Wire Mesh Slope Protection
8-29
Wire Mesh Slope Protection
8-29.1 Description
This Work consists of furnishing and installing the anchors and the wire mesh slope
protection in accordance with these Specifications and the details shown in the Plans
and in conformity with the lines and dimensions shown in the Plans or specified by the
Engineer.
8-29.2 Materials
Materials shall meet the requirements of
Section 9-16.4
.
8-29.3
Construction Requirements
8-29.3(1) Submittals
The Contractor shall submit a Type 2 Working Drawing consisting of a wire mesh slope
protection plan. The wire mesh slope protection plan shall include the following:
1. Plan sheets for anchor layout and installation, and the equipment and process
used to confirm the capacity of the constructed anchors including the calibration
data for the stressing devices used to proof test the anchors, as completed by an
independent testing laboratory within 60 calendar days of the wire mesh slope work.
2. Working drawings for the temporary yoke or load frame to be used for anchor proof
testing in accordance with
Section 6-01.9
.
3. Plans and details for assembling wire mesh and erecting the assembled mesh on the
slope.
All the costs for the Work required for Submittals shall be included in the unit Bid price
detailed in
Section 8-29.5
.
8-29.3(2) Anchors
The Contractor shall install anchors of the type shown in the Plans and in conformance
with the layout shown in the wire mesh protection plan. The spacing and number of the
anchors and wire ropes as shown in the Plans are approximate only, and upon review of
the wire mesh slope protection plan, the Engineer may arrange the spacing to better hold
the wire mesh against the slope. Backfill material shall be thoroughly compacted with a
mechanical compactor.
The Contractor shall proof test up to 25 percent of the anchors in vertical pullout to the
minimum allowable anchor capacity specified in the Plans. Proof testing of anchors shall
be performed against a temporary yoke or load frame. No part of the temporary yoke or
load frame shall bear within three feet of the anchor being tested. For vertical pullout
proof testing, an anchor is acceptable if it sustains the specified capacity for 10 minutes
with no loss of load. Anchors that fail this criterion shall be replaced and retested. If more
than three anchors fail, the Contractor shall proof test all anchors.