Abu Dhabi, United Arab Emirates. STANDARD CONSTRUCTION SPECIFICATIONS (PART 1 - ROADS, Second Edition 2020) - page 22

 

 

 

 

 

3  PAVEMENT 

This  work  shall  consist  of  furnishing,  placing,  spreading,  and  compacting  pavements  for  new 
construction and rehabilitation works including asphaltic and Portland cement types in accordance 
with these specifications and conforming to the lines, grades, and dimensions shown in the Contract 
documents.  

3.1  Reference Standards and Codes 

Standards and codes shall be as specified in these specifications, in the Contract documents, if any, 
and the following, in their latest edition: 

AASHTO 

Standard Specifications for Transportation Materials and Methods of Sampling 
and Testing; 

ASTM 

American Society for Testing and Materials; 

BSI 

British Standards Institution; 

BS EN 

European Standards; 

AIM 

Asphalt Institute Manual; 

AI MS-2 

Mix Design Methods for Asphalt Concrete and Other Hot Mixes; 

ITE 

Institute of Traffic Engineers; 

ITE 

Equipment and Material Standards of the Institute of Transportation Engineers, 

 

2001. 

Table  3-1  and  Table  3-2  presents  American  Association  of  State  Highway  and  Transportation 
Officials (AASHTO), American Society for Testing and Materials (ASTM), British (BS), and European 
(BS EN) Standards that are related to materials for pavement works. It also includes designations 
and titles. 

Table 3-1: Designations and titles for AASHTO and ASTM standards that apply to pavement 

works 

AASHTO 

DESIGNATION

 

ASTM DESIGNATION

 

TITLE

 

AASHTO T96 

 

Standard method of test for resistance to 
degradation of small-size coarse aggregate by 
abrasion and impact in the 

L

os 

A

ngeles machine.  

 

ASTM D75 / 75M - 09 

Standard practice for sampling aggregates.   

 

ASTM C131 - 06 

Standard test method for resistance to 
degradation of small-size coarse aggregate

 by 

abrasion and impact in the L

os Angeles machine. 

 

ASTM C535 

– 12 

Standard test method for resistance to 
degradation of large-size coarse aggregate by 
abrasion and impact in the los Angeles machine.  

 

ASTM C88-05 

Standard test method for soundness of 
aggregates by use of sodium sulfate or 
magnesium sulfate.  

 

ASTM D2419 - 09 

Standard test method for sand equivalent value of 
soils and fine aggregate.  

 

 

 

AASHTO 

DESIGNATION

 

ASTM DESIGNATION

 

TITLE

 

 

ASTM D4318-10 

Standard test methods for liquid limit, plastic limit, 
and plasticity index of soils.  

 

ASTM D1883-07e2  

Standard test method for CBR (California bearing 
ratio) of laboratory-compacted soils. 

 

ASTM C128-12 

Standard test method for density, relative density 
(specific gravity), and absorption of fine 
aggregate. 

 

ASTM C127-12 

Standard test method for density, relative density 
(specific gravity), and absorption of coarse 
aggregate. 

 

ASTM D1559-89 

Test method for resistance of plastic flow of 
bituminous mixtures using Marshall apparatus 
(withdrawn 1998). 

 

ASTM C25 - 11 

Standard test methods for chemical analysis of 
limestone, quicklime, and hydrated lime. 

 

ASTM C50 / C50M - 12 

Standard practice for sampling, sample 
preparation, packaging, and marking of lime and 
limestone products.  

 

ASTM C51 - 11 

Standard terminology relating to lime and 
limestone (as used by the industry). 

 

ASTM D244 -09 

Standard test methods and practices for 
emulsified asphalts.  

 

ASTM D1075-11 

Standard test method for effect of water on 
compressive strength of compacted bituminous 
mixtures.  

 

ASTM D2172 / D2172M 

- 11 

Standard test methods for quantitative extraction 
of bitumen from bituminous paving mixtures.  

AASHTO M 208 

ASTM D2397 

Standard Specification for Cationic Emulsified 
Asphalt 

 

ASTM D6307 - 10 

Standard Test Method for Asphalt Content of Hot-
Mix Asphalt by Ignition Method.  

 

ASTM D3387 - 11 

Standard test method for compaction and shear 
properties of bituminous mixtures by means of the 
U.S. Corps of Engineers gyratory testing machine 
(GTM).  

 

ASTM D3142 /  D3142M 

- 11 

Standard test method for specific gravity, API 
gravity or density of cutback asphalts by 
hydrometer method.  

 

ASTM D6927 - 06 

Standard Test Method for Marshall Stability and 
Flow of Bituminous Mixtures.  

 

ASTM D6926 - 10 

Standard Practice for Preparation of Bituminous 
Specimens Using Marshall Apparatus.  

 

 

 

AASHTO 

DESIGNATION

 

ASTM DESIGNATION

 

TITLE

 

 

ASTM D5821 

– 01 

(2006) 

Standard Test Method for Determining the 
Percentage of Fractured Particles in Coarse 
Aggregate.  

 

ASTM D4791 - 10 

Standard Test Method for Flat Particles, 
Elongated Particles, or Flat and Elongated 
Particles in Coarse Aggregate. 

 

ASTM D3042 - 09 

Standard Test Method for Insoluble Residue in 
Carbonate Aggregates.  

 

ASTM C1077 - 13 

Standard Practice for Agencies Testing Concrete 
and Concrete Aggregates for Use in Construction 
and Criteria for Testing Agency Evaluation.  

 

ASTM C295 /  C295M - 

12 

Standard Guide for Petrographic Examination of 
Aggregates for Concrete.  

 

ASTM C33 / C33M - 11a 

Standard Specification for Concrete Aggregates.  

 

ASTM C186 - 05 

Standard Test Method for Heat of Hydration of 
Hydraulic Cement.  

 

ASTM C114 - 11b 

Standard Test Methods for Chemical Analysis of 
Hydraulic Cement. 

 

ASTM C1240 - 12 

Standard Specification for Silica Fume Used in 
Cementitious Mixtures.  

 

ASTM D1751 

– 04 

(2008) 

Standard Specification for Preformed Expansion 
Joint Filler for Concrete Paving and Structural 
Construction (Nonextruding and Resilient 
Bituminous Types). 

 

ASTM C494 / C494M - 

11 

Standard Specification for Chemical Admixtures 
for Concrete.  

 

ASTM C881 / C881M - 

10 

Standard Specification for Epoxy Resin Base 
Bonding Systems for Concrete. 

 

ASTM C1260 - 07 

Standard Test Method for Potential Alkali 
Reactivity of Aggregates (Mortar Bar Method).  

 

ASTM C136 - 06 

Standard Test Method for Sieve Analysis of Fine 
and Coarse Aggregates.  

AASHTO T 176-

08 

 

Plastic Fines in Graded Aggregates and Soils by 
Use of the Sand Equivalent Test. 

AASHTO T2 

 

Standard method of test for sampling of 
aggregates.  

AASHTO M 145 

 

Standard specification for classification of soils 
and soil-aggregate mixtures for highway 
construction purposes.  

AASHTO T 104  

 

Standard method of test for soundness of 
aggregate by use of sodium sulfate or magnesium 
sulfate. 

 

 

 

AASHTO 

DESIGNATION

 

ASTM DESIGNATION

 

TITLE

 

AASHTO T 89-

10  

 

Determining the Liquid Limit of Soils 

AASHTO T 90 

 

Standard Method of Test for Determining the 
Plastic Limit and Plasticity Index of Soils.  

AASHTO T 100  

 

Standard Method of Test for Specific Gravity of 
Soils.  

AASHTO T 85 

 

Standard Method of Test for Specific Gravity and 
Absorption of Coarse Aggregate. 

AASHTO T 180  

 

Standard Method of Test for Moisture-Density 
Relations of Soils Using a 4.54-kg (10-lb) Rammer 
and a 457-mm (18-in.) Drop.  

AASHTO T 193  

 

 Standard Method of Test for The California 
Bearing Ratio.  

AASHTO. T 96-

02 

 

Resistance to Degradation of Small-Size Coarse 
Aggregate by Abrasion and Impact in the Los 
Angeles Machine.  

AASHTO T112-

00 (2008) 

ASTM C142-97 

Standard method of test for clay lumps and friable 
particles in aggregate.  

AASHTO T 191 

 

Standard Method of Test for Density of Soil In-
Place by the Sand-Cone Method.  

AASHTO T 11 

 

Standard Method of Test for Materials Finer Than 
75-µm (No. 200) Sieve in Mineral Aggregates by 
Washing.  

AASHTO T 27-

06 

 

Sieve Analysis of Fine and Coarse Aggregates.  

AASHTO M 85 

 

Standard specification for Portland cement.  

AASHTO T 22-

10 

 

Compressive Strength of Cylindrical Concrete 
Specimens.  

AASHTO T 205  

 

Standard Method of Test for Density of Soil In-
Place by the Rubber-Balloon Method.  

AASHTO T 165  

 

Standard method of test for effect of water on 
compressive strength of compacted bituminous 
mixtures.  

AASHTO M 17 

ASTM D242 

Standard specification for mineral filler for 
bituminous paving.  

AASHTO M 20 

 

Standard specification for penetration-graded 
asphalt cement. 

AASHTO M 33- 

99 

 

Preformed Expansion Joint Filler for Concrete 
(Bituminous Type).  

AASHTO M 82 

 

Standard specification for cutback asphalt 
(medium-curing type).  

AASHTO M 140  

 

Standard specification for emulsified asphalt.  

 

 

 

AASHTO 

DESIGNATION

 

ASTM DESIGNATION

 

TITLE

 

AASHTO M 208 

 

Standard specification for cationic emulsified 
asphalt.  

AASHTO M 226 

 

Standard specification for viscosity-graded asphalt 
cement.  

AASHTO M 320 

 

Standard specification for performance-graded 
asphalt binder.  

AASHTO M 323 

 

Standard specification for superpave volumetric 
mix design.  

AASHTO MP2 

 

Standard specification for superpave volumetric 
mix design.  

AASHTO MP 19 

 

Standard Specification for performance-graded 
asphalt binder using multiple stress creep recover 
(MSCR) test.  

AASHTO R 12 

 

Standard Specifications for bituminous mixture 
design using the Marshall and 

H

veem procedures.  

AASHTO R 35 

 

Standard practice for superpave volumetric design 
for hot mix asphalt (HMA).  

AASHTO PP 28  

 

Standard specification for superpave volumetric 
design for hot mix asphalt (HMA).  

AASHTO T 2 

 

Standard Method of Test for Sampling of 
Aggregates.  

AASHTO T 11-

05 

 

Materials Finer Than 75-

μm (No. 200) Sieve in 

Mineral Aggregates by Washing.  

AASHTO T 30 

 

Standard specification for mechanical analysis of 
extracted aggregate.  

AASHTO T 96-

02 

 

Resistance to Degradation of Small-Size Coarse 
Aggregate by Abrasion and Impact in the Los 
Angeles Machine.  

AASHTO T 99 

 

Standard Method of Test for Moisture-Density 
Relations of Soils Using a 2.5-kg (5.5-lb) Rammer 
and a 305-mm (12-in.) Drop. 

AASHTO T 104- 

99 

 

Soundness of Aggregate by Use of Sodium 
Sulfate or Magnesium Sulfate.  

AASHTO T 164 

 

Standard method of test for quantitative extraction 
of asphalt binder from hot mix asphalt (HMA).  

AASHTO T 168 

 

Standard method of test for sampling bituminous 
paving mixtures.  

AASHTO T 219 

 

Standard method of test for testing lime for 
chemical constituents and particle sizes.  

AASHTO T 230 

 

Standard method for determining the degree of 
pavement compaction of a bituminous-aggregate 
mixture.  

 

 

 

AASHTO 

DESIGNATION

 

ASTM DESIGNATION

 

TITLE

 

AASHTO T 245 

 

Standard method of test for resistance to plastic 
flow of bituminous mixtures using Marshall 
apparatus.  

AASHTO T 308 

 

Standard method of test for determi

ni

ng the 

asphalt binder content of hot-mix asphalt (HMA) 
by the ignition method.  

AASHTO T 304-

11  

 

Standard Method of Test for Uncompacted Void 
Content of Fine Aggregate.  

AASHTO M 303 

 

Standard Specification for Lime for Asphalt 
Mixtures.  

AASHTO R 14-

88 (2007) 

ASTM D4552-92 (2004) 

Standard Recommended Practice for Classifying 
Hot-Mix Recycling Agents.  

AASHTO TP 61  

 

Standard Method of Test for Determining the 
Percentage of Fracture in Coarse Aggregate. 

AASHTO T 85-

10 

 

Specific Gravity and Absorption of Coarse 
Aggregate.  

AASHTO T 84-

10 

ASTM C 128-07a) 

Standard Method of Test for Specific Gravity and 
Absorption of Fine Aggregate.  

 

ASTM C150 / C150M - 

11 

Standard Specification for Portland Cement.  

AASHTO M 140 

 

Standard Specification for Emulsified Asphalt.  

AASHTO T 

19M/T 19-00 

(2004) 

 

Standard Method of Test for Bulk Density ("Unit 
Weight") and Voids in Aggregate.  

AASHTO T 182 

 

Standard Method of Test for Coating and Stripping 
of Bitumen-Aggregate Mixtures.  

AASHTO T 210-

10 

 

Aggregate Durability Index.  

AASHTO T 112 

 

Standard Method of Test for Clay Lumps and 
Friable Particles in Aggregate.  

AASHTO M 

195-06 

 

Lightweight Aggregates for Structural Concrete.  

AASHTO T 27 

 

Sieve Analysis of Fine and Coarse Aggregate.  

AASHTO T 89 

 

Standard Method of Test for Determining the 
Liquid Limit of Soils.  

AASHTO M 43-

05 

 

Sizes of Aggregate for Road and Bridge 
Construction.  

AASHTO M 254 

 

Standard Specification for Corrosion-Resistant 
Coated Dowel Bars.  

AASHTO M 

284M/M 284-09 

 

Epoxy-Coated Reinforcing Bars: Materials and 
Coating Requirements. 

 

 

 

AASHTO 

DESIGNATION

 

ASTM DESIGNATION

 

TITLE

 

AASHTO T 97 

 

Standard Method of Test for Flexural Strength of 
Concrete (Using Simple Beam with Third-Point 
Loading).  

AASHTO PP 50 

 

Standard Practice for Operating Inertial Profilers 
and Evaluating Pavement Profiles.  

AASHTO PP 51 

 

Standard Practice for Pavement Ride Quality 
When Measured Using Inertial Profiling Systems.  

AASHTO PP 52 

 

Standard Practice for Developing a Quality 
Assurance Plan for Hot-Mix Asphalt (HMA).  

 

ASTM C618 - 08a 

Standard Specification for Coal Fly Ash and Raw 
or Calcined Natural Pozzolan for Use in Concrete.  

 

ASTM A615 / A615M - 

09b 

Standard Specification for Deformed and Plain 
Carbon Steel Bars for Concrete Reinforcement.  

ASHTO M 

31M/M 31 - 10 

 

Deformed and Plain Carbon-Steel Bars for 
Concrete Reinforcement.  

AASHTO M 

42M/M42 

ASTM A996 / A996M - 

09b 

Standard Specification for Rail-Steel and Axle-
Steel Deformed Bars for Concrete Reinforcement 

Table 3-2: Designations and titles for BS and BS EN standards that apply to pavement 

works 

BS 

Designation 

BS EN 

Designation 

Title 

BS 1377-

2:1990 

 

Methods of test for soils for civil engineering purposes. 
Classification tests. 

BS 1377-

3:1990 

 

Methods of test for soils for civil engineering purposes. 
Chemical and electro-chemical tests. 

BS 812-

110:1990 

 

Testing aggregates. Methods for determination of 
aggregate crushing value (ACV). 

BS 812-105-

105.1:1985 

 

Testing aggregates. Methods for determination of 
particle shape. Flakiness index. 

BS 1377-4: 

1990 

 

Methods of test for soils for civil engineering purposes. 
Compaction-related tests. 

BS 1377-

9:1990 

 

Methods for test for soils for civil engineering 
purposes. In-situ test.  

 

BS EN 1744-1+A1 

Tests for chemical properties of aggregates. Chemical 
analysis. 

BS 812-

117:1988 

 

Testing aggregates. Method for determination of 
water-soluble chloride salts.  

 

BS EN -

12620:2002+A1:2008 

Aggregates for concrete. 

 

 

 

3.2  Subbase and Bases  

3.2.1 Granular Subbase Course 

3.2.1.1 Description 

Granular  subbase  shall  consist  of  furnishing,  spreading,  and  compacting  subbase  in  accordance 
with the details shown on Contract plans and these specifications or as established by the Engineer. 

3.2.1.2  Materials 

Granular subbase material shall consist of hard, durable natural, screened gravel or crushed stone, 
and shall be free from clay balls or other deleterious substances. Granular subbase type I shall be 
used under footpath and type II under roads.  Granular subbase shall be well graded and lie within 
the grading envelope shown in Table 3-3 when tested in accordance with 

AASHTO T27 

Table 3-3: Granular subbase gradation 

Sieve size 

Percentage passing 

 

Type I (Under Footpath) 

Type II (Under Roads) 

50 mm 

100 

100 

37.5 mm 

85 

– 100 

85-100 

25.4 mm 

72 

– 96 

70-90 

19.0 mm 

62 

– 92 

62-82 

9.5 mm 

40 - 82 

40-70 

4.75 mm 

25 - 70 

25-55 

0.6 mm 

8 - 32 

8-28 

0.075 mm 

0 - 10 

0-10 

a.  Sampling and Testing 

 

One sample every 1000 m

3  

of 

Type II and One sample every 2000 m

3  

of Type I

 , or part of as 

directed by the Engineer shall be tested for grading, plasticity index, maximum dry density, CBR and 
loss by abrasion.  Three in-situ density tests shall be made every unit of granular subbase laid (one 
unit being 300 m

2

) or as directed by the Engineer.  

Materials  shall  meet  the  minimum  requirements  per  the  testing  standards  listed  in  Table  3-4. 
Materials  that  do  not  comply  with  the  requirements  of  these  specifications  will  be  rejected  and 
removed  immediately  from  the  site  unless  otherwise  instructed  by  the  Engineer.    No  rejected 
materials, the defects of which have been corrected, shall be used until approval has been given by 
the Engineer. 

Table 3-4:  Granular subbase test requirements 

Test 

Standard 

Limit 

Sampling 

AASHTO - T2 

Min. One sample 
every 1,000 m

3

 

Los Angeles Abrasion 

AASHTO-T96 

30 % max. 

Soundness (Magnesium Sulphate Solution - 5 
cycles) 

 AASHTO-T-104 

15% max. 

Liquid Limit 

AASHTO-T-89 

35 % max. 

 

 

 

Test 

Standard 

Limit 

Plasticity Index 

AASHTO-T-90  

6 max. 

Compaction Test (Dry Density / Moisture 
Content test) 

AASHTO-T-180 D  

2.00 Mg/m

3

 min 

Particle size sieve analysis of fine and coarse 
aggregate  

AASHTO T27 

Table 3-3 

C.B.R. at 98 % of Maximum dry density (96 
hour soaked) 

AASHTO-193 

45% min Type I 
60% min Type II 

Field Density 

AASHTO T191 

Avg.100% min. at 
MDD

 for Type II 

Avg.98% min. at 
MDD for Type I

 

Linear Shrinkage 

BS 1377: Part 2 Method 
6.5 

3 % max. 

Sulphate Content (Acid soluble) 

BS EN 1744-1

 

 

0.5 % max. 

Chloride Content (Acid soluble) 

AASHTO T260 

1 % max. 

Sand Equivalent 

AASHTO - T176

  

 

25% Min. for 
footpath 35% Min.  
for Roads 

Organic matter content  

AASHTO T267 

0.2% Max. 

b.  Material Sources  

Contractor shall notify the Engineer of the sources of materials for the Engineer’s approval prior to 
delivery of materials to the site.  Where the source of material does not meet specified requirements, 
the  Contractor  shall  furnish  material  from  other  sources.    Delivery  of  materials  produced  from 
commercial manufacturing processes shall be accompanied by the manufacturer's certification and 
test report showing the materials comply with the specification requirements.

 

c.  Storage and Handling of Materials 

Handling  and  stockpiling  of  aggregates  shall  at  all  times  be  such  as  to  eliminate  segregation  or 
contamination  of  the  various  sizes.    Stockpiles  shall  be  kept  flat  and  the  formation  of  high  cone-
shaped piles will not be permitted.  When conveyor belts are used for stockpiling aggregates, the 
Engineer  may  require the  use  of  baffle-chutes  or  perforated  chimneys.  When trucks  are  used  to 
construct stockpiles, the stockpiles shall be constructed one layer at a time with trucks depositing 
their loads as close to the previous load as possible.  The use of tractors or loaders to push material 
deposited  at  one  location  to  another  location  in  the  stockpile  will  not  be  allowed  during  the 
construction of the stockpile and their use shall be limited to levelling the deposited material only.   

3.2.1.3  Construction Requirements 

Pavement  subbase  material  shall  be  delivered  to  the  roadbed  as  a  uniform  mixture  and  shall  be 
spread  in  layers  or  windrows.    Segregation  shall  be  avoided  and  the  subbase  shall  be  free  from 
pockets of coarse or fine materials. 

Each  pavement  subbase  layer  shall  be  spread  by  finisher  and/or  grader  or  other  approved 
mechanical  methods,  watered,  shaped  to  a  compacted  thickness  not  exceeding  150  mm  and 
compacted to the required grade and cross section. 

 

 

 

Compaction  procedure  and  plant  shall  be  to  the  satisfaction  of  the  Engineer.    At  the  time  of 
compaction, the moisture content of the laid material shall not vary by more  than + 2 % from the 
optimum moisture content. 

Granular subbase shall be compacted to an average of 100% with no single value less than minimum 
value of 98% 

for Type II, and an average of 98% with no single value less than minimum value 

of 96% for Type I.  

Surface on completion of compaction shall be well closed, free from movement 

under compaction plant and free from ridges cracks or loose material.  Finished surfaces of the road 
subbase  shall  not  vary  at  any  point  more  than  10  mm  above  or  below  the  grade  shown  on  the 
Contract plans or established by the Engineer.  Pavement subbase shall be maintained in a condition 
satisfactory to receive any subsequent base or surfacing material.  Subbase which does not conform 
to the above requirements shall be reshaped or reworked, watered and thoroughly recompacted to 
conform to the specified requirements. 

3.2.2 Aggregate Base Course 

3.2.2.1  Description 

Aggregate base course shall consist of crushed mineral aggregates natural mineral aggregates, or 
a combination of crushed and natural mineral aggregates of the gradation and thickness specified 
in these specifications and shown on the Contract plans.  Contractor shall furnish, place and compact 
aggregate  base  course for  approach  slabs  for  paved  roadways,  service roads  and  parking  areas 
complying with the lines, grades, thicknesses and typical sections shown on the Contract plans, as 
specified herein or as directed by the Engineer. 

3.2.2.2  Materials 

Natural aggregate base course shall consist of coarse and fine mineral aggregates which have been 
screened and blended to the various gradations specified herein and constructed to the thickness 
as indicated on the Contract plans. 

Crushed aggregate base course shall consist of crushed coarse aggregate and crushed or natural 
fine  aggregate  screened  and  blended  in  accordance  with  the  gradation  specified  herein  and 
constructed to the thicknesses as indicated on the Contract plans. 

Materials for base courses shall comply with the requirements as specified herein and shall be as 
approved  by  the  Engineer.    Contractor  shall  submit  samples  of  all  materials  to  the  Engineer  for 
approval prior to furnishing and placing any materials. 

One  sample  every  1000  m

3

,  or  part  of  as  directed  by  the  Engineer  shall  be  tested  for  grading, 

plasticity index, maximum dry density, CBR and loss by abrasion.  Three in-situ density test shall be 
made  every  unit  of  aggregate  base  course  laid  (one  unit  being  300  m

3

)  or  as  directed  by  the 

Engineer. 

Material samples shall meet the minimum requirements per testing standards shown in Table 3-5.  

Materials  that  do  not  comply  with  the  requirements  of  these  specifications  will  be  rejected  and 
removed  immediately  from  the  site  unless  otherwise  instructed  by  the  Engineer.    No  rejected 
materials, the defects of which have been corrected, shall be used until approval has been given by 
the Engineer. 

Table 3-5:  Aggregate base course test requirements 

Test 

Standard 

Limits 

Sampling 

AASHTO - T2

 

 

Min. One sample 
every 1,000 m

3

 

Classification 

AASHTO - M 145 

A-1-a  

Los Angeles Abrasion 

AASHTO - T96

 

 

30 Max. 

 

 

 

Test 

Standard 

Limits 

Soundness (Sodium) 

AASHTO - T104

 

 

12% Max. 

Soundness (Magnesium) 

AASHTO - T104  

15% Max. 

Sand Equivalent 

AASHTO - T176 

40% Mini. 

Liquid Limit 

AASHTO - T89

 

  

35% Max. 

Plasticity Index 

AASHTO - T90

 

 

6.0% Max. 

Sulphate Content (Acid 
soluble) 

BS EN 1744-1 

0.50% Max. 

Chloride Content (Acid 
soluble) 

AASHTO T260 

1.0% Max. 

Flakiness Index 

BS EN 933-3 

35% Max. 

Elongation 

ASTM D4791 

35% Max. 

Specific Gravity 

AASHTO-T100

 

 & T85

 

 

2.20 Min. 

Max Dry Density 

AASHTO - T180D

 

 

2.10 gr/cc Min. 

C.B.R. at 98% of M.D.D. 

AASHTO - T193

 

 

70

% min.  

a.

  Fine Aggregates 

Fine aggregate (passing the 4.75 mm sieve) shall consist of natural sand and/or crushed sand and 
shall  be  of  such  gradation  that  when  combined  with  other  required  aggregate  fractions  in  proper 
proportions, the resultant mixture will meet the gradation specified in Sub-article c of Article 3.2.2.2. 

Fine aggregate shall be clean and free from organic matter, clay and other extraneous or detrimental 
materials. 

Portion of fine aggregates passing the 75 µm sieve shall not exceed 2/3 of the portion passing the 
425 µm sieve. 

Material passing the 425 µm sieve shall have a maximum liquid limit of 35 and the plasticity index 
shall not exceed 6. 

When the source of fine aggregates does not meet the above requirements, the  Contractor may, 
with the Engineer's approval, add additional fine aggregate and/or filler to correct the gradation or to 
change the characteristics of the material passing the 425 µm sieve so as to meet the specifications.  
Such  additional  material  shall  be  added  in  a  manner  which  ensures  a  completely  homogeneous 
gradation as approved by the Engineer. 

b.

  Coarse Aggregate 

Coarse aggregate (retained on the 4.75 mm sieve) shall consist of crushed stone, crushed gravel or 
natural  gravel  and  shall  be  of  such  gradation  that  when  combined  with  other  required  aggregate 
fractions in proper proportion, the resultant mixture will meet the gradation specified in Sub-article c 
of Article 3.2.2.2. 

When crushed aggregate is required, not less than 50 % by weight of the particles retained on the 
4.75 mm sieve shall have at least one fractured face. Flakiness Index of the crushed aggregate shall 
not exceed 35 %. 

Percentage of wear of coarse aggregate shall not exceed 30% maximum when tested for resistance 
to abrasion (AASHTO T-96). 

Course aggregate shall be hard and durable and free from organic matter, clay and other extraneous 
or detrimental materials. 

 

 

 

Coarse aggregate shall have a maximum sodium sulphate soundness loss of 12 % and magnesium 
sulphate soundness loss of 15 %. 

c.

  Aggregate Gradation   

Combined gradation including fine and coarse aggregates shall conform to the gradation of Type (A) 
or (B) or (C) in Table 3-6. 

Table 3-6:  Aggregate base course gradation 

 

Percent passing by weight 

Sieve size 

Gradation A 

Gradation B 

Gradation C 

50.8  mm 

 

100 

41.75 mm 

 

100 

75-100 

25.4  mm 

100 

70-100 

55-85 

19.05 mm 

70-100 

60-90 

50-80 

9.53 mm  

50-80 

45-75 

40-70 

4.75 mm 

35-65 

30-60 

30-60 

2.00 mm  

25-50 

20-50 

20-50 

425 µm   

15-30 

10-30 

10-30 

75 µm 

5-15 

5-15 

5-15 

Note:  

The final gradation of aggregate subcase and base course shall be subject to the following 
tolerances during construction:  

Passing 25mm sieve and larger ± 6%  
Passing sieves 4.75mm (No. 4) to 19mm (No. 3/4”) ± 5%  
Passing sieves 425μm (No. 40) to 2mm (No. 10) ± 4%  
Passing 75μm (No. 200) ± 2% 

The gradation of materials to be used in the aggregate base courses as shown in Table 3-6 indicates 
the limits within which the material could be accepted. The continuous smooth gradation of materials 
used shall be kept within the specified gradation limits and gap grading shall be avoided. Selection 
of one of the gradations shown in the table shall be as shown on the Contract plans and approved 
by the Engineer.  Unless otherwise specified, Gradation B shall be used. 

d.

  Material Sources  

Contractor shall notify the Engineer of the sou

rces of materials for the Engineer’s approval prior to 

delivery of materials to the site.  Where the source of material does not meet specified requirements, 
the  Contractor  shall  furnish  material  from  other  sources.    Delivery  of  materials  produced  from 
commercial manufacturing processes shall be accompanied by the manufacturer's certification and 
test report showing the materials comply with the specification requirements.

 

e.

  Storage and Handling of Materials 

Handling  and  stockpiling  of  aggregates  shall  at  all  times  be  such  as  to  eliminate  segregation  or 
contamination  of  the  various  sizes.    Stockpiles  shall  be  kept  flat  and  the  formation  of  high  cone-
shaped piles will not be permitted.  When conveyor belts are used for stockpiling aggregates, the 
Engineer may  require the  use  of  baffle-chutes  or  perforated  chimneys.  When trucks  are  used  to 
construct stockpiles, the stockpiles shall be constructed one layer at a time with trucks depositing 
their loads as close to the previous load as possible.  The use of tractors or loaders to push material 

 

3.2.2.3  Construction Requirements 

a.

  Equipment

1.  Spreaders:  Spreaders / pavers shall be self-propelled and shall be capable of spreading the

base materials in one operation so as to make it ready for compaction with minimum shaping. 
Spreader shall be provided with a screed that strikes off and distributes the material to the 
required  width  and  level.    Width  of  each  spread shall  not  be  less  than  a  traffic  lane  wide. 
Screed shall be adjustable to the required cross-section.  Screed action includes any practical 
motion that produces a finished surface texture of uniform appearance. 

2.  Travel mixers:  Travel mixers shall be of a type which is capable of mixing to the full depth of

the layer thickness being processed, by picking up the material, mixing, agitating or otherwise 
blending into a homogeneous mass which complies with the required general gradation and 
other specifications.  Mixers shall be equipped with an accurate depth control device to avoid 
the disturbance of previously accepted layers. After mixing, the material shall be deposited 
by  the  mixer  in  its  final  position  so  that  prior  to  compaction  no  spotting,  picking-up  or 
otherwise shifting the material will be required.  Mixers may be equipped with pressure spray 
bars which can supply a uniform distribution of metered water during the mixing process. 

3.  Central mixers:  A central mixing plant shall be either of an approved drum or pugmill type

with a moisture control system so that the material may be spread without further mixing or 
processing. 

b.

  Surface Preparation

Prior to commencing the construction of the base courses, the Contractor shall make sure that the 
subbase complies with the specifications and that the surface thereof complies with the levels and 
slopes shown in the longitudinal and cross-section Contract plans.  In all cases the approval of the 
Engineer must be obtained before commencing spreading of material for the base courses. 

c.

  Screening and Mixture of the Materials

Screening shall be required for the materials used in aggregate base courses.  Screens shall be of 
the  size  and  number  required  to  remove  oversize  aggregate  and,  if  necessary,  to  separate  the 
materials into two or more fractions so that they may be combined to meet the required gradation. 
When  conveyor  belt  samples  from  the  end  of  the  screening  and/or  crushing-screening  operation 
yield a product consistently within the specified gradation, no further mixing shall be required and 
the  material  may  be  loaded  and  hauled  directly  to  the  stockpile.    In  the  event  the  material  is 
stockpiled, it shall be stockpiled so as to prevent segregation.

 

Mixing  of  material  shall  be  achieved  through  the  use  of  the  central  mixing  plant  or  travel  mixer 
specified in sub-article a) of Article 3.2.2.3. 

Where separate size materials are to be blended to meet the gradation, such blending shall be as 
directed  by  the  Engineer  and  shall  be  accomplished  prior  to  delivery  to  the  roadway.    Mixing  of 
separate materials on the roadway by motor grader will not be permitted by the Engineer. 

d.

  Compaction Trials

Prior  to  the  commencement  of  aggregate  base  course  operations,  the  Contractor  shall 

construct trial length, not less than 30m.  Material used in the trials shall be that approved for use 

as  aggregate  base  course  and  the  equipment  used  shall  be  that  accepted  as  the 

Contractor’s approved detailed list of resources. 
Aim  of  this  trial  is  to  determine  the  adequacy  of  the  Contractor’s  equipment,  the  loose 

thickness measurements necessary to result in the specified compacted layer thickness, the

 

resulting density of the material. 
Contractor  may  proceed  with  aggregate  base  course  work  only  after  the  method  and 

procedures established in the compaction trial have been approved by the Engineer 
 Method statement shall indicate the width of the pavers, number of pavers, compacting plant and 

equipment, number of passes by rollers .     

e.

  Spreading and Compaction

After carrying out the screening and mixing of aggregate material, samples of the approved material 
shall be taken in order to determine the optimum moisture content. 

 

Material shall then be spread on the prepared surface by mechanical paver / spreader in layers not 
more than 150 mm compacted thickness to achieve the total thickness as shown on the Contract 
plans. After spreading and before compaction the gradation shall be checked by the engineer for its 
compliance with specifications. 

Care shall be taken in spreading and compacting the aggregate base not to damage the geotextile 
fabric, if provided. It is required to use 50 mm thick crushed sand on top of the geotextile to protect 
the geotextile during spreading the subsequent aggregate layer. 

Existing  moisture  content  of  materials  constituting  the  base  courses  shall  be  determined.    If  the 
existing moisture content is less than the optimum moisture content, the necessary amount of water 
must be added to obtain the optimum moisture content allowing for the quantity which may be lost 
by evaporation in the process of raking, levelling and compacting.  Layer shall be compacted when 
the moisture content therein is within ± 2 % of the optimum moisture content and uniform in all parts 
of the section and depths within the layer thickness. 

Compaction shall start immediately thereafter, by means of pneumatic and steel rollers or vibratory 
rollers and in accordance with the Engineer

’s approval or instructions. 

Compaction shall start with rollers from extreme sides proceeding gradually toward the road axis. 
Rolling shall continue until a relative density of not less than  100% of the maximum dry density has 
been obtained as determined by the moisture-density relationship test, AASHTO T-180.  CBR of the 
base material shall not be less than 70% @ 98% MDD. 

f.

  Multi-layers

During the operations of mixing, spreading, compacting and levelling of base course material, care 
shall be taken so that layers already compacted under the layer being executed are not affected, or 
that the finished subgrade or subbase surface is also not affected.  This requirement shall be given 
special  attention  in  places  where  equipment  makes  turns  in  going  back  and  forth  and  any  such 
damage resulting in mixing the various layers constituting the different subgrade, subbase and base 
courses shall be carefully made good by the Contractor at his expense and to the satisfaction of the 
Engineer. 

If  more  than  one  base  course  is  required  for  reaching  the  required  thickness  described  in  the 
specifications, each such course shall be constructed as specified herein. 

Where  the  finished  total  compacted  thickness  exceeds  150  mm,  each  layer  shall  be  executed  in 
composite layers not exceeding 150 mm in thickness after compaction unless otherwise approved 
by the Engineer. 

g.

  Protection of Surface

Contractor shall protect the base course so that it shall be maintained sound during work progress, 
after its completion and prior to receiving the bituminous layers or prior to laying the surface overlay 
thereon.    Any  damage  caused  to  the  layer  if  exposed  to  traffic  or  natural  conditions  resulting  in 
damage to its surface should be made good to the satisfaction of the Engineer. 

 

 

 

Base courses shall not be rolled when the underlying material is soft or yielding or when the rolling 
causes a wave-like motion in this course. 

When the rolling develops irregularities, the irregular surface shall be loosened, then refilled with the 
same kind of material as used in constructing the course and again rolled according to specifications.  
Along  places  inaccessible  to  rollers,  the  base  course  material  shall  be  tamped  thoroughly  with 
mechanical tampers. 

Work on the base course will not be permitted during rainy weather. 

Hauling equipment may be routed over completed portions of the base courses provided no damage 
results and provided that such equipment is routed over the full width of the course to avoid rutting 
or uneven compaction. 

Engineer has the right to stop all hauling over completed or partially completed base courses when 
in his opinion such hauling is causing damage. 

h.

  Acceptance of Aggregate Base Courses   

Prior to the application of any prime coat or any other paving course, the aggregate base course 
shall have been tested and accepted by the Engineer.  The following shall be adhered to in accepting 
completed aggregate base courses: 

1.  Requirements  for  compaction:    the  degree  of  compaction  testing  values  should  have  an 

average of 100% with no single value less than minimum value of 98%. Wherever the degree 
of compaction is found to be less than the 98% specified, the area of base course involved 
shall be satisfactorily corrected so that the minimum specified density is achieved. 

2.  Requirements  for  gradation:  Wherever  the  gradation  is  found  to  be  outside  the  limits 

specified, the area of base course involved shall be scarified, removed or otherwise reworked 
as directed by the Engineer to provide a material within the specified limits. 

3.  Thickness requirements:  The total constructed thickness of aggregate base course used for 

new  construction,  reconstruction  or  widening  of  roadways  shall  not  vary  more  than  8  mm 
from the total thickness indicated on the Contract plans. 

In the event the constructed thickness of the aggregate base course is 8 mm more than the 
total  thickness  indicated  on  the  Contract  plans,  the  area  involved  shall  be  corrected  as 
directed by the Engineer by removing excess material in an approved manner to provide the 
required thickness. 

In the event the constructed thickness of the aggregate base course is 8 mm less than the 
total  thickness  indicated  on  the  Contract  plans,  the  Contractor  shall  provide  additional 
material in the next course (base course or wearing course).  In no case shall the deficiency 
of the base course exceed 12mm. 

Aggregate base course shall be constructed to the grade level as indicated on the Contract 
plans, as specified and as approved by the Engineer. 

In no case shall the total sum thickness of the aggregate subbase course, aggregate base 
course and asphalt pavements be less than the total sum thickness of all courses as indicated 
on the Contract plans. 

4.  Requirements for evenness of surface and grade level:  Final surfaces of the base course 

shall be tested by means of a 5 m long straight edge; and no rises or depressions in excess 
of 10 mm shall appear on the surface; otherwise such areas shall be stripped, corrected and 
re-compacted to comply with all specification requirements and as approved by the Engineer.  
Further, the finished surface of the base course shall be constructed to within 12 mm of the 
grade levels indicated on the Contract plans. 

 

 

 

 

 

 

 