point

8.2.2.6 

 Cold Applied Plastics 

Cold  plastic  is  a  double  component  road  marking  material.  Unlike  thermoplastic  material,  no 
application heat is required (it is a catalytic reaction process). The material is excellent for countries 
with low temperatures. Due to the hot climate in this vicinity, the use of this material may not be cost 
effective. However, the cost factor has to be appropriately decided based on the intent of the usage 
and approved by the Engineer/ Owner. 

C

HAPTER 

8

:

 

T

RAFFIC 

M

ARKINGS AND 

S

IGNS

Type M1 

3.8 litres MMA and 90 millilitres of benzoyl peroxide powder 

Type  M2,  M3,  M4, 
M5 

Four parts MMA and one part liquid benzoyl peroxide. 

Elongation - ASTM D638 

20 % minimum 

Hardness 

– ASTM D2240 

(Shore Durometer Type D) 

55 minimum after 24 hours 

No Track Time 

– ASTM 

D711, modified as follows: 

15 minutes at 40 mils. 

Reflectance 

– ASTM D6359  Newly  applied  pavement  markings  shall  have  a  minimum  initial 

coefficient of retroreflective luminance of 250 mcd/m

2

/lux for white 

and 175 mcd/m

2

/lux for yellow in accordance with ASTM D6359 

when  measured  with  a  30-metre  retroreflectometer.  Compliance 
shall be measured with a Delta LTL-X retroreflectometer. 

Skid  Resistance 

–  ASTM 

E303 

45 BPN units minimum 

Tensile  Strength 

–  ASTM 

D638 

0.088 kg/mm

2

 minimum at break 

Viscosity 

–  ASTM  D2196 

Method  B,  LV  Model  at  50 
rpm. 

Type M1 

11,000 to 15,000 cps, spindle #7 

Type M2 

26,000 to 28,000 cps, spindle #7 

Type M3 

17,000 to 21,000 cps, spindle #7 

Type M4 

8,000 to 10,000 cps, spindle # 4 

Type M5 White 

5,000 to 8,000 cps, spindle #4 

Type M5 Yellow 

7,000 to 11,000 cps, spindle #4 

Ultraviolet Light 

No effect 

C

HAPTER 

8

:

 

T

RAFFIC 

M

ARKINGS AND 

S

IGNS

or more. Medium oil soya modified alkyd resin. Primary solvent is VM and P Naphtha. 

2.  Type N Traffic Paint

—Paint with immediate drying properties for use in areas where drying

is  acceptable  for  15  to  30  minutes.  Medium  oil  soya-modified  pentaerythritol  alkyd  resin; 
chlorinated rubber, 4 to 1. Primary solvent is toluene. 

3.  Type  F  Traffic  Paint

—Paint  for  use  where  faster  drying  time  is  required,  typically  3  to  6

minutes  if  heated  to  51.5  ±2.5ºC  in  the  applicator.  Medium  oil  soya/linseed  alkyd  resin; 
chlorinated rubber; chlorinated paraffin; 1.03 to 1.30 to 1.00. Primary solvent is MEK. 

Road-marking paint shall be Type F. Types N and S may be used to paint kerbs. Alkyd resin paint 
for road markings shall not be thinned. For kerb marking, thinning with manufacturer recommended 
product  shall  be  allowed  up  to  3  %  or  the  manufacturer’s  recommended  minimum,  whichever  is 
lesser.  

Alkyd resin paints may be reflectorized for night visibility by adding glass beads immediately after 
application of the alkyd resin material.  

Red and black alkyd resin paint shall be non-reflectorized road marking paint based on alkyd resin 
and chlorinated rubber blended with rich pigments and low VOC contents. 

a.  Composition of Alkyd Resin Paint Markings

Composition of alkyd resin markings (paint) shall be as stated in AASHTO M 248. 

Inert or filler pigments shall be first quality paint grade products. 

Paint drawdowns shall be performed per ASTM D823. Alkyd resin paint shall be low VOC solvent 
based  paint that meets the  following  requirements for  white  (W), yellow  (Y),  red  (R),  or  black (B) 
paint as applicable:  

Table 8-7: Alkyd resin paint characteristics 

Standard 

Criteria 

W/Y 

R/B 

Bleeding over asphalt  
ASTM D969, modified 
as follows: 

Reflectance measurement of the alkyd resin paint over 
asphalt paper shall be at least 90 % of the reflectance 
measurement  of  the  material  over  a  taped  (non-
bleeding) surface. 

Chromium content 
ASTM D3718 

< 50 ppm 

Directional reflectance 
ASTM E1347 

White paint shall have a minimum reflectance of 80 %. 

Density  
ASTM D1475, at 21

o

 C 

1.5 kg/litre minimum 

 

Flexibility  
ASTM D522 

Alkyd resin shall be applied at a wet film thickness of 
0.15 mm to a 75x125 mm panel that has been solvent 
cleaned  and  lightly  buffed  with  steel  wool.  With  the 
panel  kept  in  a  horizontal  position,  the  paint  shall  be 
allowed to dry for 18 hours at 24 ± 2.8

o

 C then baked 

for 3 hours at 60 ± 2.2

o

 C. Panel shall be cooled to 24 

± 2.8

o

 C for at least 30 minutes, bent over a 0.25-inch 

mandrel  and  then  examined  without  magnification. 

 

C

HAPTER 

8

:

 

T

RAFFIC 

M

ARKINGS AND 

S

IGNS

 

Lead content  
ASTM D3335 

0.06 % maximum 

Nonvolatile content 
ASTM D2369 

65 % minimum 

Package stability 
ASTM D1849 

6 rating minimum for all criteria 

Pigment content 
ASTM D2371 

53 % maximum 

Retroreflectance 
ASTM D6359 

Newly  applied  pavement  markings  shall  have  a 
minimum initial coefficient of retroreflective luminance 
of  250  mcd/m

2

/lux  for  white  and  175  mcd/m

2

/lux  for 

yellow  in  accordance  with  ASTM  D  6359  when 
measured with a 30-metre retroreflectometer. Measure 
retroreflectivity  for  compliance  with  a  Delta  LTL-X 
retroreflectometer. 

Skinning 

Alkyd resin shall not skin within 48 hours in a ¾ filled 
tightly closed container. 

 

Settling properties 
during storage 
 ASTM D1309 

Sample  shall  show  no  more  than  12.7  mm  of  clear 
material over the opaque portion of the paint and there 
shall be no settling below a rating of seven. 

 

Titanium dioxide (rutile 
type II)  
ASTM D476 

White 

– 0.12 kg/litre minimum. (ASTM D4563) 

Yellow 

– 0.02 kg/litre maximum. (ASTM D4563) 

Viscosity  
ASTM D562 

105 Krebs units maximum at 10

o

 C 

75-85 Krebs units at 21

o

 C

65 Krebs units minimum at 49

o

 C 

 

Volatile Organic 
Compound Content 

0.15 kg/litre maximum 

 

C

HAPTER 

8

:

 

T

RAFFIC 

M

ARKINGS AND 

S

IGNS

Titanium dioxide (TiO

2

), ASTM D 476, types II and III  18 % min. 

Epoxy resin 

75 to 82 % 

Yellow 

Chrome yellow (PbCrO

4

), ASTM D126, type III 

23 % min 

Epoxy resin 

70 to 77 % 

Non-lead 
yellow 

Titanium dioxide (TiO

2

), ASTM D476, types II and III  14 % min 

Organic yellow 

7 to 8 % 

Epoxy resin 

75 to 79 % 

Epoxy content. Component A. 

Mass per epoxy equivalent, ASTM D1652 

Manufacturer's target 
value ±50 

Amine value. Component B. 

ASTM D2074 

Manufacturer's target 
value ±50 

Toxicity 

Toxic or injurious fumes at application temperature 

none 

Directional reflectance (without glass beads) 

White 

ASTM E1347 

84 % relative to 
magnesium oxide 
standard 

Yellow 

ASTM E1347 

55 % relative to 
magnesium oxide 
standard 

Drying time. 0.38-millimetre film thickness with beads. 

Laboratory 
at 22 º C 

ASTM D711 to no-pick-up condition 

30 minutes maximum 

Field at 25 
º C 

Viewed from 15 m to no-tracking condition 

10 minutes maximum 

Abrasion 
resistance: 

Wear index with a CS-17 wheel under a 1000 g load 
for 1000 cycles, ASTM D4060 

82 max 

Hardness 

Shore D hardness with 72- to 96-hour cure at 22 º C, 
ASTM D2240 

75 to 100 

Storage 

Individual  epoxy  components  shall  not  require 
mixing before use. 

When stored for up to 
12 months 

C

HAPTER 

8

:

 

T

RAFFIC 

M

ARKINGS AND 

S

IGNS

ASTM E1347 

80 % relative to magnesium oxide 
standard 

Yellow 

ASTM E1347 

55 % relative to magnesium oxide 
standard 

Viscosity 

Uncatalyzed polyester at -4º C, 
ASTM D562 

70 to 90 Krebs units 

Bleeding 

ASTM D969 

6 minimum 

Field drying 
time 

Viewed from 15 m to no-tracking 
condition 

45 minutes maximum 

Colour shall be white or yellow or as shown on the Contract plans. 

8.2.2.10 

Preformed Plastic (Tape and Symbols) Types 1 and 2 

Preformed plastic tape and symbols shall be a high durability retro-reflective pliant polymer film for 
preformed striping and markings to be used for permanent pavement markings. 

Colour shall be white or yellow or as shown on the Contract plans or as directed by the Engineer. 

It should be a durable retro-reflective marking material suitable for roadway, intersection, commercial 
or private pavement delineation and markings. The markings shall be resilient thermoplastic product 
with uniformly distributed glass beads throughout the entire cross section area. 

The markings shall be resistant to detrimental effects of motor fuels etc. The lines, legends, symbols 
are to be capable of affixing to bituminous or cement concrete pavements. 

The manufacturer shall be ISO 9001 certified or equivalent as approved by the Owner and provide 
proof of current certification. 

Preformed plastic tape and symbols material is identified by the following designations: 

a. 

Type 1: On bituminous surfaces, Type 1 preformed pavement marking tape and symbols shall
be capable of being installed onto wearing surfaces during the final roller operation. Application 
on  concrete  surfaces  shall  be  in  accordance  with  the  manufacturer’s  application 
recommendations. After application, the tape shall be immediately ready to receive traffic.  

Tape and symbols shall consist of a mixture of polymeric material, pigments and glass beads 
distributed throughout the cross-sectional area, with a reflective layer of glass beads embedded 
in  the  top  surface.  Material  shall  be  sufficiently  flexible  to  conform  to  the  roadway  without 
cracking  or  breaking.  A  patterned  surface  will  be  allowable;  however  the  tape  and  symbols, 
without adhesive, shall have a minimum thickness of 1.5 mm over at least 50 % 

of the tape’s 

surface. The edges of the tape/symbols shall not be tapered.  

Tape/symbols  shall  be  supplied  with  a  pre-coated  factory-applied  adhesive  for  immediate 
application  to  bituminous  pavement  without  the  use  of  heat,  solvent  or  other  adhesive 
operations. Tape/symbols and adhesive shall be of a type that water used on the compaction 
roller will not be detrimental to successful application. On concrete surfaces, application shall 
be in accordance with the manufacturer’s recommendations. 

b. 

Type  2:  Type  2  preformed  pavement  marking  tape/symbols  shall  consist  of  a  mixture  of
polymeric material and pigments with beads distributed throughout the cross-sectional area and 
with  a  reflective  layer  of  ceramic  beads  embedded  in  the  embossed,  patterned  surface. 

C

HAPTER 

8

:

 

T

RAFFIC 

M

ARKINGS AND 

S

IGNS

2.  Yellow 

– 175 mill candelas/metre

2

/lux

a.  Composition

Preformed plastic pavement marking material shall consist of the following components: 

Table 8-10: Composition of preformed plastic materials types 1 and 2 

Material 

Minimum percent by weight/quantity 

Resins and plasticizers 

20 

Pigments (as per EN 1790)-white and Yellow 

30 

Reflective glass beads (premix) 

30 

Other fillers 

30 (maximum) 

Surface beads (factory applied) 

300g/m

2

 

The material shall be supplied at thickness of 2.8 (-0.3+0.4) mm. The material shall be resistant to 
deterioration due to exposure to sunlight, water, salt or any adverse weather conditions and resistant 
to oil and gasoline. 

b.  Packing

The  preformed  thermoplastic  material  shall  be  placed  in  protective  cardboard  boxes  and  shall 
contain no plastic in between the sheets/layers. Liner materials shall be cut into a maximum of 100cm 
long pieces. Legends and symbols also supplied in flat pieces. The cartons size shall not exceed 
110x70cm and the weight of the individual carton must not exceed 20 kg. 

c.  Material Sampling and Testing for Acceptance

Preformed plastic marking materials Type 1 and 2 shall meet the requirements of Table 

8-11

Table 8-11 Preformed plastic tape testing and acceptance criteria 

Test 

Procedure 

Criteria for Acceptance 

Bend test 

Temperature: 25° C to 28° C 

Specimen: 75 mm by 150 mm unmounted piece of 
material (without adhesive and paper backing) 

Bend specimen over a 25 mm mandrel until the end 
faces are parallel and 25 mm apart.  

 

No visible fracture lines in the 
uppermost surface. 

C

HAPTER 

8

:

 

T

RAFFIC 

M

ARKINGS AND 

S

IGNS

Elongation no greater than 75 
%.  

Abrasion 
resistance 
test 

Abrade  the  plastic  film  according  to  Federal  Test 
Method Standard No. 141, 

 

Method 6192, using H-

18  calibrase  wheels  with  a  1000  g  load  on  each 
wheel. 

Maximum  loss  in  weight  of 
0.25 g in 500 revolutions 

8.2.2.11 

Acrylic Paint 

A quick drying paint based on acrylic or modified acrylic resin especially formulated for application 
in the harsh UAE environment with high durability and excellent adhesion to concrete. The acrylic 
paint  shall  be  a  non-yellowing,  UV-resistant  material  with  excellent  gloss  and  colour  retention 
properties. The minimum requirements for paint are given below: 

 

Solids by volume: 

minimum 37%

 

Specific gravity: 

minimum 1.2

 

Highly UV resistant against fading and peeling.

8.2.2.12 

Glass Beads 

This  specification  covers  glass  beads  to  be  dropped  or  sprayed  upon  pavement  markings,  or 
intermixed  with  pavement  marking  material,  so  as  to  produce  a  reflectorized  pavement  marking. 
Glass beads shall be transparent, clean, colourless glass, smooth and spherically shaped, free from 
milkiness, pits, or excessive air bubbles. Glass beads shall be dry and free of lumps and clusters. 
Glass beads that show a tendency toward decomposition, including surface etching, when exposed 
to atmospheric conditions, moisture, dilute acids or alkalis will be rejected.  

Glass beads shall conform to AASHTO M 247 or any equivalent standard approved by the Owner. 

Pre-mix glass beads: The thermoplastic material shall contain thirty percent (30%) glass beads by 
weight. The premix shall conform to the above standard or equivalent as approved by the Owner. 

Drop-on glass beads: The drop on glass beads shall be within the range of 400 to 500 g/m

2

. It is 

recommended  that  adding  a  minimum  of  10%  high  performance  glass  beads  by  weight  to  the 
traditional  glass  beads  to  produce  good  performance  on  the  retro-reflectivity.  The  Coefficient  of 
Retroreflected Luminance (RL) of newly applied road marking should be >250 mcd/m2/lux.

a.  Packaging and Marking

Glass beads shall be packaged in moisture-proofed bags guaranteed to furnish dry and undamaged 
beads. 

b.  Sampling and Testing

Acceptance shall be evaluated per the test methods and criteria for acceptance identified in AASHTO 
M247

 

or any other equivalent standard approved by the Owner for the following parameters:  

1.  Gradation

2.  Roundness

3.  Refractive index

4.  Coatings: flotation, flow, moisture resistance and adherence

C

HAPTER 

8

:

 

T

RAFFIC 

M

ARKINGS AND 

S

IGNS

Type 2 

0.850 

100 

--- 

0.600 

75 

– 95 

100 

0.425 

--- 

90 - 100 

0.300 

15 

– 35 

50 - 75 

0.180 

--- 

0 - 5 

0.150 

0

–5 

--- 

Table 8-13 Gradation of glass beads 

Sieve Designation 

Mass % Passing 

mm 

Type 4 

Type 5 

2.35 

100 

2.00 

100 

95-100

1.70 

95-100

80-95

1.40 

80-95

10-40

1.18 

10-40

0-5

1.0 

0-5

0-2

0.850 

0-2

8.2.3 

Construction Requirements  

8.2.3.1 

Preparation of Roadway Surfaces 

New and existing pavement shall be dry, clean, and free of contaminants such as surface oils or 
curing agents or any material which will be detrimental to the bond between the  marking and the 
surface. Clean pavement is essential for a good bond to pavement marking material.  

Contaminants and existing pavement markings shall be removed from surfaces where the pavement 
marking is to be applied by approved mechanical means: watering, brooming or compressed air if 
required.  Contractor shall avoid damaging the pavement surface.  

Contaminants up to 1.6 mm

2

 may remain if they are not removed by the following test, performed 

just before application of markings:  

1.  Air-blast the surface to be tested

2.  Firmly  press  a  250 mm,  50  mm  wide  strip  of  monofilament tape  onto the  surface,  leaving

approximately 50 mm free 

C

HAPTER 

8

:

 

T

RAFFIC 

M

ARKINGS AND 

S

IGNS

Positions and outlines of special markings shall be produced on the finished road in chalk. Approved 
templates may be used on condition that the positioning of the marking is approved by the Engineer 
before painting is commenced. 

Any additional work necessary to establish satisfactory lines for stripes and all layout work required 
for pavement markings shall be performed by the Contractor at the Contractor

’s expense. Material 

used for spotting shall be the same colour as the permanent marking.

Preliminary spotting for lines shall be established with painted marks, cat tracks or dribble lines, the 
use of laser guidance devices or by a combination of these techniques. Preliminary spotting shall be 
provided at a spacing of 60 m maximum on tangents and 15 m maximum on curves.  

Cat tracking shall consist of stretching a rope on a straight line between control points on tangent 
alignment and on a true arc through control points on curved alignment and placing spots of paint 
along the rope. The spots shall be not more than 50 mm in width and not more than 1.5 m apart on 
curves nor more than 3 m apart on tangents. 

Dribble lines shall consist of marking the pavement with a thin line of paint using a striping machine 
or other suitable device. Dribble lines shall be on a straight line between control points on tangent 
alignment and on a true arc through control points on curved alignment. 

Laser  guidance equipment  shall be capable of maintaining the alignment of traffic stripes with an 
accuracy equivalent to, or better than, that obtainable through use of cat tracking or dribble lines, as 
determined by the Engineer. 

8.2.3.3 

Marking Application 

Pavement  markings  shall  be  installed  as  shown  on  the  Contract  plans  and  as  approved  by  the 
Engineer.  

Rate  of  application  shall  be  checked  and  adjusted  until  pavement  marking  dimensions  are  within 
tolerances as stated in these Specifications before application on a large scale is commenced.  

Double lines shall be applied simultaneously by the same machine. 

Centre  lines  on  two-lane  highways  with  broken  line  patterns  shall  be  applied  in  the  increasing 
kilometer post or stationing direction to be in cycle with existing broken line patterns at the beginning 
of the project. Broken line patterns applied to multi-lane or divided roadways shall be applied in cycle 
in the direction of travel.  

When 2 or more spray applications are required to meet thickness requirements, top dressing with 
glass beads is only allowed on the last application. Successive applications shall be applied squarely 
on top of the preceding application and in the opposite direction as the first application direction.  

C

HAPTER 

8

:

 

T

RAFFIC 

M

ARKINGS AND 

S

IGNS

Tips 

Debonding 

Unclean road surface

  Low temperatures

  Moisture in pavement

  Defective material

  Marking speed too fast

Bubbles in line 

Moisture in pavement

  Overheated material

Flowing  Line  (i.e.,  no  defined 
edge), line with excessive edges 

  Material too hot

Cracks in line 

Temperature stress from overheating

  Low temperatures

  Material applied too thin

Rough  line  surface  or  crumbly 
edges 

  Material temperature too low

  Material has been scorched

  Moisture in pavement

Smooth shiny, glossy line 

No or insufficient glass beads or beads too deeply
embedded

Smooth line with slight dimples 

  Glass beads too low 

  Bead gun too close to application shoe

Cratered line 

Glass beads have popped out

  Material is too cool or bead gun located too far back

Greenish yellow appearance 

Material has been scorched

  Material reheated too many times or inadequate

cleaning of application pots 

Splattering 

Material too hot or too cold

Dingy or dull white colour 

Material has been scorched

  Material reheated too many times or inadequate

cleaning of application pots 

  Yellow thermoplastic not completely removed before

white was added to the application pots 

Lumps in line 

Material is either overheated or under heated

C

HAPTER 

8

:

 

T

RAFFIC 

M

ARKINGS AND 

S

IGNS

Equipment  utilized  shall  form  an  extruded  line  which  shall  be  uniform  in  shape  having  clear  and 
sharp dimensions.  

Pavement marking traffic control shall be done in accordance with the applicable provisions of the 
MUTCD  for  work  zone  traffic  safety  management.  In  addition,  pavement  marking  machines  shall 
have  clearly  visible  amber  warning  flashing  lights  which  shall  always  be  in  operation  when  the 
machine is on the road. 

b.  Marking of Kerbs, Noses, and Kerb Cuts

Kerbs, noses, and kerb cuts shall be painted as indicated on the Contract plans as per the nature of 
the parking zone as follows: 

i.  Alternating colours of turquoise and gray shall be used to indicate a Mawaqif pay parking

zone. 

ii.  Alternating colours of turquoise and white shall be used to indicate a premium Mawaqif pay

parking zone, typically next to a major building entrance. 

iii.  Either unpainted kerbs or gray kerbs may be used within zones indicating that parking is

allowed. 

iv.  Solid yellow shall be used to indicate a loading zone.

v.  Alternating colours of gray and yellow shall be used to indicate a no parking zone as well as

the edges of kerbs and channelization islands. Yellow shall be provided on the nose of any 
channelization island, including barriers that protect the front of the island and any signal 
poles or other devices located behind the nose of the island. 

vi.  Solid red shall be used to indicate the presence of fire hydrants along roads.

Length  of  each  band  shall  be  1.20  m  (or  two  precast  kerb  stones)  and  shall  be  painted  on  the 
exposed kerb surfaces after kerb and pavement are in place or as approved by the Engineer.  

Areas adjacent to fire hydrants shall be painted solid with red non-reflectorized paint. 

Kerb marking may be accomplished by applying non-reflectorized epoxy or alkyd resin paint with a 
roller, brush or spray.  

c.  Application of Glass Beads

Where reflective pavement markings are required, glass beads shall be applied at a uniform rate, in 
one continuous operation, by a bead dispenser immediately following the pavement marking material 

C

HAPTER 

8

:

 

T

RAFFIC 

M

ARKINGS AND 

S

IGNS

Time between applications will vary depending on the type of pavement per the following table. The 
manufacturer’s recommendations shall be applied as approved by the Engineer.  

Table 8-15: Alkyd resin time between successive applications 

Pavement Type

 

Time Period

 

Bituminous surface treatment 

40 min. min., 

48 hrs. max. 

Hot mix asphalt pavement 

40 min. min., 

30-days max.

Cement concrete pavement 

40 min. min., 

30-days max.

Alkyd resin paint for road markings shall not be thinned. 

For kerb marking, thinning with manufacturer recommended product shall be allowed up to 3 % or 
the manufacturer’s recommended minimum, whichever is lesser. 

C

HAPTER 

8

:

 

T

RAFFIC 

M

ARKINGS AND 

S

IGNS

2.  Equipment

The Contractor shall meet the general requirements of Sub-article (a)  of Article 8.2.3.3. In 
addition: 

1.  Motorized airless striping machine shall be used for road marking applications.

2.  For  nonlinear  applications  and  kerb  marking,  material  may  be  brushed  or  rolled  onto

concrete surface. 

3.  Application Thickness

For  reflectorized  markings,  glass  beads  shall  be  applied  immediately  after  the  pavement 
mark

ing material has been applied and as per the approved manufacturer’s recommendation 

including the thickness. 

Table 8-16: Minimum thickness, application rates for alkyd resin and glass beads 

Minimum Thickness 

Application Rate 

Alkyd resin 

– first coat 

0.25 mm 

4.0 m

2

 per liter max. 

Alkyd resin 

– second coat 

0.38 mm 

2.6 m

2

 per liter max. 

Type 1 glass beads 

0.38 mm 

0.85 kg/litre of paint min. 

f.  Application of Thermoplastic

Thermoplastic material shall be applied by spraying, screed extrusion, or ribbon extrusion, as shown 
in the Contract plans or as directed by the Engineer, at temperatures of 211 ±7º C from approved 
equipment to produce a continuous and uniform in shape line having clear and sharp dimensions, 
particularly when extruded.  

Contractor 

shall utilize the material manufacturer’s recommended procedure for the application. A 

manufacturer’s technical representative shall be present at the initial installation of plastic material 
to supervise the installation procedure, if required by the Engineer. 

1.  Preparation of Roadway Surface

The contractor shall meet the general requirements of Article 8.2.3.1. In addition: 

i.  Pavement surface temperature shall not exceed 82

o

 C. Requirement may be superseded

by 

manufacturer’s written installation instructions. 

ii.  Pavement  shall  be  free  from  existing  pavement  marking  materials.  The  Contractor  shall

conform to the requirements of Article 8.2.3.7 for removal methods. 

iii.  Thermoplastic  test  for  pavement  dryness:  place  a  sample  of  thermoplastic  pavement

marking material on a piece of tarpaper placed on the pavement. Allow material to cool to 
ambient temperature. Pavement is dry if there is no condensation on the underside of the 
tarpaper in contact with the pavement. 

C

HAPTER 

8

:

 

T

RAFFIC 

M

ARKINGS AND 

S

IGNS

iii.  Hand applicator equipment shall be sufficiently maneuverable to install curves and straight

lines, both longitudinally and transversely. 

iv.  Application  equipment  shall  be  so  constructed  as  to  assure  continuous  uniformity  in  the

dimensions of the stripe. The applicator shall provide a means for cleanly cutting off square 
stripe ends and shall provide a method of applying skip lines.  

v.  Equipment shall be constructed so as to provide varying widths of traffic markings.

vi.  Application equipment shall be capable of following straight lines and normal curves in a

true arc. 

vii.  Bead dispenser shall utilize pressure type spray guns which will embed the beads into the

stripe surface to at least 1/2 the bead diameter. Bead dispenser shall be equipped with an 
automatic cut-off synchronized with the cut-off of the thermoplastic material. 

viii.  Equipment  used  to  install  hot  applied  thermoplastic  material  shall  be  provide  continuous

uniform heating to temperatures exceeding 204° C while mixing and agitating the material. 
Conveying  portion  of  the  equipment,  between  the  main  material  reservoir  and  the  line 
dispensing device, shall be configured to prevent accumulation and clogging.  

ix.  All parts of the equipment which will come in contact with the material shall be constructed

for  easy  accessibility  for  cleaning  and  maintenance.  Equipment  shall  operate  so  that  all 
mixing and conveying parts including the line dispensing device, maintain the material at 
211 ±7º C. Use of pans, aprons or similar appliances which the dispenser overruns will not 
be permitted.  

x.  A  special  kettle  shall  be  provided  for  uniformly  melting  and  heating  the  thermoplastic

material.  The  kettle  must  be  equipped  with  an  automatic  thermostat  control  device  and 
material  thermometer  for  positive  temperature  control  to  prevent  overheating  or  under 
heating of the material.  

xi.  If  screed  or  extrusion  application  or  thermoplastic  is  allowed  by  the  Engineer  for  short

applications, the screed/extrusion application method shall be utilized wherein one side of 
the  shaping  die  is  the  pavement  and  the  other  three  sides  are  contained  by  equipment 
suitable for heating or controlling the flow of material.  

3.  Application

Primer  

Use the thermoplastic 

manufacturer’s recommended primer on: 

1.  Portland cement concrete pavement

2.  Asphalt  surfaces  that  are  more  than  two  years  old,  oxidized  and/or  have  aggregate

exposed 

Primer shall be applied to all pavement surfaces at manufacturer’s recommended application 
rates.  It  must  set  for  the  specified  cure  or  evaporation  time  prior  to  thermoplastic  being 
applied.  

C

HAPTER 

8

:

 

T

RAFFIC 

M

ARKINGS AND 

S

IGNS

C. Material temperature shall be measured at the point of road contact. Material 

temperature for application on Portland cement concrete shall not be less than 218 

0

C. 

The top surface of the material shall have regularly spaced heat indicators to ensure that the 
material has reached the molten state and to the required criteria for application. 

Glass Beads 

Drop-on  glass  beads  must  be  immediately  mechanically  deposited  after  applying  the 
thermoplastic line. If the glass beads are not adhering to the thermoplastic line, all operations 
shall immediately be suspended until the problem can be corrected. Drop-on beads anchor 
and reflect best at 50-60 % embedment and this depth of embedment should generally be 
achieved (confirmed by visual inspection), unless otherwise approved by the Engineer or the 
Owner. 

Types and Thickness 

Thermoplastic marking types are defined by application procedures as shown in Table 8-17 
and/or 

as recommended by the manufacturer’s specification and approved by the Owner. 

Pavement markings shall be installed at the following base line thicknesses measured above 
the pavement surface or above the groove bottom for grooved markings

:  

Table 8-17: Minimum thickness for thermoplastic pavement markings 

Type 

Use 

Method 

Minimum base line thickness (mm) 

On HMA/ PCC 

(mm) 

On BST (mm) 

T1 or T2 

Flat/transverse & 
symbols 

Extruded 

3.2 

3.2 

T1 or T2 

Flat/long line & 
symbols 

Spray 

2.3 

3.0 

T1 or T2 

With profiles 

Extruded 

2.3 

3.0 

T1 or T2 

Embossed 

Extruded 

4.1 

4.1 

T1 or T2 

Embossed with 
profiles 

Extruded 

4.1 

4.1 

C

HAPTER 

8

:

 

T

RAFFIC 

M

ARKINGS AND 

S

IGNS

 

 

 

 

 

 

 