Abu Dhabi, United Arab Emirates. STANDARD CONSTRUCTION SPECIFICATIONS (PART 1 - ROADS, Second Edition 2020) - page 9

 

 

S

YSTEM

 

 

and equipment records and replacement parts ordered to bring the inventory to the recommended 
levels. Spare parts and consumable items shall be maintained in a secure location that is staffed as 
required to meet system availability requirements. 

The  subcontractor  shall  provide  samples  of  all  equipment,  components  and  parts  thereof  to  the 
Owner for his review and approval if requested by the Owner and/or the Engineer. The subcontractor 
shall not start the procurement, manufacturing and/or  assembling of  any equipment, components 
and/or parts until after the Owner

’s approval of the samples. The Owner’s approval of such samples 

shall  not  relieve  the  Contractor  from  his  responsibilities  of  equipment  performance  under  this 
Contract. 

The  Owner  shall  have  the  right  to  inspect,  through  their  representatives,  any  or  all  equipment, 
components and/or parts of the spare parts and new materials to be installed under this Contract 
prior to its installation during preparation and/or assembly at the Cont

ractor’s or the Subcontractor’s 

Project vicinity facilities. If the Owner uses its right of inspection, no manufactured, prepared and/or 
assembled  equipment,  component  and/or  spare  part  shall  be  shipped  to  the  job  site  without  the 
inspection approval of the Owner and/or the Engineer. 

Contractor assumes all risks for replacing and installing materials and equipment not complying with 
the above requirements and said materials and equipment may be subject to removal and disposal 
at the Contractor’s expense. 

Contractor  shall  be  responsible  for  all  commitments  for  the  supply  of  replacement  materials  and 
equipment so that he can complete the job within the specified time of the Contract. Delays in receipt 
of replacement materials and equipment will not be considered as a valid reason for a time extension. 

Subcontractor shall be responsible for the assembly and testing of the spare parts of the existing 
Systems to make the systems operational to the satisfaction of the Owner and/or the Engineer. 

All  equipment,  components  and  parts  of  the  system  shall  continuously  operate  in  a  satisfactory 
condition on the job site before they will be conditionally accepted by the Owner and/or the Engineer. 
Owner shall be the sole judge as to whether the equipment has operated in a satisfactory condition. 

Subcontractor  shall  be  responsible  for  the  maintenance  and  repair  work  on  the  system  and 
associated equipment during the time period specified within this document. 

Subcontractor shall maintain and have readily available an up to date inventory of all consumables, 
systems  equipment,  and/or  parts.  Subcontractor shall  be  responsible  for  developing  an  inventory 
tracking  system  for  all  the  spare  parts  and  consumables,  maintained  in  the  computerized 
maintenance management (CMMS) system.  

The spare part inventory tracking system shall include at a minimum: 

1.  Manufacturer; 
2.  Model number; 
3.  Descriptive name; 
4.  Manufacturer serial number; 
5.  Date of Manufacture; 
6.  Spare or newly ordered part; 
7.  Location where installed including stationing, if possible; 
8.  Date of purchase; 
9.  Date of repair; 
10. Date when scrapped; 
11. Calibration status and date; 
12. 

Manufacturer’s routine maintenance schedule; and 

13. Warranty status if applicable. 

f.  Final Acceptance 

Upon successful completion of the operations and maintenance period of a system as specified in 
Sub-article c of Article 9.6.5, the Engineer will issue a final acceptance certificate.  Final acceptance 

S

YSTEM

 

 

certificate shall relieve the Subcontractor from his responsibilities concerning the performance of the 
subject system. 

9.6.5.1 

New Technology Prices 

If  at  any  time  during  the  life  of  this  Contract,  the  Owner  elects  the  option  of  authorizing  the 
Subcontractor to implement new technology subsystems, equipment, components and/or software 
which are developed after the signing of this Contract, the price of such new technology items shall 
be computed on the basis of the official cost figures audited and certified by the government of the 
country of origin, unless otherwise agreed upon mutually by the Owner and the Contractor. 

9.6.5.2 

Training 

Subcontractor shall provide full training for all installed systems, software, human machine interfaces 
(HMI) and equipment. This section provides general requirements for the required training. 

Training shall cover all systems, software, HMI and components installed under the Contract. Owner 
reserves the right to eliminate portions of training, at a corresponding credit, if the Owner

’s personnel 

are  sufficiently  proficient  in  operation  and  maintenance  of  provided  equipment.  Subcontractor  is 
however required to provide full set of Training documents and materials for all installed equipment 
and subsystems. 

Subcontractor  shall  provide  multiple  training  courses  with  the  syllabus  tailored  to  the  intended 
audience.  Training  shall  be  provided  for  management,  operators,  supervisors  and  maintenance 
personnel. Description of target audience shall be as follows: 

1. 

Management  training:  Target  audience  for  this  training  course  shall  be  management 

personnel who need an overview of the entire systems and the capabilities thereof. Special emphasis 
shall be placed on any management features of the central software system. 

2. 

Operator training: Target audience for this training course will be operators of the system. As 

a result this training shall provide a complete overview of the system including field devices and shall 
provide complete coverage of all operator features and actions. In addition, this course shall provide 
operator level troubleshooting instructions. 

3. 

Supervisor  training:  Target  audience  for  this  training  course  shall  be  supervisors  of  the 

system.  This  training  shall  cover  all  aspects  of operator  training  and  shall  include  any  supervisor 
specific  features  as  well  as  all  configuration  features  of  the  central  software  and  of  the  each 
subsystem. In addition this course shall provide instructions on supervisor level troubleshooting. 

4. 

Maintenance  training:  Target  audience  for  this  training  course  shall  be  maintenance  and 

engineering  personnel.  In  addition  to  all  topics covered  under the  supervisor  training  this training 
shall  also  cover  detailed  troubleshooting,  preventive  and  corrective  maintenance  of  all  provided 
equipment. 

Training  shall  not  commence  without  submission  and  approval  of  all  training  documents.  At  the 
minimum,  the  training  documentation  must  contain  a  lesson  plan,  instructor  manual  and  student 
workbook. Lesson plan shall contain the syllabus and the proposed duration of each training session. 
Instructor’s manual shall contain all of the necessary information for the Instructor leading the course. 
If a power point or other presentation is used, it shall be provided as part of the 

instructor’s manual 

and  the  instructions  shall  be  clearly  matched  to  the  presentation  slides.  Student  workbook  shall 
contain all required documents, tests, labs and exercises needed by the student during the course. 
Training shall also not commence until all auxiliary documentation has been submitted and approved 
(O&M manuals, record drawings). 

Instructors shall be proficient in language used for training course delivery (English and/or Arabic if 
so  desired  by  the  Owner).  All  Instructors  must  be  qualified.  Qualification  shall  be  demonstrated 
through certificates, familiarity with the equipment and equipment manufacturer’s approval. CVs of 
the instructors shall be submitted with the training documentation for approval. No Instructor shall be 
allowed to teach a course without the approval from the Owner and/or the Engineer. 

R

 

5.  Utility requirements (power, water, etc.)

6. 

Manufacturer’s rating or performance curves

7.  Wiring diagrams and control schematics

8.  Recommended spare parts

9.  Special tools

10. 

Deviations from Contract requirements

11. 

Additional requirements contained in individual specification sections

d.  Copies of the Contract plans are not acceptable for submission as component arrangement

(layout)  drawings.  Use  shop  drawing  title  block  and  standard  sheet  format  provided  by  the 
Engineer.  

e. 

Manufacturer’s  model  numbers  or  catalogue  numbers  alone  shall  not  be  acceptable  for
describing equipment or components. 

1.11.5 

Sample Submittals 

The Contractor shall comply with the following requirements when submitting samples. 

a.  Furnish samples as required by the individual specification section.

b.  Unless otherwise specified, samples shall be labelled and properly identified with the following:

1.  Date

2.  Part(s) of the works for which offered

3.  Specification section and applicable paragraph numbers

4.  Supplier / manufacturer

5.  Product identification (trade name)

6.  Samples shall be accompanied by an approved transmittal form, specifications and other

pertinent  data  required  for  Engineer  to  determine  that  the  material  conforms  to  the 
specification 

c.  Three sets of samples shall be submitted unless otherwise specified.

d.  One set of approved samples and all disapproved samples will be returned to the Contractor.

e.  If requested in writing by the Contractor, samples of value will be returned to the Contractor

after completion of the work. 

f.  Approved  samples returned  to  the  Contractor  may  only  be  incorporated into  the  work  upon

written approval of the Engineer. 

1.11.6 

Operations and Maintenance Manual Submittals 

The Contractor shall submit 6 copies of operation and maintenance (O&M) manuals that contain all 
items required in Section 1.26. 

1.11.7 

Certificates and Affidavits 

The  Contractor 

shall  provide  the  original  and  seven  copies  of  manufacturers’  certificates  in 

accordance with the following and the requirements specified Section 1.11.1:  

1.  Certificate  indicates  test  results,  component  manufacture,  or  installation  complies  with

specified standards. 

2.  Affidavit  is  a  sworn  statement  by  an  officer  of  the  company  manufacturing  the  product

indicating  that  the  information  on  the  certificate  is  true  and  accurate.  An  affidavit  shall 
accompany all certificates.  

R

 

A statement from the Contractor, subcontractor, equipment supplier, or agent indicating the product 
meets the requirements of the  Contract documents shall not be considered as a certificate. Such 
submittals  will  not  be  approved.  Corresponding  equipment,  products,  or  components  will  not  be 
accepted. 

1.11.8 

Miscellaneous Submissions 

1.11.8.1 

es

Manufacturers’ Guarantees a nd Warranti

a.  Submit originals, including organization registration stamps (unless otherwise specified)

b.  Submit before final acceptance

1.11.8.2 

Work Plans

a.  Submit 3 copies, unless otherwise specified, at least 30 days before beginning work

1.11.8.3 

Staging and Detour Plans

See Section 1.15.13 for details.  

1.11.8.4 

Submittal Schedule 

a.  Show the proposed date the Contractor will deliver each required submittal to the Engineer for

review in format provided by the Engineer 

b.  Submit within 10 calendar days of receiving letter of intent

1.11.8.5 

Health and safety plan (HSP)

a.  Submit 3 copies of the Contractor

’s project specific HSP unless otherwise specified

b.  Refer to Section 1.12.7 for specific requirements

c.  No work shall commence on the site until the HSP is approved

1.11.8.6 

Accident Reports 

a.  Submit 3 copies unless otherwise specified

b.  Refer to Section 1.12.7  for specific requirements

1.11.8.7 

Reports

a.  Progress  reports:  Prepare  and  submit  the  progress  reports  described  hereinafter  in  a  form

provided by the Engineer. Refer to Section 1.10.10 for specific requirements. 

b.  Work activities and procurement reports: Reports should be referenced where relevant to the

approved  Contractor

’s  construction schedule.  Refer  to  Section 1.6.1  and Section 1.18.3 for 

specific requirements. Submit three copies unless otherwise specified. 

c.  The Contractor

’s daily reports: Refer to Section 1.9.10 for specific requirements.

1.  Submit on a daily basis no later than 9.00 am the following day

2.  Describe labour force and its allocation

3.  Describe material and equipment utilized

4.  Describe work progress during the day

5.  Describe temperature and weather conditions

6.  Describe any occurrence which may affect the progress of the works

7.  The Contractor

’s authorized representative must sign

 

G

ENERAL 

R

 

 

 

d.  Procurement status reports:  

1.  Submit on a weekly basis 

2.  Include a list of materials and items procured 

3.  Include list of items delivered to the site 

4.  Provide references to all correspondence and transmittals between the Contractor and the 

Engineer regarding approval of such materials and items 

e.  Inspection and test reports: Submit 3 copies unless otherwise specified 

f.  Survey data: Refer to Section 1.7.4 for specific requirements 

g.  Closeout submittals: Refer to Section 1.24 for specific requirements 

h.  Record (as-built) documents: Detailed hereafter 

i.  Final statement: Submit 3 copies in accordance with the applicable clauses of the Department 

of Transport Conditions of Contract and Schedule of Further Requirements 

j.  Organization chart:  

1.  Submit for Engineer

’s approval within 10 days of the commencement date 

2.  Show the management, administrative, quality control, safety and construction supervision 

organization 

3.  Include all personnel from Engineer through foreman level reporting to the onsite Engineer 

i. 

Describe personnel duties 

ii. 

Amplify details provided in the “schedule of data” submitted with the tender 

iii. 

Provide qualifications and experience of all personnel shown on the organization chart 

4.  Update the organization chart whenever key personnel are reassigned 

5.  Engineer may interview any of the Contractor

’s proposed staff before approval 

6.  Engineer may direct the Contractor to remove personnel from the site who, in the Engineer

’s 

sole opinion: 

i. 

Exhibit inappropriate conduct 

ii. 

Who are incompetent, negligent in the performance of their duties 

iii. 

Who are otherwise considered undesirable 

k.  Letter of authority:  

1.  Submit within 10 days of the commencement date and before beginning any construction 

activities 

2.  Identify  the  Contractor

’s  representative  and  detail  the  extent  of  his  authority  and 

responsibility 

3.  All site work to be under direct supervision of the Contractor

’s representative 

4.  The Contractor

’s representative shall be present at the job site whenever work is underway 

5.  The Contractor

’s representative shall have full authority to represent the Contractor 

6.  Communication given to or received from the Contractor

’s representative shall be as binding 

as that given to or received from the Contractor 

l.  Site layout for the Contractor

’s facilities:  

1.  Submit within 10 days of the commencement date for approval by the Engineer 

2.  Site plan should include but not necessarily be limited to the following: 

 

G

ENERAL 

R

 

 

 

i. 

Temporary facilities including accommodation 

ii. 

Storage areas including permanent dumping of excavated material and all debris 

iii. 

Fences, gates and security lighting 

iv. 

Access for subcontractors, vendors, plant staff, visitors, etc. 

m. Correspondence: 

1.  Provide one original and three photocopies of transmittals and letters including attachments 

and enclosures 

2.  Submit on A4 size whenever possible 

3.  Clearly indicate the following on each document 

4.  Project number 

5.  Title of project 

6.  The Contractor

’s name 

7.  Date 

8.  Correspondence reference number 

9.  Signed by the Contractor or his representative 

1.11.9 

Contract Plans 

Contract plans forming part of the Contract are listed in the tender documents. The Contractor shall 
comply with the following:  

1.11.9.1 

Compliance with the Contract Plans 

a.  All work, during its progress, and upon completion shall conform to the lines, elevations and 

grades as shown on the Contract plans.  

b.  The Contractor shall complete the proposed work in every detail as specified. 

c.  The Contractor shall bring to the notice of the  Engineer any detail or details that have been 

omitted  from  the  Contract  plans  and  specifications  which  are  essential  to  the  intended 
completeness of the works.  

1.11.9.2 

Additional Plans 

The Engineer may issue additional plans to the Contractor as work progresses.  

1.11.9.3 

Record Drawings and Specifications 

a.  The Contractor shall maintain one record copy of all Contract plans, specifications, addenda, 

variations, approved submittals, correspondence, and transmittals at the site in good order and 
readily available to the Owner and the Engineer. 

b.  In  addition  to  the  requirements  of  the  specifications,  record  drawings  shall  be  clearly  and 

correctly marked and the record specifications annotated by the Contractor to show:  

1.  All  changes  made  during  the  construction  process,  the  date  the  changes  are  made  and 

those parts of the works affected by the changes 

2.  Works as executed complete with:  

i. 

Existing and finished levels 

ii. 

Universal transverse mercator (UTM) coordinates 

iii. 

Profiles of all pipelines 

S

YSTEM

 

 

I

NDEX

 

alternative detection technology, 9-30 
animated LED pedestrian signal heads, 9-25 
artery master controller, 9-39 
audible tactile facility, 9-27 
audio transmission (telephone) cable, 9-18 
automatic transfer dual power supply, 9-43 
cabinets and enclosures, 9-74 
cable and conduit (direct bury), 9-9 
camera coaxial cable, 9-57 
camera control cable, 9-57 
central computer control, 9-41 
commencement  of  integration  and  reliability 
tests, 9-84 
commissioning of subsystem field equipment, 
9-84 
communications cable, 9-18 
communications interface, 9-39 
communications subsystem, 9-66 
conditional acceptance, 9-80, 9-85 
conduit, 9-18 
Conduit, 9-4 
conduit (concrete-encased), 9-9 
conduits, 9-4 
conflict monitor, 9-38 
controller cabinets, 9-37 
Covers and frames, 9-5 
definitions and abbreviations, 9-16 
digital  video  management  sytem  (DVMS),  9-
54 
digital video storage system (DVSS), 9-54 
electric cable, 9-18 
equipment cabinet, 9-74 
equipment enclosure (pole mount), 9-79 
ethernet fibre transceiver, 9-69 
existing and temporary traffic signals, 9-12 
external flash units, 9-38 
factory acceptance testing, 9-81 
Fibre optic cable. See f 
fibre optic patch cords, 9-72 
fibre optic patch panel, 9-72 
field equipment cabinet remote switch, 9-67 
field equipment cabinets, 9-75 
final acceptance, 9-86, 9-91 
foundations, 9-4 
Foundations, 9-6 
Foundations for traffic signals, type C and D, 
9-7 
free right turn LED signals, 9-47 
free right turn signal, 9-47 
hybrid cable, 9-57 
independent 

testing 

supervision 

and 

verification, 9-82 
integration tests, 9-82 

intelligent transportation system, 9-51 
Intelligent transportation system, 9-4 
interconnection (system) detectors, 9-41 
ITS. 

See

 Intelligent transportation system 

ITS electrical and control cables, 9-74 
LED  pedestrian  countdown  clock  counter,  9-
26 
LED vehicular signal heads, 9-23 
load switches, 9-38 
local intersection traffic signal controllers, 9-30 
loop detectors, 9-27 
loop wire, 9-28 
maintenance and repair shop facilities, 9-87 
mast arms, 9-21 
master controller, 9-40 
master controller cabinet, 9-40 
microwave / radar vehicle detector, 9-58 
network management system, 9-67 
network PTZ camera assembly, 9-54 
new technology, 9-92 
operation & maintenance, 9-49 
operation and maintenance manuals, 9-87 
operations and maintenance (O&M) phase, 9-
88 
outdoor splice enclosure, 9-79 
overheight vehicle detection system, 9-64 
pedestrian poles, 9-11 
pedestrian pushbutton, 9-26 
pedestrian signal heads, 9-24 
pedestrian signal poles, 9-21 
portable variable message signs, 9-63 
post-installation tests, 9-82 
pre-installation testing, 9-81 
pullboxes, 9-4 
pullboxes (manholes), 9-10 
reliability test, 9-84 
roadway weather information system, 9-65 
RWIS tower, 9-66 
Sampling, 9-1 
security unit, 9-38 
solar power system, 9-80 
spare parts and tools, 9-90 
standards and codes, 9-16 
STP CAT-6 cable, 9-73 
STP Cat-6 patch panel, 9-73 
subcontractor, 9-14 
subcontractor’s scope-of-works, 9-14 
submittals, 9-53 
surge protection, 9-28 
system start-up and initial operation, 9-85 
temporary signal assembly, 9-13 
testing, 9-49, 9-80 
traffic control system, 9-14 

 

 

 

 

 

 

 