Abu Dhabi, United Arab Emirates. STANDARD CONSTRUCTION SPECIFICATIONS (PART 1 - ROADS, Second Edition 2020) - page 14

 

 

 

G

ENERAL 

R

 

 

 

12.  Brightness adaptor shall be continuous and automatic from 100 % to 10 % 

d.  Temporary Barriers 

The Contractor shall be responsible for furnishing, installing and maintaining all temporary barriers 
in areas as determined by the Engineer, where construction operations result in a condition that is 
considered  to  be  hazardous  to  the  general  public,  or  to  separate  the  work  area  from  pedestrian 
areas.  Location  and  extent  of  the  temporary  barriers  shall  be  as  directed  and  approved  by  the 
Engineer. Temporary barriers shall remain the property of the Contractor and shall be removed from 
the site of the works as approved by the Engineer when no longer required. Temporary barriers may 
be of the following:  

1.  Temporary concrete barriers 

2.  Temporary concrete barriers with screens 

3.  Water filled portable barriers 

4.  Safety barrier fence system  

1.  Temporary Concrete Barriers 

Temporary  concrete  barrier  shall  be  new  or  used  precast  barrier  complying  with  the 
requirements  of  the  Contract  plans  for  precast  barrier  and  meeting  the  requirements  of 
Section 7.5 of Chapter 7, Incidental Construction, except for the following:  

x

  Lengths may differ from those shown in the Contract plans 

x

  Permanent lifting holes less than 100 mm in diameter may remain 

x

  Lifting loops are permitted  

x

 

A stamp or stencil reading “temporary” shall be visible on each barrier segment  

Permanent barriers that will be removed and reset per the Contract plans or the direction of 
the engineer may be used as temporary concrete barrier without being stamped or stencilled 
“temporary.”  Any  permanent  barrier  damaged  during  its  use  as  a  temporary  barrier  will 
become  the  property  of  the  Contractor  and  be  replaced  with  an  undamaged  permanent 
barrier at no expense to the Owner when the permanent barrier is reset to its location. 

All barriers shall be in good condition, without cracks, chips, spalls, dirt, or traffic marks. If 
any  barrier  segment  becomes  damaged  during  or  after  placement,  the  Contractor,  at  no 
expense to the Owner, shall immediately repair it to the engineer’s satisfaction or replace it 
with an undamaged section. 

As soon as the temporary barrier is no longer needed, the Contractor shall remove it from 
the  site  of  the  works.  Owner-furnished  barrier  shall  remain  Owner  property,  and  the 
Contractor shall deliver it to a stockpile site noted in the contract or to locations approved by 
the engineer. The Contractor-furnished barrier shall remain the property of the Contractor.  

2.  Temporary Concrete Barriers with Screens 

Temporary  concrete  barriers  shall  meet  the  requirements  of  Paragraph  1  above.  The 
Contractor shall be required, when directed by the Engineer, to provide warning lights and 
reflective  painted  markings  on  continuous  temporary  barriers  in  areas  where  detour 
pavement is poorly illuminated. 

Screen shall be constructed of painted metal and shall be neat in appearance. Screen shall 
be fixed over the temporary concrete barriers. Screen shall be solid and continuous, not less 
than  1.2  m  in  height.  Supplemental  screens  shall  be  connected  with  the  metal  screen  as 
indicated on the Contract plans and as directed by the Engineer. Details of construction shall 
be  as  indicated  on  the  Contract  plans  and  approved  by  the  Engineer.  Screen  shall  be  of 
substantial construction such that it will not be damaged or displaced by wind or other normal 
natural or manmade forces. 

 

G

ENERAL 

R

 

 

 

Slots shall be provided in temporary concrete barriers for fixing screens as indicated on the 
Contract plans.  

3.  Water Filled Portable Barriers 

Barrier shall be a highly portable and crashworthy longitudinal barrier. Barrier section shall 
be constructed of a lightweight, recyclable, virgin linear low density polyethylene plastic shell, 
with  ultraviolet  stabilisers  and  antioxidants,  designed  to  accept  water  ballast.  End  of  each 
barrier  section  shall  be  constructed  with  vertically  aligned  knuckles  which  interlock  with 
adjacent sections by means of a steel connecting pin. Connecting pin shall be constructed to 
securely connect adjoining sections. 

Barrier  sections  shall  be  constructed  in  white  or work  zone  safety  orange  colours  for  high 
visibility. Each barrier section shall include an internal galvanised steel framework to provide 
additional rigidity during handling and impacts. Barrier section shall have ribbed sidewalls to 
interact with an impacting vehicle in a manner that resists penetration, vaulting and under 
riding. 

Barrier  sections  shall  have  elevated  forklift  openings  to  allow  for  mechanical  lifting  when 
empty or full. Barrier shall have arrangements like quick fill openings with covers, and a rapid 
release gate valve to allow quick draining of the water ballast. A reflectorised fill level indicator 
shall be constructed in the top of each section to allow quick verification that the section is 
adequately full of water ballast. 

4.  Safety Barrier Fence System 

Safety barrier fence system type A shall have the following salient features: 

i. 

Constructed of galvanised steel, with red/white banner planks  

ii. 

Overall dimensions: 2,000 mm by 1,000 mm  

iii. 

Universal base plate K1 weighing approximately 28 kg  

iv. 

Galvanised steel support posts 

v. 

Complete with a transport and storage box for up to 20 barrier elements having 2,000 
mm by 1,000 mm dimension  

vi. 

System shall be supplied by M/s Nissan or approved equivalent 

Safety barrier fence system type b shall have the following salient features: 

i. 

Constructed  of  high  quality  plastic,  with  upright  tubes  made  from  galvanised  steel 
parts with red/white barrier planks and blind man’s rail with retroflective foil, Type 1 

ii. 

Include facility to mount warning lamps 

iii. 

Banner element shall be 2,000 mm by 1,000 mm 

iv. 

Universal base plate K1 weighing approximately 28 kg 

v. 

Galvanised steel support posts 

vi. 

Complete  with  a  transport  and  storage  box  for  up  to  20  safety  barriers  elements 
having 2,000 mm by 1,000 mm dimension. 

vii. 

System shall be supplied by M/s Nissan or approved equivalent 

viii. 

This  system  shall  also  include  monolight  LED  warning  lamp  and  battery.  Salient 
features of the monolight shall be as follows: 

a)  Light type: Flashing/constant 

b)  Light Intensity: 15 cd 

c)  Light Colour: Amber 

d)  Light Flash Rate: 60 f/min to 70 f/min 

e)  Light Direction: 2 sided 

f)  With LED roadwork lamp with one battery, LED unlimited life 

 

G

ENERAL 

R

 

 

 

g)  With bracket for mounting on 54 mm diameter vertical tube 

h)  Salient features of 1 dry cell battery shall be as follows: 

1)  Continuous light: 300 hours 

2)  Flashing light: 1,200 hours 

i)  Salient features of the 1 battery konstant 25 shall be as follows: 

3)  Continuous light: 950 hours 

4)  Flashing light: 3,800 hours 

e.  Temporary Crash Cushions Systems (Attenuators) 

The Contractor shall be responsible for furnishing, installing and maintaining all temporary detour 
crash cushions in areas as shown on the Contract plans and required by the Engineer. Location of 
the  crash  cushions  shall  be  as  directed  and  approved  by  the  Engineer.  The  Contractor  shall 
dissemble and remove the temporary detour crash cushions as directed by the Engineer. All crash 
cushion systems shall meet the requirements of the relevant sections of NCHRP 350. 

The Contractor shall be responsible for maintaining local stock of routine impact kits for all types of 
crash cushions, which are as part of the temporary safety design features. 

1.  Truck-mounted Attenuator 

Truck-mounted attenuators (TMAs) shall be mounted on a vehicle with a minimum weight of 
6,800 kg and a maximum 

weight in accordance with the manufacturer’s recommendations. 

Ballast used to obtain the minimum weight requirement, or any other object that is placed on 
the vehicle shall be securely anchored such that it will be retained on the vehicle during an 
impact. The Contractor shall provide certification that the unit complies with NCHRP 350 Test 
level 3 requirements. 

TMAs shall have an adjustable height so that it can be placed at the correct elevation during 
usage and to a safe height for transporting. If needed, the Contractor shall install additional 
lights to provide fully visible brake lights at all times. TMA units shall have a chevron pattern 
on  the  rear  of  the  unit.  Standard  chevron  pattern  shall  consist  of  100  mm  yellow  stripes, 
alternating non-reflective black and retro-reflective yellow sheeting, slanted at 45 degrees in 
an inverted-V with the V at the centre of the unit.  

2.  Type 1 Crash Cushions: Redirective, Non-grating 

Crash cushions at gore position as shown on the  Contract plans shall be redirective, non-
grating, comprising of a cartridge assembly units, meeting NCHRP 350, Quadguard® from 
M/s Quixote Corporation or equivalent as approved by the Engineer. 

If  required,  the  Engineer  shall  review  the  structural  and  performance  based  integrity  of  a 
crash cushion after an accident, and shall determine the number of elements to the crash 
cushion which need to be replaced. Elements and assembly units of a crash cushion shall 
be replaced by the Contractor with genuine parts from the original manufacturer, as approved 
by the Engineer. All replaced elements/assembly units after an accident shall be such that 
the  reconstructed  crash  cushion  system  meets  the  NCHRP  350  standards  in  accordance 
with the manufacturer’s recommendations and Engineer’s approval. 

3.  Type 2 Crash Cushion: Non-redirective  

Crash cushion at the gore positions next to the temporary portable barriers on detours shall 
be shall be React 350 (Reusable Energy Absorbing Crash Terminal) from M/s. Quixote Corp., 
or an equivalent as approved by the Engineer. This crash cushion shall be redirective, not-
gating,  reusable make  up  from  arrays  of  cylinders that  have the  ability to  recover  a major 
portion of their shape, position and capabilities after being impacted meeting NCHRP 350. 

 

G

ENERAL 

R

 

 

 

f.  Portable Steel Barrier Gate 

The Contractor shall be responsible for furnishing, installing and maintaining all portable steel barrier 
gates at emergency median crossovers and in detour areas as shown on the Contract plans or as 
directed by the Engineer. Portable steel barrier gates shall be Vulcan Barrier/Gate System from M/s. 
Quixote Corp. or equivalent as approved by the Engineer. Portable steel barrier gate shall be steel 
longitudinal barriers pinned securely to each other and shall meet the NCHRP 350 standards. 

All fabrication, metal work, bolts, nuts, and washers shall be galvanised. If required, the Contractor 
shall replace damaged elements of portable steel barrier gate with genuine parts from the original 
manufacturer, approved by the Engineer. 

g.  Directional Safety Beacon System 

Furnishing, installing, and maintaining all directional safety beacon systems in areas as determined 
by  the  Engineer  shall  be  the  responsibility  of  the  Contractor.  Locations  of  the  directional  safety 
beacon systems shall be as directed and or approved by the Engineer. 

Directional safety beacon system shall have the following salient features: 

x

  Safety  beacons shall  be  one  sided,  either  left  or  right  with  an  integrated,  amber  warning 

light 

x

  Warning  light  shall  be  5  joules,  180-mm-diameter,  high-luminous  intensity,  with  an 

integrated fault indicator 

x

  Auto solar switch and 1- 6V battery in the beacon housing unit. 

x

  Stripe sheeting shall be red/white, Type 2, in accordance with EN 12352-L7 

x

  Black base plate weighing minimum 28 kg 

Systems shall be as pro9vided by M/S Nissan or an equivalent, as approved by the Engineer. 

h.  Temporary Signage 

All temporary signs and appurtenances shall be furnished, installed, maintained, and removed on 
completion of the works where shown on the Contract plans or required by the Engineer, including 
the following locations:  

1.  Where roads are closed, partially closed, or where work is in progress  

2.  Where required to direct, inform or assist traffic in the area of construction  

Temporary signs shall be placed at locations shown on the Contract plans and as directed by the 
Engineer to direct traffic smoothly and safely.  

The Contractor shall submit specimens of signs for approval by the Engineer. The Contractor shall 
relocate all temporary signs as required by the construction stages or steps and his sequence of 
construction operations.  

Drawings  and  signs  as  specified  herein  are  stated  in  the  English  language.  The  Contractor  shall 
provide equal signs in size and description in Arabic at the same locations. Signs in Arabic shall be 
mounted adjacent to the English signs and as directed by the Engineer.  

Temporary  signs,  panels,  and  supports  shall  be  either  wood  or  metal  and  shall  be  substantially 
constructed to withstand the climatic conditions of Abu Dhabi. All types of sign panels shall be high 
intensity grade reflective sheeting.  The Contractor shall submit samples of  the proposed types of 
sign  panels  and  supports  for  approval  of  the  Engineer  prior  to  the  fabrication  and  erection  of 
temporary signs. All posts shall be suitably anchored and as approved by the Engineer. 

This item shall be in accordance with Abu Dhabi

’s Manual of Uniform Traffic Control Devices (AD-

D-11), and shall be of the exclusive colours as illustrated in the Contract plans. All temporary warning 
signs for detour arrangements and work zones adjacent to live road traffic shall be made from high 
intensity reflective sheeting, in accordance with ASTM Type III.  

 

G

ENERAL 

R

 

 

 

Type III reflective sheeting shall consist of spherical or prismatic lens elements adhered to a synthetic 
resin  and  encapsulated  by  a  flexible,  transparent,  weatherproof  plastic  having  a  smooth  outer 
surface. 

Sheeting shall conform to the applicable day time colour and luminance factor requirements of ASTM 
D 4950 when tested instrumentally or the diffuse day colour of the reflective sheeting shall be visually 
evaluated by comparison with the applicable highway colour tolerance chart. 

Reflective  sheeting  shall  have  the  following  minimum  coefficient  of  retroreflection  values  at  0.2 
degrees  and  0.5  degrees  observation  angle  expressed  as  average candelas  per foot-candle,  per 
square foot of material. Measurements shall be conducted in accordance with ASTM E 810.  

Table 1-3: Type III glass bead retroreflective element material for temporary signs 

Observation 
Angle 

Minimum Retroreflection (candelas/ft-cd/ft

2

Entrance Angle 

Silver 

White 

Yellow 

Orange 

Green 

Red 

Blue 

Brown 

0.2

0

 

-4

0

 

250 

170 

100 

45 

45 

20 

12 

0.2

0

 

+30

0

 

150 

100 

60 

25 

25 

11 

8.5 

0.5

0

 

-4

0

 

95 

62 

30 

15 

15 

7.5 

5.0 

0.5

0

 

+30

0

 

65 

45 

25 

10 

10 

5.0 

3.5 

Sheeting shall conform to the applicable daytime colour and luminance factor requirements of ASTM 
D4956  when  tested  instrumentally.  Or  the  diffuse  day  colour  of  the  reflective  sheeting  shall  be 
visually  evaluated  by  comparison  with  the  applicable  Highway  Colour  Tolerance  Chart.  Colour 
comparison shall be made under north daylight or a scientific daylight having a colour temperature 
from 6,500 kelvin to 7,500 kelvin. Daytime colour evaluation shall be illuminated at 45 degrees and 
viewed  at  90  degrees.  There  shall  be  no  significant  colour  shift  when  viewed  under  night-time 
(retroreflective) conditions. 

Reflective sheeting shall have a pre-coated pressure sensitive adhesive (Class 1) or a heat-activated 
adhesive (Class 2) either of which will adhere to flat, clean surfaces without necessity of additional 
adhesive  coats  on the reflective  sheeting  or  application  surface.  Chemical  activators  shall  not  be 
used to activate Class 2 adhesive.  

Pre-coated adhesive shall be protected by an easily removed liner which, when removed, shall not 
have  a  staining  effect  on  the  reflective  sheeting  and  shall  be  mildew  resistant.  Protective  liner 
attached to the adhesive shall be removable by peeling without soaking in water or other solvents 
and shall be easily removed after storage for 4 hours at 815

o

  C under weight of 1482 kPa. Sheeting 

with liner removed, conditioned for 24 hours at 382

o

 C and 50 % relative humidity, shall be sufficiently 

flexible to show no cracking when bent around a 30.5-mm-diameter mandrel with the adhesive side 
contacting  the  mandrel.  For  ease  of  testing,  talcum  powder  may  be  spread  on  the  adhesive  to 
prevent sticking to the mandrel.  

Sheeting surface shall be smooth and flat to facilitate self-cleaning in the rain, regular cleaning, and 
wet  performance,  and  exhibit  85  degrees  glossmeter  rating  of  not  less  than  50  when  tested  in 
accordance  with  ASTM  D523.  Sheeting  surface  shall  be  readily  processed  and  compatible  with 
transparent and opaque process colours and show no loss of the colour coat with normal handling, 
cutting, and application. Sheeting shall permit cutting and colour processing at temperatures of 315

o

 

C to 538

o

 C and 20 % to 80 % RH.  

Sheeting shall be heat resistant and permit force curing without staining of  unapplied sheeting or 
applied  sheeting  at  temperatures  recommended  by  the  manufacturer  not  to  exceed  815

o

  C  for 

unapplied sheeting or 1,093

o

 C for applied sheeting. Sheeting surface shall be solvent resistant to 

permit cleaning by wiping with a clean soft cloth dampened with VM & P Naphtha or mineral spirits. 

Adhesive shall form a durable bond to smooth, corrosion and weather resistant surfaces and permit 
the reflective sheeting to adhere securely, 48 hours after application at temperatures of -184

o

 C to 

 

G

ENERAL 

R

 

 

 

1093

o

  C.  Adhesive  bond  shall  be  sufficient  to  render  the  applied  sheeting  vandal-resistant  and 

prevent its shocking off when subjected to impact energy of 13.6 joules applied with a hemispherical 
tipped object 25 mm in diameter at -18

o

 C. Test specimen shall be applied to aluminium backing not 

less  than  2.0mm  thick  and  having  a  dimension  of  not  less  than  2,580  mm2.  During  testing,  the 
specimen shall be supported on a 75 mm diameter ring. Adhesion test shall conform to ASTM D4956 
with the addition of the temperatures noted herein. 

Resistance to accelerated weathering shall be as described in ASTM D4956 except the weathering 
apparatus and procedure shall be in accordance with ASTM G 154. 

Reflective sheeting shall be sufficiently flexible to be cut to shape easily and permit application over, 
and  conform  to,  moderate shallow  embossing  characteristic  of  certain  sign  borders  and  symbols. 
Following liner removal, the reflective sheeting shall not shrink more than 0.79 mm in 10 minutes or 
more than 3 mm in 24 hours in any dimension per 5,800 mm2 at 382

o

 C and 50 % relative humidity. 

Sheeting, when applied according to manufacturer’s recommendations to cleaned and etched 0.50 
mm by 50 mm by 200 mm aluminium, conditioned (24 hours) and tested at 382

o

 C and 50 % humidity, 

shall be sufficiently flexible to show no cracking when bent around a 19mm diameter mandrel. 

Reflective sheeting shall be applied in the manner specified by the sheeting manufacturer. Applied 
sign face shall not have bubbles, wrinkles, or foreign material beneath the reflective sheeting. 

All  edges  and  splices  of  reflective  sheeting  signs  shall  be  coated  with  an  edge  sealer  when 
recommended by the manufacturer of the reflectorised sheeting. 

Splicing of reflective sheeting shall not be permitted on signs or panels with dimensions up to and 
including 1.2 m in height or width unless the reflective sheeting specified does not come in this width, 
then the widest width material shall be used. When sheeting joints are required, they shall be lap-
jointed with the top sheet overlapping the bottom sheet by no less than 4.75 mm. Fabricator shall 
endeavour  to  use  the  least  number  of  seams  possible  with  the  horizontal  lap  preferable.  Roller 
applied or reverse screened sheeting may be butt-jointed with joint gap not to exceed 0.8 mm. Colour 
matching of adjacent sheets of reflective sheeting comprising a sign shall be accomplished without 
a noticeable difference in colour. No borders shall be spliced other than the splice of the tangent 
border to the corner radius. 

Demountable prismatic reflectorised message and borders shall have the following characteristic:  

Letters, digits, and alphabet accessories shall consist of embossed 10.2 mm thick sheet aluminium 
frames  confirming  to  ASTM  B209  grade  3003-H14  in  which  prismatic  reflectors  are  installed  to 
prevent  their  displacement  in  handling  or  service.  Letters  in  which  reflectors  are  assembled  by 
means of tape are unacceptable. Plastic reflectors face shall be colourless and be entirely smooth 
to  present  a  water repellent  and  dirt  resistant  surface.  Area  indicating  the  letter  shape that  is  not 
reflectorised shall be white for maximum daytime contrast with the sign background. All letters shall 
be free of any imperfections and shall present a high quality appearance. Demountable prismatic 
border shall be comprised of a minimum length of  600 mm with allowance of one shorter section 
between each corner radius. 

Letters shall be fastened to the sign with aluminium screws or blind rivets conforming to ASTM B209 
grade 2024-T4. 

Co-efficient of retroreflection of each reflex reflector intended for use in cut-out letters, symbols, and 
accessories  shall  be  equal  to  or  exceed the  following  minimum  values with  measurements made 
with reflectors spinning. 

 

 

 

G

ENERAL 

R

 

 

 

Table 1-4: Coefficient of retroreflection of reflex reflectors for use in cut-out letters and 

symbols 

Observation angle

 

(degrees) 

Entrance angle

 

(degrees) 

Co-efficient of retroreflection candle 

power/square inch/foot candle 

0.1 

14.0 

0.1 

20 

5.6 

Failure to meet the specific minimum values shall constitute failure of the reflector being used. Upon 
failure of more than 2 of the 50 samples tested, a resample of 100 reflectors shall be tested. Failure 
of more than 4 of these samples shall be cause for rejection of the lot. 

Maintenance  of  all  signs  furnished  shall  include,  but  not  by  way  of  limitation,  all  restoration  or 
replacement  of  reflective  sheeting,  replacement or  other  work  required to  maintain the  signs  in a 
condition and position as approved by the Engineer.  

At the completion of construction or when directed by the Engineer, all signs shall be removed and 
disposed of by the Contractor. 

i.  Construction Identification Signage 

The Contractor shall provide and maintain and remove, when directed by the Engineer, construction 
identification signs for the site as per the requirements of Section 1.15.8. These wooden signs shall 
be constructed of 7 separate panels as shown on the Contract plans with an overall size of 2.60 m 
wide by 3.15 m high, all painted with 2 coats of white oil paint back and front and supported 0.60 m 
above  the  ground  with  galvanised  steel  angle,  pipe  or  tubular  framing  and  struts  painted  gray  or 
silver and set into the ground and fixed in concrete foundations for adequate support.  

Boards shall be lettered in both Arabic and English to include the information as indicated on the 
Contract plans and as approved by the Engineer.  

A large scale layout  shall be submitted for approval before manufacture. No advertising material, 
other  than  the  above,  will  be  permitted.  Temporary  construction  identification  signs  shall  be 
maintained in good condition, repainted as directed by the Engineer and removed from the site at 
the  end  of  the  Contract  to  be  disposed  of  as  approved  by  the  Engineer.  Siting  and  layout  of 
subcontractors’ and manufacturers' signs shall be approved by the Engineer.  

Construction identification signs shall be placed at approaches or the beginning of construction on 
roads as directed by the Engineer. 

j.  Temporary Light Standards 

Temporary lighting for detour pavements or other detour areas shall be as required or as directed 
by the Engineer. In all possible cases, the Contractor shall make use of the existing or newly installed 
permanent lighting system to provide temporary lighting for the detour pavements or areas. When 
directed by the Engineer, the Contractor shall furnish and install, or install, temporary light standards 
complete as specified herein.  

Temporary light standards (poles) shall be 10 m high with one 250 watt High Pressure Sodium (HPS) 
lantern  and  shall  be  installed  staggered  on  both  sides  of  the  temporary  detour  pavement  or  as 
approved by the Engineer. The lighting levels and uniformity for temporary light standards shall be 
as  included  in  Section  10.8,  Lanterns  (HID  and  LED)  and  Ornamental  Lighting,  of  Chapter  10, 
Lighting and Electrical Distribution Works. The pole height and wattage of the lantern included herein 
are  for  guideline  only.  The  Contractor  can  propose  the  lighting  system  as  per  detour  areas. 
Temporary  light  standards  shall  be  furnished  and  installed  by  the  Contractor  as  approved  by  the 
Engineer.  

The Contractor shall make all necessary arrangements for power supply for the temporary lighting 
system including furnishing and installing all cables, control switches and all related appurtenances 
required per Abu Dhabi Water and Electricity Authority (ADWEA) regulations for the power supply 

 

G

ENERAL 

R

 

 

 

and all electric power required to operate the temporary light standards. The Contractor shall submit 
shop drawings with all details of the proposed temporary lighting system to the Engineer for approval.  

The Contractor shall furnish and install 10 m high temporary light standards for areas as shown on 
the approved detour/staging drawings, complete with all components, including but not limited to, 
single  250  watt  HPS  lanterns,  ballasts,  lamps,  cables,  concrete  foundations,  base  plates,  anchor 
bolts,  reinforcement  steel,  concrete,  PVC  conduit,  controllers,  control  cabinets,  all  related 
appurtenances and power supply. Temporary lighting system shall be maintained by the Contractor 
at all times until removal is directed or approved by the Engineer.  

The  Contractor  shall  maintain  the  temporary  light  standards  and  all  light  standards  damaged  by 
accidents or for any other reason shall be replaced at the Contractor

’s expense and at no cost to the 

Owner.  

When  temporary  light  standards  and  all  related  appurtenances  as  specified  herein  are  no  longer 
required on the site or when directed or approved by the Engineer, the Contractor shall remove all 
such temporary light standards from the site which shall become the property of the Contractor and 
be disposed of as approved by the Engineer.  

Existing or newly installed street lighting system shall be incorporated wherever possible for lighting 
of temporary detour pavement and other detour areas as required or as directed by the Engineer. 
The Contractor shall make all necessary arrangements with ADWEA; make all payments of any fees 
or power charges; make modifications to the existing lighting system if required; and maintain and 
operate the existing or newly installed lighting system for all required temporary detour areas.  

The Contractor shall install and supply any additional temporary light standards, cables, controllers, 
control  cabinets  and  appurtenances  as  necessary  to  provide  for  the  complete  temporary  detour 
lighting  system,  while  incorporating  existing  or  newly  installed  street  lighting  standards  where 
possible, as approved by the Engineer.  

The  Contractor  shall  relocate  temporary  or  existing  light  standards  as  indicated  on  the  Contract 
plans, as specified herein and as directed by the Engineer. Relocation of temporary or existing light 
standards shall be complete with light standard, lantern, cable, power, and all appurtenances.  

k.  Temporary Signals for Traffic and Pedestrians 

The Contractor shall furnish, install, maintain, and remove temporary traffic signals as indicated on 
the Contract plans, as specified herein, and as directed by the Engineer. All temporary traffic signal 
poles shall be furnished and maintained with the number of traffic signal units (heads) consisting of 
red, amber and green signals as directed by the Engineer. Traffic signal units (heads) proposed by 
the Contractor shall be capable of manual operation as well as standard fixed phase operation from 
a local controller.  

Installation of temporary traffic signals shall be complete with all poles, traffic signal units, conduit, 
wiring, electric power to all control units and traffic signal units and all appurtenances required for 
the operation of all units as approved by the Engineer.  

The  Contractor  shall  submit  all  details  of  proposed  temporary  traffic  signals  to  the  Engineer  for 
approval prior to construction. The Contractor shall maintain all temporary traffic signals and replace 
any defective or damaged units at no cost or expense to the Owner.  

Owner reserves the right to direct the Contractor to obtain all materials, except cables and wiring, 
for the temporary traffic signals from the Owner. The Contractor shall obtain poles, traffic signal units 
(heads), controls, and appurtenances, as directed by the Owner, from the designated Owner store 
yard. The Contractor shall load, transport, unload, and install all such temporary traffic signal poles, 
complete.  

The  Contractor  shall  furnish  and  install  all  conduit,  cables  and/or  wiring  and  electric  power  to  all 
temporary traffic signal poles and control units required for the operation of all units as approved by 
the Engineer.  

 

G

ENERAL 

R

 

 

 

When the temporary traffic signals and all related appurtenances are no longer required on the works 
or when directed or approved by the Engineer, they shall be removed by the Contractor and materials 
obtained  from  the  Owner  returned  to  the  Owner.  All  such  temporary  traffic  signals  and 
appurtenances shall be carefully removed, cleaned and suitably protected. Such equipment shall be 
loaded, transported, unloaded and placed in storage where directed by the Engineer or the Owner.  

Temporary traffic signals supplied by the Contractor shall remain his property at completion of the 
Contract, and shall be removed from the site and/or disposed of as approved by the Engineer unless 
otherwise specified in the particular specifications.  

1.  Relocate Temporary Traffic Signals 

The Contractor shall relocate temporary traffic signals as indicated on the Contract plans, as 
specified herein and as directed by the Engineer. Relocation of temporary traffic signals shall 
be complete with all poles, signal units, wiring, conduits, power, and appurtenances.  

2.  Temporary Traffic Signal Controllers 

The  Contractor  shall  furnish,  install  and  maintain  temporary  traffic  signal  controllers  and 
associated  equipment  as  specified  herein  and  as  approved  by  the  Engineer.  Local 
intersection control equipment shall perform all functions necessary for the control of traffic 
signals  such  as  to  safely  assign  rights-of-way  to  vehicular  traffic.  Intersection  control 
equipment  shall  be  uniform  throughout  the  Contract  unless  otherwise  approved  by  the 
Engineer.  

The Contractor shall include all conduit, wiring and appurtenances and all electric power to 
all temporary traffic signal controllers.  

Local  control  equipment  shall  include,  but  not  by  way  of  limitation,  the  following  major 
components:  

i. 

Traffic signal controller 

ii. 

Local intersection controller  

iii. 

Local intersection controller cabinet;  

iv. 

Solid state load switches or electro-mechanical load switches (relays)  

v. 

Intersection conflict monitor;  

vi. 

External flash device  

vii. 

Device  so  that  when  red  is  absent,  the  signal  will  automatically  switch  to  flash  red 
(minor traffic flow) and amber (major traffic flow) 

Descriptions for each of the major components above are provided herein.  The Contractor 
shall provide any additional equipment necessary to make the system perform in accordance 
with good traffic engineering practices, and to the satisfaction of the Engineer.  

3.  Traffic Signal Controllers  

All traffic signal controllers shall be pretimed solid state devices. The Contractor shall supply 
all devices necessary to fully program the solid state as well as the source and object code 
for  the  traffic  control  programs.  Timing  shall  be  digital  in  nature  and  based  on  a  50  hertz 
supply frequency. Number and sequence of phases at each intersection shall be as required, 
as  indicated  on  the  Contract  plans  or  by  the  traffic  patterns  and  traffic  volumes,  and  as 
directed by the Engineer.  

Controllers shall be capable of withstanding the local temperature and humidity conditions 
and provide continuous, uninterrupted service under all conditions.  

It  shall  be  possible  to  change  controller  timing  parameters  manually  from  the  front  of  the 
controller cabinet. All controllers shall provide the following features:  

 

G

ENERAL 

R

 

 

 

i. 

Signal  indication  sequence:  Vehicular  signal  indication  sequence  shall  be  green-
amber-red.  No  amber  indication  shall  appear  between  red  and  green  indications. 
Capability shall be included to provide all-red clearance intervals for each phase.  

ii. 

Dials: Controllers shall contain a minimum of 4 timing dials.  

iii. 

Cycle length: Signals shall have a cycle length range of 0 seconds to 99.9 seconds, 
adjustable at 5-second steps.  

iv. 

Number of phases: Capability to accommodate 4 separate phases.  

v. 

Signal  intervals:  Number  of  intervals  shall  range  from  1  to  16.  Interval  timing  shall 
range from 0 seconds to 99.9 seconds, adjustable in 0.1-second steps.  

vi. 

Manual control: Manual controls shall be provided to permit vehicular signals to switch 
to any related phase, or to display red indication in all directions, or to switch from one 
time plan to another. When red is absent, the signal shall switch to flash red (minor 
traffic flow) and amber (major traffic flow).  

vii. 

Flashing mode: For late night operation, signals shall have the capability of operating 
in  a  flashing  mode  whereby  vehicular  signals  controlling  the  main  road  shall  flash 
showing amber indication, and vehicular signals controlling the cross road shall flash 
showing red indication.  

The  Contractor  shall  bring  electric  power  to  the  local  controllers  in  accordance  with  the 
ADWEA requirements.  

4.  Controller Cabinets 

All local control equipment  at a given intersection shall be mounted in a single waterproof 
cabinet made of approved materials. All cabinets shall include a ventilation fan and filter. It 
shall be possible to operate the controller in a manual mode without opening the large door 
(e.g., via a "police panel"). All equipment necessary to properly mount the cabinets (including 
mounting poles or foundations if required) and to install the local control equipment in the 
cabinet shall be provided by the Contractor. An electric power outlet shall be provided in each 
controller cabinet.  

5.  Load Switches  

Signal light circuits shall be controlled by solid state load switches or electro-mechanical load 
switches (relays). Each circuit shall have a minimum rating of 600 watts for tungsten lamp or 
gas tubing transformer load at 240 volts, AC. Switches shall be capable of operating in all 
local climatic conditions.  

6.  Intersection Conflict Monitor  

An intersection conflict monitor shall be provided for each intersection which shall monitor 
the  output  of  the  green  load  switches.  In  the  event  a  conflict  condition  exists,  the  conflict 
monitor shall cause the intersection to go to the emergency flash condition. Intersection shall 
also go to the emergency flash condition under any of the following occurrences:  

i. 

Absence of required red or amber signal  

ii. 

Absence of security program  

iii. 

Signals hanging indefinitely in one state  

iv. 

Processor fault condition  

7.  External Flash Units  

Each local controller cabinet shall contain a solid state flasher unit to drive the signal lights 
during  periods  of  controller  maintenance  or  controller  malfunction.  When  operating,  the 
flasher shall flash all red or amber and red indications in designated directions at a rate of 60 

 

G

ENERAL 

R

 

 

 

flashes per minute. It shall be possible to remove control of the signal lights from the local 
controller and give control to the flasher unit in the following manner:  

v. 

Manually changing position of a single switch  

vi. 

Action of a conflict monitor  

vii. 

Action of a watchdog timer, as applicable  

8.  Watchdog Timer  

A watchdog timer shall be provided and installed, and shall be used with solid state based 
controllers.  Purpose  of  this  timer  is  to  prohibit  faulty  controller  operation  from  causing  the 
signal light indication to "hang" indefinitely in one state. When used, the controller shall reset 
the timer periodically. If allowed to time out, the watchdog timer shall cause the signal lights 
to be put in the flash mode. Watchdog timer may be either part of the hardware of the local 
controller  or  an  external  device.  All  switches,  solid  state  components  and  other  ancillary 
equipment necessary to provide the operation just described shall be provided and installed 
by the Contractor.  

9.  Temporary Traffic Signal Controllers, Supplied by Owner 

Owner  reserves  the  right  to  direct  the  Contractor  to  obtain  all  temporary  traffic  signal 
controllers, except cables and/or wiring, from the Owners store yards. The Contractor shall 
obtain the temporary traffic signal controllers, as directed by the Owner, from the designated 
store yard. The Contractor shall load, transport, unload, and install all such temporary traffic 
signal  controllers,  complete.  The  Contractor  shall  furnish  and  install  all  conduits,  cables 
and/or  wiring  and  electric  power  to  all  temporary  traffic  signal  controllers  required  for  the 
operation of all units as approved by the Engineer.  

10. Relocate Temporary Traffic Signal Controllers  

The Contractor shall relocate temporary traffic signal controllers as indicated on the Contract 
plans, as specified herein and as directed by the  Engineer. Relocation of temporary traffic 
signal controllers shall be complete with all associated equipment and electric power to the 
relocated controllers, wiring, conduits, and appurtenances. 

l.  Flaggers 

Where directed by the Engineer, the Contractor shall provide and station competent flaggers whose 
sole duties shall consist in directing the movement of pedestrians and traffic through or around the 
works. Flaggers, flagging stations, equipment, and operations shall be consistent with the MUTCD 
treatment of these topics and shall meet the requirements stated therein.  

m. Temporary Utility Protection and Removal at Detour Roads 

The  Contractor  shall  furnish  and  install  temporary  concrete  slab  protection  and/or  temporary 
concrete encased split PVC duct at detour road and construction equipment crossings of utilities as 
indicated on the Contract plans or as directed by the Engineer. All such temporary utility and service 
protection shall be as detailed on the Contract plans and as specified in the applicable sections of 
Chapter 11, Utilities.  

The Contractor shall be responsible for all costs, expenses and other expenditures required repairing 
or  restoring  any  damaged  utility,  service  property,  and/or  structure.  In  the  event  the  concerned 
governing  agency  or  owner  of  such  damaged  utility,  service,  property,  and/or  structure  elects  to 
make necessary repairs or restoration with their own forces or designated Contractor, the Contractor 
shall bear all costs, expenses or other expenditures involved or incurred by said governing agency 
or  owner.  The  Contractor  shall  directly  resolve  with  the  concerned  agency,  Owner,  or  owner  the 
extent of repairs, costs, expenses, or other expenditures as required.  

Unless  otherwise  directed  by  the  governing  agency  or  owner  of  the  utility  and/or  service  that  the 
temporary protection shall remain in place, the Contractor shall remove and dispose of all temporary 

 

G

ENERAL 

R

 

 

 

utility protection slabs and split ducts as required per the relevant sections in Chapter 11, Utilities, 
as soon as the temporary crossing is removed from service.  

n.  Temporary Electrical Work  

All temporary electrical work shall be protected by ground fault circuit Interrupters (GFCI) and shall 
be in accordance with the AGC Manual of Accident Prevention in Construction. 

All connections and installation shall be in compliance with ADWEA Regulations. 

If portable generators are used to supply temporary power needs, the generators shall be grounded, 
inspected and documented on a regular basis for proper operation.  

All  temporary  electrical  work  shall  be  inspected  on  a  weekly  basis  and  audited  by  a  certified 
electrician and results documented. 

o.  Accommodation of Existing Conditions 

1.  Existing Informational, Guide, Street Name and Numbering Signs 

In  locations  where  existing  informational,  guide  street  name  and  numbering  signs  conflict 
with  proposed  improvements,  the  Contractor  shall  adopt  the  following  procedure  for  their 
removal, storage and reinstatement.  

i. 

The  Contractor  shall  obtain  the  applicable  forms  from  the  appropriate  authority  to 
apply for permission to remove the signs.  

ii. 

Only after permission has been granted, the Contractor shall proceed with the removal 
of the sign.  

iii. 

It  is  the  Contractor

’s  responsibility  to  remove,  store  and  reinstate  the  signs  upon 

completion of the works, to the satisfaction and approval of the relevant authority and 
the Engineer. The Contractor shall be responsible for the safety of the sign and shall 
replace and/or repair signs damaged by him or through his negligence.  

iv. 

If  the  sign  is  not  to  be  reinstated  in  the  same  location,  the  foundation  shall  be 
demolished  or  removed  along  with  all  associated  cabling,  conduit,  pull  boxes  and 
other  appurtenances  with  the  resulting  excavations  being  properly  backfilled  in 
accordance with the specifications.  

v. 

When  appropriate,  the  Contractor  shall  have  any  new  locations  approved  by  the 
relevant authority before commencing the reinstatement works.  

vi. 

The Contractor shall construct new foundations, all necessary ducting and pull boxes, 
reinstall  the  previously  removed  signs,  and  if  applicable,  reconnect  the  sign  to  a 
suitable power source.  

vii. 

The Contractor shall obtain a clearance certificate from the relevant authority to record 
that the signs have been reinstated to their satisfaction.  

2.  Existing Roadside Structures and Street Furniture 

In locations where existing roadside structures and street furniture (includes such items as 
bus  stop  shelters,  fountains,  shade  structures,  play  equipment,  benches  and  other 
miscellaneous.  roadside  items  as  identified  on  the  Contract  plans  or  as  directed  by  the 
Engineer) will conflict with roadway improvements, the Contractor shall advise the relevant 
authority  and  then  proceed  to  carefully  remove  those  structures  when  required  for 
construction.  The  removed  structures  shall  be  stored  in  a  manner  and  at  a  location 
acceptable to the relevant authority while construction proceeds.  

After removal of the structures, their foundations shall be demolished (or removed if such can 
be suitably done) with the ensuing excavations being properly backfilled.  

 

G

ENERAL 

R

 

 

 

In coordination with the relevant authority and with the approval of the Engineer, locations for 
the reinstatement of the removed structures compatible with roadway improvements shall be 
determined. The Contractor shall then construct new foundations and/or reinstate removed 
foundations and reinstall the previously removed structures.  

All work related to the removal, storage and reinstatement of the existing structures shall be 
done in accordance with the requirements of the relevant authority. The Contractor shall be 
responsible  for  the  safety  of  the  structures  and  shall  replace  and/or  repair  any  damage 
caused by him or through his negligence.  

3.  Removal,  Protection  and  Transportation  of  Trees,  Palms  and  Shrubs  for 

Transplanting 

Where  directed  by  the  Engineer  the  Contractor  shall  carefully  excavate  and  protect  all 
existing trees, palms and shrubs identified for transplanting on the Contract plans or by the 
Engineer  and  transport  to  other  locations  specified  by  the  Engineer,  and  replanted.  All 
removal, transporting and replanting shall meet the applicable requirements of Chapter 13, 
Landscaping and Irrigation. 

p.  Rumble Strips 

The  Contractor  shall  be  responsible  for  furnishing;  installing  and  maintaining  all  rumble  strips  on 
approaching  roadways,  detour  pavement,  other  temporary  roadways  and  on  service  roads  as 
directed  by  the  Engineer.  Maintenance  shall  include  all  labour,  materials,  tools,  equipment  and 
appurtenances to remove deteriorated rumble strips and to furnish and install replacement or new 
rumble strips as approved by the Engineer. The Contractor shall remove all rumble strips from the 
site and disposed of as approved by the Engineer when no longer required. 

Material, execution, layout, machinery and equipment utilised in application of rumble strips for the 
works as described above shall conform to Section 8.4.5 of Chapter 8, Traffic Marking and Signs. 
Width, colour, length, and location of rumble strips shall be indicated on the Contract plans for the 
intended use on the detour pavement, other temporary roadways and on service roads as directed 
by the Engineer. 

Rumble strips shall be 6 mm thick and 200 mm wide. Rumble strips material shall be applied in 2 
equal layers, with glass beads applied uniformly on the top layer only. 

q.  Temporary Pedestrian Access and Safety Items 

The Contractor shall be responsible for furnishing, installing and maintaining all temporary pedestrian 
access  and  safety  items  in  areas  as  determined  by  the  Engineer,  where  construction  operations 
result in a condition that is considered to be hazardous to the general public, to maintain pedestrian 
access or to separate the work area from pedestrian areas. Location and extent of the temporary 
access and safety items shall be as directed and approved by the Engineer. Temporary pedestrian 
access and safety items shall remain the property of the Contractor and shall be removed from the 
site  of  the  works  as  approved  by  the  Engineer  when  no  longer  required.  Temporary  pedestrian 
access and safety items may be of the following:  

x

  Temporary sight screen 

x

  Temporary pedestrian wire fence 

x

  Temporary pedestrian bridges 

x

  Temporary sidewalks 

1.  Temporary Sight Screen 

In areas as determined by the Engineer, where sensitive construction operations are to be 
screened  from  the  general  public,  the  Contractor  shall  construct  temporary  sight  screen 
fencing to separate the work area from public view. Location and extent of the fencing shall 
be as directed and approved by the Engineer.  

 

G

ENERAL 

R

 

 

 

Fencing  shall  be  solid  and  continuous,  not  less  than  3.0  m  in  height.  Screen  shall  be 
constructed of painted wood or metal and shall be neat in appearance. Details of construction 
shall be as proposed by the Contractor and approved by the Engineer. Fencing shall be of 
substantial construction such that it will not be damaged or displaced by wind or other normal 
natural or manmade forces. Fence shall be maintained by the Contractor until such sensitive 
operations are complete as approved by the Engineer.  

Maintenance  and  upkeep  of  the  screens  shall  be  the  responsibility  of  the  Contractor 
throughout the duration of their use. 

2.  Decorative Painting on Temporary Sight Screen 

If  directed,  the  Contractor  shall  apply  a  decorative  painted  finish  to  the  temporary  sight 
screens used on the project. Decorative painted finish shall be applied only to the surface 
exposed to the general public view. 

Form  of  the  decoration  shall  be  a  multi-coloured,  maximum  3  colours,  geometric  or  free 
flowing pattern, with simple stencilled details such as a tree, Municipality logo or similar item, 
at an interval of approximately 20 m. 

3.  Temporary Pedestrian Wire Fence 

Where pedestrians must be separated from the work  site, or directed through work zones 
and detour traffic, the Contractor shall install temporary pedestrian wire fences as directed 
or approved by the Engineer. Temporary pedestrian wire fences shall meet the requirements 
of Section 7.7 of Chapter 7, Incidental Construction. 

4.  Temporary Pedestrian Bridges 

In areas as determined by the Engineer, the Contractor shall construct temporary pedestrian 
bridges to maintain the access. These areas include, but not by way of limitation:  

i. 

Locations where trench excavations obstruction pedestrian access to buildings 

ii. 

Bridges over the proposed detour routes and work areas 

Bridge shall be solid and continuous, not less than 1.5 m in width, with rigid hand rails. Bridge 
shall  be  constructed  of  wood  and/or  metal  and  shall  be  neat  in  appearance.  Details  of 
construction and the installation locations shall be proposed by the contactor and approved 
by the Engineer.  

The Contractor shall maintain the bridge until the trench excavations are backfilled and public 
right of way is no longer obstructed as directed and approved by the Engineer.  

Bridges shall be multi-span, providing a clear span of 40 m to 45 m, and provide a minimum 
vertical clearance of 6.5 m. Walkway width shall be in the range 1.8 m to 2.0 m. 

Bridge shall be of modular steel construction with aluminium or other approval deck, and shall 
have  wooden  access  stair  treads.  All  walking  surfaces  shall  be  non-slip.  Actual  span 
configuration of each bridge shall be as determined by the site conditions. All support towers 
and stairs shall be adequately protected from impact by passing traffic. 

These bridges shall not be used by the Contractor for any construction activities. 

The Contractor shall submit fully detailed shop drawings of all proposed temporary pedestrian 
bridges  for  the  Engineer’s  review  and  approval.  Bridges  shall  be  fully  compliant  with  the 
design requirements of the Abu Dhabi Road Structures Design Manual (AD-D-06). Details 
provided shall include the proposed foundation details. 

5.  Temporary Sidewalk 

Temporary sidewalk shall be installed at the locations as shown on the Contractor’s approved 
detour  plans,  or  as  directed  by  the  Engineer.    Construction  shall  meet  the  applicable 
installation  requirements  of  Section  7.6.3  of  Chapter  7,  Incidental  construction,  except  as 

 

G

ENERAL 

R

 

 

 

noted herein.  Temporary sidewalks shall meet the general requirements of Article 7.6.3.1 for 
slopes and grades.  

Prior  to  placement  of  pavement  for  temporary  sidewalks,  the  Contractor  shall  prepare  a 
foundation  in  accordance  with  Article  7.6.3.2  of  Chapter  7,  Incidental  construction,  or  as 
approved by the Engineer. 

On the prepared subgrade, the Contractor shall place and compact either 5 cm of asphaltic 
concrete base course as specified in Section 3.3 of Chapter 3, Pavement, or Class C20/20 
concrete  as  specified  in  Section  7.6.4  of  Chapter  7,  Incidental  construction,  for  use  as 
temporary sidewalk.  Installation of asphaltic concrete temporary sidewalks shall meet the 
applicable installation requirements of Section 3.3.3, with the provision that hand placement 
and  compaction  may  be  used  for  areas  inaccessible  to  the  approved  asphalt  paving 
equipment, if approved by the Engineer. Installation of concrete temporary sidewalks shall 
meet the requirements of Section 7.6.4. 

When no longer required, the Contractor shall remove all construction of temporary sidewalks 
and  restore  the  site  as  required  by  applicable  Articles  of  the  Department  of  Transport 
Conditions of Contract and Schedule of Further Requirements, as indicated on the Contract 
plans and as directed by the Engineer. 

All  materials  resulting  from  removal  of  temporary  sidewalk  shall  be  considered  the 
Contractor’s materials to be removed from site and/or disposed of in accordance with Section 
2.3 of Chapter 2, Earthworks.  

r.  Detour Shop Drawings  

The  Contractor  shall  follow  maintenance  of  traffic  (detour  plans)  plans  included  in  the  Contract, 
unless  otherwise  directed  by  the  Engineer,  and  shall  obtain  all  necessary  approvals  from  the 
appropriate local agencies. If modifications are proposed by the Contractor to the maintenance of 
traffic Contract plans, the Engineer shall have the right to reject any proposed modifications that are 
not acceptable to the Owner or do not comply with the requirements of the Contract documents.  

The Contractor shall submit shop drawings complete with all details and description of construction 
staging and temporary construction for the maintenance of traffic as indicated on the Contract plans 
and as necessary for the proposed construction sequence, and obtain the approval of the Engineer 
prior to reviewing with and obtaining local agency and authorities approvals.  

Vehicular and pedestrian access to facilities within the local area affected by the construction works 
must be maintained at all times. 

The  Contractor  shall  construct  detours  and  install  temporary traffic  control  devices  in  accordance 
with the approved shop drawings, standard specifications, and the Contract plans. The Contractor 
shall be responsible for coordinating the relocation and removal of all greenery which obstructs the 
construction of the detour route. Similarly, it shall be the Contractor

’s sole responsibility to obtain the 

necessary  clearances  and  approvals  for  detours  which  conflict  with  existing  or  proposed  utility 
installations. 

The  Contractor  shall  consider  the  use  of  additional  sub-stage  detours  to  facilitate  any  utility 
installations in service reservation crossings that pass under existing roads or detour routes. All such 
utility installations shall be fully reviewed with the Engineer prior to commencing each detour phase. 

1.  Criteria for Revising Detour Shop Drawings  

Flow  of  traffic  shall  be  maintained  at  all  times.  Traffic  will  not  be  permitted  to  pass  under 
bridges which are under construction, unless adequate protective cover is provided.  

Temporary roadway cross sections and pavement structure sections shall be as detailed in 
the Contract plans.  

Temporary  roadway  widths  for  main  road  detours  shall  be  a  minimum  of  2  lanes  in  each 
direction, each lane 3.5 m wide, plus a paved shy distance on the inside and outside edge of 

 

G

ENERAL 

R

 

 

 

pavement  as  detailed  on  the  Contract  plans  unless  specifically  directed  or  approved 
otherwise by the Engineer.  

All construction staging or substaging shall be approved by the Engineer in writing prior to 
commencing  construction.  After  approval  by  the  Engineer,  the  Contractor  shall  obtain 
approvals in writing from the concerned authorities.  

The  Contractor  shall  provide  and  maintain  vehicle  and  pedestrian  access  to  adjacent 
buildings, commercial establishments, facilities, or areas during all work. Such access and 
its maintenance shall be subject to approval by the Engineer.  

Single lane traffic may be proposed by the Contractor when no other means of detouring is 
available and when approved by the Engineer.  

In general, one lane of traffic shall be maintained on the service roads and detour roads on 
isolated sections and the lengths of isolated approved single lanes (along a multi-lane road) 
shall not exceed 500 m and,  in the event work is proceeding at more than one place, the 
distance  between  lengths  of  single  lanes  shall  be  no  less  than  500  m  unless  otherwise 
approved by the Engineer.  

The Contractor shall propose his detour to offer the least possible obstruction, inconvenience 
and delay to public traffic, and shall be responsible for providing adequate control of public 
traffic using these single lane lengths as previously specified.  

Existing roadways shall be used for detours whenever possible.  

Works shall be scheduled in accordance with the Contract staging plans as approved by the 
Engineer.  

1.16 

Temporary Works 

This  section  describes  the  design,  construction,  maintenance,  and  removal  of  temporary  works, 
which are generally designed and employed by the Contractor to execute a work. Failure of such 
temporary works can negatively affect project work and endanger adjacent facilities, property, or the 
public. Temporary works for structure include falsework, forms, cofferdams, shoring, water control 
systems, and temporary bridges. 

Safety and adequacy of all temporary works shall be solely the responsibility of the Contractor. 

Forms are enclosures or panels that, containing concrete, resist contrary forces due to their weight, 
rate  of/  and  placement. Forms  may  themselves reside  on top  of  falsework for  additional  support. 
Falsework  is  any  temporary  structure  that  supports  structural  elements,  such  as  concrete  slabs, 
girders, steel, and masonry, during their construction. Falsework is no longer needed after a structure 
is complete and can support itself including surcharge load. 

1.16.1 

Working Drawings for Temporary Works 

The  Contractor  shall  provide  working  drawings  with  design  calculations  and  supporting  data  and 
assumptions in sufficient detail to permit a structural review of the proposed design of a temporary 
work. The Contractor shall submit working drawings and design calculations sufficiently in advance 
of proposed use, typically at least 14 days before the Engineer's approval is required, to allow time 
for review, possible revision, and approval without delaying work. 

The  Contractor  shall  design  and  show  the  details  for  constructing  the  temporary  works  including 
falsework that provides the necessary rigidity and supports the loads to be imposed on them. The 
Contractor shall engage the services of a Specialist Engineer to design, sign, and seal the drawings. 
Design calculations shall show the stresses and deflections in load supporting members.   

The Contractor shall submit three sets of working drawings and one set of design calculations for 
approval. 

 

 

 

 

 

 

 